Loading...
HomeMy WebLinkAboutARROWHEAD COTTAGES - MJA/FDP - FDP160004 - REPORTS - STORMWATER-RELATED DOCUMENTS301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com LID Conformance Report Date: June 3, 2016 Project: Arrowhead Cottages Project No. 374-018 Fort Collins, CO Attn: Stormwater Staff City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 Stormwater Staff: This letter serves to document conformance of the above referenced project with City of Fort Collins Low Impact Development (LID) requirements. In particular, the project is meeting Section 3.1 of the Fort Collins Stormwater Amendments to the Urban Drainage and Flood Control District Criteria Manual, including Section 3.1 (a)(1) requiring that no less than 50% of any newly added impervious area be treated using one or more LID techniques and Section 3.1(a)(2) requiring that no less than 25% of all new paving use a permeable pavement technology that is considered an LID technique. Section 3.1(a)(1) The project as a whole is proposing 0.491 acres of new on-site impervious area. This results in a minimum required LID treatment area of 0.245 acres. The project is treating 0.060 acres of on-site impervious area by pavers (directly or indirectly). 0.042 acres of permeable pavers will receive 0.018 acres of adjacent impermeable runoff. The project is treating 0.086 acres of on-site impervious areas using a Rain Garden. Roof drains will be collected by an underground storm sewer system and direct runoff from these areas to a rain garden located immediately west of the garage. This rain garden will be adequately sized to treat stormwater during a minor event. During larger events, the rain garden will overtop into the existing nearby detention facility. The project is treating 0.103 acres of on-site impervious area using a Bio-swale with Soft Bottom. The primary source of impervious area is the south half of Building 2, which will directly drain into the Bio-swale Low Impact Design feature. The bio-swale will have a designed section that will treat stormwater during minor events. An underdrain will collect the treated stormwater and discharge into the Centre Avenue Right- of-Way. Larger events will overtop directly into the adjacent Centre Avenue Right-of-Way. The total on-site project area treated by LID techniques is 0.249 acres, which is 50.7% of the total new impervious area. Section 3.1(a)(2) The project as a whole is proposing 0.163 acres of new impervious paving. This results in a minimum required permeable paving area of 0.041 acres. The project has evaluated various areas for pavers to provide LID treatment to multiple areas of the Site. The total area of permeable pavers provided by the project is 0.042 acres, which is 25.8% of the total new paving. Arrowhead Cottages LID Report An exhibit has been provided to illustrate the topics outlined, and calculations supporting the LID techniques. Please feel free to contact me if you have any questions. Sincerely, Danny Weber, PE Project Engineer ATTACHMENTS: Low Impact Development (LID) Treatment Exhibit UD UD UD UD UD WV T T T T G G G G G G G G G G G G T T T T T T T T V AULT ELEC GAS V.P. ST ST ST ST ST ST 21" SS 21" SS 21" SS 21" SS 21" SS 21" SS 21" SS ST ST ST ST ST ST ST ST 8" SS 8" SS 8" SS 8" SS 8" SS T T T T T T T T ST E E E E E E 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W CONTROL IRR F E S S h2o H2O C S W H Y D S S C.O. C.O. C.O. C.O. WV H2O W ST ST ST ST 6" W 6" W D D D CENTRE AVENUE WORTHINGTON CIRCLE STUCCO BUILDING FFE=~5048.1 EXISTING APARTMENT BUILDING FFE=~5049.0 NEW MERCER DITCH PROPOSED BIO-SWALE PROPOSED BIO-SWALE IMPERVIOUS AREA TREATED BY BIO-SWALE BLDG 2 BLDG 1 PROPOSED RAIN GARDEN GARAGE IMPERVIOUS AREA TREATED BY RAIN GARDEN IMPERVIOUS AREA TREATED BY RAIN GARDEN PROPOSED PERMEABLE PAVERS RUN-ON AREA FOR PERMEABLE PAVERS Dr Fl i c k e Cant er bur y Rai nt r ee Ln H i l l P o n Mi r r o r ma r e Ci r Gi l gal ad Wa y A ve Av e Dr Dr Sq Worthington Cl Centre eel Dr Haven Dr Suddering Spring Creek Heatheridge Ct Woodcrest Ct l e n b u r g Dr Waters Edge Winterberry Way d Rd Trail Wind Weathertop Ln Meadowlark Dr Davidson Winchester Dr Powderhorn Dr Stagecoach Ave Snowberry Rd Park Ct W Stuart St Chetwood Dr Dr PROJECT LOCATION DRAKE ROAD SHIELDS STREET LOW IMPACT DEVELOPMENT (LID) TREATMENT EXHIBIT LID-1 FORT COLLINS, CO ARROWHEAD COTTAGES E NGINEER ING N O R T H E RN 06.03.16 D:\PROJECTS\374-018\DRAINAGE\REPORTS\LID REPORT\374-018_LID.DWG LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PERMEABLE PAVERS RUN-ON AREA FOR PERMEABLE PAVERS IMPERMEABLE AREA TREATED BY LID ( IN FEET ) 0 1 INCH = 40 FEET 40 40 50% On-Site Treatment by LID Requirement New On-Site Impervious Area 0.491 Ac. Paver Area 0.042 Ac. Traditional Pavement Area 0.120 Ac. Other Impervious Surfaces (Roofs, Concrete Walks, etc.) 0.329 Ac. Required Minimum Impervious Area to be Treated 0.245 Ac. Paver LID Treatment Paver area 0.042 Ac. Run-on area for Paver 0.018 Ac. Impervious Area Treated by LID Pavers 0.060 Ac. Rain Garden Treatment Impervious Area Treated by Rain Garden 0.086 Ac. Bio Swale with Soft Bottom Treatment Impervious Area Treated by Bio Swale 0.103 Ac. Total On-Site Impervious Area Treated 0.249 Ac. Percent of On-Site Impervious Area Treated 50.7 % 25% Permeable Pavement Requirement New Pavement Area 0.163 Ac. Required Minimum Area of Permeable Pavement 0.041 Ac. Total Permeable Pavement Area 0.042 Ac. Actual % of Permeable Pavement Provided 25.8 %