Loading...
HomeMy WebLinkAboutSPRING CREEK STATION (2105 S. COLLEGE AVE.) - PDP - PDP160020 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTCity of Fort Collins 2105 South College Avenue Preliminary Drainage Report JUNE 2016 | VERSION 1 Prepared By: 4582 South Ulster Street, Suite 1500 Denver, CO 80237 Daniel L. Skeehan, P.E. Registered Professional Engineer State of Colorado No. 46391 2 INTRODUCTION The proposed 2105 South College Avenue Project is located within the Northeast Quarter of Section 23, Township 7 North, Range 69 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, Colorado. The site is bound by an existing self-storage business and undeveloped land to the north, an existing drive aisle and retail development to the east, an existing parking lot and retail development to the south and the MAX Spring Creek Bus Station to the west. A vicinity map is provided below. PROPOSED DEVELOPMENT This project will be developed on a platted tract located in the northeast quarter of Section 23, Township 7 North, Range 69 West of the 6th PM. The site is approximately 2.22 acres and contains two existing buildings with associated surface parking. The site is divided topographically with half of the site sloping to the northeast and the other half sloping to the northwest at 1% to 5%. The soil on the site is 73% Nunn loam (73), which is classified as Hydrologic Soil Group C; and 27% Altvan-Satanta loams (4), which is classified as Hydrologic Soil Group B. The soil Classification Map can be found in Appendix A. The site is currently zoned C-G (General Commercial). The proposed land uses for this site will consist of standard multi-family residential housing and structured parking. Preliminary Drainage Report 2105 S. College Ave – Fort Collins, Colorado 3 HISTORIC DRAINAGE The existing Site drains to the northwest and northeast at slopes of 1% to 5%. There are currently no existing on-site water quality or detention improvements. The Site and the surrounding area are considered part of the Spring Creek Drainage Basin and ultimately outfall to the Poudre River to the northeast of the site. The majority of existing flows for this site are conveyed into an existing inlet at the northwest corner of the site which flows into a vegetated swale until it is intercepted by Spring Creek. Additional flows either surface flow into an existing irrigation ditch or surface flow to an existing curb inlet in S. College Avenue. Flows captured within S. College Avenue travel through an existing underground storm drainage system and ultimately discharge into Spring Creek. The site is located within City of Fort Collins Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map Number 08069C0987G, revised May 2, 2012 and is designated as an area outside of the 500-year floodplain. The FEMA Firmette is included in Appendix A. DESIGN CRITERIA The City of Fort Collins “Amendments to the Urban Drainage and Flood Control District Criteria Manual,” (Criteria Manual) and the “Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual” Volumes 1, 2, and 3 (Drainage Manual), with latest revisions, were used to prepare the storm calculations. Weighted impervious values were calculated and used for the site area in accordance with the Criteria Manual and Drainage Manual. Hydrologic Criteria The existing and proposed imperviousness of the site was determined in order to evaluate the Project’s potential impacts on stormwater runoff. A topographic survey and knowledge of the Site was utilized for this analysis. The existing and proposed imperviousness of the Site were determined to be 92.6% and 83.9% respectively. This analysis is included