May 10, 2013
Terence Hoaglund
Vignette Studios
P.O. Box 1889
Fort Collins, CO 80522-1889
Comment Summary:
Department: Current Planning
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
05/03/2013: Landscape plan will need to add one street tree per lot frontage, or possibly more
for the wider lots, per section 3.2.1(D)(2)(a).
Comment Number: 1 Comment Originated: 05/03/2013
05/03/2013: Show species diversity chart. Add a note about 8' driveway separation
requirement for street trees, also per section 3.2.1(D)(2)(a).
Comment Number: 2 Comment Originated: 05/03/2013
05/10/2013: Please add a note to the plan that how the project plan will comply with 3.5.2(B)(1
and 2) for housing model variety.
Comment Number: 3 Comment Originated: 05/10/2013
05/10/2013: Traffic study will need to be reviewed and approved prior to hearing.
Comment Number: 4 Comment Originated: 05/10/2013
05/10/2013: Please show all site walls on site and landscape plans and show sufficient plan
and section detail / labeling to explain the wall height(s) and that the wall can be constructed
without encroachment onto adjacent properties. Please indicate general wall material and
color.
Comment Number: 5 Comment Originated: 05/10/2013
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126
or jholland@fcgov.com.
RE: Spring Creek Farms North Fourth Filing, PDP130014, Round Number 1
Page 1 of 8
Department: Current Planning
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
05/10/2013: A condition for hearing will likely be needed that describes the need for a Minor
Amendment of Spring Creek Farms Filing 2 to address water quality requirements. This
amendment would be processed in conjunction with final plans.
Comment Number: 6 Comment Originated: 05/10/2013
05/10/2013: Comcast had the following comments: Rear lot: 6' easement required on both
sides of property, Block 6 not 3' easement. Block 5 Lots 5-8 need 6' utility easement. Contact:
Don Kapperman 970-567-0245
Comment Number: 7 Comment Originated: 05/10/2013
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
05/08/2013: Thank you for providing overlay callouts along Joseph Allen Drive between
Charles Brockman and Nancy Gray Avenue. Please note that triple street cuts will apply for the
utility cut on Joseph Allen south of Charles Brockman and as will if the Curb cut on Joseph
Allen extends into the asphalt.
Comment Number: 3 Comment Originated: 05/08/2013
05/08/2013: Provide more detail and ensure that the block wall running along the west side of
the property may be constructed without disturbing the adjacent railroad property. If the wall
can't be constructed without being on adjacent property than a letter of intent will be required
from that property owner and ultimately a temporary construction easement or grading
easement.
Comment Number: 4 Comment Originated: 05/08/2013
05/08/2013: Ensure that proper cover is being met over all storm sewer crossings of Public
Roadways. It appears that the storm sewer crossing of Adobe near the park might not meet the
36" clearance between top of pipe and top of asphalt requirement.
Comment Number: 5 Comment Originated: 05/08/2013
05/08/2013: With proposed cut along the centerline of Adobe at the existing irrigation crossing
there is concerns of the amount of cover over that irrigation line. 36" of cover from top of pipe
to top of asphalt is required.
Comment Number: 6 Comment Originated: 05/08/2013
05/08/2013: Please review the proposed K values and Vertical Curve lengths on many of the
proposed street profiles as a few of them appear to not meet standards. Most of these curves
occur near the intersections so additional discussion may be required to talk about grade
breaks, vertical curves, stop conditions, etc.
Comment Number: 7 Comment Originated: 05/08/2013
05/10/2013: A pedestrian connection was built along Drake to connect S.C.F. 2nd to the trail
adjacent to the rail road tracks. Provide a connection to the Drake pedestrian connection, this
can be concrete or temporary asphalt.
Comment Number: 10 Comment Originated: 05/10/2013
Page 2 of 8
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
05/10/2013: The Storm sewer proposed in the park will require an easement as this is an
offsite improvement.
Comment Number: 12 Comment Originated: 05/10/2013
Topic: General
05/10/2013: It is recommended that a Utility Coordination meeting be held for this project. This
is due to the close proximity of utilities within the private drive as well as a retaining wall sharing
a good length of the back of lot utility easements on the west side.
Comment Number: 9 Comment Originated: 05/10/2013
Topic: Plat
05/08/2013: Label all right of way for proposed streets with dimensions and labels.
Comment Number: 1 Comment Originated: 05/08/2013
05/08/2013: Provide 10' x 10' site triangle easements at the corners of the private drive and
Adobe Drive intersection.
Comment Number: 2 Comment Originated: 05/08/2013
Topic: Site Plan
05/08/2013: The site plan shows Adobe Drive as 51' ROW and Civil and Plat show 53' of ROW
for the rollover curb cross section.
