Loading...
HomeMy WebLinkAbout2008 TURNBERRY RD., WIRELESS TELECOMMUNICATIONS FACILITY - PDP - PDP160018 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANSPROJECT DESCRIPTION: TITLE SHEET T-1 PROPOSED TELE- COMMUNICATIONS FACILITY SITE NAME: PROJECT DESCRIPTION: TOWER TYPE: SITE ADDRESS: 60' SILO TURNBERRY ZONING JURISDICTION: ZONING: TBD CITY OF FORT COLLINS 2008 TURNBERRY ROAD FORT COLLINS, CO 80524 (LARIMER COUNTY) POWER COMPANY: CONTACT: PHONE: METER# NEAR SITE: TELEPHONE COMPANY: CONTACT: PHONE: PEDESTAL # NEAR SITE: TOWER ENGINEERING PROFESSIONALS 5545 W. 56TH AVE., UNIT E ARVADA, CO 80002 NICHOLAS M. CONSTANTINE (303) 566-9914 WiBLUE, INC. KEN BRADTKE (303) 448-8896 SITE CONSTRUCTION MANAGER: SITE APPLICANT: SURVEYOR: CIVIL ENGINEER: PROPERTY OWNER: NAME: ADDRESS: CITY, STATE, ZIP: CONTACT: PHONE: NAME: ADDRESS: CITY, STATE, ZIP: NAME: ADDRESS: CITY, STATE, ZIP: CONTACT: PHONE: NAME: ADDRESS: CITY, STATE, ZIP: CONTACT: PHONE: NAME: CONTACT: PHONE: N GENERAL NOTES: STRUCTURAL STEEL NOTES: 0 TURNBERRY KES NMC 0 04-27-16 ZONING ZONING REVIEW GENERAL NOTES N-1 GENERAL NOTES NOTES: LEGEND SITE COORDINATES TURNBERRY ROAD TURNBERRY ROAD IMPERMEABLE AREA CALCULATIONS SITE PLAN & COMPOUND DETIAL C-1 SITE PLAN 0 TURNBERRY KES NMC 0 04-27-16 ZONING COMPOUND DETAIL FENCE NOTE: DRAWING NOTES: 6' HIGH FENCE FOOTINGS WOODEN FENCE ATTACHMENT BRACKET NOTE: TOWER NOTES: TOWER ELEVATION & FENCE DETAILS C-2 TOWER ELEVATION 5 ALTA VISTA KES NMC 0 12-10-15 ZONING 1 03-01-16 ZONING 2 03-18-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 3 03-24-16 4 04-06-16 5 04-06-16 ZONING ZONING ZONING TYPICAL FENCE ELEVATION GATE DETENT DETAIL FENCE SIDE VIEW TURNBERRY ROAD TURNBERRY ROAD EROSION NOTES: PUBLIC ROAD NOTES: EROSION & DRIVEWAY PLANS C-3 SOIL & EROSION CONTROL PLAN 0 TURNBERRY KES NMC 0 04-27-16 ZONING ZONING REVIEW SILT FENCE DETAILS STANDARD ROAD SEC. (POOR SUBGRADE) STABILIZED CONSTRUCTION ENTRANCE STANDARD ROAD SEC. (GOOD SUBGRADE) TURNBERRY ROAD CODES TESTING GUARANTEE CO-ORDINATION: EXAMINATION OF SITE CUTTING, PATCHING AND EXCAVATION: SCOPE: ELECTRICAL NOTES: CONDUCTORS GROUNDING PENETRATIONS: EXTERIOR CONDUIT: EQUIPMENT: RACEWAYS ABBREVIATIONS AND LEGEND MATERIALS POWER NOTES: UTILITY PLAN SCHEDULE 0 TURNBERRY KES NMC 0 04-27-16 ZONING ZONING REVIEW E-1 ELECTRICAL NOTES & UTILITY COORDINATION ELECTRICAL NOTES UTILITY COORDINATION NOTES: FRONT VIEW REAR VIEW POWER PANEL SCHEDULE NOTES: VZW SERVICE RACK (FRONT AND BACK) ATLAS