HomeMy WebLinkAboutMAJESTIC ESTATES - PDP - PDP160016 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT FOR MAJESTIC ESTATES Prepared For: Suburban Land Reserve, Inc. 79 South Main Street, Suite 500 Salt Lake City, UT 84111 (801) 321-7567 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 (970) 491-9888 Contact: Tim Halopoff, P.E. July 6, 2016 Job No. 39699.01 X:\3960000.all\3969901\Word\Reports\Drainage Report\3969901 Drainage Report.docx Page i TABLE OF CONTENTS TABLE OF CONTENTS .......................................................................................................... I APPENDIX ................................................................................................................................ I VICINITY MAP ........................................................................................................................1 GENERAL DESCRIPTION AND LOCATION ......................................................................2 LOCATION AND EXISTING SITE CHARACTERISTICS ....................................................................2 SITE SOILS ...............................................................................................................................2 FLOODPLAIN ............................................................................................................................2 DRAINAGE BASINS AND SUB-BASINS ...............................................................................3 MAJOR BASIN ..........................................................................................................................3 HISTORIC SUB-BASINS .............................................................................................................3 DEVELOPED SUB-BASINS .........................................................................................................5 DRAINAGE DESIGN CRITERIA ...........................................................................................6 REGULATIONS ..........................................................................................................................6 LOW-IMPACT DEVELOPMENT ...................................................................................................6 HYDROLOGIC CRITERIA............................................................................................................7 HYDRAULIC CRITERIA ..............................................................................................................7 DRAINAGE FACILITY DESIGN ...........................................................................................8 GENERAL CONCEPT ..................................................................................................................8 OFFSITE FLOWS .......................................................................................................................8 WATER QUALITY/DETENTION FACILITIES .................................................................................8 STORMWATER POLLUTION PREVENTION .................................................................. 10 TEMPORARY EROSION CONTROL ............................................................................................ 10 PERMANENT EROSION CONTROL ............................................................................................ 10 MAINTENANCE....................................................................................................................... 10 SUMMARY AND CONCLUSIONS ...................................................................................... 11 EXISTING AND PROPOSED CONDITIONS ................................................................................... 11 REFERENCES ........................................................................................................................ 12 APPENDIX Appendix A – Figures Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Referenced Information Appendix E– LID Exhibits Appendix F – Drainage Plans Page ii Engineer’s Certification Block I hereby certify that this Preliminary Drainage Report for Majestic Estates was prepared by me (or under my direct supervision) for JR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. Timothy J. Halopoff, P.E. Registered Professional Engineer State of Colorado No. 39753 Page 1 VICINITY MAP Page 2 GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS Majestic Estates is located in the northwest quarter of Section 17, Township 6 North, Range 68 West of the 6th Principal Meridian in the City of Fort Collins, Larimer County, Colorado. More specifically, the Majestic Estates site is a 19.90 acre property that is currently undeveloped fallow farmland previously planted with hay and is currently covered in native grasses and sparse alfalfa. The site is zoned UE (Urban Estates) and will support single family estate lots once developed. The proposed use of the site is 8 single family estate lots and about 13.5 acres of open space. The existing site generally slopes to the east and is split into two drainage directions. The northern portion of the site drains to the northeast corner of the property, with slopes ranging between 0.60% and 2.5%, into an existing water quality pond. The southern portion of the site sheet flows to the southeast corner of the property, with slopes ranging between 0.60% and 2.5%, where runoff is collected in an existing ditch and piped through existing 12” pipe under Rock Castle Lane to the south. SITE SOILS The Majestic Estates site soils consist of loamy soil, predominately Nunn clay loam and Fort Collins loam. Nunn clay loams belong to hydrologic soils Group C. Group C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Nunn clay loam with 0-3 percent slopes generally has a combined surface layer thickness of approx. 