Loading...
HomeMy WebLinkAboutFRONT RANGE COMMUNITY COLLEGE, INTEGRATED TECHNOLOGY BUILDING - SPAR - SPA130006 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS (13)1" = 30' PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS ‹2=$5&+,7(&785( SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 3003 LARIMER STREET DENVER, CO 80205 PHONE 303.861.5704 www.ozarch.com 4616 SOUTH SHIELDS ST. FORT COLLINS, CO 80526 812011.00 RAB JTC 10/29/13 CITY SPAR SUBMITTAL SITE PLAN SP-1 TECHNOLOGY BLDG. CRH PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS ‹2=$5&+,7(&785( SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 3003 LARIMER STREET DENVER, CO 80205 PHONE 303.861.5704 www.ozarch.com 4616 SOUTH SHIELDS ST. FORT COLLINS, CO 80526 812011.00 RAB JTC 11/25/13 CITY SPAR SUBMITTAL TECHNOLOGY BLDG. CRH C1.0 1" = 30' GRADING, DRAINAGE, & EROSION CONTROL PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS ‹2=$5&+,7(&785( SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 3003 LARIMER STREET DENVER, CO 80205 PHONE 303.861.5704 www.ozarch.com 4616 SOUTH SHIELDS ST. FORT COLLINS, CO 80526 812011.00 RAB JTC 11/25/13 CITY SPAR SUBMITTAL TECHNOLOGY BLDG. CRH C2.0 1" = 30' UTILITY PLAN All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. Mr. Terry Farrill, P.E., District Engineer Date Mr. Michael D. DiTullio, Manager Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT