HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, FIFTH FILING - BASIC DEVELOPMENT REVIEW - BDR150005 - CORRESPONDENCE -Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
August 07, 2015
Mark Malchi
2723 S State Suite 250
Ann Arbor, MI 48104
RE: Harmony Technology Park Fifth Filing-BDR, BDR150005, Round Number 1
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
08/03/2015: Please change the Planning signature block to Director of Community
Development and Neighborhood Services.
Comment Number: 1 Comment Originated: 08/03/2015
08/03/2015: Where will sidewalk connections into the property from the public
sidewalk along Harmony occur? Will it interfere with the proposed landscaping?
Comment Number: 2 Comment Originated: 08/03/2015
08/03/2015: Why isthere a section of sidwalk at the corner of Hamonry and
Technology labeled future?
Comment Number: 3 Comment Originated: 08/03/2015
08/03/2015: When will the landscaping be completed? We may need a financial
guarantee in place before final approval.
Comment Number: 4 Comment Originated: 08/03/2015
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
08/03/2015: Please look to have the plans be named in a manner that doesn't use
"Filing". Perhaps something like Harmony Technology Park Public Infrastructure
Plans.
Comment Number: 1 Comment Originated: 08/03/2015
08/03/2015: Please provide turning templates for the Harmony Road/Technology
Parkway and Technology Parkway/Timberwood Drive intersections in accordance
with 8.2.8 of LCUASS.
Comment Number: 2 Comment Originated: 08/03/2015
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at
970-416-2313 or nbeals@fcgov.com.
Page 1 of 6
08/03/2015: What is the expectation regarding the access onto Harmony Road
from Technology Parkway until warrants are met for the signalization? Will full
access occur for the time being before and uses are built between Harmony Road
and Timberwood Drive? Or should it be closed off until development occurs?
Comment Number: 3 Comment Originated: 08/03/2015
08/03/2015: Is the westernmost southbound vehicular lane on Technology Parkway
intended to function as a second through lane that becomes a right turn lane?
Previous striping for Harmony Technology First Filing showed right turn arrows
along the entire stretch that gave an indication that it's a turn lane, would that be
worth looking into here?
Comment Number: 4 Comment Originated: 08/03/2015
08/03/2015: The northbound through lane of Technology Parkway across Harmony
Road appears to be tracking into the outside lane at the entrance, which does not
appear to have striping indicating that the through movement can cross here. It
would seem that either the striping on the northside of Harmony needs to be revised
to accept this through movement, or the movement needs to be directed to use the
inside northbound lane, which would have concerns on having a full lane offset and
not meet street standards.
Comment Number: 5 Comment Originated: 08/03/2015
08/03/2015: The limits of development show that construction is occurring on Intel,
which would require some sort of easement, letter from Intel for doing work that falls
within their property. Additionally, easement would appear to be needed for
construction and grading on both sides of Timberwood Drive.
Comment Number: 6 Comment Originated: 08/03/2015
08/03/2015: The plans should be showing the Technology Parkway/Harmony Road
intersection related signal infrastructure that was designed and constructed with the
Harmony Road and Technology Parkway Intersection (originally by Stantec in 2008).
The plans should be indicating whether the project intends to utilize this signal
infrastructure design with this BDR, thought I believe the information would need to
be amended, as the signage reflects a single left at Technology Parkway to
westbound Harmony Road, which is now planned for a double left.
Comment Number: 7 Comment Originated: 08/03/2015
08/03/2015: Based on the signal pole location at the southeast corner of the
intersection on the Harmony Road and Technology Parkway Intersection plans, the
redesigned sidewalk to intersect further south is problematic as it forces
pedestrians heading west along Harmony to make a u-turn type movement to get to
the signal pole to cross either Harmony or Technology Parkway. The walk along
Harmony Road east of Technology Parkway should curve to the north, not to the
south in order to better connect to the specified signal pole location on the southeast
corner of the intersection.
Comment Number: 8 Comment Originated: 08/03/2015
08/03/2015: Please provide cross sections of Technology Parkway at 50 foot
intervals.
Comment Number: 9 Comment Originated: 08/03/2015
08/03/2015: Please provide verification on the intent of the median maintenance. Is
MAVD agreeing to the ongoing irrigation and landscaping maintenance of the
Technology Parkway median? The plans should be showing how irrigation is
provided to the median and where the control box/backflow system is located.