30 inches. Runoff is moderately high, and the hazards of wind erosion are moderately low. Fort Collins loams belong to the hydraulic soils Group B. Group B soils have a moderate infiltration rate when thoroughly west. These consist mostly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine testier to moderately coarse texture. These soils have a moderate rate of water transmission. Supporting figures can be found in Appendix A. FLOODPLAIN The site is shown on FEMA FIRM panel 08069C1200F which is a non-printed panel. There are no major drainage ways located within or immediately adjacent to the site. Page 3 DRAINAGE BASINS AND SUB-BASINS MAJOR BASIN The proposed Majestic Estates site is located in the Fossil Creek major basin. The Fossil Creek Basin encompasses approximately 32 square miles in south Fort Collins and Larimer County. The basin extends from the foothills across Interstate 25 past County Road 5. Historically, the Fox Meadows basin consisted of agricultural land, but has experienced significant development in the recent years. The site is shown on FEMA FIRM panel 08069C1200F which is a non-printed panel. There are no major drainage ways located within or immediately adjacent to the site. HISTORIC SUB-BASINS The site has existed as agricultural farmland for years and runoff from the site has generally been split in half by a raised earthen tributary ditch that bisected to property in an L-shape. The northeast zone of the property traditionally drains to the northeast corner of the site, where the flows are conveyed to the Westchase Tract N detention pond through a 15” ADS pipe. The southern portion of the site drains to the north borrow ditch of Rock Castle Drive and crossed under the drive through existing 12” CMP at the southeast corner of the property. The Majestic Estates site was previously a part of the Final Drainage Report for the Church of Jesus Christ of Latter Day Saints Temple (LDS) completed by Landmark Engineering, LTD. in September 2013. In accordance with the previous report the existing irrigation channel that bisects the property has been abandoned and will be regarded to accommodate the proposed site layout. Wetland Mitigation Areas were added to replace the low quality natural habitat removed with the irrigation ditch. The wetlands areas are located in both the northeast corner of the property and in an offsite pond southwest of the property. According to the previous drainage report, the Westchase offsite detention pond has been designed to handle up to 216 cfs from the LDS site and the Majestic Estates site. Referring to the “Existing Drainage Plan”, included in Appendix F, the following describes the existing condition drainage basins. Page 4 Existing Offsite Drainage Basins (OS): Sub-basin OS1 consists of 6.61 acres of LDS temple site that drains in an easterly direction and is captured by existing storm sewer and released by a 36” RCP storm pip onto the subject property via the existing swale. From the LDS Final Drainage report Basin OS1 runoff in the 100yr event is 58.39 cfs thru the 36” RCP. Existing Onsite Sub-Basins: The site has three existing onsite drainage basins approximately delineated by the previous LDS Final Drainage report. Sub-basin EX-D58 consists of 12.09 acre area of undeveloped open space with native grasses and weeds covering the majority of the ground and is assumed to have a 100 year runoff coefficient of 0.25. Runoff generally flows southeasterly across basin EX-D58, at slopes ranging from 0.60% to 2.0%, into the existing north borrow ditch of Rock Castle Lane and east to the existing 12” CMP under Rock Castle Lane. Sub-basin EX-D59 consists of 6.76 acre area of undeveloped open space with the same ground cover and runoff coefficient as sub-basin EX-D58. Runoff generally flows northeasterly, at slopes ranging from 0.60% to 4.0% into the exiting wetlands area/ water quality pond in the northeast corner of the site. Sub-basin EX-D60 consists of 2.41 acre area of undeveloped open space with the same ground cover and runoff coefficient as sub-basin EX-D58 and EX-D59. Runoff generally sheet flows northeasterly offsite at slopes ranging from 0.60% to 2.0%. Page 5 DEVELOPED SUB-BASINS The proposed developed condition sub-basins have been designed to mimic the historic basins’ runoff patterns, for both on- and off-site basins. The following describes the proposed conditions on-site drainage basins. Refer to the “Proposed Drainage Plan” in Appendix F for reference. Proposed Onsite Sub-Basins: Sub-basin A consists of 12.42 acres on the south side of the subject property. Runoff from the proposed lots and open space travels southeast to the existing north borrow ditch of Rock Castle Lane. Collected flows are conveyed east to the existing 12” CMP under Rock Castle Lane at DP1. Sub-basin A has a runoff coefficient of 0.25 in the 100yr event, matching the previous LDS Final Drainage Report. Sub-basin A has a total discharge of 17.7 cfs in the 100 year event which is less than the 23.85 cfs from the previous LDS Final Drainage Report. Sub-basin B1 consists of 1.30 acres on the west side of the subject property. Runoff from the proposed lots sheet flows to Majestic Drive where it is collected in curb and gutter and is conveyed to an existing sump inlet at DP2. Piped flows are conveyed in the storm sewer under Majestic Drive and east to the proposed swale eventually discharging into the existing wetland/ WQ pond in the northeast corner of the site. Sub-basin B2 consists of 4.82 acres in the northern portion of the subject property. Runoff from the proposed lots and open space flow over a grass buffer and into the proposed swale eventually discharging into the existing wetland/ WQ pond in the northeast corner of the site. Sub-basin B3 consists of 1.48 acres on the north side of the subject property and includes the existing wetland/ WQ Pond. Runoff is captured in the existing WQ pond and released over 40 hours to the existing Westchase detention pond to the northeast of the site. Sub-basin C consists of 1.27 acres along the eastern edge of the subject property. Runoff from this sub-basin sheet flows east off site similar to historic conditions. Page 6 DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Storm Drainage Design Criteria and Construction Manual (with all current 2011 Revisions)(FCSDDCCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. This report was also prepared in accordance with the previous drainage report for the site, Final Drainage Report for the Church of Jesus Christ of Latter Day Saints Temple, completed by Landmark Engineering, LTD. in September 2013. Please see Appendix D for excerpts from this report. LOW-IMPACT DEVELOPMENT Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management. Per City criteria, a minimum of 50 percent of new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP) as well as 25% of the new pavement area must be treated by porous pavement unless 75% of the site is treated by LID then porous pavement is not needed. The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The improvements will decrease the composite runoff coefficient of the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. The proposed site uses grass buffers for the LID/BMP design elements. In total 75% of the new impervious area is treated by an LID thus eliminating the need for porous pavement, see the tables below for treatment ratios and additional detail on each LID. An illustrative LID/Surface Maps well as sizing of the grass buffers is provided in Appendix F. On-Site Treatment by LID Requirement New Impervious Area 30,400 sq. ft. Required