Comment Number: 8 Comment Originated: 05/08/2013
05/10/2013: Show the back of lot fence locations along the Private Drive on the Site Plan and
Civil Plans. Their may be a minimum width required by zoning between the fences on either
side of the Drive.
Comment Number: 11 Comment Originated: 05/10/2013
05/10/2013: The site plan and civil drawings appear to be inconsistent with Storm Sewer shown
along Joseph Allen Drive and specifically at Charles Brockman and Joseph Allen.
Comment Number: 13 Comment Originated: 05/10/2013
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
05/08/2013: No comments.
Comment Number: 1 Comment Originated: 05/08/2013
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Page 3 of 8
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
05/08/2013:
Provide a landscape plan that includes street tree locations labeled as to species. Select
species from the City of Fort Collins street tree list.
Comment Number: 1 Comment Originated: 05/08/2013
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
04/30/2013: Please coordinate electric requirements and electric development charges with
Light & Power Engineering at (970)221-6700.
Comment Number: 1 Comment Originated: 04/30/2013
Department: Park Planning
Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com
Topic: General
04/17/2013: No comments
Comment Number: 1 Comment Originated: 04/17/2013
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
05/09/2013: WATER SUPPLY
After further review, the hydrant placement on the development and adjacent to the site is
satisfactory. No changes need be made.
Comment Number: 01 Comment Originated: 05/09/2013
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
04/30/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion
and Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements.
Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Comment Number: 1 Comment Originated: 04/30/2013
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Page 4 of 8
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
05/08/2013: The PDP needs to show how it will meet the LID requirements, specifically 50% of
the land area being treated by an infiltrating water quality method. This site will not have any
pavement areas that will need to be porous.
Comment Number: 2 Comment Originated: 05/08/2013
05/08/2013: PDP is ready for a hearing by Stormwater once comment 2 is addressed.
Comment Number: 3 Comment Originated: 05/08/2013
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
05/08/2013: Please correct the description on sheet C-002 for benchmark 17-92.
Comment Number: 11 Comment Originated: 05/08/2013
05/08/2013: There is a missing reception number on sheet C-004, C-009 & C-011 for a
temporary construction & grading easement. See redlines.
Comment Number: 12 Comment Originated: 05/08/2013
05/08/2013: There are line over text issues on sheets C-008, C-009, C-012, C-013, C-014,
C-016. See redlines.
Comment Number: 13 Comment Originated: 05/08/2013
05/08/2013: Please improve the quality of the metal sidewalk culvert detail on sheet C-017.
See redlines.
Comment Number: 14 Comment Originated: 05/08/2013
Topic: General
05/08/2013: Please change the Railroad name from "Burlington Northern" to Union Pacific" on
all Site & Landscape Plans. See redlines.
Comment Number: 1 Comment Originated: 05/08/2013
05/08/2013: Please add "North" to Spring Creek Farms on all Site & Landscape Plans. See
redlines.
Comment Number: 2 Comment Originated: 05/08/2013
05/08/2013: Please change the title to "Spring Creek Farms North Filing No. 4" on all Site &
Landscape Plans. See redlines.
Comment Number: 3 Comment Originated: 05/08/2013
Topic: Landscape Plans
05/08/2013: There are line over text issues on sheets 4 & 5. See redlines.
Comment Number: 10 Comment Originated: 05/08/2013
Topic: Plat
05/08/2013: Please change "men" to "persons" in the Statement Of Ownership And
Subdivision.
Comment Number: 15 Comment Originated: 05/08/2013
Page 5 of 8
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
05/08/2013: Make sure that all language is the most current.
Comment Number: 16 Comment Originated: 05/08/2013
05/08/2013: The boundary & legal description close.
Comment Number: 17 Comment Originated: 05/08/2013
05/08/2013: Are there any Lienholders? If so, please add the Lienholders signature block.
Comment Number: 18 Comment Originated: 05/08/2013
05/08/2013: Please add "as Manager of SC Residential, LLC, a Colorado Limited Liability
Company" to the Owners signature block. See redlines.
Comment Number: 19 Comment Originated: 05/08/2013
05/08/2013: Please explain Existing Easement Note #1.
Comment Number: 20 Comment Originated: 05/08/2013
05/08/2013: Please correct the spelling of dedicated in Existing Easement Note #2. See
redlines.
Comment Number: 21 Comment Originated: 05/08/2013
05/08/2013: C.R.S. 38-51-106 requires all recorded rights of way and easements to be shown,
together with the source from which such recorded rights of way and easements were obtained.
Please ammend Surveyor's Note #2 accordingly, or obtain a title commitment for the property.
Comment Number: 22 Comment Originated: 05/08/2013
05/08/2013: Please correct the typos in Surveyor's Note #5. See redlines.
Comment Number: 23 Comment Originated: 05/08/2013
05/08/2013: Please note who own & maintains Tract D, and what it's use will be.
Comment Number: 24 Comment Originated: 05/08/2013
05/08/2013: Please add "Part of" to the Outlot A, Spring Creek Farms North labels. See
redlines.
Comment Number: 25 Comment Originated: 05/08/2013
05/08/2013: Please provide the current monument records for the public land corners used for
control.
Comment Number: 26 Comment Originated: 05/08/2013
05/08/2013: Please show the controlling corner at the south end of the west right of way of
Joseph Allen Drive on sheet 2. See redlines.
Comment Number: 27 Comment Originated: 05/08/2013
05/08/2013: Are the corners of Tract A, Spring Creek Farms North Filing No. 3 found? Wouldn't
they be recently set?
Comment Number: 28 Comment Originated: 05/08/2013
05/08/2013: There are line over text issues on sheet 2. See redlines.
Comment Number: 29 Comment Originated: 05/08/2013
Page 6 of 8
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
05/08/2013: Please make all text plan readable. The sheets should be read from the bottom
and/or right side.
Comment Number: 30 Comment Originated: 05/08/2013
05/08/2013: Does a portion of the Cargill Irrigation Easement lie on Lot 1, Block 1? See
redlines.
Comment Number: 31 Comment Originated: 05/08/2013
05/08/2013: Please correct the spelling of separate on sheet 4. See redlines.
Comment Number: 32 Comment Originated: 05/08/2013
05/08/2013: Please provide the missing reception number on sheet 4 prior to filing mylars.
See redlines.
Comment Number: 33 Comment Originated: 05/08/2013
Topic: Site Plan
05/08/2013: What is the Lot 3 shown on sheet 1 south of the project? This area was platted as
Outlot A, Spring Creek Farms North.
Comment Number: 4 Comment Originated: 05/08/2013
05/08/2013: Please correct the easement labels on sheets 2 & 3. See redlines.
Comment Number: 5 Comment Originated: 05/08/2013
05/08/2013: There are line over text issues on sheets 2 & 3. See redlines.
Comment Number: 6 Comment Originated: 05/08/2013
05/08/2013: There is cut off text on sheets 2 & 3. See redlines.
Comment Number: 7 Comment Originated: 05/08/2013
05/08/2013: Please correct the right of way width of Sdobe Drive on sheet 2. See redlines.
Comment Number: 8 Comment Originated: 05/08/2013
05/08/2013: There is text that needs to be rotated 180 degrees, to be plan readable on sheets
2 & 3. See redlines.
Comment Number: 9 Comment Originated: 05/08/2013
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Construction Drawings
05/07/2013: Sht 17: Figure 1401; please revise or add notes to state the street name size as
12" in height, and the Stop sign is a 36" sign.
Comment Number: 4 Comment Originated: 05/07/2013
Topic: Site Plan
05/07/2013: Please remove the crosswalk striping on Joseph Allen shown on the Site Plans
and the Landscape Plans.
Comment Number: 2 Comment Originated: 05/07/2013
Page 7 of 8
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Site Plan
05/07/2013: Sheet 1: Please remove the striping shown on Timberline Road and on Drake
Road.
Comment Number: 3 Comment Originated: 05/07/2013
Topic: Traffic Impact Study
05/07/2013: Traffic Operations acknowledges approval to submit the initial TIS late, but no later
than with the 2nd submittal.
Comment Number: 1 Comment Originated: 05/07/2013
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
05/07/2013: What is the distance from water main to face of curb on Nancy Gray? (It's difficult to
tell at 60-scale.)
Comment Number: 1 Comment Originated: 05/07/2013
05/07/2013: Schedule a meeting to review water/sewer mains and services in the two
cul-de-sacs and the water/sewer service locations on the lots.
Comment Number: 2 Comment Originated: 05/07/2013
05/07/2013: On Nancy Gray and Charles Brockman, City maps show MH's at the ends of the
existing sewers extending west of Joseph Allen.
Comment Number: 3 Comment Originated: 05/07/2013
05/07/2013: Drive locations are shown on the utility plans. Will these be fixed locations?
Comment Number: 4 Comment Originated: 05/07/2013
05/07/2013: The utility services to the lots on the south side of the private drive (Tract D) will
likely be problematic. The fences also restrict access to the curb stops and meter pits. A
utility coordination meeting is needed.
Comment Number: 5 Comment Originated: 05/07/2013
05/07/2013: See redlined utility plans for other comments.
Comment Number: 6 Comment Originated: 05/07/2013
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
04/29/2013: The landscaping is not showing on the landscape plan nor is the legend showing
any of the quantities. This will need to be corrected.
Comment Number: 1 Comment Originated: 04/29/2013
Page 8 of 8