Loading...
HomeMy WebLinkAboutLANDMARK APARTMENTS EXPANSION - PDP - PDP160013 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT June 15, 2016 Landmark Apartments Expansion Fort Collins, Colorado Prepared for: Summit Management Services 730 W. Market Street Akron, Ohio 44303 330-535-7027 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1257-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Preliminary Drainage and Erosion Control Report for Landmark Apartments Expansion Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies Project Development Plan submittal for the proposed Landmark Apartments Expansion development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer Landmark Apartments Expansion Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ....................................................................................................................................... 1 B. Description of Property ................................................................................................................ 1 C. Floodplain .................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 5 A. Major Basin Description ............................................................................................................... 5 B. Sub-Basin Description .................................................................................................................. 5 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations .................................................................................................................................. 5 B. Four Step Process ........................................................................................................................ 5 C. Development Criteria Reference and Constraints ......................................................................... 6 D. Hydrological Criteria .................................................................................................................... 6 E. Hydraulic Criteria ......................................................................................................................... 6 F. Floodplain Regulations Compliance .............................................................................................. 7 G. Modifications of Criteria .............................................................................................................. 7 IV. DRAINAGE FACILITY DESIGN .................................................................................... 7 A. General Concept .......................................................................................................................... 7 B. Low-Impact Development ............................................................................................................ 9 C. Specific Details ............................................................................................................................. 9 V. CONCLUSIONS ........................................................................................................ 9 A. Compliance with Standards .......................................................................................................... 9 B. Drainage Concept ........................................................................................................................ 9 References ....................................................................................................................... 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations (NOT INCLUDED WITH PDP) B.1 – Detention Ponds and Water Quality B.2 – Storm Sewers (NOT INCLUDED WITH PDP) B.3 – Inlets (NOT INCLUDED WITH PDP) APPENDIX C – SWMM Modeling APPENDIX D – Erosion Control Report APPENDIX E – FEMA Firmette APPENDIX F – LID Exhibit and Calculations Landmark Apartments Expansion Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 MAP POCKET: DR1 - Drainage Exhibit Landmark Apartments Expansion Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. Located in the northwest quarter of Section 23, Township 7 North, Range 69 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. The site includes Lots 1, 2, 3, 4 and Tracts A, D, E, and F of Young’s Creek Subdivision. The site is replatted as Lots 1 and 2, Landmark Apartments. 3. Bounded to the north by Prospect Road, to the west by the existing Landmark Apartments development, to the south by vacant land, and to the east by a single- family development. 