Minimum Impervious Area to be Treated 15,200 sq. ft. (=50% of new impervious area) Impervious Area Directly Treated by LID Treatment Method #1 – Grass Buffer 11,400 sq. ft. Impervious Area Directly Treated by LID Treatment Method #2 - Grass Buffer 11,400 sq. ft. Total Impervious Area Treated 22,800 sq. ft. Actual % of Impervious Area Treated 75.0 % Page 7 HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted runoff coefficients were calculated for each basin using Tables RO-11 based on Natural Resources Conservation Service (NRCS) Type C and Type B hydrologic soil classifications and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO- 3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To more closely match the City of Fort Collins IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.786. The City of Fort Collins area has 2-year, 1-hour rainfall depth of 0.82 inches and a 100-year, 1- hour rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. The 2- hour 100-year rainfall total is 3.67 inches, based on the rainfall frequencies adopted by the City of Fort Collins. HYDRAULIC CRITERIA The ultimate Majestic Estates storm drainage system will be designed to convey the minor and major storm events through the property with the inlets, storm sewer pipes, and swales for the flows being calculated by this report. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm flows. Pipe capacities were modeled in Bentley Storm CAD V8i. All pipes have been designed to be in accordance with the Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual with respect to pipe slope, capacity, velocity, and HGL/EGL elevation. An existing onsite wetland/ WQ pond will be used to capture the developed conditions runoff from the site as well as the contributing runoff from the LDS temple that flows onto the site. An existing outfall from the site will be used to convey detained releases northeast to the existing Westchase detention pond. All swale and pipe outlets will be protected with turf mat or riprap; whichever is most appropriate. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection of downstream conveyance channels and culverts. LID measures have been integrated into this design. In all, 75 percent of this project’s impervious areas pass through and are treated in LIDs prior to reaching the wetland/ WQ pond, which exceeds the minimum requirement of 50 percent, set by the City of Fort Collins. Page 8 DRAINAGE FACILITY DESIGN GENERAL CONCEPT The proposed improvements to the Majestic Estates site will result in developed condition runoff being conveyed across the proposed lots and to the east via surface flow and a proposed swale. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows and attenuating stormwater peaks. Specifically, a grass buffers are proposed to improve water quality. The existing wetland/ WQ pond outfall has been designed to capture flows from the Majestic Estates site and discharge to the existing Westchase detention pond located to the northeast of the site. OFFSITE FLOWS A portion of offsite flows from the LDS temple enter the site through the 36” RCP and are conveyed to the existing wetland/WQ pond via the proposed swale. The amount of flow from the offsite basin was determined from the Final Drainage Report for the LDS temple, 22.57 cfs in the minor storm event and 58.39 cfs in the major storm event. The offsite flows are collected in the grass lined swale and conveyed to the north where they are detained in the existing wetland/ WQ pond. WATER QUALITY/DETENTION FACILITIES A proposed grass buffer will provide water quality for Basin A and Basin B2 of the site. The existing wetland/ water quality pond will provide water quality for the remainder of the site as well as the offsite flows. There is no detention proposed for Basin A since the amount of runoff calculated in the proposed condition does not exceed the flow rate assumed in the previous drainage analysis. The previous LDS temple drainage report determined a 100yr flow of 23.85 cfs for Basin A. The total runoff for the 100yr storm event for Basin A is 17.7 cfs; which is lower than the previous report and thus no detention is necessary for Basin A. The existing offsite Westchase detention pond will provide detention for Majestic Estates Basins B1-B3 and Basin C as well as the offsite flows. According to the Final Drainage report for the LDS Temple the existing wetland/ WQ pond in the northeast corner of the site was designed to capture the flows from the Majestic Estates Basins B1-B3 and Basin C as well as the contributing flows from the LDS Temple site. The existing pond was designed to capture 18.7 cfs from the contributing basins of the Majestic Estates site in the 100 year event. The 100 year storm event calculated by the Rational Method for the contributing basins of the Majestic Estates is 16.2 cfs (-Basins B1-B3 and Basin C), less than the 18.7 cfs it was designed for. The existing water quality pond was designed to capture flows from Basin C although all of the runoff from Basin C may not necessarily get to the outlet structure. The existing water quality Page 9 structure was designed to release the water quality volume over 40 hours and release the 100yr storm event over a weir and into the existing Westchase detention pond. Please see Appendix D for excerpts from this report and the memo referencing the conditions for Basin A. Page 10 STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, and others. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed detention/water quality ponds, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. A detailed Erosion Control Report, plan, and cost estimate meeting all City requirements is submitted under a separate cover. MAINTENANCE The owner of the drainage facility is responsible for the maintenance of all components of the drainage system located on their property; including inlets, pipes, culverts, channels, ditches, hydraulic structures, detention basins or other such appurtenances unless modified by development agreement. Annual inspections should take place on detention facilities to ensure they are functioning as intended. At no time should the outlet structure be blocked by sediment or debris, and consequently, minor maintenance should take place after significant storm events to remove trash and debris buildup from the outlet structures of both facilities. Removal of accumulated debris should be scheduled annually as well, typically no later than May to ensure that each facility is operating as designed before each storm season. Frequent mowing of vegetation will help the ponds with odor and insect control. Annual maintenance operations should include: x Inspect outlet structure