April 13, 2016
Cathy Mathis
TB GROUP
444 MOUNTAIN AVENUE
Berthoud, CO 80525
RE: 2590 Midpoint Drive, PDP160010, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Meaghan Overton, at 970-416-2283 or moverton@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Meaghan Overton, 970-416-2283, moverton@fcgov.com
Topic: Building Elevations
Comment Number: 4 Comment Originated: 04/12/2016
04/12/2016: What is the material proposed for the non-metal portions of the
building façade? The elevations show “R1” but this refers to a roof system
element. The only wall systems I see listed are both metal accent panels.
Topic: General
Comment Number: 1 Comment Originated: 04/12/2016
04/12/2016: What is the intended use of the asphalt area at the back of the
site? Additional screening may be required.
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 04/12/2016
04/12/2016: The response letter indicated that there is a calculation showing
that 6% of the parking lot interior is devoted to landscaping. I don't see that on
the landscape plan. Please include this calculation.
Comment Number: 3 Comment Originated: 04/12/2016
04/12/2016: There does not appear to be any landscaping in the shrub beds
along the northeast lot line or on the southeast lot line. Consider adding shrubs
to enhance visual interest, particularly along the southeast side of the building
near Midpoint Drive.
Topic: Site Plan
Comment Number: 5 Comment Originated: 04/12/2016
04/12/2016: A total of 8 bicycle parking spaces will required. The requirement
for office use is a minimum of 4 bicycle parking spaces, regardless of the size
of the office space. The site plan currently shows 5 bicycle spaces, so 3 more
will need to be added.
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/12/2016
04/12/2016: Current driveway configuration does not conform to LCUASS
access spacing standards (Table 7-3). A variance request letter will need to be
prepared by a PE registered in the State of Colorado which outlines why the
current design meets or exceeds the intent of the standard.
Comment Number: 2 Comment Originated: 04/12/2016
04/12/2016: Additional right-of-way needs to be dedicated to accommodate
the master street planned major collector cross section (LCUASS Figure 7-4F).
ROW required for this cross section is 33 feet from the centerline. The sidewalk
should be designed and constructed in the ultimate location – the back of walk
should be the ROW line. Please label proposed vs existing ROW on site and
utility plans.
Comment Number: 3 Comment Originated: 04/12/2016
04/12/2016: The existing easement along Midpoint Drive (dedicated by
Prospect Industrial Park) appears to be about 6 feet long, which is what is
shown on the utility plans. New easement area will need to be dedicated by
separate document so that there is a 9 foot easement corridor behind the new
ROW line. The proposed easement should be shown on site and utility plans.
For more information about dedicating easements by separate document see:
http://www.fcgov.com/engineering/pdf/Easrowdedications2010.pdf
Comment Number: 4 Comment Originated: 04/12/2016
04/12/2016: A slope easement is shown on the site plan but not the utility plans.
Comment Number: 5 Comment Originated: 04/12/2016
04/12/2016: Please show pedestrian ramps on utility plans plan view.
Comment Number: 6 Comment Originated: 04/12/2016
04/12/2016: It appears that the fence currently sits in the ROW. This is
allowable only with the issuance of a revocable encroachment permit.
Encroachments should not be shown on the site plan because the permit can be
revoked at any time.
Comment Number: 7 Comment Originated: 04/12/2016
04/12/2016: Sidewalk chase detail needs to be updated – I can send this to
you if necessary.
Comment Number: 8 Comment Originated: 04/12/2016
04/12/2016: Notes 19, 41, EC 16 need to be revised.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/08/2016
04/08/2016: Please provide a seed mix (including scientific names) for the
native seed areas.
Comment Number: 2 Comment Originated: 04/08/2016
04/08/2016: The side slopes of the detention area should vary and range from
4:1 to 20:1 in slope, per the City of Fort Collins Stormwater Standards, which
would also create a more naturalistic appearance.
Comment Number: 3 Comment Originated: 04/08/2016
04/08/2016: Please add a note to the lighting plan that light fixture B should only
be installed in the down-directional configuration.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 04/13/2016
04/13/2016: In the plant list record sizes of trees and transplant method as B&B.
Size trees as follows.
Shade Trees 2.0 inch caliper
Ornamental Trees 1.5 inch caliper
Evergreen Trees 6 feet height
Comment Number: 2 Comment Originated: 04/13/2016
04/13/2016:
Shift the two street trees closest to the curb cut away some from the entry drive
to prove increase visibility.
Comment Number: 3 Comment Originated: 04/13/2016
04/13/2016:
If there are any existing trees on site contact the City Forester for an onsite
meeting to get tree inventory and protection information. For existing trees to
retain add the City of Fort Collins Planning Department tree protection notes.
Department: Historical Preservation
Contact: Maren Bzdek, 970-221-6206, mbzdek@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/01/2016
04/01/2016: The property does not contain buildings 50 years old or older, and
the proposed plans are unlikely to affect adjacent historic properties, if any.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/11/2016
04/11/2016: Electric power for this site is shown coming from an existing
120/208v 3-phase transformer NW of the site. This transformer does not look to
be in a utility easement. Verify that the transformer is in a utility easement. If a
utility easement does not exist, one will need to be dedicated for the service to
come from this transformer.
Comment Number: 2 Comment Originated: 04/11/2016
04/11/2016: Any relocation or modification to existing electric facilities will be at
the expense of the owner/developer. If Light & Power’s existing electric
facilities are to remain within the limits of the project they must be located within
a utility easement.
Comment Number: 3 Comment Originated: 04/11/2016
04/11/2016: A C-1 Form and a One-line diagram will need to be submitted to
Light & Power Engineering for review. Please click on the following link for the
C-1 Form.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 4 Comment Originated: 04/11/2016
04/11/2016: Electric Capacity Fee and Building Site charges will apply to this
development. Please click on the following link for Estimated Light & Power
charges and the Light & Power Fee calculator.
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 03/31/2016
03/31/2016: FIRE LANE
Emergency Access Easement details will be provided by time of FDP.
Comment Number: 2 Comment Originated: 03/31/2016
03/31/2016: DEAD-END FIRE LANES
Fire lanes exceeding 150' in length require an approved turnaround. Code
language provided below.
FCLUC 3.6.2(B)2006; IFC 503.2.5 and Appendix D: Dead-end fire apparatus
access roads cannot exceed 660 feet in length. Dead-end fire access roads in
excess of 150 feet in length shall be provided with an approved area for turning
around fire apparatus
Comment Number: 3 Comment Originated: 03/31/2016
03/31/2016: FIRE LANE SIGNAGE
Limits of fire lane need to be identified with signage. Please label sign locations
on subsequent plans. Code language below.
> IFC D103.6: Where required by the fire code official, fire apparatus access
roads shall be marked with permanent NO PARKING - FIRE LANE signs
complying with Figure D103.6. Signs shall have a minimum dimension of 12
inches wide by 18 inches high and have red letters on a white reflective
background. Signs shall be posted on one or both sides of the fire apparatus
road as required by Section D103.6.1 or D103.6.2.
Comment Number: 4 Comment Originated: 04/12/2016
04/12/2016: WATER SUPPLY
The proposed hydrant on the property is not required.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 04/12/2016
04/12/2016: Please provide a drainage basin map with the report/plans.
Comment Number: 3 Comment Originated: 04/12/2016
04/12/2016: It is noted that Basin 1 will be sharing a detention basin with the
adjacent property. It doesn't appear that easement will be required as the
properties are owned by the same party. Please document the required volume
for the adjacent property or include in the basin sizing calculations.
Comment Number: 4 Comment Originated: 04/12/2016
04/12/2016: Please review Fort Collins Criteria for C-factor and recalculate.
Comment Number: 5 Comment Originated: 04/12/2016
04/12/2016: Please review the time of concentration and associated rainfall
intensities using in the runoff calculations.
Comment Number: 6 Comment Originated: 04/12/2016
04/12/2016: What is sub-basin P1? It is seen in the calculations, but other
references remain unseen.
Comment Number: 7 Comment Originated: 04/12/2016
04/12/2016: If the effective imperviousness is to be used for WQCV
calculations, please use Level 1 as it doesn't appear that Level 2 is being met.
Comment Number: 8 Comment Originated: 04/12/2016
04/12/2016: Please revise methods used to calculate detention volumes as the
Urban Drainage spreadsheet used does not use Fort Collins Criteria.
Comment Number: 9 Comment Originated: 04/12/2016
04/12/2016: How was the designed outfall rate of 0.14 cfs/acre determined?
Please show calculation for 2-year historic runoff rate.
Comment Number: 10 Comment Originated: 04/12/2016
04/12/2016: Please expand the drainage report narrative overall to give a
better understanding of the proposed development. A number of things are
currently unclear with the project including how the LID requirements are being
met and what is ultimately being proposed for the 2 detention basins. Are both
water quality and LID being proposed for the detention basin bottoms? Please
expand to help clarify the overall design.
Comment Number: 11 Comment Originated: 04/12/2016
04/12/2016: Please discuss and document how LID requirements are being
met. A table would be helpful for this and a sample table can be downloaded at:
http://tinyurl.com/SampleLIDTable.