4. Offsite flows from the existing single-family development are expected, but should be relatively small due to the low imperviousness. Off-site flows will be passed through the site undetained. 5. This site was originally platted as Young’s Creek. B. Description of Property 1. The site is approximately 3.67 acres. Landmark Apartments Expansion Preliminary Drainage Report 2 Figure 1 – Aerial Photograph 2. The existing site is comprised of vacant land with natural grasses and vegetation. The Canal Importation Channel bisects the site from the western boundary to the south boundary of the site. 3. The majority of the site slopes to the south, while a portion of the site, south of the channel, slopes to the north. 4. A report by Soilogic, Inc. dated February 24, 2016 lists the soils for the area as consisting of lean clay with varying amounts of silt and sand. These soils are classified as Hydrologic Soil Group C and have a low infiltration rate. 5. The proposed project site plan is composed of 5 multi-family residential buildings. This site will employ water quality features and runoff reduction facilities including rain gardens and pervious pavers. Landmark Apartments Expansion Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 6. No existing irrigation facilities are known at this time. 7. The proposed project is not requesting a change in the land use. C. Floodplain 1. The subject property is bisected by both a FEMA and City regulatory floodplain. Development within the floodplain will be limited and subject to regulations set forth by the City of Fort Collins City Code Chapter 10 and FEMA. Landmark Apartments Expansion Preliminary Drainage Report 4 2. The FEMA floodplain associated with this site is shown in FEMA Map Number 08069C0979H. See appendix for FEMA firmette. 3. The City of Fort Collins floodplain is more dominant over the site. As such, all grading and finished floor elevations are in relation to the City of Fort Collins floodplain and base flood elevations. Figure 3 – Existing Floodplains 4. This site is not subject to City of Fort Collins published erosion buffers. 5. Multi-family apartments are proposed as slab on grade. No residential structures are proposed in the floodway or flood-fringe. Though these structures will be subject to additional requirements. Specifically, all duct work, heating, ventilation and air conditioning systems, hot water heater, electrical, and the lowest floor of the building are a minimum of 18 inches above the Base Flood Elevation (BFE). That minimum is known as the regulatory flood protection elevation (RFPE). 6. Non-residential structures can be flood proofed instead of elevated to the regulatory flood protection elevation. 7. No garages are proposed with this site. 8. Any and all construction activities in the floodway or flood fringe must be preceded by an approved Floodplain Use Permit. If the construction is in the floodway a no-rise certification must be approved prior to construction. Specifically, a floodplain use permit will be required for the trail connection, associated grading, bridge, and storm sewer outfalls. Landmark Apartments Expansion Preliminary Drainage Report 5 9. A bridge is planned over the drainage channel and floodway. This bridge deck will be elevated above the base flood elevation. Abutments will be placed outside of the floodway. No additional construction is planned in the floodway. 10. If a structure requiring a Certificate of Occupancy is proposed in the floodplain, a FEMA elevation or floodproofing certificate will be completed and approved before the Certificate of Occupancy is issued. No structures requiring a Certificate of Occupancy are proposed in the floodplain. II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Landmark Apartments Expansion project is located within the Canal Importation Basin, which is located south of Laporte Avenue, north of Drake Road, west of Shields Street, and East of the foothills. B. Sub-Basin Description 1. The northern portion of the site drains south to the Canal Importation Channel. The southern portion of the site drains north to the Canal Importation Channel. 2. Due to proximity to the Canal Importation Channel and location within the Canal Importation Drainage Basin, no stormwater detention is proposed on this site. The flow volumes and times of concentration for on-site basins are very small compared to the regional flow through the Canal Importation Channel. The peak runoff from this site will be conveyed through the channel prior to the peak flows from the major basin upstream of the site. III. DRAINAGE DESIGN CRITERIA A. Regulations This project seeks provisions outside of the FCSCM to waive the detention requirement within the Canal Importation Basin. B. Four Step Process The overall stormwater management strategy employed with Landmark Apartments Expansion project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Providing rain gardens throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Providing pervious pavers to intercept runoff from roof drains. Pervious pavers reduce runoff and also provide a lower overall imperviousness. Utilizing large vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious area (MDCIA). Landmark Apartments Expansion Preliminary Drainage Report 6 Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff. Additionally, the majority of stormwater runoff from the site will ultimately be intercepted and treated in rain gardens prior to release to the drainage channel. Step 3 – Stabilize Drainageways Buried riprap pads will be installed at the stormwater outfalls into the Canal Importation Channel. These pads will fortify the outfall and reduce any erosion within the channel. Additional buried riprap will be provided on-site at locations where steep grades within swales could produce erosion. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Localized trash enclosures within the development will allow for the disposal of solid waste. Rain gardens and vegetated open areas for water treatment prior to flows entering the drainage channel. Channeling runoff from parking lots through rain gardens for water quality treatment. C. Development Criteria Reference and Constraints 1. No previous studies were utilized with this project. 2. Low-Impact Development and water quality facilities make up the majority of this drainage concept and report. 3. This project will be subject to the design guidelines as set forth by the Fort Collins Stormwater Criteria Manual (FCSCM) and the Urban Drainage and Flood Control District Criteria Manual. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. EPA Stormwater Management Model (SWMM) modeling was utilized to model peak flow in the channel before and after development of this site. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. The northern portion of the site drains south to the Canal Importation Channel. The Landmark Apartments Expansion Preliminary Drainage Report 7 southern portion of the site drains north to the Canal Importation Channel. 2. All drainage facilities proposed with Landmark Apartments Expansion project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is bisected by both a FEMA and City regulatory floodplain. Development within the floodplain will be limited and subject to regulations set forth by the City and FEMA. 4. The Landmark Apartments Expansion project does not propose to modify the Canal Importation Channel within the floodway limits. Limited grading within the southern flood fringe is expected to accommodate the trail connection and grading to the buildings. No grading is proposed in the floodway. F. Floodplain Regulations Compliance 1. As stated previously, the subject property is bisected by both a FEMA and City regulatory floodplain. Development within the floodplain will be limited and subject to regulations set forth by the City and FEMA. G. Modifications of Criteria 1. This project seeks provisions outside of the FCSCM to waive the detention requirement within the Canal Importation Basin. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Landmark Apartments Expansion drainage design are to provide water quality for stormwater runoff and safely convey stormwater runoff to the Canal. 2. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 3. The Landmark Apartments Expansion project is divided into three (4) major drainage basins, designated as Basins A, B, UD and OS. Basin A is on-site and located north of the canal. Basin B is on-site and located south of the canal. Basins designated UD are on-site basins that flow directly to the canal by-passing any water quality ponds. Basins designated OS are off-site basins that flow onto the subject property. Basin A Basin A consists of proposed multi-family apartments, sidewalk, landscaped areas, pavers and parking. Runoff from roofs will be conveyed through curb cuts and swales to rain gardens. Sidewalk chases, curb cuts, and swales are the main mode of water conveyance around the site. Basins A1, A2, A3, and A5 are conveyed to a rain gardens sized for the respective basin. Runoff from Basin A4 is released unto pervious pavers for LID and Water Quality Treatment. The rain gardens are sized for water quality utilizing the Urban Drainage BMP spreadsheets. Runoff produced during a 2-year event will ultimately be captured in inlets and conveyed to the canal via storm sewer. Landmark Apartments Expansion Preliminary Drainage Report 8 Runoff produced during a 100-year event, up to the limits of inlet and storm sewer capacities, will be captured by inlets and conveyed to the canal by storm sewer. Additional flow above the inlet/sewer capacities will overtop sidewalks and berms at rain garden locations and will flow directly into the canal. Basin B Basin B consists of proposed multi-family apartments, sidewalk, landscaped areas and parking. Runoff is captured by a curb cut and conveyed to the rain garden. The rain garden in Basin B is sized for water quality utilizing the Urban Drainage BMP Spreadsheet. Runoff produced during a 2-year event will ultimately be treated for water quality and release via storm sewer to the canal. Runoff produced during a 100-year event, up to the limits of inlet and storm sewer capacities, will be captured by inlets and conveyed to the canal by storm sewer. Additional flow above the inlet/sewer capacities will overtop sidewalks and berms at the rain garden location and will flow directly into the canal. Basin UD Basin UD consists of proposed concrete trail, and landscaped areas. Runoff during both 2-year and 100-year events will flow directly to the canal over landscaped areas. These landscape buffers will provide some water quality treatment, but these areas have not been included in the LID calculations. The majority of the UD basins consist of landscaping. The concrete trail adjacent the drainage canal is the only impervious area in the UD basin. Due to the proximity to the canal, this trail was unable to be captured for additional water quality treatment. The trail is expected to cause very little concern in regard to water quality. Basin OS Basin OS consists of proposed parking, proposed sidewalks, existing single family lots and existing multifamily development. Runoff from Basins OS-1, OS-2 and OS-3 will be passed through Basin A safely to the canal without detention or water quality treatment. Rain gardens are not sized to treat these areas. Runoff from Basin OS-4 will continue through the existing parking lot to the sidewalk chase in Basin A3. This chase will be sized to convey the 2-yr flows from Basin OS-4 along with the 2-yr flows from Basin A3. The rain garden is not sized to accommodate runoff from Basin OS-4; therefore, flows from Basin OS-4 will safely bypass to the canal. Basin OS-5 consists of existing parking lot, proposed parking, and landscaped areas. Runoff from Basin OS-5 will be captured and treated in the rain garden for Basin B. The Basin B rain garden will be sized to treat the existing parking lot in Basin OS-5; thereby, providing additional water quality treatment for existing impervious areas. Basin OS-6 consists of the proposed cul-de-sac at the end of Hobbit Street. Runoff from OS-6 will continue as historically to the drainage pan in Hobbit Street, and be Landmark Apartments Expansion Preliminary Drainage Report 9 conveyed to the canal via redefined swale. The swale will provide a certain amount of LID and water quality treatment. This additional treatment has not been included in the LID treatment calculations. The additional proposed impervious area is less than the existing impervious area from Basin OS-5 that is now being treated for water quality. A full-size copy of the Drainage Plan can be found in the Map Pocket at the end of this report. B. Low-Impact Development The site achieves the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 88% of total impervious areas as being treated through an LID treatment. Please see LID Exhibit located in the Appendix. C. Specific Details 1. Additional details to be provided with the FDP submittal. V. CONCLUSIONS A. Compliance with Standards 1. This project seeks provisions outside of the FCSCM to waive the detention requirement within the Canal Importation Basin. 