in Appendix B. A drainage area map representing the existing conditions has been included in Appendix D, and the proposed conditions has been included in Appendix C. The 2-year and 100-year storm events were used in determining rainfall and runoff for the proposed site. Table RA-7 of the Criteria Manual was used to determine rainfall data for the storm events and has been included in Appendix B. The 5-minute rainfall intensities used for the calculations at the site were 2.85 inches per hour and 9.95 inches per hour for the 2 and 100-year events, respectively. Table RO-10 from the Criteria Manual was utilized to obtain the runoff coefficients based upon zoning classification, resulting coefficient values of 0.95 and 1.19 for the 2 and 100-year events, respectively. As the imperviousness of the Site is decreasing with redevelopment, on-site detention is not required. However, due to limited available capacity in the receiving off-site storm conveyance systems, detention may be required if flows to any receiving off-site storm conveyance system. The proposed development contemplates increasing the discharge to the west, requiring on-site detention to mitigate the increased discharge. Detention for the proposed development will be provided by an onsite underground detention facility to be located in the northwest corner of the site. Required volumes for the detention facility were determined using the Modified Rational Formula-based FAA Method as outlined within Volume 2, Chapter 10, Section 3.2.3 of the Criteria Manual. Standard release rates were also determined as outlined by Volume 1, Chapter 1, Section 1.6 of the Criteria Manual. 4 Hydraulic Criteria The design will include a private storm sewer system connecting into existing public storm sewer inlet at the northwest of the site, adjacent to the MAX bus facility. The storm sewer and inlets will be designed to provide for the 100-year event. Calculations for the private storm sewer system and HGL will be completed using StormCAD and included in the Final Drainage Report. There are no major drainage ways located on the proposed site. Water Quality Treatment Criteria Applicable water quality design criteria is referenced from Volume 3, Section 3.0 of the Drainage Manual. Permanent best management practices associated with the water quality treatment design will be per the Criteria Manual and discussed in further detail in the Drainage Plan section. WQCV Watershed Inches = a*(0.91i3-1.19i2+.78i) =0.8*(0.91(0.84) 3-1.19(0.84)2+.78(0.84)) =0.284 watershed inches WQCVother= (WQCV/0.43)*(d6) = (0.284/0.43)*0.43 =0.284 ac-ft V = (WQCV/12)*(A) = (0.284/12)*2.22 =0.053 ac-ft (2,309 ft3) i = Composite Tributary Imperviousness [%] A = Area [ac] a = Coefficient of drain time (a = 0.8 for 12 hour drain time) d6 = depth of average runoff producing storm from Figure 3-1 from Urban Storm Drainage Criteria Manual Volume 3 DRAINAGE PLAN GENERAL CONCEPT The site was divided into seven onsite sub-basins which are described in greater detail in the following section. Runoff generated by the majority of these drainage basins will be conveyed into a proposed storm sewer system and will be treated by a WQ BMP before being detained within a proposed underground detention facility. Flows from the underground detention facility will outfall into an existing storm drain inlet located in the northwest corner of the site near the Max Spring Creek Bus Station. A proposed drainage area map which shows the limits of these sub-basins has been provided in Appendix C. Calculations related to the preliminary sizing of the storm sewer pipes have been included in Appendix B. Preliminary Drainage