and pipes, check structural integrity x Check pond sedimentation levels x Trash and debris removal (each spring, before storm season) x Wetland vegetation overgrowth mitigation, odor control, insect control as needed based on observation or complaints x Scheduled sediment removal and disposal for every 5 years, or as needed to keep forebays to less than 1/3 full of sediment at all times. Page 11 SUMMARY AND CONCLUSIONS The proposed concept for the development of the Majestic Estates site involves surface flows and piping of developed conditions flows to an existing wetland/ WQ pond. LID site enhancements will treat the site runoff at the source before allowing the runoff to be conveyed to the existing wetland/ WQ pond. Offsite flows from the west will be conveyed through the site and captured in the wetland/ WQ pond. EXISTING AND PROPOSED CONDITIONS The existing conditions drainage has three onsite sub-basins with different outfall points, one to the southeast side and one to the northeast side of the subject property. The existing conditions drainage patterns are maintained in the proposed conditions. The proposed improvements will have no adverse impacts on the flow rate, character, or quality of runoff leaving the site. The hydrologic and water quality calculations were performed using the required methods as outlined in the City of Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual. The proposed drainage improvements meet or exceed the City’s requirements. This report exhibits that the proposed drainage improvements are also in accordance with the previous drainage report for the site, Final Drainage Report for the Church of Jesus Christ of Latter Day Saints Temple, completed by Landmark Engineering, LTD. in September 2013. Page 12 REFERENCES Final Drainage Report for the Church of Jesus Christ of Latter Day Saints Temple, Landmark Engineering, LDT., September 2013. Hydrologic Group Rating for Larimer County Area, Colorado; USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [July 21, 2010] Storm Drainage Criteria Manual and Construction Standards; City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3); Urban Drainage and Flood Control District, June 2001. APPENDIXA–FIGURES Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/15/2016 Page 1 of 4 4482230 4482310 4482390 4482470 4482550 4482630 4482710 4482230 4482310 4482390 4482470 4482550 4482630 4482710 496520 496600 496680 496760 496840 496920 497000 497080 497160 497240 496520 496600 496680 496760 496840 496920 497000 497080 497160 497240 40° 29' 42'' N 105° 2' 28'' W 40° 29' 42'' N 105° 1' 56'' W 40° 29' 26'' N 105° 2' 28'' W 40° 29' 26'' N 105° 1' 56'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 150 300 600 900 Feet 0 50 100 200 300 Meters Map Scale: 1:3,450 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 35 Fort Collins loam, 0 to 3 percent slopes C 2.7 6.6% 36 Fort Collins loam, 3 to 5 percent slopes B 21.7 52.2% 55 Kim loam, 5 to 9 percent slopes B 0.5 1.1% 63 Longmont clay, 0 to 3 percent slopes D 0.3 0.8% 74 Nunn clay loam, 1 to 3 percent slopes C 16.3 39.3% Totals for Area of Interest 41.6 100.0% Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/15/2016 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/15/2016 Page 4 of 4 APPENDIX B – HYDROLOGIC CALCULATIONS Subdivision: Majestic Estates Project Name: Majestic Estates Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 5/18/16 A 12.42 0.95 0.50 0.04 0.15 7.24 0.09 0.25 4.68 0.09 0.22 0.28 B1 1.30 0.95 0.25 0.18 0.15 0.50 0.06 0.25 0.55 0.11 0.35 0.44 B2 4.82 0.95 0.32 0.06 0.15 1.83 0.06 0.25 2.67 0.14 0.26 0.33 B3 1.48 0.95 0.06 0.04 0.15 1.17 0.12 0.25 0.25 0.04 0.20 0.25 C 1.27 0.95 0.11 0.08 0.15 0.97 0.11 0.25 0.19 0.04 0.23 0.29 Basin B 7.60 0.26 0.33 TOTAL 21.29 0.24 0.30 C100= 1.25* Basin Total Weighted Runoff Coeff COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Total Area (ac) Basin ID Area (ac) 39699.01 Weighted Runoff Coeff. Basins Total Weighted Runoff Coeff. C100 Runoff Coeff. Area (ac) Lawns, Heavy Soils (Type C) Runoff Coeff. Area (ac) Weighted Runoff Coeff. Paved Roads/ Roofs Lawns, Sandy Soil (Type B) Weighted Runoff Coeff. Basins Total Weighted Runoff Coeff. C2 Runoff Coeff. X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 5/2/2016 Subdivision: Majestic Estates Project Name: Majestic Estates Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 5/18/16 A 12.42 100% 0.17 1.4% 95% 0.33 2.5% 5% 11.92 4.8% 8.7% B1 1.30 100% 0.10 7.7% 95% 0.15 11.0% 5% 1.05 4.0% 22.7% B2 4.82 100% 0.06 1.2% 95% 0.26 5.1% 5% 4.50 4.7% 11.0% B3 1.48 100% 0.06 4.1% 95% 0.00 0.0% 5% 1.42 4.8% 8.9% C 1.27 100% 0.11 8.7% 95% 0.00 0.0% 5% 1.16 4.6% 13.2% Basin B 7.60 12.6% TOTAL 21.29 10.4% Weighted % Imp. (%). % Imp. (%) Area (ac) Weighted % Imp. (%). % Imp. (%) COMPOSITE PERCENT IMPERVIOUS CALCULATIONS 39699.01 Basin ID Total Area (ac) Pavement Roofs Lawns/ Grass Basins Total Weighted % Imp. (%) % Imp. (%) Area (ac) Weighted % Imp. (%). Area (ac) X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 5/2/2016 Subdivision: Majestic Estates Project Name: Majestic Estates Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 5/18/16 FINAL BASIN D.A. Hydrologic Impervious C2 C100 L S o t i L t S o K VEL. t t COMP. t c TOTAL Urbanized t c t c ID (ac) Soils Group (%) (ft) (%) (min) (ft) (%) (ft/s) (min) (min) LENGTH (ft) (min) (min) A 12.42 B/C 9% 0.22 0.28 200 2.0% 84.6 200 0.5% 7.0 0.5 6.7 91.4 400.0 23.4 23.4 B1 1.30 B/C 23% 0.35 0.44 80 2.0% 45.6 270 1.0% 20.0 2.0 2.3 47.9 350.0 17.9 17.9 B2 4.82 B/C 11% 0.26 0.33 130 2.0% 65.1 70 0.5% 20.0 1.4 0.8 66.0 200.0 19.6 19.6 B3 1.48 B/C 9% 0.20 0.25 75 2.0% 53.0 320 0.5% 20.0 1.4 3.8 56.8 395.0 23.3 23.3 C 1.27 B/C 13% 0.23 0.29 40 1.0% 47.0 500 1.0% 7.0 0.7 11.9 58.9 540.0 21.9 21.9 NOTES: t c =t i +t t (Equation 6-2) t i = (1.87*(1.1 -C*Cf)*(L)^0.5)/((S o)^0.33) L= length of overland flow ( 500' max) C= runoff coefficient Cf= Frequency adjustment factor t i = overland (initial) flow time (minutes) K S = Average Slope along the overland flow path, ft/ft 2.5 t t =L/(60K*(S o)^0.5 (Equation 6-4) 5 t t = channelized flow time (minutes) 7 S = waterway slope, ft/ft 10 V t = travel time velocity (ft/sec) = K*S o^0.5 15 20 First Design Point Time of Concentration: t c =(18-15*i )+L/(60*(24*i +12)*(S o)^0.5) (Equation 6-5) i = imperviousness (expressed as a decimal) t c is lesser of Equation 6-2 and Equation 6-5. For Urbanized basins a minimum t c of 5.0 minutes is required. For non-urbanized basins a minimum t c of 10.0 minutes is required. DATA (URBANIZED BASINS) INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN tc CHECK 39699.01 Table 6-2. NRCS Conveyance Factors, K Nearly bare ground Grassed waterway Paved areas and shallow