2. Other than the detention requirement, drainage design proposed with the Landmark Apartments Expansion project complies with the City of Fort Collins’ Stormwater Criteria Manual. 3. The subject property is bisected by both a FEMA and City regulatory floodplain. Development within the floodplain will be limited and subject to regulations set forth by the City and FEMA. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site achieves the requirements set forth by the City of Fort Collins for Low Impact Development (LID). B. Drainage Concept 1. All drainage facilities proposed with Landmark Apartments Expansion project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 2. The drainage design proposed with this project will effectively limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development 3. The proposed development will not have any impact on the Master Drainage Plan recommendations for the Canal Importation Basin. 4. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration from rain gardens and pervious pavers. This is currently unable to be calculated with available soils data. Landmark Apartments Expansion Preliminary Drainage Report 10 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Geotechnical Subsurface Exploration Report Landmark Apartments Expansion Southeast of West Prospect Road and South Shields Street, Fort Collins, Colorado, February 24, 2016, Soilogic, Inc. (Soilogic Project No. 16-1024). 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Landmark Apartments CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: Landmark Apartments Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….. 0.95 100% Date: June 14, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….. 0.95 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….. 0.50 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 40% Land Use Existing Multi-family ……....……………...……….....…...……………….…………………………………………… 0.55 50% Existing Single Family …….......……………….….……….………………..….……………………………………… 0.30 30% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….. 0.15 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….. 0.25 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Roofs (ac) Area of Single Family (ac) Area of Multi Family (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient Landmark Apartments Expansion Overland Flow, Time of Concentration: Landmark Apartments Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) Landmark Apartments Expansion Rational Method Equation: Project: Landmark Apartments Calculations By: Date: Rainfall Intensity: 7 North Historic Basin 2.68 22 22 21 0.25 0.25 0.31 1.53 2.61 5.46 1.02 1.75 4.56 7 South Historic Basin 0.53 11 11 11 0.25 0.25 0.31 2.13 3.63 7.57 0.28 0.49 1.27 7 Total Existing Site 3.21 22 22 21 0.25 0.25 0.31 1.53 2.61 5.46 1.23 2.09 5.48 1 A1 0.62 7 7 5 0.62 0.62 0.77 2.60 4.44 9.95 0.99 1.69 4.75 2 A2 0.32 7 7 5 0.77 0.77 0.97 2.60 4.44 9.95 0.65 1.11 3.11 3 A3 0.37 6 6 5 0.79 0.79 0.98 2.76 4.72 9.95 0.81 1.38 3.64 4 A4 0.97 7 7 5 0.67 0.67 0.84 2.60 4.44 9.95 1.69 2.89 8.10 5 A5 0.18 7 7 5 0.73 0.73 0.91 2.60 4.44 9.95 0.35 0.59 1.66 7 UD-1 0.21 6 6 6 0.26 0.26 0.32 2.67 4.56 9.63 0.14 0.24 0.64 7 North Proposed Basin 2.68 12 12 9 0.66 0.66 0.82 2.05 3.50 8.21 3.61 6.17 18.08 6 B1 0.33 5 5 5 0.78 0.78 0.98 2.85 4.87 9.95 0.73 1.25 3.20 7 UD-2 0.18 7 7 7 0.43 0.43 0.53 2.52 4.31 9.06 0.20 0.33 0.88 7 UD-3 0.02 8 8 7 0.41 0.41 0.51 2.46 4.21 8.80 0.02 0.04 0.11 7 South Proposed Basin 0.53 6 6 5 0.64 0.64 0.81 2.76 4.72 9.95 0.95 1.62 4.29 1 OS-1 0.77 11 11 10 0.30 0.30 0.38 2.13 3.63 7.72 0.49 0.84 2.23 4 OS-2 0.24 12 12 11 0.30 0.30 0.38 2.05 3.50 7.42 0.15 0.25 0.67 4 OS-3 1.05 12 12 11 0.30 0.30 0.38 2.09 3.57 7.57 0.66 1.12 2.98 3 OS-4 1.21 13 13 10 0.46 0.46 0.58 2.02 3.45 7.72 1.13 1.94 5.43 6 OS-5 0.23 5 5 5 0.90 0.90 1.00 2.85 4.87 9.95 0.58 0.98 2.25 7 OS-6 0.24 7 7 7 0.92 0.92 1.00 2.60 4.44 9.06 0.57 0.98 2.16 PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 June 14, 2016 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 APPENDIX B HYDRAULIC COMPUTATIONS B.1 WATER QUALITY POND SIZING B.2 STORM SEWER (NOT INCLUDED) B.3 INLET (NOT INCLUDED) APPENDIX B.1 WATER QUALITY POND Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 51.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.510 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 26,861 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 374 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 250 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 24.