Report 2105 S. College Ave – Fort Collins, Colorado 5 SPECIFIC DETAILS WQCV Device Water quality for the proposed development will be provided by means of an underground proprietary device which will treat the required 0.053 ac-ft volume. This device is still being specified, but may include a mechanical separator (similar to the device utilized by the MAX facility). Detention Facility The underground detention facility has been sized and designed using the Modified FAA method as outlined by Volume 2, Chapter 10, Section 3.2.3 of the Criteria Manual and requires 0.0486 acre-feet (2,118 ft3) for the 1.65 acres contributing runoff to the detention vault. The volume provided in the proposed underground detention facility will meet or exceed the required 0.1403 ac-ft volume. The detention facility will discharge at a rate of 4.38 cfs and 10.49 cfs for the 10 and 100-year events respectively. These values were determined by finding the historical flow rates to the existing inlet in the northwest corner of the site. Proposed flows to this storm sewer structure will include a combination of overland flows and flows which will have passed through the Water Quality BMP and Detention Facility. To determine the proposed discharge release rates from the Detention Facility, the overland flows from sub-basin 25, described below, were subtracted from the historical flows. Flows from the detention facility will be regulated using a combination of a restrictor plate and an orifice. Supporting calculations related to the sizing of the detention facility using the Modified FAA method are available in Appendix B. Calculations and sizes for the 10 and 100-year detention outlets will be included in the Final Drainage Report. Inlets There are four proposed inlets on the project site. All inlets and storm sewer will be designed to convey the 100-year storm event. The type of inlet for each is indicated in Table 2. Discussion of each inlet by sub-basin follows the table. Table 1. Inlet Types Design Point Sub-basin Structure Type CB-3 15 Sump Inlet CB-2 20 On-Grade Inlet CB-4 30 Sump Inlet CB-5 35 Sump Inlet 6 Sub-basin 05 Sub-basin 05 is 1.39 acres and consists of building/roof area. Runoff within this sub-basin will collect at roof drains that tie into the private underground storm sewer that discharges to the Underground Detention Facility. The runoff coefficients for this sub-basin are 0.95 and 1.19 for the 2-year and 100-year storm, respectively. Sub-basin 10 Sub-basin 10 is 0.34 acres and consists of parking, sidewalk and landscaped areas. Runoff within this sub- basin will surface flow onto S. College Avenue following its historical drainage path. The runoff coefficients for this sub-basin are 0.85 and 1.06 for the 2-year and 100-year storm, respectively. Sub-basin 15 Sub-basin 15 is 0.09 acres and consists of a paved fire lane drive aisle. Runoff within this sub-basin will enter inlet CB-3 and be conveyed to the Underground Detention Facility through a private underground storm sewer. The runoff coefficients for this sub-basin are 0.94 and 1.17 for the 2-year and 100-year storm, respectively. If inlet CB-3 were to plug, the runoff for this basin would flow north onto an existing access drive following its historic path to the Sherwood Lateral. Sub-basin 20 Sub-basin 20 is 0.05 acres and consists of a paved fire lane drive aisle. Runoff within this sub-basin will enter inlet CB-2 and be conveyed to the Underground Detention Facility through a private underground storm sewer. The runoff coefficients for this sub-basin are 0.95 and 1.19 for the 2-year and 100-year storm, respectively. If inlet CB-2 were to plug, the runoff for this sub-basin would flow west into the existing inlet CB-1 following its historic path. Sub-basin 25 Sub-basin 25 is 0.23 acres and consists of sidewalks and landscaped areas. Runoff within this sub-basin will enter inlet CB-1 and be conveyed off-site through a private underground storm sewer. The runoff coefficients for this sub-basin are 0.28 and 0.35 for the 2-year and 100-year storm, respectively. If inlet CB-1 were to plug, the runoff for the basin would flow north following its historic path to Sherwood Lateral. Sub-basin 30 Sub-basin 30 is 0.05 acres and consists of a sidewalk and landscaped areas. Runoff within this sub-basin will enter area inlet CB-4 and be conveyed to the Underground Detention Vault through a private underground storm sewer. The runoff coefficients for this sub-basin are 0.67 and 0.84 for the 2-year and 100-year storm, respectively. If inlet CB-4 were to plug, the runoff for the basin would flow west and north following its historic path to the Sherwood Lateral. Sub-basin 35 Sub-basin 35 is 0.07 acres and consists of a sidewalk and landscaped areas. Runoff within this sub-basin will enter inlet CB-5 and be conveyed to the Underground Detention Facility through a private underground storm sewer. The runoff coefficients for this sub-basin are 0.69 and 0.87 for the 2-year and 100-year storm, respectively. If inlet CB-5 were to plug, the runoff for the basin would flow west and north following its historic path to the Sherwood Lateral. Preliminary Drainage Report 2105 S. College Ave – Fort Collins, Colorado 7 IMPLEMENTATION AND PHASING The Project will disturb over 10,000 square feet of stabilized ground; therefore, a Stormwater Management Plan is required. Construction will be implemented in two phases due to the size of the project and types of improvements required for the Project. The Stormwater Management Plans and Details will be provided in the Project Construction Documents. CONCLUSIONS COMPLIANCE WITH STANDARDS The 2105 S. College Avenue project is in compliance with City of Fort Collins criteria for storm drainage design. The “Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual” and the Urban Drainage Flood Control District “Urban Storm Drainage Criteria Manual Volumes 1, 2, and 3 have been utilized in the design of the storm sewer. The private onsite storm sewer system for this site will provide conveyance for the 100-yr storm event. SUMMARY OF CONCEPT The onsite drainage basins use private roof drains, storm inlets, and curb and gutter to collect and convey runoff generated within the project site to an existing storm sewer in the northwest corner of the site. With the exception of flow in sub-basins 10 and 25, all stormwater runoff will be collected and routed through a WQ BMP and onsite underground detention facility before entering the existing storm sewer system in the northwest corner of the site. This design will provide water quality for a minimum of 75% of the site, or all of the sub-basins except for 10 and 25, as well as limit damages due to erosion. REFERENCES Fort Collins Amendments to the Urban Drainage and Flood Control District, City of Fort Collins. Urban Storm Drainage Criteria Manual, Volume 1-3, Urban Drainage and Flood Control District, Denver, CO; January 2016, with latest revisions. APPENDICES A. Firmette and NRCS Data B. Hydrology and Hydraulics C. Proposed Drainage Map D. Existing Drainage Map 8 APPENDIX A Hydrologic Soil Group—Larimer County Area, Colorado (2105 S. College Ave) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/13/2016 Page 1 of 4 4489880 4489900 4489920 4489940 4489960 4489980 4489880 4489900 4489920 4489940 4489960 