Loading...
HomeMy WebLinkAboutMORNINGSTAR ASSISTED LIVING & MEMORY CARE - PDP - PDP130024 - CORRESPONDENCE - (3)Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview October 18, 2013 Cathy Mathis TB Group 444 Mountain Ave. Berthoud, CO 80513 Comment Summary: Department: Current Planning Contact: Jason Holland, 970-224-6126, jholland@fcgov.com Topic: General Elevations-- Please provide color paint samples on the detail sheet for the siding scheme and clarify whether the shingle siding is stained or painted and specify the color with a graphic sample. Please also clarify the site wall material, color and pattern. Comment Number: 10 Comment Originated: 10/15/2013 Elevations-- The base course required with the building design is very low to the ground, and in some areas the base is a siding material adjacent to siding above at the wall plane. Please clarify with the materials information that the base siding will be a different color from the siding on the wall plane above. Staff recommends that the stone base and/or corresponding siding base course be raised and wrap around the base of the windows, so that the base is more prominent. The code requirement is for the base to be "recognizable" and raising the stone base and the siding base, up higher on the wall plane will make the base more recognizable, similar to what is shown in the material example photographs submitted. Comment Number: 11 Comment Originated: 10/15/2013 Utility Plans-- A note shows that a portion of the existing sidewalk to the north will be removed. Is this correct? Also, the existing topo is difficult to read, can this be a darker tone. Comment Number: 12 Comment Originated: 10/15/2013 Utility Plans-- a railing is noted for the top of the retaining wall, is this needed for the 30" wall? Comment Number: 13 Comment Originated: 10/15/2013 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com. RE: Morningstar Assisted Living & Memory Care, PDP130024, Round Number 2 Page 1 of 10 Site Plans-- The wood fence needs to be extended north and south to extend the view corridor looking towards the service area, for additional privacy. Please provide a detail for the fence on sheet 2. Label and describe the memory care fence and west privacy fence on the plan. Move building dimension that is on top of section line. Please verify that the fixed bike racks can accommodate a total of 11 bikes and specify on the plan where the 3 covered spaces are located. Label site walls. Comment Number: 14 Comment Originated: 10/15/2013 Site Details-- The trash enclosure detail does not match the site plan. On the site plan, it does not appear that the interior of the enclosure is big enough to provide access through to the recycling bins. Comment Number: 15 Comment Originated: 10/15/2013 The trash pick up time note needs to be updated to include deliveries and specific hours need to be listed. Comment Number: 16 Comment Originated: 10/15/2013 Landscape Plan-- The plan is very difficult to read, ground cover and mulch patterns, line weights, scale of drawing, and line tones. Difficult to see existing trees and proposed utilities. Plan appears to have several utility conflicts and light pole conflicts. Resolution of tables and charts is poor and difficult to read. Comment Number: 17 Comment Originated: 10/15/2013 Landscape Plan-- Show existing neighborhood sidewalk as solid line. Turf is shown on top of the walk as well as an austrian pine. Consider more native hybrid ornamental variety in areas where serviceberry is used. Consider use of additional small evergreen trees in addition to tannebaum species. Staff is advocating for small evergreen tree groupings in appropriate areas along building foundations, as many past developments have relied too heavily on deciduous material. Comment Number: 18 Comment Originated: 10/15/2013 Landscape Plan-- Some of the shrub massings in the open areas seem a little too segmented and could be clustered together to simplify maintenance/mowing. Shrub massings such as snowberry would look better grouped with other plant types and not a single massing. Along the west wall, plants could be grouped tighter against the wall but still be informally arranged so that there's a distinct shrub bed vs. grass area, for easier maintenance. For plants in the northwest corner, please spread out evergreen material to maximize layered screening from different vantage points of existing homes. Comment Number: 19 Comment Originated: 10/16/2013 Landscape Plan-- along the north boundary, screen the parking stalls and soften the view from the residence adjacent to the north. Comment Number: 20 Comment Originated: 10/16/2013 Page 2 of 10 In order to maintain the established connection from Calabasis Court and Lochwood, the existing sidewalk will need to remain and be within a public access easement. If the sidewalk is proposed to be removed, the existing connection will need to be recreated with the site design. The connection is required to be established per LUC 3.2.2(C)(6) which states that "Direct On-Site Access to Pedestrian and Bicycle Destinations. The on-site pedestrian and bicycle circulation system must be designed to provide, or allow for, direct connections to major pedestrian and bicycle destinations including, but not limited to, parks, schools, Neighborhood Centers, Neighborhood Commercial Districts and transit stops that are located either within the development or adjacent to the development as required, to the maximum extent feasible. The on-site pedestrian and bicycle circulation system must also provide, or allow for, on-site connections to existing or planned off-site pedestrian and bicycle facilities at points necessary to provide direct pedestrian and bicycle travel from the development to major pedestrian destinations located within the neighborhood. In order to provide direct pedestrian connections to these destinations, additional sidewalks or walkways not associated with a street, or the extension of a sidewalk from the end of a cul-de-sac to another street or walkway, may be required" Comment Number: 21 Comment