paved swales Type of Land Surface Heavy Meadow Tillage/field Project Name: Majestic Estates Subdivision: Majestic Estates Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. tc (min) C*A (Ac) I (in/hr) Q (cfs) tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) tt (min) REMARKS Sheet flow to EX. Borrow Ditch 1 A 12.42 0.22 23.4 2.73 1.48 4.0 Add Ex. Majestic Dr. Flow Street Flow to EX. Inlet 2 B1 1.30 0.35 17.9 0.46 1.71 0.8 3.5 3.5 Piped to proposed swale via 36" RCP Add LDS Temple flows 3a 23.4 Flow coming out of 36" RCP Add 36" RCP Flow Sheet flow to swale 3 B2 4.82 0.26 19.6 1.25 1.63 2.0 25.4 Swale flow to EX. Wetland/ WQ Pond Add Bio-Swale Flow Sheet flow to EX. Wetland/ WQ Pond 4 B3 1.48 0.20 23.3 0.30 1.49 0.4 25.8 Total flow into EX. Wetland/ WQ Pond Sheet flow offsite 5 C 1.27 0.23 21.9 0.29 1.54 0.4 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 2-Year 39699.01 5/18/16 X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 7/5/2016 STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Majestic Estates Subdivision: Majestic Estates Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. tc (min) C*A (Ac) I (in/hr) Q (cfs) tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) tt (min) REMARKS Sheet flow to EX. Borrow Ditch 1 A 12.42 0.28 23.4 3.42 5.17 17.7 Add Ex. Majestic Dr. Flow Street Flow to EX. Inlet 2 B1 1.30 0.44 17.9 0.57 5.95 3.4 8.8 8.8 Piped to proposed swale via 36" RCP Add LDS Temple flows 3a 61.8 Flow coming out of 36" RCP Add 36" RCP Flow Sheet flow to swale 3 B2 4.82 0.33 19.6 1.57 5.69 8.9 70.7 Swale flow to EX. Wetland/ WQ Pond Add Swale Flow Sheet flow to EX. Wetland/ WQ Pond 4 B3 1.48 0.25 23.3 0.37 5.19 1.9 72.6 Total flow into EX. Wetland/ WQ Pond Sheet flow offsite 5 C 1.27 0.29 21.9 0.37 5.35 2.0 39699.01 PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET 5/18/16 X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 7/5/2016 APPENDIX C – HYDRAULIC CALCULATIONS Worksheet Protected Project: Inlet ID: Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm (local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 3.5 8.8 cfs * If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet. Geographic Information: (Enter data in the blue cells): Subcatchment Area = Acres Percent Imperviousness = % NRCS Soil Type = A, B, C, or D Slope (ft/ft) Length (ft) Overland Flow = Channel Flow = Rainfall Information: Intensity I (inch/hr) = C1 * P 1 / ( C2 + Tc ) ^ C 3 Minor Storm Major Storm Design Storm Return Period, Tr = years Return Period One-Hour Precipitation, P1 = inches C1 = C2 = C3 = User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 = Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.0 cfs Total Design Peak Flow, Q = 3.5 8.8 cfs <--- FILL IN THIS SECTION OR… FILL IN THE SECTIONS BELOW. <--- DESIGN PEAK FLOW FOR ONE-HALF OF STREET OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD Majestic Estates DP 2 EX Fort Collins Single Curb Inlet Site is Urban Site is Non-Urban Show Details Site Type: Street Inlets Area Inlets in a Median Flows Developed For: UD-Inlet_v3.14-DP2.xlsm, Q-Peak 5/2/2016, 1:41 PM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 15.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.002 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 18.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.002 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 9.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Majestic Estates DP 2 EX Fort Collins Single Curb Inlet (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' UD-Inlet_v3.14-DP2.xlsm, Q-Allow 5/2/2016, 1:41 PM Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 10.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 2.00 2.00 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.6 8.8 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 3.5 8.8 cfs Warning 1: Dimension entered is not a typical dimension for inlet type specified. INLET IN A SUMP OR SAG LOCATION Majestic Estates DP 2 EX Fort Collins Single Curb Inlet CDOT/Denver 13 Combination H-Vert H-Curb W Lo (C) Lo (G) Wo WP Override Depths UD-Inlet_v3.14-DP2.xlsm, Inlet In Sump 5/2/2016, 1:43 PM CO-2 CO-1 O-1 Connect to EX. 36" MH-1 Plan View 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203 Page 1 of 2 -755-1666 5/2/2016 Bentley StormCAD V8i (SELECTseries 3) 3969901StormCAD.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] 2yr Results J-loss Coeff N-value Pipe Velocity Down (ft/s) Velocity Up (ft/s) Velocity Avg (ft/s) EGL Down (ft) EGL Up (ft) HGL Down (ft) HGL Up (ft) Invert Down (ft) Invert Up (ft) Line Slope (ft/ft) Line Length (ft) Line Size (in) Capacity (Design) (cfs) Flow (cfs) Label CO-1 23.40 69.78 36.0 190.0 0.011 4,911.41 4,909.33 4,912.97 4,911.20 4,913.59 4,911.60 8.89 6.31 5.06 0.013 1.700 CO-2 23.40 46.55 36.0 39.0 0.005 4,909.33 4,909.14 4,910.89 4,910.65 4,911.51 4,911.32 6.59 6.31 6.59 0.013 0.500 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203 Page 1 of 1 -755-1666 5/3/2016 Bentley StormCAD V8i (SELECTseries 3) 3969901StormCAD.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] 100yr Results J-loss Coeff N-value Pipe Velocity Down (ft/s) Velocity Up (ft/s) Velocity Avg (ft/s) EGL Down (ft) EGL Up (ft) HGL Down (ft) HGL Up (ft) Invert Down (ft) Invert Up (ft) Line Slope (ft/ft) Line Length (ft) Line Size (in) Capacity (Design) (cfs) Flow (cfs) Label CO-1 61.80 69.78 36.0 190.0 0.011 4,911.41 4,909.33 4,914.45 4,912.82 4,915.64 4,914.01 8.74 8.74 8.74 0.013 1.700 CO-2 61.80 46.55 36.0 39.0 0.005 4,909.33 4,909.14 4,912.21 4,911.67 4,913.43 4,913.14 8.74 8.86 9.71 0.013 0.500 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203 Page 1 of 1 -755-1666 5/3/2016 Bentley StormCAD V8i (SELECTseries 3) 3969901StormCAD.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] Subdivision: Majestic Estates Project Name: Majestic Estates Location: Fort Collins Project No.: 39699.01 Calculated By: BAB Checked By: 0 Date: 5/18/16 36" RCP DESIGN POINT Q100 (cfs) 61.8 Flows are the greater of proposed vs. future D or H (in) 36 W (ft) Slope (%) 0.50 Yn (in) 8.74 Yt (ft) Unknown If "Unknown" Yt/D=0.4 Yt/D, Yt/H 0.40 Per Chapter 9, Section 3.2.3 Supercritical (yes/no) no Da, Ha (in) * Da=0.5(D+Yn), Ha=0.5(H+Yn) d50 (in), Required 1.42 Required Riprap Size L Fig. 9-38 or Fig. 9-36 Use Riprap Size L d50 (in) 9 Table MD-7 Expansion Factor, 1/(2 tanT) 4.50 Fig. 9-35 OR 9-36 T 0.11 Erosive Soils? Yes At 11.23 At=Q/V Lp 28.6 L=(1/(2 tan q))(At/Yt - D) Min Length (ft) 9.0 Min L=3D or 3H Max Length (ft) 30.0 Max L=10D or 10H Min Bottom Width, T (ft) 12.4 T=2*(Lp *tanT)+W Design Length (ft) 29.0 Design Width (ft) 12.4 Riprap Depth (in) 18 Depth=2(d50 ) Type II Base Depth (in) 6 *Not used if Soil Riprap Cutoff Wall Yes Cutoff Wall Depth (ft) 24.0 Depth of Riprap and Base Cutoff Wall Width (ft) 9.3 Note: No Type II Base to be used if Soil Riprap is specified within the plans * For use when the flow in the culvert is supercritical (and less than full). STORM DRAIN SYSTEM PIPE OUTFALL RIPRAP SIZING CALCULATIONS X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 2 5/2/2016 X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 2 of 2 5/2/2016 APPENDIX D – REFERENCED INFORMATION !