4489980 493260 493280 493300 493320 493340 493360 493380 493400 493420 493260 493280 493300 493320 493340 493360 493380 493400 493420 40° 33' 38'' N 105° 4' 46'' W 40° 33' 38'' N 105° 4' 39'' W 40° 33' 34'' N 105° 4' 46'' W 40° 33' 34'' N 105° 4' 39'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 40 80 160 240 Feet 0 10 20 40 60 Meters Map Scale: 1:847 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 4 Altvan-Satanta loams, 3 to 9 percent slopes B 0.6 26.6% 73 Nunn clay loam, 0 to 1 percent slopes C 1.7 73.4% Totals for Area of Interest 2.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado 2105 S. College Ave Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/13/2016 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado 2105 S. College Ave Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/13/2016 Page 4 of 4 Preliminary Drainage Report 2105 S. College Ave – Fort Collins, Colorado 9 APPENDIX B 33 (11) Section 4.0 is amended to read as follows: 4.0 Intensity-Duration-Frequency Curves for Rational Method: The one-hour rainfall Intensity-Duration-Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) 2-Year 10-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 34 Table RA-8 -- City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with the Rational Method (31 minutes to 60 minutes) 2-Year 10-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.0 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.8 40 1.07 1.83 3.74 41 1.05 1.8 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.6 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.9 1.54 3.14 53 0.89 1.52 3.1 54 0.88 1.5 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.4 2.86 40 Table RO-10 Rational Method Minor Storm Runoff Coefficients for Zoning Classifications Description of Area or Zoning Coefficient R-F 0.3 U-E 0.3 L-M-In 0.55 R-L, N-C-L 0.6 M-M-N, N-C-M 0.65 N-C-B 0.7 Business: C-C-N, C-C-R, C-N, N-C, C-S 0.95 R-D-R, C-C, C-L 0.95 D, C 0.95 H-C 0.95 C-S 0.95 Industrial: E 0.85 I 0.95 Undeveloped: R-C, T 0.2 P-O-L 0.25 For guidance regarding zoning districts and classifications of such districts please refer to Article Four of the City Land Use Code, as amended. 096291001 2105 SOUTH COLLEGE AVENUE 6/30/2016 2105 S. College Sub-Basin Characteristics Existing Site Area (sf) Area (Ac) Basin % Landscape Roof Pavement IWEIGHTED C2 C100 Entire Site 96,692 2.22 100.0% 2320 31330 63042 92.77% 0.93 1.16 Proposed Site Area (sf) Area (Ac) Basin % Landscape Roof Pavement IWEIGHTED C2 C100 5 60,492 1.39 62.6% 0 60492 0 95.00% 0.95 1.19 10 14,916 0.34 15.4% 1889 0 13027 85.50% 0.85 1.06 15 4,076 0.09 4.2% 59 0 4017 93.91% 0.94 1.17 20 2,335 0.054 2.4% 0 0 2335 95.00% 0.95 1.19 25 9,897 0.23 10.2% 8284 0 1613 17.16% 0.28 0.35 30 2,139 0.05 2.2% 736 0 1403 63.00% 0.67 0.84 35 2,835 0.07 2.9% 910 0 1925 65.15% 0.69 0.87 Total 96,690 2.22 100% 11878 60492 24320 83.94% 0.85 1.06 Landuse I C2 C100 Landscape 2% 0.15 0.19 Permeable Pavement 65% 0.45 0.56 Roof 95% 0.95 1.19 Drives and Walks 95% 0.95 1.19 Paved Streets 95% 0.95 1.19 K:\DEN_Civil\096291001_Fort Collins - College & Rutgers\_Project Files\Eng\Drainage\CALCS.xls 096291001 2105 SOUTH COLLEGE AVENUE 6/30/2016 2105 S. College Sub-Basin Characteristics - Existing 2-Year Design Storm Runoff Calculations (Rational Method Procedure) DRAIN AREA RUNOFF T(c) C x A I Q BASIN ac. COEFF min in/hr cfs B1 1.01 0.95 5.0 0.9566 4.90 4.69 B2 0.46 0.95 5.0 0.4372 4.90 2.14 B3 0.30 0.95 5.0 0.2829 4.90 1.39 B4 0.45 0.95 5.0 0.4321 4.90 2.12 Net Runoff: 10.3 100-Year Design Storm Runoff Calculations (Rational Method Procedure) BASIN INFORMATION DRAIN AREA RUNOFF T(c) C x A I Q BASIN ac. COEFF