Originated: 10/16/2013 With the fencing detail, consider further embellishment of the wood fence design by providing a center trim piece and trim wrap (see redlines) so that this fencing, adjacent to the existing neighborhood to the west, is further articulated and further reduced to a human scale through more detailed articulation. Comment Number: 22 Comment Originated: 10/18/2013 With the trash enclosure detail, please add a top screen such as a wood arbor trellis detail over the top of the enclosure so that the view of the trash is screened from above as well as the sides. This is intended to address comments from the neighborhood meeting. Comment Number: 23 Comment Originated: 10/18/2013 Please provide a material detail and specification for the retaining wall. Because the retaining wall is a prominent feature needed to accommodate the placement of the proposed use and proposed building footprint, staff recommends that the wall material be designed with a patterned modular wall system with a field stone appearance similar to the main building, as opposed to a more utilitarian running bond pattern typically seen in commercial developments. Comment Number: 24 Comment Originated: 10/18/2013 Topic: Landscape Plans The landscape plan needs to be reformatted. Plants are not readable at 1:30. Tree labels at tree centers are not readable and are awkard at 90 degrees. The smaller plant list symbols are not readable. The evergreen tree key code is too small to be readable. The shade tree key code at the center of the symbol makes the plans difficult to read and there is no center trunk demarcation. 10-15-2013 - While some issues have been resolved, the landscape plan is still very difficult to read. Comment Number: 3 Comment Originated: 09/04/2013 Topic: Site Plan Please show materials, color and design details for the retaining wall. Coordinate with the utility plans and label approximate height of the wall at various locations for informational purposes. Material and color still needs to be resolved, please see comment 24 for more detail. Comment Number: 6 Comment Originated: 09/04/2013 Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: General Page 3 of 10 10/15/2013: Response noted. Will look to additional information provided in a final geotech report. 09/04/2013: To the extent that the geotech report indicates the presence and concern of high groundwater, are the proposed LID measures going to implement underdrain systems beneath them? It seems that the drainage report and geotech report don't cross reference each other with regards to their findings and recommendations. Shouldn't the geotech report provide some analysis on the site's proposed use of LID measures for example and whether the porous pavers are able to infiltrate without interference from groundwater? Comment Number: 4 Comment Originated: 09/04/2013 10/15/2013: The following was added to the comment below but apparently was added after the final letter was sent. "In checking with the City Engineer and Traffic Engineer, the striping for Lochwood and the current indication of where parking is allowed is going to remain. The amount of patching south of the start of the no parking along Lochwood is required to be half a lane width. For the area north where parking is allowed, a two foot patch is allowed." Note that the street patching note is still needed and the information can be shown at time of final, but the patching should follow the additional information shown above. 09/04/2013: The construction plans should be showing the removal of the existing attached sidewalk/hollywood curb where detached sidewalk is being installed and show proposed patching along Lochwood Drive for the installation of the new (presumably vertical) curb and gutter. In checking with the City Engineer and Traffic Engineer, the striping for Lochwood and the current indication of where parking is allowed is going to remain. The amount of patching south of the start of the no parking along Lochwood is required to be half a lane width. For the area north where parking is allowed, a two foot patch is allowed. Add the City's standard note regarding limits of street repair: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Comment Number: 8 Comment Originated: 09/04/2013 10/15/2013: The submitted variance request was approved on 10/15 after review and consultation with Traffic Operations. Please indicate the approval of the variance on the construction plan set notes. 09/06/2013: A variance request to the requirement of constructing a right turn lane from Horsetooth to Lochwood is required. Staff has indicated preliminary support in granting the variance, however. Comment Number: 11 Comment Originated: 09/06/2013 10/15/2013: Engineering has no pre-hearing issues remaining. Additional review and comment will occur with review after hearing. Comment Number: 12 Comment Originated: 10/15/2013 Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 09/04/2013: At time of final plan submittal, please include a detailed species description of the Arkansas Valley seed mix, including the rates of seed mix to be applied. Comment Number: 1 Comment Originated: 09/04/2013 Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans Page 4 of 10 09/06/2013: If there will be any street lights then show locations on landscape plan and provide tree separation of 40 feet for shade trees or 15 feet for ornamental trees. Comment Number: 1 Comment Originated: 09/06/2013 09/06/2013: If there are any existing trees on the site schedule an meeting with The City Forester to review and inventory. Comment Number: 2 Comment Originated: 09/06/2013 09/06/2013: Will any off-site trees be impacted by proposed construction? Comment Number: 3 Comment Originated: 09/06/2013 09/06/2013: Tree protection note # 7 does not seem to apply and may not be needed. Comment Number: 4 Comment Originated: 09/06/2013 09/06/2013: Consider using lanceleaf cottonwood or plains cottonwood in place of the narrowleaf cottonwood. The narrowleaf cottonwood produces and abundance of root suckers that can causes maintenance