SERVICE RACK (FRONT) ATLAS SERVICE RACK (BACK) ONE LINE DIAGRAM NOTES: NOTES: NOTES: DRAWING NOTES: 0 TURNBERRY KES NMC 0 04-27-16 ZONING ZONING REVIEW E-2 ELECTRICAL DETAILS SERVICE RACK DETAILS ONE LINE ELEVATION ONE LINE DETAIL UNDERGROUND CONDUIT(S) TRENCH DETAIL POWER AND TELCO PLAN TOP VIEW SIDE VIEW FIXED GENERATOR GROUNDING NOTES DRAWING NOTES: NOTES: SINGLE CONNECTOR AT GROUND BARS BACK TO BACK CONNECTOR AT GROUND BARS SINGLE CONNECTOR AT STEEL OBJECTS BACK TO BACK CONNECTOR AT STEEL OBJECTS SINGLE CONNECTOR AT METALLIC/STEEL OBJECTS BACK TO BACK CONNECTOR AT METALLIC/STEEL OBJECTS GROUNDING DETAILS E-3 ELECTRICAL DETAIL 0 TURNBERRY KES NMC 0 04-27-16 ZONING ZONING REVIEW CADWELD GROUNDING DETAIL TOWER GROUNDING ISOLATED GROUND BAR COPPER-CLAD STEEL GROUND ROD TOWER GROUNDING MOUNTING DETAIL COAX ISOLATED GROUND BAR EXTERNAL CIGBE - BOTTOM TYPE 1 GROUND BAR TYPE 2 GROUND BAR COAX ISOLATED GROUND BAR EXT. CIGBE - TOP & INTERMEDIATE GROUNDING PLAN GROUNDING AT GATE POST TRENCH DETAIL INSPECTION WELL DETAIL CONNECTOR AND HARDWARE DETAIL TBD TBD TBD TBD TBD PROJECT DESCRIPTION SITE COORDINATES CODE COMPLIANCE UTILITY INFORMATION ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITES. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THE LATEST EDITIONS OF THE FOLLOWING: 1. INTERNATIONAL BUILDING CODE (2012 EDITION) 3. ANSI/TIA/EIA-222-G 4. NATIONAL ELECTRIC CODE (2014 EDITION) 5. LOCAL BUILDING CODE 6. CITY/COUNTY ORDINANCES CONTACT INFORMATION PROJECT INFORMATION SHEET INDEX DRIVING DIRECTIONS LOCATION MAP FROM DENVER, CO TAKE I-25 NORTH FOR 60.9 MILES. TAKE EXIT 271 FOR MOUNTAIN VISTA DRIVE. TURN LEFT ONTO E CO RD 50/ MOUNTAIN VISTA DRIVE. TURN RIGHT ONTO COUNTY ROAD 11/ TURNBERRY ROAD. SITE WILL BE ON THE RIGHT. 2008 TURNBERRY ROAD FORT COLLINS, CO 80524 (LARIMER COUNTY) SITE NAME: TURNBERRY LATITUDE: :ƒ  1ƒ  LONGITUDE: *INFORMATION FOUND IN A SURVEY DATED MARCH 24, 2016. KENNETH & JEANETTE FORBES 2008 TURNBERRY ROAD FORT COLLINS, CO 80524 CENTURY LINK CUSTOMER SERVICE (877) 395-9493 UNKNOWN FORT COLLINS LIGHT & POWER CUSTOMER SERVICE (970) 221-6700 TBD SHEET: DESCRIPTION: REV 0 TURNBERRY KES NMC 0 04-27-16 ZONING ZONING REVIEW PARCEL NUMBER: 8832005002 GROUND ELEVATION: 5052' ATLAS ONE, LLC. 4450 ARAPAHOE AVE, SUITE 100 BOULDER, CO 80303 CALEB CROSSLAND (303)448-8896 LEGAL DESCRIPTION: LOT 2, FORBES MINOR SUB, FTC (NAD '83) * (NAD '83) * (NAVD '88) * AREA OF CONSTRUCTION: “64)7 /($6($5($ 2. INTERNATIONAL CODE COUNCIL