Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, FIFTH FILING - BASIC DEVELOPMENT REVIEW - BDR150005 - CORRESPONDENCE - (4)Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview March 30, 2016 Mark Melchi 2723 S State Suite 250 Ann Arbor, MI 48104 RE: Harmony Technology Park Infrastructure Improvements- BDR, BDR150005, Round Number 3 Comment Summary: Department: Planning Services Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General 01/06/2016: We need a fiancial guarantee for the landscaping both in the Public Right of way including the median and the 80ft buffer area. 08/03/2015: When will the landscaping be completed? We may need a financial guarantee in place before final approval. We will need financial guarantee before approval for both the landscaping in the 80ft buffer and the median. Comment Number: 4 Comment Originated: 08/03/2015 03/28/1216: Applicant is clarifying with the City Attorney concerning necessary requirements for the ditch easement. 01/06/2016: It is the City's understanding that the Landscaping in the irrigation easement is being reviewed with the easement holder and the applicant. Are there any changes to what has been submitted? Comment Number: 11 Comment Originated: 01/06/2016 Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: General Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or nbeals@fcgov.com. Page 1 of 2 03/29/2016: We'll need to coordinate the placement of a big note on the cover sheet of Phase 1 (road plans) referencing the date of the expiration of the temporary construction agreement between MAVD and Intel. To the extent that the ability to perform work on the plans within Intel's property is predicated on the agreement not having expired, a note similar to the following (subject to finalizing) should be added to the cover sheet of Phase 1 (and may also be added as a condition to the DCP for Phase 1): "The Phase 1 plans are valid for construction until March 24, 2019 in conformance with the "Grant of Temporary Construction and Grading License" from Intel Corporation to Harmony Technology Park, LLC, granting access onto Intel Corporation property for the purposes of constructing Technology Parkway as shown on the Phase 1 plans. No work on Intel Corporation property is allowed after March 24, 2019, and Harmony Technology Park, LLC's agents, successors and/or assigns agrees to cease work on Intel Corporation property until either: 1) the Phase 1 plans are amended and approved by the City in a manner which no longer requires access onto Intel Corporation's property, or 2) a new license or extension of the license is granted by Intel Corporation to Harmony Technology Park, LLC (or alternatively, the City of Fort Collins). 01/06/2016: Carried over as unresolved. Note that the plans would need to be revised should permission for work on Intel property not be obtained. 11/24/2015: The permission from Intel for work on their property is required prior to approval of the plans. 08/03/2015: The limits of development show that construction is occurring on Intel, which would require some sort of easement, letter from Intel for doing work that falls within their property. Additionally, easement would appear to be needed for construction and grading on both sides of Timberwood Drive. Comment Number: 6 Comment Originated: 08/03/2015 03/29/2016: I would want to confirm with Aspen the latest legal description for the pond. Tony had emailed a legal on 3/9, but I'm aware of subsequent emailed seeking further discussion of this while I was out on vacation. I would just want to make sure that I'm understanding what is the latest legal description for this dedication and the boundaries established for it. A $250 deed of dedication Transportation Review Fee is required (if not already provided) and recording fees assessed by Larimer County upon determining the number of pages. Comment Number: 24 Comment Originated: 03/29/2016 03/29/2016: I'm ready for the submittal of mylars (pending the addition of the note referenced in comment #6). The deed of dedication in the previous comment will need to be finalized, dedicated and associated fees provided prior to final sign off by the City Engineer on the civil drawings. Additionally, I'll need advisement from Brad Yatabe on the acceptability to complete the sign off on the civil mylars pertaining to the status of the agreement with Les Kaplan. Comment Number: 25 Comment Originated: 03/29/2016 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Site Plan 03/28/2016: There are line over text issues. See redlines. Comment Number: 14 Comment Originated: 03/28/2016 03/28/2016: Please add sheet 4 to the sheet index. See redlines. Comment Number: 15 Comment Originated: 03/28/2016 Page 2 of 2