Comment Number: 10 Comment Originated: 08/03/2015
Page 2 of 6
08/03/2015: The median design for Technology Parkway should use the successive
vertical curb on vertical curb look (as was detailed on the PVH A-Wing plans) and
not use the splash block design. Please revise the drawings to reflect the
back-to-back curb design and provide the construction detail used for PVH A-Wing.
Comment Number: 11 Comment Originated: 08/03/2015
08/03/2015: The use of spill curb instead of catch curb on the Technology Parkway
median will be allowed with verification of both: a) The irrigation of the landscaping
within the median will be done via drip irrigation and not utilize surface spray type
irrigation, and b) The crown of the street is such that it does not direct drainage back
to the median edge, which would be demonstrated by the providing of cross
sections at 50 foot intervals.
Comment Number: 12 Comment Originated: 08/03/2015
08/03/2015: Offsite design for Technology Parkway should be shown south of its
proposed termination point a minimum distance of 500 feet.
Comment Number: 13 Comment Originated: 08/03/2015
08/03/2015: The overall utility plan shows an existing vent pipe to remain at the new
northwest corner of Timberwood Drive and Lady Moon Drive. Its location is in
between the sidewalk and curb and should be moved outside of the right-of-way 2
feet behind future sidewalk.
Comment Number: 14 Comment Originated: 08/03/2015
08/03/2015: Please provide additional spot elevations on Sheet C-019 as redlined.
My check of the spot elevations looked fine for the most part, except a discrepancy
along Technology Parkway midpoint at Timberwood Drive.
Comment Number: 15 Comment Originated: 08/03/2015
08/03/2015: The culvert detail shown for the Harmony Road sidewalk needs to
utilize a City detail such as Stormwater's D-12B. Among other items, the walk
needs to transition to be 6 inches wider on both sides approaching the culvert on
both directions.
Comment Number: 16 Comment Originated: 08/03/2015
08/03/2015: The grading behind the edge of pavement along Harmony Road is
difficult to follow, but seems to imply both changing the grades along the combined
irrigation ditch and drainage ditch, while also showing the combined ditch to remain.
We need to verify what is occurring and whether work shown requires permission
from the irrigation ditch user.
Comment Number: 17 Comment Originated: 08/03/2015
08/03/2015: In general, on all the plans (civil, site and landscape plans) please
ensure the property/right-of-way line is "boldly" shown and labelled.
Comment Number: 18 Comment Originated: 08/03/2015
08/03/2015: We should verify the approach on a potential development agreement
associated with this BDR, this would require input from Stormwater/Water as well
as potentially Traffic Operations.
Comment Number: 19 Comment Originated: 08/03/2015
08/03/2015: City internal question: Is the Technology Parkway median landscaping
being reviewed by the appropriate streetscape team members?
Comment Number: 20 Comment Originated: 08/03/2015
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
08/05/2015: The project owes $9,105 more for the TDRFees.
Comment Number: 21 Comment Originated: 08/05/2015
Page 3 of 6
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
08/03/2015: Primary power is located along the South side of Harmony Rd.
Comment Number: 1 Comment Originated: 08/03/2015
08/03/2015: Please contact Light & Power Engineering if you have any questions at
221-6700. Please reference our policies, development charge processes, and use
our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 2 Comment Originated: 08/03/2015
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
07/30/2015: WATER SUPPLY
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide
1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the
building, on 600-foot centers thereafter.
As the spacing between hydrants in commercial areas shall not exceed 600'; the
utility plan does not provide for this condition in all areas of the site at this time.
Recommendations (counter clockwise from NW corner of utility plan, Sheet no.
C-014):
> The Ex. hydrant now at Harmony and Technology Parkway should remain in this
approximate location.
> One additional hydrant needs to be added along Harmony Road, approximately
midway between Technology Parkway and Ladymoon Dr.
> The Ex. hydrant at Harmony Road and Ladymoon Dr. shall remain in place.
> The Ex. hydrant on the east end of Timberwood Dr., currently shown as "to be
removed," either needs to remain in this approximate area, or be relocated to the
north side of Timberwood Dr. - but it needs to remain in this area.