&$ *!& *('*, '* ,   -* ' "+-+  *!+, ' $,,* 1 +!&,+ ,%($ '*, '$$!&+ '$'*' (C7B3C76 8AC :FC5: A8 "7DFD :C;DE A8 $3EE7C 3I +3;@ED  7200 South Alton Way, Suite C400 Centennial, CO80112 303-740-9393 x Fax 303-921-7320 130 East Kiowa Street, Suite 400 Colorado Springs, CO80903 719-593-2593 x Fax 303-921-7320 ‹2900 South College Avenue, Suite 3D Fort Collins, CO80525 970-491-9888 x Fax 303-921-7320 MEMORANDUM JR Engineering, LLC has completed a conceptual storm drainage evaluation for the Majestic Estates project. The following is a summary of the findings discovered while performing an analysis of the proposed Majestic Estates project in order to determine the basin’s 100yr runoff and LID requirements. It is our understanding that by showing the amount of runoff in the proposed condition does not exceed the flow rate assumed in the previous drainage analysis, no detention will be necessary for the southeastern drainage basin area. We have also shown that the LIDs depicted on the attached exhibit, are able to adequately treat at least 75% of the project’s new impervious area. This memo relies upon a previous drainage study for the site, which was completed in September 2013, entitled Final Drainage Report for the Church of Jesus Christ of Latter Day Saints Temple. The previous report determined a 100yr flow of 23.85 cfs for the southeast basin, which JR Engineering identifies as Basin A for this analysis. Basin A is 12.42 acres and consists of 4 proposed lots and one existing lot. For this analysis it was assumed that the average impervious area per lot would be approximately 3,800 square feet ( 600 sf driveway, 700 sf garage, and 2500 sf home footprint) and that the lots will be graded as type B lots with about 75% of each lot’s impervious area draining to the rear of the lot and the rest draining to the front. The area that drains to the front of the lots is conveyed to a large natural swale and into an existing wetland/ water quality pond. These flows are not included in those being treated by an official LID. Using the City of Fort Collins Stormwater Criteria Manual, JR Engineering found the following for the southeast basin A: a composite runoff coefficient of 0.28, a composite percent impervious of 8.7%, a time of concentration of 23.4 minutes, and a total discharge of 17.7 cfs in the 100 year event. See the attached spreadsheet calculations for more details. Our conclusion is that, using the assumed 3,800 sf of impervious area per lot and the existing soil types B and C( as shown in the exhibit), the total runoff for the 100yr storm event for the southeast Basin A of the Majestic Estates project is 17.7 cfs; which is lower than the previous report. Thus we will propose no detention for Basin A. Water quality for the site will be provided for 75% of the entire site’s new impervious area via a grass buffer in the southeast and a sand filter in the northeast. The grass buffer will provide water quality for Basin A before flowing into the existing northern roadside swale of Rock Castle Lane. The sand filter will provide water quality for Basin B2 which will fill and then flow directly into the proposed swale, via a level spreader, draining to the existing wetland/ WQ pond in the northeast corner of the site. Ultimately, we plan to proceed with a formal submittal, using these hydrologic methods to achieve substantial compliance with the City of Fort Collins’s Stormwater Criteria Manual. Please contact me if you find that any changes should be implemented prior to our formal submittal. Sincerely, Becky Brush To: Heather McDowell From: Becky Brush, EIT Date: April 20, 2016 Subject: Majestic Estates- Drainage Analysis Subdivision: Majestic Estates Project Name: Majestic Estates Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 3/20/16 A 12.42 0.95 0.50 0.04 0.15 7.24 0.09 0.25 4.68 0.09 0.22 0.28 B1 1.30 0.95 0.25 0.18 0.15 0.50 0.06 0.25 0.55 0.11 0.35 0.44 B2 4.82 0.95 0.32 0.06 0.15 1.83 0.06 0.25 2.67 0.14 0.26 0.33 B3 1.48 0.95 0.06 0.04 0.15 1.17 0.12 0.25 0.25 0.04 0.20 0.25 C 1.27 0.95 0.11 0.08 0.15 0.97 0.11 0.25 0.19 0.04 0.23 0.29 Basin B 7.60 0.26 0.33 TOTAL 21.29 0.24 0.30 C100= 1.25* Basin Total Weighted Runoff Coeff Lawns, Sandy Soil (Type B) Weighted Runoff Coeff. Basins Total Weighted Runoff Coeff. C2 Runoff Coeff. COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Total Area (ac) Basin ID Area (ac) 39699.01 Weighted Runoff Coeff. Basins Total Weighted Runoff Coeff. C100 Runoff Coeff. Area (ac) Lawns, Heavy Soils (Type C) Runoff Coeff. Area (ac) Weighted Runoff Coeff. Paved Roads/ Roofs X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 4/20/2016 Subdivision: Majestic Estates Project Name: Majestic Estates Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 3/20/16 A 12.42 100% 0.17 1.4% 95% 0.33 2.5% 5% 11.92 4.8% 8.7% B1 1.30 100% 0.10 7.7% 95% 0.15 11.0% 5% 1.05 4.0% 22.7% B2 4.82 100% 0.06 1.2% 95% 0.26 5.1% 5% 4.50 4.7% 11.0% B3 1.48 100% 0.06 4.1% 95% 0.00 0.0% 5% 1.42 4.8% 8.9% C 1.27 100% 0.11 8.7% 95% 0.00 0.0% 5% 1.16 4.6% 13.2% TOTAL 21.29 10.4% Area (ac) Weighted % Imp. (%). % Imp. (%) COMPOSITE PERCENT IMPERVIOUS CALCULATIONS 39699.01 Basin ID Total Area (ac) Pavement Roofs Lawns/ Grass Basins Total Weighted % Imp. (%) % Imp. (%) Area (ac) Weighted % Imp. (%). Area (ac) Weighted % Imp. (%). % Imp. (%) X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 4/20/2016 Subdivision: Majestic Estates Project Name: Majestic Estates Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 3/20/16 FINAL BASIN D.A. Hydrologic Impervious C2 C100 L S o t i L t S o K VEL. t t COMP. t c TOTAL Urbanized t c t c ID (ac) Soils Group (%) (ft) (%) (min) (ft) (%) (ft/s) (min) (min) LENGTH (ft) (min) (min) A 12.42 B/C 9% 0.22 0.28 200 2.0% 84.6 200 0.5% 7.0 0.5 6.7 91.4 400.0 23.4 23.4 B1 1.30 B/C 23% 0.35 0.44 80 2.0% 45.6 270 1.0% 20.0 2.0 2.3 47.9 350.0 17.9 17.9 B2 4.82 B/C 11% 0.26 0.33 130 2.0% 65.1 70 0.5% 20.0 1.4 0.8 66.0 200.0 19.6 19.6 B3 1.48 B/C 9% 0.20 0.25 75 2.0% 53.0 320 0.5% 20.0 1.4 3.8 56.8 395.0 23.3 23.3 C 1.27 B/C 13% 0.23 0.29 40 1.0% 47.0 500 1.0% 7.0 0.7 11.9 58.9 540.0 21.9 21.9 NOTES: t c =t i +t t (Equation 6-2) t i = (1.87*(1.1 -C*Cf)*(L)^0.5)/((S o)^0.33) L= length of overland flow ( 500' max) C= runoff