HomeMy WebLinkAboutFRONT RANGE COMMUNITY COLLEGE, INTEGRATED TECHNOLOGY BUILDING - SPAR - SPA130006 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS (13)1" = 30'
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS
2=$5&+,7(&785(
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
3003 LARIMER STREET
DENVER, CO 80205
PHONE 303.861.5704
www.ozarch.com
4616 SOUTH SHIELDS ST.
FORT COLLINS, CO 80526
812011.00
RAB
JTC
10/29/13
CITY SPAR SUBMITTAL
SITE PLAN
SP-1
TECHNOLOGY BLDG.
CRH
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS
2=$5&+,7(&785(
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
3003 LARIMER STREET
DENVER, CO 80205
PHONE 303.861.5704
www.ozarch.com
4616 SOUTH SHIELDS ST.
FORT COLLINS, CO 80526
812011.00
RAB
JTC
11/25/13
CITY SPAR SUBMITTAL
TECHNOLOGY BLDG.
CRH
C1.0
1" = 30'
GRADING, DRAINAGE, &
EROSION CONTROL
PROJ. NO.
DRAWN:
CHECKED:
DATE:
REVISIONS
2=$5&+,7(&785(
SCALE:
SHEET NUMBER
SHEET TITLE:
ISSUED FOR:
APPROVED:
3003 LARIMER STREET
DENVER, CO 80205
PHONE 303.861.5704
www.ozarch.com
4616 SOUTH SHIELDS ST.
FORT COLLINS, CO 80526
812011.00
RAB
JTC
11/25/13
CITY SPAR SUBMITTAL
TECHNOLOGY BLDG.
CRH
C2.0
1" = 30'
UTILITY PLAN
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland
Water District and the South Fort Collins Sanitation District.
Mr. Terry Farrill, P.E., District Engineer Date
Mr. Michael D. DiTullio, Manager Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT