HomeMy WebLinkAboutTHE LYRIC CINEMA CAFE - PDP - PDP160008 - CORRESPONDENCE - REVISIONSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview April 12, 2016 (Lyric Design Team Response: May 4, 2016) Glozer, LLC 109 S. Sherwood Street Fort Collins, RE: The Lyric Cinema Cafe, PDP160008, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com. Comment Summary: Department: Planning Services Contact: Jason Holland, 970-224-6126, jholland@fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/06/2016 04/06/2016: Elevations: On the elevation sheets, add dimensions to the top of roofline of the various portions of the building and an overall maximum height to the top of the tower. U|R Response: Complete, thank you. Comment Number: 2 Comment Originated: 04/06/2016 04/06/2016: Elevations: Under the building sign label, add (separate permit required prior to installation of the sign). Also add note 7 from the site plan notes in a bold text box on this plan. U|R Response: Complete, thank you. Comment Number: 3 Comment Originated: 04/06/2016 04/06/2016: Elevations: It might help to add a few axon views on the plan or a separate sheet to help explain the massing depth and bldg. components. Could also add the rendering. U|R Response: Complete, thank you. Comment Number: 4 Comment Originated: 04/06/2016 04/06/2016: Site Plan Details: Add a detail that explains the materials/color/height/design of the trash/recycling enclosure. Enclosure needs to show gates on the plan. Also need a detail for the south retaining wall with the same. U|R Response: Complete, thank you. DDS Response: South retaining wall details currently being resolved with structural. Comment Number: 5 Comment Originated: 04/06/2016 04/06/2016: Site and Landscape plan: Both plans are difficult to read, would suggest removing some of the information from the plans and simplifying these sheets. Also need some additional labeling for the major plans elements, walls etc. as well as dimensions. See civil set for example. DDS Response: Plans have been updated, thank you. Comment Number: 6 Comment Originated: 04/06/2016 04/06/2016: Parking memo- Please change title to Traffic and Alternative Parking Memo. Add a simple breakdown of how the 68 parking spaces were determined by LUC standards. This needs to reflect that only a 10% deduct is allowed for bike/ped combined. U|R Response: Complete, thank you. Department: Engineering Development Review Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com Topic: General Comment Number: 2 Comment Originated: 04/06/2016 04/06/2016: Remove the "s" in Lyric Cinemas for the title of the Utility Plan. This should match the plat. NE Response: The “s” has been removed from the title. Comment Number: 7 Comment Originated: 04/06/2016 04/06/2016: Label width of existing walk on College Avenue. Show the ADA ramp as well. NE Response: The existing sidewalk width along College Avenue has been labeled. Comment Number: 8 Comment Originated: 04/06/2016 04/06/2016: Show dimensions of easements on site. NE Response: Proposed easement are dimensioned and labeled. Comment Number: 9 Comment Originated: 04/06/2016 04/06/2016: Label future Mason Street on the Utility Plans NE Response: Mason Street has been labeled as “future”. Comment Number: 10 Comment Originated: 04/06/2016 04/06/2016: Will the retaining wall construction to the south of the property require an offsite construction easement? If so, a letter of intent will be needed prior to hearing. U|R Response: No easement necessary. Noted, thank you. Comment Number: 11 Comment Originated: 04/06/2016 04/06/2016: A reimbursement is due to the City for the construction of the local portion of College Avenue prior to the issuance of the first building permit. Curb, gutter, sidewalk and parkways were installed with the North College Improvements. Details will be included in the Development Agreement. U|R Response: Noted, thank you. Comment Number: 12 Comment Originated: 04/06/2016 04/06/2016: A payment in lieu will be needed for the local portion of Mason Street. Details will be included in the Development Agreement. U|R Response: Complete, thank you. Topic: Plat Comment Number: 3 Comment Originated: 04/06/2016 04/06/2016: Add the following note to the plat: “There shall be no private conditions, covenants or restrictions that prohibit or limit the installation of resource conserving equipment or landscaping that are allowed by sections 12-120 – 12-122 of the City Code.” NE Response: Specified note has been added to plat. Comment Number: 4 Comment Originated: 04/06/2016 04/06/2016: Leave a Reception # space for the Utility Easement to be vacated by separate document. NE Response: A space has been added for utility easement reception number. Comment Number: 5 Comment Originated: 04/06/2016 04/06/2016: Is there a reason the 10' Utility Easement is being vacated by separate document? Can we vacate via the plat? NE Response: We will confirm the owner of the existing easement. If the owner is the City than yes we can vacate existing easement via the plat since the City will be signing the plat. If the owner is not the City then the owner of the easement will need to sign the plat if easement is intended to get vacated per plat or it will have to be vacated via separate document. Comment Number: 6 Comment Originated: 04/06/2016 04/06/2016: Remove lot lines that are existing on the plat. With this plat, a Lot should be created. NE Response: Existing lot lines have been removed. Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/30/2016 03/30/2016: The plat does not identify the total acreage being platted. This information is needed in order to confirm and calculate the TDRFees. NE Response: The total area is shown on the plat (acres and square feet). Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: General Comment Number: 4 Comment Originated: 04/05/2016 04/05/2016: There may be an opportunity to partner with the Nature in the City program or Audubon Rockies to create additional habitat for birds, butterflies, and other species on this site, perhaps in the rain garden area. Let me know if you're interested in pursuing this opportunity further. DDS Response: Noted, thank you. Topic: Landscape Plans Comment Number: 1 Comment Originated: 04/05/2016 04/05/2016: There are two species shown on the landscape plan that are not on the City's approved plant list: Agave havardiana and Nassella tenuissima. Please substitute with plants that are on the approved list (such as Agave neomexicana and Calamagrostis acutiflora). The City plant list is available here: http://www.fcgov.com/developmentreview/pdf/2011approvedplantlist.pdf DDS Response: Substitutions include: Agave neomexicana and Pennisetum alopecuroides ‘Moudry’. Plant list has been updated, thank you. Comment Number: 2 Comment Originated: 04/05/2016 04/05/2016: What species will be used for the fescue turf? Please include on the landscape plan. DDS Response: Festuca elatior. Plant list has been updated, thank you. Topic: Lighting Plan Comment Number: 3 Comment Originated: 04/05/2016 04/05/2016: In regard to LED light fixtures, IDA (International Dark-Sky Association) recommends using lighting that has a color temperature of no more than 3000 degrees Kelvin in order to limit the amount of blue light in the night environment, as blue light brightens the night sky more than any other color of light. Both LED and metal halide fixtures contain large amounts of blue light in their spectrum, and exposure to blue light at night has been shown to harm human health and endanger wildlife. Please consider a warmer color temperature (3000K or less) for light fixtures B, C, D, E,F, G, and H. Please also consider fixtures with dimming capabilities so that light levels can be adjusted if needed. PEC Response: These recommendations will be considered during the design phase. Department: Historical Preservation Contact: Maren Bzdek, 970-221-6206, mbzdek@fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/05/2016 04/05/2016: No effect. The property does not contain buildings 50 years old or older, and the proposed plans are unlikely to affect adjacent historic properties. U|R Response: Noted, thank you. Department: Internal Services Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 04/06/2016 04/06/2016: Building Permit Pre-Submittal Meeting: Pre-Submittal meetings are required to assist the designer/builder by assuring, early on in the design, that the new commercial or multi-family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid-design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi-family projects are advised to call 416-2341 to schedule a pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2012 International Building Code (IBC) 2012 International Residential Code (IRC) 2012 International Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (IPC) as amended by the State of Colorado 2014 National Electrical Code (NEC) as amended by the State of Colorado Fort Collins has amendments to most of the codes listed above. See the fcgov.com web page to view them. Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC. 2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter. 3. Commercial and Multi-family 4 stories and taller 2012 IECC. Lyric – project specific concerns: 1. Upgraded insulation is required for buildings using electric heat or cooling. 2. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min. if building located within 1000ft to train tracks. 3. Low-flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required. 4. Special combustion safety requirements for natural draft gas appliances. 5. Low VOC interior finishes. City of Fort Collins Building Services Plan Review 416-2341 U|R Response: Complete, thank you. We will look set up a meeting the first week of June. Department: Light And Power Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/01/2016 04/01/2016: New development and system modification charges will apply. Please reference our online electric estimator for new development charges. A link to this is below. http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen t-development-fees/electric-development-fee-estimator?id=3 U|R Response: Noted, thank you. Comment Number: 2 Comment Originated: 04/01/2016 04/01/2016: Currently there is overhead power line that feeds the residence located at 1203 North College. Modification charges will apply to remove the secondary service off of this pole. We cannot relocate existing power poles and must be converted underground. Coordination will need to be done with this property owner to feed primary line from oval vault off of North College and set a pad mount transformer at this location and/or feed the secondary service from Lyiric Cinema transformer if proper phasing and voltage is satisfied. NE Response: A meeting will be held with Lyric Cinema Owner and property owner to the south for new electrical service to existing building. Revisions will be made to Utility Drawing during final design to reflect what was agreed upon per meeting. Comment Number: 3 Comment Originated: 04/01/2016 04/01/2016: Power is currently available along North College located at the SE corner of the lot in the right of way. NE Response: Noted, thank you. Comment Number: 4 Comment Originated: 04/01/2016 04/01/2016: Please reference our Electric Construction Policies, Practices and Procedures to ensure all transformer and metering requirements are met. Please coordinate transformer and meter location with Light & Power. http://www.fcgov.com/utilities/business/builders-and-developers/development-fo rms-guidelines-regulations U|R Response: Noted, thank you. Comment Number: 5 Comment Originated: 04/01/2016 04/01/2016: A completed one-line diagram and Commercial Service Form (C-1) will need to be filled out entirely to ensure proper transformer sizing and metering requirements are met. A link to this C-1 form is below. http://www.fcgov.com/utilities/business/builders-and-developers/development-fo rms-guidelines-regulations PEC Response: This form will be filled out with the permit set submittal. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 04/05/2016 04/05/2016: FIRE LANE SIGNS No parking - fire lane signs will be required to delineate the limits of the EAE. Please label fire lane signs on future plans. Code language provided below. > IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked with permanent NO PARKING - FIRE LANE signs complying with Figure D103.6. Signs shall have a minimum dimension of 12 inches wide by 18 inches high and have red letters on a white reflective background. Signs shall be posted on one or both sides of the fire apparatus road as required by Section D103.6.1 or D103.6.2. NE Response: Fire lane signs will be added. Department: Stormwater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Topic: Construction Drawings Comment Number: 2 Comment Originated: 03/31/2016 03/31/2016: Utility Plans - The plans and drainage report indicate that you propose to put a rain garden at the bottom of the detention pond. This is not a recommended solution to providing adequate LID water quality for the following reasons: 1. An LID system should not be located within the same footprint as the standard WQCV footprint because the WQCV location is frequently inundated with sediment and standing water longer than 12 hours. 2. The PLD footprint shown on the plans looks like it’s about twice as big as it needs to be based on a WQCV rain garden volume calculation. It looks like there is ample opportunity to put smaller pockets of rain gardens around the site. NE Response: Per meeting with Shane Boyle and Heather McDowell on Monday 4/11 the proposed LID locations within the detention pond will remain as currently shown. The proposed outlet structure will be modified so that the LID water depth does not exceed 12-inches during less frequent storms. Topic: Drainage Report Comment Number: 3 Comment Originated: 03/31/2016 03/31/2016: Drainage Report This site is actually located within the Dry Creek Basin and the allowable release rate from sites within this basin is 0.20 cfs/acre. Please revise your detention pond sizing calculations. NE Response: The drainage report will be revised accordingly. Topic: General Comment Number: 4 Comment Originated: 03/31/2016 03/31/2016: See redlined plans for other minor comments. NE Response: Noted, thank you. Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 03/22/2016 03/22/2016: The site disturbs more than 10,000 sq. ft., therefore Erosion and Sediment Control Materials need to be submitted. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com NE Response: An Erosion Control Report has been submitted. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations Comment Number: 30 Comment Originated: 04/05/2016 04/05/2016: The titles need to match on all plan sets. See redlines. PEC Response: This form will be filled out with the permit set submittal. Topic: Construction Drawings Comment Number: 33 Comment Originated: 04/05/2016 04/05/2016: The titles need to match on all plan sets. See redlines. NE Response: The titles have been revised to match on all plan sets. Comment Number: 34 Comment Originated: 04/05/2016 04/05/2016: Please revise the sub-title to match the sub-title on the Subdivision Plat. NE Response: The subtitle has been revised to match the subtitle on the subdivision. Comment Number: 35 Comment Originated: 04/05/2016 04/05/2016: The Basis Of Bearings statements need to match the Subdivision Plat. NE Response: The basis of bearing statements have been revised to match the subdivision. Comment Number: 36 Comment Originated: 04/05/2016 04/05/2016: All benchmark statements must match on all sheets. NE Response: The benchmark statements have been revised to match on all sheets. Comment Number: 37 Comment Originated: 04/05/2016 04/05/2016: There are line over text issues. See redlines. NE Response: The drawings have been revised accordingly. Comment Number: 38 Comment Originated: 04/05/2016 04/05/2016: Please add "Mason Street" to all sheets showing the 33' right of way. See redlines. NE Response: “Future Mason Street” has been labeled on all sheets. Comment Number: 39 Comment Originated: 04/05/2016 04/05/2016: There are text over text issues. See redlines. NE Response: The drawings have been revised accordingly. Topic: Landscape Plans Comment Number: 26 Comment Originated: 04/05/2016 04/05/2016: There are line over text issues. See redlines. DDS Response: Plans updated, thank you. Comment Number: 27 Comment Originated: 04/05/2016 04/05/2016: Please label "Mason Street" along the west side of the property. See redlines. DDS Response: Plans updated, thank you. Comment Number: 28 Comment Originated: 04/05/2016 04/05/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines. DDS Response: Plans updated, thank you. Comment Number: 29 Comment Originated: 04/05/2016 04/05/2016: The titles need to match on all plan sets. See redlines. DDS Response: Plan sets have been updated, thank you. Topic: Lighting Plan Comment Number: 31 Comment Originated: 04/05/2016 04/05/2016: Information needs to be kept inside of the borders. See redlines. PEC Response: Redlines of lighting plan were not received. All relevant information is within borders. Comment Number: 32 Comment Originated: 04/05/2016 04/05/2016: The titles need to match on all plan sets. See redlines. PEC Response: Redlines of lighting plan were not received. Topic: Plat Comment Number: 1 Comment Originated: 04/05/2016 04/05/2016: The legal description closes, but there is not enough information to see if the boundary closes with the measured data. The legal & boundary do not match. See redlines. NE Response: Plat has been revised accordingly. Comment Number: 2 Comment Originated: 04/05/2016 04/05/2016: Please make changes to the sub-title as marked. See redlines. NE Response: Subtitle has been revised per redlines. Comment Number: 3 Comment Originated: 04/05/2016 04/05/2016: Please make changes to the Statement Of Ownership And Subdivision as marked. See redlines. NE Response: The Statement of Ownership and Subdivision has been revised per redlines. Comment Number: 4 Comment Originated: 04/05/2016 04/05/2016: Please provide current acceptable monument records for the aliquot corners shown. These should be emailed directly to Jeff at jcounty@fcgov.com NE Response: Current acceptable monument records for the aliquot corner have been emailed to Jeff County. Comment Number: 5 Comment Originated: 04/05/2016 04/05/2016: Please add title commitment information as available. NE Response: The latest title commitment information has been added. Comment Number: 6 Comment Originated: 04/05/2016 04/05/2016: All of the lot lines shown make sheet 2 very confusing. NE Response: Existing lot lines have been removed. Comment Number: 7 Comment Originated: 04/05/2016 04/05/2016: Is the 33' right of way along the west side of the property dedicated by this plat? NE Response: Yes, the 33-ft of additional right-of-way for future Mason Street is being dedicated per this plat. Comment Number: 8 Comment Originated: 04/05/2016 04/05/2016: Please show right of way lines as a solid line. See redlines. NE Response: Plat has been revised accordingly. Comment Number: 9 Comment Originated: 04/05/2016 04/05/2016: Please label all surrounding properties with "Unplatted" or the subdivision name. This includes properties across right of ways. See redlines. NE Response: Plat has been revised accordingly. Comment Number: 10 Comment Originated: 04/05/2016 04/05/2016: The 10' Utility Easement (Book 1748, Page 256) (only the portion within the boundary of this plat) can be vacated by this plat or via separate document. If by separate document, we will need the reception number added t this plat prior to filing. NE Response: Noted, thank you. Comment Number: 11 Comment Originated: 04/05/2016 04/05/2016: Please change the bearings to read as the legal description does/ See redlines. NE Response: Bearings have been changed to read as the legal description. Comment Number: 12 Comment Originated: 04/05/2016 04/05/2016: Where is the east line of the Drainage Easement NE Response: The east line of the proposed drainage easement is the west line of the proposed 30-ft wide utility easement. Comment Number: 13 Comment Originated: 04/05/2016 04/05/2016: Please label as Lot 1. See redlines. NE Response: Plat has been revised accordingly. Comment Number: 14 Comment Originated: 04/05/2016 04/05/2016: Please add bearings & distances as marked. See redlines. NE Response: Plat has been revised accordingly. Comment Number: 15 Comment Originated: 04/05/2016 04/05/2016: All easements must be labeled & locatable. See redlines. NE Response: Plat has been revised accordingly. Comment Number: 16 Comment Originated: 04/05/2016 04/05/2016: Please label the Point Of Beginning. NE Response: Point of Beginning has been labeled. Comment Number: 17 Comment Originated: 04/05/2016 04/05/2016: What is the area marked along College Avenue? See redlines. NE Response: Additional right-of-way was previously dedicated prior to this development and it will be noted on plat. Comment Number: 18 Comment Originated: 04/05/2016 04/05/2016: Please add dedication information for all street rights of way. See redlines. NE Response: Dedication information has been added to street right-of-way. Comment Number: 19 Comment Originated: 04/05/2016 04/05/2016: Please show the right of way lines on the opposite side of all adjacent streets. See redlines. NE Response: Plat has been revised accordingly. Topic: Site Plan Comment Number: 20 Comment Originated: 04/05/2016 04/05/2016: Please add a legal description. "Lot 1, Lyric Cinema" DDS Response: Legal description added, thank you. Comment Number: 21 Comment Originated: 04/05/2016 04/05/2016: There are line over text issues. See redlines. DDS Response: Legal description added, thank you. Comment Number: 22 Comment Originated: 04/05/2016 04/05/2016: The titles need to match on all plan sets. See redlines. DDS Response: Plan sets have been added, thank you. Comment Number: 23 Comment Originated: 04/05/2016 04/05/2016: Please label "Mason Street" along the west side of the property. DDS Response: Plans updated, thank you. See redlines. Comment Number: 24 Comment Originated: 04/05/2016 04/05/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines. DDS Response: Plans updated, thank you. Comment Number: 25 Comment Originated: 04/05/2016 04/05/2016: There is text that needs to be rotated 180 degrees. See redlines. DDS Response: Plans updated, thank you. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/06/2016 04/06/2016: The submitted traffic and parking information has been reviewed. Based on the off-peak hour trip generation, and the dispersed parking plan, the conclusions are accepted. UR Response: Noted, thank you! Comment Number: 2 Comment Originated: 04/06/2016 04/06/2016: The signal at College Avenue at Conifer may require some modifications to support increased east-west pedestrian traffic. Traffic Operations will complete the work at no cost to the Lyric, but it will need to be coordinated with your opening. UR Response: Noted, thank you! Comment Number: 3 Comment Originated: 04/06/2016 04/06/2016: The shared access on College will need some striping to keep outbound patrons from blocking inbound traffic (since there is a jog in the access). NE Response: Proposed striping has been added to drawings. Comment Number: 4 Comment Originated: 04/06/2016 04/06/2016: PS - love the overall shape of the site plan being a guitar! UR Response: Noted, thanks! Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/04/2016 04/04/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com DDS Response: Noted, thank you. Department: Water-Wastewater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 03/31/2016 03/31/2016: Utility Plans • Please include the approximate size and location of the meter and curb stop. Please note that the curb stop should be within the utility easement and the meter can be behind the easement (in private property). The 3’ separation between the fire line and the domestic service may need to increase to make room for the meter. • Please include the approximate size of the sewer service. NE Response: Proposed water meter, water service size, and sanitary sewer size have been added to drawings. Detailed information will be provided in final design. Department: Zoning Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 04/06/2016 04/06/2016: The elevation shows "root top units" to be part of the "spacheship" concept. We require RTU's be screened. We'll need to talk about these. UR Response: We have provided a roof screen to hide the RTU’s, thank you. Topic: Site Plan Comment Number: 1 Comment Originated: 04/06/2016 04/06/2016: The handicap parking spaces are too narrow. You are required to have 2 spaces, one being van-accessible. The standard handicap space shall be 9' x 19' and the van-accessible space shall be at minimum 8 foot wide with an 8 foot wide access aisle. DDS Response: Handicap parking spaces have been updated to reflect requirements, thank you.