coefficient Cf= Frequency adjustment factor t i = overland (initial) flow time (minutes) K S = Average Slope along the overland flow path, ft/ft 2.5 t t =L/(60K*(S o)^0.5 (Equation 6-4) 5 t t = channelized flow time (minutes) 7 S = waterway slope, ft/ft 10 V t = travel time velocity (ft/sec) = K*S o^0.5 15 20 First Design Point Time of Concentration: t c =(18-15*i )+L/(60*(24*i +12)*(S o)^0.5) (Equation 6-5) i = imperviousness (expressed as a decimal) t c is lesser of Equation 6-2 and Equation 6-5. For Urbanized basins a minimum t c of 5.0 minutes is required. For non-urbanized basins a minimum t c of 10.0 minutes is required. DATA (URBANIZED BASINS) INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN tc CHECK 39699.01 Table 6-2. NRCS Conveyance Factors, K Nearly bare ground Grassed waterway Paved areas and shallow paved swales Type of Land Surface Heavy Meadow Tillage/field Project Name: Majestic Estates Subdivision: Majestic Estates Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. tc (min) C*A (Ac) I (in/hr) Q (cfs) tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) tt (min) REMARKS Sheet flow to EX. Borrow Ditch 1 A 12.42 0.22 23.4 2.73 1.48 4.0 Add Ex. Majestic Dr. Flow Street Flow to EX. Inlet 2 B1 1.30 0.35 17.9 0.46 1.71 0.8 3.5 3.5 Piped to proposed LID Bio-Swale via 36" RCP Add 36" RCP Flow Sheet flow to LID Bio-Swale 3 B2 4.82 0.26 19.6 1.25 1.63 2.0 25.4 Swale flow to EX. Wetland/ WQ Pond Add Bio-Swale Flow Sheet flow to EX. Wetland/ WQ Pond 4 B3 1.48 0.20 23.3 0.30 1.49 0.4 25.8 Total flow into EX. Wetland/ WQ Pond Sheet flow offsite 5 C 1.27 0.23 21.9 0.29 1.54 0.4 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 2-Year 39699.01 3/20/16 X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 4/20/2016 STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Majestic Estates Subdivision: Majestic Estates Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. tc (min) C*A (Ac) I (in/hr) Q (cfs) tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) tt (min) REMARKS Sheet flow to EX. Borrow Ditch 1 A 12.42 0.28 23.4 3.42 5.17 17.7 Add Ex. Majestic Dr. Flow Street Flow to EX. Inlet 2 B1 1.30 0.44 17.9 0.57 5.95 3.4 8.8 8.8 Piped to proposed LID Bio-Swale via 36" RCP Add 36" RCP Flow Sheet flow to LID Basin and swale 3 B2 4.82 0.33 19.6 1.57 5.69 8.9 70.7 Swale flow to EX. Wetland/ WQ Pond Add Swale Flow Sheet flow to EX. Wetland/ WQ Pond 4 B3 1.48 0.25 23.3 0.37 5.19 1.9 72.6 Total flow into EX. Wetland/ WQ Pond Sheet flow offsite 5 C 1.27 0.29 21.9 0.37 5.35 2.0 39699.01 PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET 3/20/16 X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 4/20/2016 STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Majestic Estates Subdivision: Majestic Estates Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. tc (min) C*A (Ac) I (in/hr) Q (cfs) tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) tt (min) REMARKS D58 12.09 0.325 17.17 3.93 6.08 23.89 *LDS Temple basin with City of Fort Collins rainfall data 39699.01 100-Year 3/20/16 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 4/20/2016 Grass Buffer T-1 November 2010 Urban Drainage and Flood Control District GB-1 Urban Storm Drainage Criteria Manual Volume 3 Photograph GB-1. A flush curb allows roadway runoff to sheet flow through the grass buffer. Flows are then further treated by the grass swale. Photo courtesy of Muller Engineering. Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration and slowing runoff. Grass buffers provide filtration (straining) of sediment. Buffers differ from swales in that they are designed to accommodate overland sheet flow rather than concentrated or channelized flow. Site Selection Grass buffers can be incorporated into a wide range of development settings. Runoff can be directly accepted from a parking lot, roadway, or the roof of a structure, provided the flow is distributed in a uniform manner over the width of the buffer. This can be achieved through the use of flush curbs, slotted curbs, or level spreaders where needed. Grass buffers are often used in conjunction with grass swales. They are well suited for use in riparian zones to assist in stabilizing channel banks adjacent to major drainageways and receiving waters. These areas can also sometimes serve multiple functions such as recreation. Hydrologic Soil Groups A and B provide the best infiltration capacity for grass buffers. For Type C and D soils, buffers still serve to provide filtration (straining) although infiltration rates are lower. Designing for Maintenance Recommended ongoing maintenance practices for all BMPs are provided in Chapter 6 of this manual. During design the following should be considered to ensure ease of maintenance over the long-term: Where appropriate (where vehicle safety would not be impacted), install the top of the buffer 1 to 3 inches below the adjacent pavement so that growth of vegetation and accumulation of sediment at the edge of the strip does not prevent runoff from entering the buffer. Alternatively, a sloped edge can be used adjacent to vehicular traffic areas. Amend soils to encourage deep roots and reduce irrigation requirements, as well as promote infiltration. Grass Buffer Functions LID/Volume Red. Yes WQCV Capture No WQCV+Flood Control No Fact Sheet Includes EURV Guidance No Typical Effectiveness for Targeted Pollutants3 Sediment/Solids Good Nutrients Moderate Total Metals Good Bacteria Poor Other Considerations Life-cycle Costs Low T-6 Sand Filter SF-8 Urban Drainage and Flood Control District November 2015 Urban Storm Drainage Criteria Manual Volume 3 Figure SF-1. Sand Filter Plan and Sections Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge A) 2-Year Peak Flow Rate of the Area Draining to the Grass Buffer Q2 = 4.0 cfs 2. Minimum Width of Grass Buffer WG = 80 ft 3. Length of Grass Buffer (14' or greater recommended) LG = 14 ft 4. Buffer Slope (in the direction of flow, not to exceed 0.1 ft / ft) SG = 0.007 ft / ft 5. Flow Characteristics (sheet or concentrated) A) Does runoff flow into the grass buffer across the entire width of the buffer? B) Watershed Flow Length FL= 480 ft C) Interface Slope (normal to flow) SI= 0.001 ft / ft D) Type of Flow SHEET FLOW Sheet Flow: FL * SI < 1 Concentrated Flow: FL * SI > 1 6. Flow Distribution for Concentrated Flows 7 Soil Preparation (Describe soil amendment) 8 Vegetation (Check the type used or describe "Other") 9. Irrigation (*Select None if existing buffer area has 80% vegetation AND will not be disturbed during construction.) 