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 374 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.27 in MINIMUM DIAMETER = 3/8" Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin A1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03 Rain Gardens -A1.xlsm, RG 6/14/2016, 1:37 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin A1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03 Rain Gardens -A1.xlsm, RG 6/14/2016, 1:37 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 71.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.710 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.22 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 30,272 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 564 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 14 in 12-INCH MAXIMUM B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 376 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 24.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 564 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.33 in MINIMUM DIAMETER = 3/8" Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin A3 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03 Rain Gardens -A3.xlsm, RG 6/14/2016, 1:38 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin A3 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03 Rain Gardens -A3.xlsm, RG 6/14/2016, 1:38 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 58.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.580 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 42,316 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 648 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 11 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 432 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 24.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 648 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.35 in MINIMUM DIAMETER = 3/8" Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin A4 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03 Rain Gardens -A4.xlsm, RG 6/14/2016, 1:38 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin A4 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03 Rain Gardens -A4.xlsm, RG 6/14/2016, 1:38 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 79.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.790 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.26 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 24,192 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 520 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 10 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 346 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 24.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 520 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.32 in MINIMUM DIAMETER = 3/8" Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin B1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03 Rain Gardens -B1.xlsm, RG 6/14/2016, 1:38 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering June 14, 2016 Landmark Apartments Expansion Basin B1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03 Rain Gardens -B1.xlsm, RG 6/14/2016, 1:38 PM APPENDIX B.2 STORM SEWERS APPENDIX B.3 INLETS APPENDIX C SWMM MODELING 01/01/2013 00:01:00 SWMM 5 Page 1 S U M M A R Y S T A T I S T I C S =================================== Object .............. Link 43 Variable ............. Flow (CFS) Event Period ......... Variable Event Statistic ...... Peak (CFS) Event Threshold ...... Flow > 0.0000 (CFS) Event Threshold ...... Event Volume > 0.0000 (ft3) Event Threshold ...... Separation Time >= 6.0 (hr) Period of Record ..... 01/01/2013 to 01/01/2013 Number of Events ..... 1 Event Frequency*...... 0.993 Minimum Value ........ 518.730 Maximum Value ........ 518.730 Mean Value ........... 518.730 Std. Deviation ....... 0.000 Skewness Coeff. ...... 0.000 *Fraction of all reporting periods belonging to an event. SWMM 5 Page 1 S U M M A R Y S T A T I S T I C S =================================== Object .............. Link 43 Variable ............. Flow (CFS) Event Period ......... Variable Event Statistic ...... Peak (CFS) Event Threshold ...... Flow > 0.0000 (CFS) Event Threshold ...... Event Volume > 0.0000 (ft3) Event Threshold ...... Separation Time >= 6.0 (hr) Period of Record ..... 01/01/2013 to 01/01/2013 Number of Events ..... 1 Event Frequency*...... 0.993 Minimum Value ........ 518.810 Maximum Value ........ 518.810 Mean Value ........... 518.810 Std. Deviation ....... 0.000 Skewness Coeff. ...... 0.000 *Fraction of all reporting periods belonging to an event. SWMM 5 Page 1 APPENDIX D EROSION CONTROL REPORT Landmark Apartments Expansion Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX E FEMA FIRMETTE APPENDIX F LID EXHIBIT AND CALCULATIONS Project: Landmark Apartments Calculations By: Date: L1 A1 26,861 51% 13,664 L2 A2 14,061 69% 9,730 A3 16,211 72% 11,696 Total L2 30,272 71% 21,425 L3 A4 42,316 58% 24,557 L4 A5 8,019 65% 5,224 L5 B1 14,355 72% 10,346 OS-5 9,837 89% 8,745 Total L5 24,192 79% 19,091 Total Treated 131,660 64% 83,961 UD-1 9,072 1% 78 UD-2 7,931 23% 1,804 UD-3 1,016 22% 220 OS-6 10,406 94% 9,746 Total Proposed Untreated 28,425 42% 11,848 PROPOSED LID COMPUTATIONS S. Thomas June 14, 2016 PROPOSED LID TREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) PROPOSED LID UNTREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) 374 1,023 13,664 564 564 21,425 648 648 24,557 520 700 19,091 5,224 1,544 3.4 160,085 95,809 71,857 83,961 88% LID TREATMENT SUMMARY Total Site Area (sf) Total Proposed Impervious Area (sf) 75% Required Minimum Area to be Treated Rain Garden - Basin L1 Total Volume Required (cf) Total Volume Provided (cf) Total Impervious Area Treated (sf) Total Impervious Area Treated (sf) Total Treated Impervious Area (sf) Percent Impervious Treated by LID measures Rain Garden - Basin L2 Total Volume Required (cf) Total Volume Provided (cf) Total Impervious Area Treated (sf) Rain Garden - Basin L3 Total Volume Required (cf) Total Volume Provided (cf) Rain Garden - Basin L5 Total Volume Required (cf) Total Volume Provided (cf) Total Impervious Area Treated (sf) Pavers - Basin L4 Total Impervious Area Treated (sf) Total Paver Area (sf) Run-on Ratio (x:1) LID CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 KEYMAP X X X X X X X LID TREATMENT SUMMARY Total Volume Required (cf) 374 Total Volume Provided (cf) 1,023 Total Impervious Area Treated (sf) 13,664 Total Volume Required (cf) 564 Total Volume Provided (cf) 564 Total Impervious Area Treated (sf) 21,425 Total Volume Required (cf) 648 Total Volume Provided (cf) 648 Total Impervious Area Treated (sf) 24,557 Total Volume Required (cf) 520 Total Volume Provided (cf) 700 Total Impervious Area Treated (sf) 19,091 Total Impervious Area Treated (sf) 5,224 Total Paver Area (sf) 1,544 Run-on Ratio (x:1) 3.4 Total Site Area (sf) 160,085 Total Proposed Impervious Area (sf) 95,809 75% Required Minimum Area to be Treated by LID measures (sf) 71,857 Total Treated Impervious Area (sf) 83,961 Percent Impervious Treated by LID measures 88% MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X NBERG DRIVE TRACT C YOUNG'S CREEK OWNER: CITY OF FORT COLLINS TRACT B YOUNG'S CREEK OWNER: CITY OF FORT COLLINS LOT 1 LANDMARK SUBDIVISION PUD OWNER: LANDMARK HOUSING LLC TRACT B PULSE PUD 1ST OWNER: NORTH SPRING CREEK LOT 6 SEAMAN SUBDIVISION OWNER: EWAN, JOHN L & YVONNE S OS-4 OS-3 OS-1 B1 UD-3 OS-5 OS-6 A1 A2 A3 A4 A5 1 2 4 5 6 EX. 10.00' SEWER EASEMENT BOOK 1204, PAGE 344 EX. 15.00' UTILITY EASEMENT REC. NO. 20040037611 EX. 90.00' STORM DRAINAGE EASEMENT REC. NO. 86072551 CITY OF FORT COLLINS 100-YR FLOODWAY CITY OF FORT COLLINS CITY OF FORT COLLINS 100-YR FLOODPLAIN 100-YR FLOODPLAIN RAIN GARDEN RAIN GARDEN RAIN GARDEN INLET INLET INLET DR1 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 KEYMAP X X X X X X X DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 0.62 0.62 0.77 6.9 5.0 0.99 4.75 2 A2 0.32 0.77 0.97 6.6 5.0 0.65 3.11 3 A3 0.37 0.79 0.98 5.7 5.0 0.81 3.64 4 A4 0.97 0.67 0.84 6.9 5.3 1.69 8.10 5 A5 0.18 0.73 0.91 6.8 5.0 0.35 1.66 7 UD-1 0.21 0.26 0.32 6.0 5.8 0.14 0.64 6 B1 0.33 0.78 0.98 5.0 5.0 0.73 3.20 7 UD-2 0.18 0.43 0.53 7.1 6.5 0.20 0.88 7 UD-3 0.02 0.41 0.51 7.7 7.2 0.02 0.11 1 OS-1 0.77 0.30 0.38 11.1 10.1 0.49 2.23 4 OS-2 0.24 0.30 0.38 12.1 11.1 0.15 0.67 4 OS-3 1.05 0.30 0.38 12.0 11.0 0.66 2.98 3 OS-4 1.21 0.46 0.58 12.7 10.4 1.13 5.43 6 OS-5 0.23 0.90 1.00 5.0 5.0 0.58 2.25 7 OS-6 0.24 0.92 1.00 7.0 7.0 0.57 2.16 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR LANDMARK APARTMENTS EXPANSION BY NORTHERN ENGINEERING, DATED June 15, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION (in/hr) 100-yr Tc (min) Q  C f  C i  A 6/14/2016 1:36 PM D:\Projects\1257-001\Drainage\Hydrology\1257-001_Conceptual