Comment Number: 12 Comment Originated: 04/12/2016
04/12/2016: Please use City details in their original state if they are not being
altered.
ANY modification(s) must be clearly distinguished and all City logos/identifiers
must be removed from the modified detail. Detail drawings can be found in
both .pdf and .dwg formats through the links to “Construction Drawings” on
www.fcgov.com/utility-development.
Comment Number: 13 Comment Originated: 04/12/2016
04/12/2016: Please see redlined plans and drainage report. Please return with
resubmittal.
Comment Number: 14 Comment Originated: 04/12/2016
04/12/2016: Please note that additional comments may be forthcoming upon
future submittals as additional details are discovered.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/29/2016
03/29/2016: Current Erosion Control Materials Submitted do not meet
requirements. Please submit; Erosion Control Plan (based upon redlines),
Erosion Control Report (Based upon comments returned to the planner on
3/29/2016) , and an Escrow / Security Calculation (with the correct method for
calculating an escrow see redline comments in the report). If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 4 Comment Originated: 04/13/2016
04/13/2016: There are text over text issues. See redlines.
Comment Number: 5 Comment Originated: 04/13/2016
04/13/2016: Please change "Fort Collins" to "Prospect Industrial Park" in the
title block. See redlines.
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 04/13/2016
04/13/2016: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX’.
Comment Number: 8 Comment Originated: 04/13/2016
04/13/2016: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
Comment Number: 9 Comment Originated: 04/13/2016
04/13/2016: All benchmark statements must match on all sheets.
Comment Number: 10 Comment Originated: 04/13/2016
04/13/2016: There are line over text issues. See redlines.
Comment Number: 11 Comment Originated: 04/13/2016
04/13/2016: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 12 Comment Originated: 04/13/2016
04/13/2016: There are cut off text issues. See redlines.
Comment Number: 13 Comment Originated: 04/13/2016
04/13/2016: There are duplicated text issues. See redlines.
Comment Number: 14 Comment Originated: 04/13/2016
04/13/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 04/13/2016
04/13/2016: Please change the "Lightfield Enterprises Lot 2" to "Lot 1, LEI
Subdivision" or remove completely. See redlines.
Topic: Lighting Plan
Comment Number: 6 Comment Originated: 04/13/2016
04/13/2016: Please change "Fort Collins" to "Prospect Industrial Park" in the
title block. See redlines.
Topic: Site Plan
Comment Number: 1 Comment Originated: 04/13/2016
04/13/2016: There are line over text issues. See redlines.
Comment Number: 2 Comment Originated: 04/13/2016
04/13/2016: Please provide information documenting a 9' Utility Easement
along Midpoint Drive. The Plat shows a 6' Utility Easement.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/12/2016
04/12/2016: no comments from traffic or transportation planning.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/11/2016
04/11/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/12/2016
04/12/2016: Please show curb stop on 1" water service.
Comment Number: 2 Comment Originated: 04/12/2016
04/12/2016: A 6" sanitary service connection into an 8" main requires either
connecting at a manhole or cutting in a tee.
Comment Number: 3 Comment Originated: 04/12/2016
04/12/2016: Is the proposed fire hydrant required? If not required, it would be
preferable to remove it from the design. If required, the main and hydrant will
need to be located within an easement.
Comment Number: 4 Comment Originated: 04/12/2016
04/12/2016: Please add valves on fire line and hydrant per redlines.
Comment Number: 5 Comment Originated: 04/12/2016
04/12/2016: Please utilize City details for hydrant, bedding, etc.
Please note that all City construction detail drawings are to be used in their
original, unaltered state. ANY modification(s) must be clearly distinguished and
all City logos/identifiers must be removed from the modified detail. Detail
drawings can be found in both .pdf and .dwg formats through the links to
“Construction Drawings” on www.fcgov.com/utility-development.
Comment Number: 6 Comment Originated: 04/12/2016
04/12/2016: Please see redlines and return with resubmittal.
Comment Number: 7 Comment Originated: 04/12/2016
04/12/2016: Please note that additional comments may be forthcoming upon
future submittals as additional details are discovered.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/12/2016
04/12/2016: The trash/recycling enclosure needs a separate walk-in access
from the main service gate.
Comment Number: 2 Comment Originated: 04/12/2016
04/12/2016: Please label the length dimension of the stalls along the west side.
Comment Number: 3 Comment Originated: 04/12/2016
04/12/2016: Please identify the fence material of the existing fence? Will it
provide screening? Is it more than chain link?
Comment Number: 4 Comment Originated: 04/12/2016
04/12/2016: Why are there not trees in all the landscape islands in the parking
lot?