min in/hr cfs B1 1.01 1.19 5.0 1.1957 9.40 11.24 B2 0.46 1.19 5.0 0.5466 9.40 5.14 B3 0.30 1.19 5.0 0.3536 9.40 3.32 B4 0.45 1.19 5.0 0.5401 9.40 5.08 Net Runoff: 24.8 DIRECT RUNOFF DIRECT RUNOFF BASIN INFORMATION K:\DEN_Civil\096291001_Fort Collins - College & Rutgers\_Project Files\Eng\Drainage\CALCS.xls 096291001 2105 SOUTH COLLEGE AVENUE 6/30/2016 2105 S. College Sub-Basin Characteristics - Proposed 2-Year Design Storm Runoff Calculations (Rational Method Procedure) DRAIN AREA RUNOFF T(c) C x A I Q BASIN ac. COEFF min in/hr cfs 5 1.39 0.95 5.0 1.3193 4.90 6.46 10 0.34 0.85 5.0 0.2906 4.90 1.42 15 0.09 0.94 5.0 0.0878 4.90 0.43 20 0.054 0.95 5.0 0.0509 4.90 0.25 25 0.23 0.28 5.0 0.0637 4.90 0.31 30 0.05 0.67 5.0 0.0331 4.90 0.16 35 0.07 0.69 5.0 0.0451 4.90 0.22 Net Runoff: 9.3 100-Year Design Storm Runoff Calculations (Rational Method Procedure) DRAIN AREA RUNOFF T(c) C x A I Q BASIN ac. COEFF min in/hr cfs 5 1.39 1.19 5.0 1.6491 9.40 15.50 10 0.34 1.06 5.0 0.3633 9.40 3.41 15 0.09 1.17 5.0 0.1098 9.40 1.03 20 0.054 1.19 5.0 0.0637 9.40 0.60 25 0.23 0.35 5.0 0.0796 9.40 0.75 30 0.05 0.84 5.0 0.0414 9.40 0.39 35 0.07 0.87 5.0 0.0564 9.40 0.53 Net Runoff: 22.2 BASIN INFORMATION DIRECT RUNOFF BASIN INFORMATION DIRECT RUNOFF K:\DEN_Civil\096291001_Fort Collins - College & Rutgers\_Project Files\Eng\Drainage\CALCS.xls Project: Basin ID: Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness Ia = 94.00 percent Catchment Drainage Imperviousness I a = 94.00 percent Catchment Drainage Area A = 1.650 acres Catchment Drainage Area A = 1.650 acres Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 5 minutes Time of Concentration of Watershed Tc = 5 minutes Allowable Unit Release Rate q = 2.66 cfs/acre Allowable Unit Release Rate q = 6.36 cfs/acre One-hour Precipitation P1 = 0.82 inches One-hour Precipitation P 1 = 2.86 inches Design Rainfall IDF Formula i = C1* P1 /(C2+Tc )^C3 Design Rainfall IDF Formula i = C1 * P1/(C2 +Tc)^C3 Coefficient One C1 = 28.50 Coefficient One C 1 = 28.50 Coefficient Two C2 = 10 Coefficient Two C 2 = 10 Coefficient Three C3 = 0.789 Coefficient Three C 3 = 0.789 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.79 Runoff Coefficient C = 0.88 Inflow Peak Runoff Qp-in = 3.60 cfs Inflow Peak Runoff Qp-in = 13.97 cfs Allowable Peak Outflow Rate Qp-out = 4.38 cfs Allowable Peak Outflow Rate Qp-out = 10.49 cfs Mod. FAA Minor Storage Volume = 13 cubic feet Mod. FAA Major Storage Volume = 2,118 cubic feet Mod. FAA Minor Storage Volume = 0.000 acre-ft Mod. FAA Major Storage Volume = 0.049 acre-ft 1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet (input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 1 3.52 0.006 1.00 4.38 0.006 0.000 1 12.29 0.025 1.00 10.49 0.014 0.010 2 3.29 0.012 1.00 4.38 0.012 0.000 2 11.47 0.046 1.00 10.49 0.029 0.017 3 3.09 0.017 1.00 4.38 0.018 -0.001 3 10.77 0.065 1.00 10.49 0.043 0.021 4 2.91 0.021 1.00 4.38 0.024 -0.003 4 10.16 0.081 1.00 10.49 0.058 0.023 5 2.76 0.025 1.00 4.38 0.030 -0.005 5 9.62 0.096 1.00 10.49 0.072 0.024 6 2.62 0.028 0.92 4.02 0.033 -0.005 6 9.14 0.110 0.92 9.62 0.080 0.030 7 2.50 0.031 0.86 3.75 0.036 -0.005 7 8.72 0.122 0.86 8.99 0.087 0.035 8 2.39 0.034 0.81 3.56 0.039 -0.005 8 8.33 0.133 0.81 8.53 0.094 0.039 9 2.29 0.037 0.78 3.41 0.042 -0.005 9 7.98 0.144 0.78 8.16 0.101 0.043 10 2.20 0.039 0.75 3.29 0.045 -0.006 10 7.67 0.153 0.75 7.87 0.108 0.045 11 2.12 0.042 0.73 3.19 0.048 -0.006 11 7.38 0.162 0.73 7.63 0.116 0.047 12 2.04 0.044 0.71 3.10 0.051 -0.007 12 7.11 0.171 0.71 7.43 0.123 0.048 13 1.97 0.046 0.69 3.03 0.054 -0.008 13 6.87 0.179 0.69 7.27 0.130 0.048 14 1.90 0.048 0.68 2.97 0.057 -0.009 14 6.64 0.186 0.68 