HomeMy WebLinkAboutCAPSTONE COTTAGES - PDP - PDP140004 - REPORTS - APPLICANT COMMUNICATIONCAPSTONE COTTAGES
Type 1 Public Hearing
December 3, 2015
APPLICANT:
CAPSTONE COLLEGIATE COMMUNITIES
CONSULTANTS:
CAPSTONE COTTAGES
Fort Collins, CO
SITE CONTEXT
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
117 Single-family attached (4-Bed/unit)
75 Single-family attached (5-Bed/unit)
2 Two-family (5-Bed/unit)
7 Single-family detached (5-Bed/unit)
201 Total Dwelling Units
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
DUFF DRIVE STREETSCAPE
CAPSTONE COTTAGES
Fort Collins, CO
COURTYARD
CAPSTONE COTTAGES
Fort Collins, CO
DUFF DRIVE STREETSCAPE
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
CLUBHOUSE STREETSCAPE VIEW
CAPSTONE COTTAGES
Fort Collins, CO
AMENITIES
CAPSTONE COTTAGES
Fort Collins, CO
AMENITIES
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
“BACKDOOR” CONNECTION TO DUFF DRIVE
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
DUFF DRIVE STREETSCAPE
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
SITE CONTEXT
CAPSTONE COTTAGES
Fort Collins, CO
MASTER STREET PLAN
CAPSTONE COTTAGES Fort Collins, CO
CAPSTONE COTTAGES Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
MODIFICATION - DENSITY
Land Use Code Standard:
LUC 4.6(D)(1): Residential developments in the Medium Density
Mixed-Use Neighborhood District shall have an overall minimum
average density of twelve (12) dwelling units per net acre of
residential land . . . residential developments containing twenty
(20) acres or less shall have an overall minimum average density
of seven (7) dwelling units per net acre . . .
Applicant’s Request:
Project has 24.60 net acres
Density of 8.17 dwelling units per net acre
MODIFICATION - DENSITY
Applicant’s Request:
8.17 du/ac x 24.60 net acres = 201 dwelling units
117 units x 4 persons (EORH proposed) = 468 residents
84 units x 5 persons (EORH proposed) = 420 residents
201 total units (all with EORH proposed) = 888 residents
Compare to:
LUC standard: 12 du/ac x 24.60 net acres = 296 dwelling units
with 3 unrelated persons per unit = 888 residents
15 du/ac x 24.60 net acres = 370 units
with 2.4 persons per unit (average per US Census) = 888
residents
MODIFICATION - DENSITY
Standards for approval:
▪ Modified plan promotes general purpose of standard equally
well or better than a plan that complies with standard
Purposes of standard:
▪ “concentrated housing within easy walking distance of transit
and a commercial district” and
▪ “form a transition and a link between surrounding
neighborhoods and the commercial core”
MODIFICATION - DENSITY
Justification:
▪ Concentrated housing achieved - 8.17 du/ac with EORH (4 and 5
bedroom units) is equal to or better because it translates into
intensity equivalent to 12 du/ac
▪ 8.17 du/ac with EORH (4 and 5 bedroom units) is equal to or better
because it results in more area for open space, recreation and
landscaping
▪ Transfort Routes 5 and 14 run adjacent to project
▪ Applicant will construct bus stop shelter
▪ Mulberry and Lemay Crossings commercial area within a block
▪ Located between lower density, smaller single-family
neighborhood (Andersonville/San Cristo/Via Lopez) and
higher density multi-family/commercial (Buffalo Run/Mulberry
and Lemay Crossings )
MODIFICATION - DENSITY
And:
▪ Modified plan does not diverge from standard except in a nominal
and inconsequential way and continues to advance purposes of Land
Use Code
Justification:
▪ Density of 8.17 du/ac plus EORH results in equivalent
number of residents as density of 12 du/ac
▪ Lower density looks like single-family: cottage-style units
with more open space, recreation and landscaping
▪ 20-acre development would have lower minimum density of
7 du/ac – Project at 24.60 net acres is only slightly over
▪ Numerous LUC purposes advanced
MODIFICATION - DENSITY
Standards for approval: No detriment to public good
Justification:
Public good from:
▪ Logical and orderly pattern of development
▪ Better transition between established single-family
neighborhood and higher density multi-family and
commercial
▪ Distribution of student housing throughout the
community
CAPSTONE COTTAGES
Fort Collins, CO
THE END
LUC Requirement Adopted Criteria Compliance
§ 3.6.4(B): All development
plans shall adequately provide .
. . facilities to maintain the
adopted transportation Level
of Service standards contained
in Part II of the City of Fort
Collins Multi-modal
Transportation Level of Service
Manual . . .
See Part II, City of Fort Collins
Multi-modal Transportation
Level of Service Manual, Figure
8: Signalized intersections in All
Other Areas must overall meet
LOS D
See March 2015 TIS pages 21-
23, 26, 29 and 34: Vine/Lemay
meets overall level of service
criteria in short range
§ 3.7.3(D)(1)(b): All
development shall meet or
exceed the transportation Level
of service standards contained
in Part II of the City of Fort
Collins Multi-modal
Transportation Level of Service
Manual . . .
Transportation LOS and APF Issues – Requirements/Compliance
LUC Requirement Adopted Criteria Compliance
§ 3.6.1(B): The transportation
network of any proposed
development shall be in
conformance with the . . .
Larimer County Urban Area
Street Standards.
LCUASS § 4.5.3, Table 4-3 (page
4-24): overall intersection must
be LOS D and legs and
movements must be LOS E but,
per § 4.5.2.A.2, when
background traffic conditions
(without project traffic) causes
an intersection to fail the
minimum acceptable level of
service standards, there is no
significant negative impact if
the project traffic causes less
than a 2 percent increase in the
intersection delay
See March 2015 TIS pages 23
and 33: Vine/Lemay
intersection does not meet LOS
criteria without project traffic
(one movement fails with a LOS
F) and the increase in delay
caused by project traffic is less
than 2%; per Tables 3 and 5 of
March 2015 TIS, no traffic is
added to the failing movement
by this project, so there is no
increase in delay at that
movement due to project
traffic
Transportation LOS and APF Issues – Requirements/Compliance
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO
SITE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
LANDSCAPE PLAN – 12-3-2015
CAPSTONE COTTAGES
Fort Collins, CO
3 AND 4 PLEX BUILDINGS
CAPSTONE COTTAGES
Fort Collins, CO
CAPSTONE COTTAGES
Fort Collins, CO