Hydrologic Calculations.xlsx\Runoff 10-yr Tc (min) 100-yr Tc (min) 7 North Historic Basin No 0.25 0.25 0.31 421 4.99% 19.1 19.1 17.7 N/A N/A N/A 331 1.18% 1.63 3.4 22.5 22.5 21.1 7 South Historic Basin No 0.25 0.25 0.31 85 5.76% 8.2 8.2 7.6 N/A N/A N/A 288 1.01% 1.51 3.2 11.4 11.4 10.8 7 Total Existing Site No 0.25 0.25 0.31 421 4.99% 19.1 19.1 17.7 N/A N/A N/A 331 1.18% 1.63 3.4 22.5 22.5 21.1 1A1 No 0.62 0.62 0.77 183 7.10% 6.3 6.3 4.3 N/A N/A N/A 97 3.61% 2.85 0.6 6.9 6.9 5.0 2A2 No 0.77 0.77 0.97 307 4.72% 6.4 6.4 2.6 N/A N/A N/A 42 4.05% 3.02 0.2 6.6 6.6 5.0 3A3 No 0.79 0.79 0.98 161 2.80% 5.3 5.3 2.0 106 4.06% 4.03 0.4 N/A N/A N/A 5.7 5.7 5.0 4A4 No 0.67 0.67 0.84 46 2.17% 4.2 4.2 2.6 365 1.23% 2.22 2.7 N/A N/A N/A 6.9 6.9 5.3 5A5 No 0.73 0.73 0.91 115 1.35% 6.8 6.8 3.5 N/A N/A N/A N/A N/A N/A 6.8 6.8 5.0 7 UD-1 No 0.26 0.26 0.32 20 19.00% 2.6 2.6 2.4 N/A N/A N/A 331 1.18% 1.63 3.4 6.0 6.0 5.8 7 North Proposed Basin No 0.66 0.66 0.82 307 4.72% 8.6 8.6 5.4 N/A N/A N/A 331 1.18% 1.63 3.4 12.0 12.0 8.8 6B1 No 0.78 0.78 0.98 24 7.50% 1.5 1.5 0.6 244 1.11% 2.10 1.9 N/A N/A N/A 5.0 5.0 5.0 7 UD-2 No 0.43 0.43 0.53 52 12.12% 4.0 4.0 3.3 N/A N/A N/A 288 1.01% 1.51 3.2 7.1 7.1 6.5 7 UD-3 No 0.41 0.41 0.51 25 11.20% 2.9 2.9 2.5 N/A N/A N/A 265 0.38% 0.92 4.8 7.7 7.7 7.2 7 South Proposed Basin No 0.64 0.64 0.81 52 12.12% 2.7 2.7 1.7 N/A N/A N/A 288 1.01% 1.51 3.2 5.9 5.9 5.0 1 OS-1 No 0.30 0.30 0.38 183 7.10% 10.5 10.5 9.5 N/A N/A N/A 97 3.61% 2.85 0.6 11.1 11.1 10.1 4 OS-2 No 0.30 0.30 0.38 199 8.09% 10.5 10.5 9.5 242 1.57% 2.51 1.6 N/A N/A N/A 12.1 12.1 11.1 4 OS-3 No 0.30 0.30 0.38 194 8.14% 10.4 10.4 9.4 242 1.57% 2.51 1.6 N/A N/A N/A 12.0 12.0 11.0 3 OS-4 No 0.46 0.46 0.58 307 4.72% 12.4 12.4 10.2 N/A N/A N/A 42 4.05% 3.02 0.2 12.7 12.7 10.4 6 OS-5 No 0.90 0.90 1.00 51 1.37% 2.5 2.5 1.2 328 1.13% 2.12 2.6 N/A N/A N/A 5.0 5.0 5.0 7 OS-6 No 0.92 0.92 1.00 N/A N/A N/A N/A 185 0.76% 1.74 1.8 402 0.74% 1.29 5.2 7.0 7.0 7.0 PROPOSED TIME OF CONCENTRATION COMPUTATIONS S. Thomas June 14, 2016 Design Point Sub-Basin Overland Flow Gutter/Pipe Flow Swale Flow Time of Concentration (Equation RO-4)  3 1 1 . 87 1 . 1 * S Ti C Cf L   6/14/2016 1:36 PM D:\Projects\1257-001\Drainage\Hydrology\1257-001_Conceptual Hydrologic Calculations.xlsx\Tc 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. North Historic Basin 2.68 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 2.675 0.25 0.25 0.31 0% South Historic Basin 0.53 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.535 0.25 0.25 0.31 0% Total Existing Site 3.21 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 3.210 0.25 0.25 0.31 0% A1 0.62 0.19 0.05 0.02 0.00 0.08 0.00 0.00 Clayey | Average 2% to 7% 0.277 0.62 0.62 0.77 51% A2 0.32 0.06 0.03 0.16 0.00 0.00 Clayey | Average 2% to 7% 0.081 0.77 0.77 0.97 69% A3 0.37 0.12 0.07 0.09 0.00 0.00 Clayey | Average 2% to 7% 0.087 0.79 0.79 0.98 72% A4 0.97 0.39 0.12 0.08 0.00 0.00 Clayey | Average 2% to 7% 0.388 0.67 0.67 0.84 58% A5 0.18 0.00 0.01 0.00 0.04 0.10 0.00 0.00 Clayey | Average 2% to 7% 0.031 0.73 0.73 0.91 65% UD-1 0.21 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.206 0.26 0.26 0.32 1% North Proposed Basin 2.68 0.75 0.28 0.02 0.04 0.51 0.00 0.00 Clayey | Average 2% to 7% 1.070 0.66 0.66 0.82 56% B1 0.33 0.13 0.04 0.09 0.00 0.00 Clayey | Average 2% to 7% 0.080 0.78 0.78 0.98 72% UD-2 0.18 0.00 0.05 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.136 0.43 0.43 0.53 23% UD-3 0.02 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.018 0.41 0.41 0.51 22% South Proposed Basin 0.53 0.13 0.09 0.00 0.00 0.09 0.00 0.00 Clayey | Average 2% to 7% 0.234 0.64 0.64 0.81 53% Total Proposed Site 3.21 0.88 0.37 0.02 0.04 0.60 0.00 0.00 Clayey | Average 2% to 7% 1.304 0.66 0.66 0.82 55% OS-1 0.77 0.00 0.00 0.00 0.77 0.00 Clayey | Average 2% to 7% 0.000 0.30 0.30 0.38 30% OS-2 0.24 0.00 0.00 0.00 0.24 0.00 Clayey | Average 2% to 7% 0.000 0.30 0.30 0.38 30% OS-3 1.05 0.00 0.00 0.00 1.05 0.00 Clayey | Average 2% to 7% 0.000 0.30 0.30 0.38 30% OS-4 1.21 0.00 0.00 0.00 0.42 0.79 Clayey | Average 2% to 7% 0.000 0.46 0.46 0.58 43% OS-5 0.23 0.13 0.07 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.018 0.90 0.90 1.00 89% OS-6 0.24 0.17 0.06 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.009 0.92 0.92 1.00 94% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 6/14/2016 1:35 PM D:\Projects\1257-001\Drainage\Hydrology\1257-001_Conceptual Hydrologic Calculations.xlsx\Composite C