> The proposed hydrant, midway between Technology Parkway and Ladymoon Dr.
is in a satisfactory location.
> The proposed hydrant on the west end of Timberwood Dr. needs to be moved
from the north to the south side of the road.
> The proposed hydrant on Technology Parkway, currently shown south of Harmony
and north of Timberwood Dr., may be omitted.
Please contact me with any questions.
Comment Number: 1 Comment Originated: 07/30/2015
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
08/03/2015: No comments.
Comment Number: 1 Comment Originated: 08/03/2015
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Page 4 of 6
Topic: Construction Drawings
07/31/2015: Please change the title to Harmony Technology Park Infrastructure
Improvements. See redlines.
Comment Number: 1 Comment Originated: 07/31/2015
07/31/2015: Add Harmony Technology Park, First Filing & Harmony Technology
Park, Second Filing to the sub-title. See redlines.
Comment Number: 2 Comment Originated: 07/31/2015
07/31/2015: Please provide the following information in the EXACT format shown
below.
PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS
DATUM)
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NAVD88 = NGVD29 UNADJUSTED
+ X.XX’.
Comment Number: 3 Comment Originated: 07/31/2015
07/31/2015: Lady Moon Drive should be 3 words. On most sheets Lady & Moon
appear to be one word.
Comment Number: 4 Comment Originated: 07/31/2015
07/31/2015: There are text over text issues. See redlines.
Comment Number: 5 Comment Originated: 07/31/2015
08/03/2015: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 6 Comment Originated: 08/03/2015
08/03/2015: There are line over text issues. See redlines.
Comment Number: 7 Comment Originated: 08/03/2015
Topic: Site Plan
08/03/2015: Please change the title to Harmony Technology Park Infrastructure
Improvements. See redlines.
Comment Number: 8 Comment Originated: 08/03/2015
08/03/2015: Add Harmony Technology Park, First Filing & Harmony Technology
Park, Second Filing to the legal description. See redlines.
Comment Number: 9 Comment Originated: 08/03/2015
08/03/2015: Please correct the matchline sheet numbers. See redlines.
Comment Number: 10 Comment Originated: 08/03/2015
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Page 5 of 6
08/03/2015: The purpose of the traffic study was to identify classifications for the
internal road system. The identification of Harmony Tech Parkway and Timberwood
as major collectors (without parking) is appropriate.
Comment Number: 1 Comment Originated: 08/03/2015
08/03/2015: Another need from the traffic study was to determine the roadway
geometrics of the roads above on approaches to intersections. The traffic study
does not address this in the text, but based on the numbers in the study:
The eastbound approach of Timberwood to Lady Moon should have a two lane
approach (add right turn bay).
The westbound approach of Timb
erwood to Harmony Tech Parkway should have a two lane approach (add right turn
bay).
The southbound geometrics of Harmony Tech Parkway between Harmony and
Timberwood should have the left lane track into the left turn lane at Timberwood.
The right lane should track into the througth lane at Timberwood, and the right turn
lane should develop with a pocket (bike lane to the left).
Comment Number: 2 Comment Originated: 08/03/2015
08/03/2015: The intersection at Harmony and Harmony Tech Parkway will be
signalized when the development in HTP generates enough traffic that if a signal
was there, it would be warranted. No actual counts will be needed, but
estimated/calculated trip generation from the TIS will be used. IN THE INTERIM:
once traffic starts to be generated on the south side of Harmony, the intersection
needs to be restricted to double 3/4 (left ins allowed, no lefts out) through the use of
an intersection median. Once development has build out enough to meet the
warrant, the median can be removed and the signal installed.
Comment Number: 3 Comment Originated: 08/03/2015
08/03/2015: The TIS notes a number of issues with the external road system that
are not addressed with this BDR. As individual PDPs come in, specific TISs will be
needed, and those proposals will need to meet City LOS standards, and other roads
need to be evaluated for turn lanes (such as Rock Creek).
Comment Number: 4 Comment Originated: 08/03/2015
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
08/03/2015: Please revise the water main to reduce the two lowerings that cross
under the smaller storm sewers that have the street inlets.
The City wants to minimize waterline lowerings to reduce the risk of main breaks
and reduce maintenance.
Comment Number: 1 Comment Originated: 08/03/2015
Page 6 of 6