10. Outflow Collection (Check the type used or describe "Other") Notes: Design Procedure Form: Grass Buffer (GB) BAB JR Engineering Majestic Estates April 20, 2016 Existing Xeric Turf Grass Irrigated Turf Grass Other (Explain): Choose One Choose One Grass Swale Street Gutter Storm Sewer Inlet Other (Explain): None (sheet flow) Slotted Curbing Level Spreader Choose One Other (Explain): Choose One Yes No Choose One Permanent None* Temporary 3969901 UD-BMP_v3#1- grass buffer.xlsm, GB 4/20/2016, 2:56 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 11.0 % (100% if all paved and roofed areas upstream of sand filter) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.110 C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.07 watershed inches WQCV= 0.9 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including sand filter area) Area = 115,434 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 629 cu ft VWQCV = WQCV / 12 * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 2,047 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth DWQCV = 1.0 ft B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft 4:1 or flatter preferred). Use "0" if sand filter has vertical walls. C) Mimimum Filter Area (Flat Surface Area) AMin = 455 sq ft D) Actual Filter Area AActual = 3201 sq ft E) Volume Provided VT = 3201 cu ft 3. Filter Material 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Majestic Estates Design Procedure Form: Sand Filter (SF) BAB JR Engineering April 20, 2016 Choose One Choose One 18" CDOT Class C Filter Material Other (Explain): YES NO 3969901 UD-BMP_v3#1- sad filter.xlsm, SF 4/20/2016, 2:55 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6-7. Inlet / Outlet Works A) Describe the type of energy dissipation at inlet points and means of conveying flows in excess of the WQCV through the outlet Notes: Design Procedure Form: Sand Filter (SF) BAB JR Engineering April 20, 2016 Majestic Estates Choose One YES NO 3969901 UD-BMP_v3#1- sad filter.xlsm, SF 4/20/2016, 2:55 PM Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date Larimer County, Colorado UTILITY PLAN APPROVAL LarimerDate County Engineer MAJESTIC DRIVE ROCK CASTLE LANE TRILBY ROAD TIMBERLINE ROAD APPENDIX E – LID EXHIBITS Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge A) 2-Year Peak Flow Rate of the Area Draining to the Grass Buffer Q2 = 2.0 cfs 2. Minimum Width of Grass Buffer WG = 40 ft 3. Length of Grass Buffer (14' or greater recommended) LG = 450 ft 4. Buffer Slope (in the direction of flow, not to exceed 0.1 ft / ft) SG = 0.020 ft / ft 5. Flow Characteristics (sheet or concentrated) A) Does runoff flow into the grass buffer across the entire width of the buffer? B) Watershed Flow Length FL= 145 ft C) Interface Slope (normal to flow) SI= 0.001 ft / ft D) Type of Flow SHEET FLOW Sheet Flow: FL * SI < 1 Concentrated Flow: FL * SI > 1 6. Flow Distribution for Concentrated Flows 7 Soil Preparation (Describe soil amendment) 8 Vegetation (Check the type used or describe "Other") 9. Irrigation (*Select None if existing buffer area has 80% vegetation AND will not be disturbed during construction.) 10. Outflow Collection (Check the type used or describe "Other") Notes: Design Procedure Form: Grass Buffer (GB) BAB JR Engineering Majestic Estates June 20, 2016 Grass Buffer North 50% sand and 50% topsoil Existing Xeric Turf Grass Irrigated Turf Grass Other (Explain): Choose One Choose One Grass Swale Street Gutter Storm Sewer Inlet Other (Explain): None (sheet flow) Slotted Curbing Level Spreader Choose One Other (Explain): Choose One Yes No Choose One Permanent None* Temporary 3969901 UD-BMP_v3#1- grass buffer 2.xlsm, GB 6/20/2016, 2:01 PM Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge A) 2-Year Peak Flow Rate of the Area Draining to the Grass Buffer Q2 = 4.0 cfs 2. Minimum Width of Grass Buffer WG = 80 ft 3. Length of Grass Buffer (14' or greater recommended) LG = 14 ft 4. Buffer Slope (in the direction of flow, not to exceed 0.1 ft / ft) SG = 0.007 ft / ft 5. Flow Characteristics (sheet or concentrated) A) Does runoff flow into the grass buffer across the entire width of the buffer? B) Watershed Flow Length FL= 480 ft C) Interface Slope (normal to flow) SI= 0.001 ft / ft D) Type of Flow SHEET FLOW Sheet Flow: FL * SI < 1 Concentrated Flow: FL * SI > 1 6. Flow Distribution for Concentrated Flows 7 Soil Preparation (Describe soil amendment) 8 Vegetation (Check the type used or describe "Other") 9. Irrigation (*Select None if existing buffer area has 80% vegetation AND will not be disturbed during construction.) 10. Outflow Collection (Check the type used or describe "Other") Notes: Grass Bunner South 50% sand and 50% topsoil Design Procedure Form: Grass Buffer (GB) BAB JR Engineering Majestic Estates May 25, 2016 Existing Xeric Turf Grass Irrigated Turf Grass Other (Explain): Choose One Choose One Grass Swale Street Gutter Storm Sewer Inlet Other (Explain): None (sheet flow) Slotted Curbing Level Spreader Choose One Other (Explain): Choose One Yes No Choose One Permanent None* Temporary 3969901 UD-BMP_v3#1- grass buffer.xlsm, GB 6/20/2016, 2:00 PM Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date Larimer County, Colorado UTILITY PLAN APPROVAL LarimerDate County Engineer LID Measure Impervious Area Treated Sq. ft. Area of LID sq.ft. Ratio Northern Grass Buffer 11,400 23,000 0.5 Southern Grass Buffer 11,400 27,100 0.4 LID Sizing New Impervious Area 30,400 sq. ft. Required Minimum Impervious Area to be Treated 15,200 sq. ft. (=50% of new impervious area) Impervious Area Directly Treated by LID Treatment Method #1 - Northern Grass Buffer 11,400 sq. ft. Impervious Area Directly Treated by LID Treatment Method #2 - Southern Grass Buffer 11,400 sq. ft. Total Impervious Area Treated 22,800 sq. ft. Actual % of Impervious Area Treated 75.0 % On-Site Treatment by LID Requirement MAJESTIC DRIVE ROCK CASTLE LANE TRILBY ROAD TIMBERLINE ROAD APPENDIX F – DRAINAGE PLANS Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date Larimer County, Colorado UTILITY PLAN APPROVAL LarimerDate County Engineer MAJESTIC DRIVE ROCK CASTLE LANE TRILBY ROAD TIMBERLINE ROAD Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date Larimer County, Colorado UTILITY PLAN APPROVAL LarimerDate County Engineer MAJESTIC DRIVE ROCK CASTLE LANE TRILBY ROAD TIMBERLINE ROAD 3 Based primarily on data from the International Stormwater BMP Database (www.bmpdatabase.org). Short pasture and lawns X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 4/20/2016  &ACE: ,7?B>7 +EC77E E: >AAC +3>E $3=7 ;EI -E3:    A@E35E %3C= ,;@97I (     ?E;@97I5A?53DE @7E +7BE7?47C   (CA<75E &A * & $  A@DF>E;@9 @9;@77C $&%*# &!&*!& $,  /7DE ;D7@:AH7C >G6 $AG7>3@6 '   (:     ,A>> C77    Short pasture and lawns X:\3960000.all\3969901\Excel\Drainage\Drainage_Calcs_3969901_v2.0.xlsm Page 1 of 1 5/2/2016 Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/15/2016 Page 2 of 4