7.12 0.137 0.049 15 1.84 0.050 0.67 2.92 0.060 -0.011 15 6.43 0.193 0.67 7.00 0.145 0.048 16 1.79 0.051 0.66 2.87 0.063 -0.012 16 6.23 0.200 0.66 6.89 0.152 0.048 17 1.74 0.053 0.65 2.83 0.066 -0.013 17 6.05 0.206 0.65 6.79 0.159 0.047 18 1.69 0.054 0.64 2.80 0.069 -0.015 18 5.88 0.212 0.64 6.70 0.166 0.045 19 1.64 0.056 0.63 2.77 0.072 -0.016 19 5.72 0.217 0.63 6.63 0.173 0.044 20 1.60 0.057 0.63 2.74 0.075 -0.018 20 5.57 0.223 0.63 6.56 0.181 0.042 21 1.56 0.059 0.62 2.71 0.078 -0.020 21 5.43 0.228 0.62 6.50 0.188 0.040 22 1.52 0.060 0.61 2.69 0.081 -0.022 22 5.29 0.233 0.61 6.44 0.195 0.038 23 1.48 0.061 0.61 2.67 0.084 -0.023 23 5.17 0.238 0.61 6.39 0.202 0.035 24 1.45 0.062 0.60 2.65 0.087 -0.025 24 5.05 0.242 0.60 6.34 0.210 0.033 25 1.41 0.063 0.60 2.63 0.091 -0.027 25 4.93 0.247 0.60 6.30 0.217 0.030 Project: Basin ID: DETENTION VOLUME BY THE MODIFIED FAA METHOD 2105 South College Avenue Full Site minus Sub-Basins 10 and 25 UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 10 20 30 40 50 60 70 Volume (acre-feet) Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Minor Storm Inflow Volume Minor Storm Outflow Volume Minor Storm Storage Volume Major Storm Inflow Volume Major Storm Outflow Volume Major Storm Storage Volume 2016_0628 Modified FAA Method.xls, Modified FAA 6/30/2016, 9:11 AM Scenario: Base 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 6/30/2016 Bentley StormCAD V8i (SELECTseries 4) StormCAD 2016_0630.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.04.54] Conduit FlexTable: Combined Pipe/Node Report Hydraulic Grade Line (Out) (ft) Elevation Ground (Stop) (ft) Invert (Stop) (ft) Hydraulic Grade Line (In) (ft) Elevation Ground (Start) (ft) Invert (Start) (ft) Velocity (ft/s) Capacity (Full Flow) (cfs) Flow (cfs) Slope (Calculated) (ft/ft) Length (Unified) (ft) Stop Node Start Node Label CO-5 CB-5 CB-4 242.0 0.005 0.46 4.53 2.37 5,015.10 5,020.36 5,016.17 5,013.91 5,020.88 5,016.16 CO-2 CB-3 CB-2 291.2 0.005 0.86 2.52 1.09 5,014.38 5,016.34 5,016.19 5,012.92 5,016.31 5,016.02 CO-1 CB-2 O-2 4.1 0.005 1.07 2.49 1.36 5,012.72 5,016.31 5,016.00 5,012.70 5,016.50 5,016.00 CB- 192.6 0.005 0.72 4.61 0.59 5,013.71 5,020.88 5,016.15 5,012.73 5,019.00 5,016.13 CO-4 CB-4 Roof CB- O-1 5.0 0.006 10.42 5.00 8.49 5,012.73 5,019.00 5,016.13 5,012.70 5,016.50 5,016.00 CO-3 Roof 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 6/30/2016 Bentley StormCAD V8i (SELECTseries 4) StormCAD 2016_0630.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.04.54] Profile Report Engineering Profile - Profile - North (StormCAD 2016_0630.stsw) 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 6/30/2016 Bentley StormCAD V8i (SELECTseries 4) StormCAD 2016_0630.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.04.54] Profile Report Engineering Profile - Profile - South (StormCAD 2016_0630.stsw) 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 6/30/2016 Bentley StormCAD V8i (SELECTseries 4) StormCAD 2016_0630.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.04.54] Project Description Friction Method Manning Formula Solve For Discharge Input Data Roughness Coefficient 0.010 Channel Slope 0.00500 ft/ft Normal Depth 1.50 ft Diameter 1.50 ft Results Discharge 9.66 ft³/s Flow Area 1.77 ft² Wetted Perimeter 4.71 ft Hydraulic Radius 0.38 ft Top Width 0.00 ft Critical Depth 1.20 ft Percent Full 100.0 % Critical Slope 0.00524 ft/ft Velocity 5.46 ft/s Velocity Head 0.46 ft Specific Energy 1.96 ft Froude Number 0.00 Maximum Discharge 10.39 ft³/s Discharge Full 9.66 ft³/s Slope Full 0.00500 ft/ft Flow Type SubCritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Normal Depth Over Rise 100.00 % Downstream Velocity Infinity ft/s Worksheet for Circular Pipe - Discharge Pipe 6/30/2016 9:21:50 AM Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 GVF Output Data Upstream Velocity Infinity ft/s Normal Depth 1.50 ft Critical Depth 1.20 ft Channel Slope 0.00500 ft/ft Critical Slope 0.00524 ft/ft Worksheet for Circular Pipe - Discharge Pipe 6/30/2016 9:21:50 AM Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 10 APPENDIX C 11 APPENDIX D 26 1.38 0.065 0.60 2.61 0.094 -0.029 26 4.82 0.251 0.60 6.26 0.224 0.027 27 1.35 0.066 0.59 2.60 0.097 -0.031 27 4.72 0.255 0.59 6.22 0.231 0.024 28 1.32 0.067 0.59 2.58 0.100 -0.033 28 4.62 0.259 0.59 6.18 0.239 0.020 29 1.30 0.068 0.59 2.57 0.103 -0.035 29 4.53 0.263 0.59 6.15 0.246 0.017 30 1.27 0.069 0.58 2.56 0.106 -0.037 30 4.44 0.266 0.58 6.12 0.253 0.013 31 1.25 0.069 0.58 2.54 0.109 -0.039 31 4.35 0.270 0.58 6.09 0.260 0.010 32 1.22 0.070 0.58 2.53 0.112 -0.041 32 4.27 0.273 0.58 6.07 0.267 0.006 33 1.20 0.071 0.58 2.52 0.115 -0.043 33 4.19 0.277 0.58 6.04 0.275 0.002 34 1.18 0.072 0.57 2.51 0.118 -0.046 34 4.12 0.280 0.57 6.02 0.282 -0.002 35 1.16 0.073 0.57 2.50 0.121 -0.048 35 4.04 0.283 0.57 6.00 0.289 -0.006 36 1.14 0.074 0.57 2.49 0.124 -0.050 36 3.97 0.286 0.57 5.98 0.296 -0.010 37 1.12 0.074 0.57 2.49 0.127 -0.052 37 3.91 0.289 0.57 5.96 0.304 -0.014 38 1.10 0.075 0.57 2.48 0.130 -0.055 38 3.84 0.292 0.57 5.94 0.311 -0.019 39 1.08 0.076 0.56 2.47 0.133 -0.057 39 3.78 0.295 0.56 5.92 0.318 -0.023 40 1.07 0.077 0.56 2.46 0.136 -0.059 40 3.72 0.298 0.56 5.90 0.325 -0.028 41 1.05 0.077 0.56 2.46 0.139 -0.061 41 3.66 0.300 0.56 5.89 0.332 -0.032 42 1.03 0.078 0.56 2.45 0.142 -0.064 42 3.61 0.303 0.56 5.87 0.340 -0.037 43 1.02 0.079 0.56 2.45 0.145 -0.066 43 3.55 0.306 0.56 5.86 0.347 -0.041 44 1.00 0.079 0.56 2.44 0.148 -0.069 44 3.50 0.308 0.56 5.84 0.354 -0.046 45 0.99 0.080 0.56 2.43 0.151 -0.071 45 3.45 0.311 0.56 5.83 0.361 -0.051 46 0.98 0.081 0.55 2.43 0.154 -0.073 46 3.40 0.313 0.55 5.82 0.369 -0.055 47 0.96 0.081 0.55 2.42 0.157 -0.076 47 3.36 0.315 0.55 5.81 0.376 -0.060 48 0.95 0.082 0.55 2.42 0.160 -0.078 48 3.31 0.318 0.55 5.79 0.383 -0.065 49 0.94 0.082 0.55 2.41 0.163 -0.081 49 3.27 0.320 0.55 5.78 0.390 -0.070 50 0.92 0.083 0.55 2.41 0.166 -0.083 50 3.22 0.322 0.55 5.77 0.398 -0.075 51 0.91 0.084 0.55 2.41 0.169 -0.085 51 3.18 0.324 0.55 5.76 0.405 -0.080 52 0.90 0.084 0.55 2.40 0.172 -0.088 52 3.14 0.327 0.55 5.75 0.412 -0.085 53 0.89 0.085 0.55 2.40 0.175 -0.090 53 3.10 0.329 0.55 5.74 0.419 -0.090 54 0.88 0.085 0.55 2.39 0.178 -0.093 54 3.06 0.331 0.55 5.73 0.426 -0.096 55 0.87 0.086 0.55 2.39 0.181 -0.095 55 3.03 0.333 0.55 5.72 0.434 -0.101 56 0.86 0.086 0.54 2.39 0.184 -0.098 56 2.99 0.335 0.54 5.72 0.441 -0.106 57 0.85 0.087 0.54 2.38 0.187 -0.100 57 2.95 0.337 0.54 5.71 0.448 -0.111 58 0.84 0.087 0.54 2.38 0.190 -0.103 58 2.92 0.339 0.54 5.70 0.455 -0.117 59 0.83 0.088 0.54 2.38 0.193 -0.105 59 2.89 0.341 0.54 5.69 0.463 -0.122 60 0.82 0.088 0.54 2.37 0.196 -0.108 60 2.85 0.342 0.54 5.68 0.470 -0.127 Mod. FAA Minor Storage Volume (cubic ft.) = 13 Mod. FAA Major Storage Volume (cubic ft.) = 2,118 Mod. FAA Minor Storage Volume (acre-ft.) = 0.0003 Mod. FAA Major Storage Volume (acre-ft.) = 0.0486 DETENTION VOLUME BY THE MODIFIED FAA METHOD 2105 South College Avenue Full Site minus Sub-Basins 10 and 25 Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 Determination of MINOR Detention Volume Using Modified FAA Method 2016_0628 Modified FAA Method.xls, Modified FAA 6/30/2016, 9:11 AM Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (2105 S. College Ave) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/13/2016 Page 2 of 4