problems. Comment Number: 5 Comment Originated: 09/06/2013 10/11/2013: Update Landscape note number 1 to include these distances found in LUC3.2.1 K. 40 feet from street lights for canopy shade trees 15 feet from street lights for ornamental trees 10 feet from water and sewer mains 6 feet from water and sewer service lines 8 feet from driveways 20 feet from signs and traffic control devices Check street tree locations for compliance with these separations. A proposed street tree along Lockwood appears to be closer than 40 feet from the light. Comment Number: 6 Comment Originated: 10/11/2013 10/11/2013: The street tree just to the north of the north of the curb cut off Lockwood is very close to the intersection. Review for deletion of this tree. Comment Number: 7 Comment Originated: 10/11/2013 10/11/2013: Please add these street tree notes: Street trees shall be installed by the developer at time of CO, unless time of year limits tree planting, in which case street trees shall be planted within than 6 months of CO. The Developer shall replace dead or dying street trees after planting unit final inspection and acceptance for maintenance by the City of Fort Collins Forestry Division. All street trees must be established, an approved species and of acceptable condition prior to acceptance. Street tree locations and numbers may be adjusted to accommodate driveway locations, utilities separation between trees, street signs and street light. Street trees to be centered in the middle of the lot to the extent feasible. Quantities shown on plan must be installed unless a reduction occurs to meet separation standards. Comment Number: 8 Comment Originated: 10/11/2013 Page 5 of 10 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 09/03/2013: PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM New buildings greater than 50,000 square feet will require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public-safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01 FYI - Information on the BDA evaluation is being provided at this time so as to properly notify and prepare the applicant for this eventual requirement. Although PFA will be present as witness, at time of testing, the BDA test is not performed by PFA personnel. When it is appropriate to do so, you may contact Assistant Fire Marshal, Ron Gonzales at 970-416-2864 for a list of qualified local contractors who are authorized to perform this evaluation. Comment Number: 1 Comment Originated: 09/03/2013 09/03/2013: FIRE ACCESS FOR STRUCTURES EXCEEDING 30' (OR THREE OR MORE STORIES) IN HEIGHT In order to accommodate aerial fire apparatus access (ladder trucks), required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. 2006 International Fire Code Appendix D; Poudre Fire Authority Administrative Policy 85-5 This code requirement is not currently being met with the current site plan and further discussion is required. Comment Number: 2 Comment Originated: 09/03/2013 09/03/2013: HYDRANT PLACEMENT The relocation of the hydrant on the SE corner of the building, shall be reviewed in future plans submittals. One additional hydrant on the west side of the building is also needed. Further discussion is required on the proposed hydrant location on the north side of the building. Comment Number: 3 Comment Originated: 09/03/2013 10/15/2013: EMERGENCY GENERATOR The storage and use of diesel fuel or propane, for the purposes of supplying an emergency generator, shall comply with any applicable sections of Chapter 34 of the International Fire Code on Flammable and Combustible Liquids. Any building, structure, or shelter housing the generator shall be properly signed and labeled. A separate permit is required if the fuel source is provided by an AST. Spill control may be required; TBD at time of building permit. Comment Number: 6 Comment Originated: 10/15/2013 Page 6 of 10 10/15/2013: SEPARATE PERMITS FYI only - Separate permits are required for fire sprinkler and alarms systems. Separate permits are also required for kitchen hood systems, Above-ground Storage Tanks and BDA antenna if required. These are all deferred submittals which can be applied for, if applicable, after the building permit is issued. Comment Number: 7 Comment Originated: 10/15/2013 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control 10/07/2013: Repeat 08/27/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Comment Number: 1 Comment Originated: 08/27/2013 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General 10/15/2013: Please provide spillway cross-sections and detailed grading at final compliance. 09/03/2013: Both detention ponds need to have spillways directed to the major swale. Comment Number: 3 Comment Originated: 09/03/2013 10/15/2013: Area is defined as 50% of site area, not impervious area. Please revise. 09/03/2013: Please document on an exhibit what land area is being treated by a LID technique. Comment Number: 4 Comment Originated: 09/03/2013 10/15/2013: Please add a note on the site and grading plan. 09/03/2013: The retaining wall will require a building permit. Comment Number: 6 Comment Originated: 09/03/2013 10/15/2013: Reminder for final compliance review. 09/04/2013: Please provide a maintenance agreement for the swale that is shared by the two properties. If an agreement can not be formalized, please provide a maintenance obligation within the drainage report that lays out the responsibilities of the Developer. Comment Number: 7 Comment Originated: 09/04/2013 10/15/2013: Please label all slopes min. 4:1. Comment Number: 8 Comment Originated: 10/15/2013 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations 10/14/2013: No comments. Comment Number: 11 Comment Originated: 10/14/2013 Topic: Construction Drawings Page 7 of 10 10/14/2013: Please correct the spelling of "Southwest" in the sub-title on sheet 1. See redlines. Comment Number: 12 Comment Originated: 10/14/2013 10/14/2013: Please change the Township number from "6" to "7" in the sub-title on sheet 1. See redlines. Comment Number: 13 Comment Originated: 10/14/2013 10/14/2013: Please correct the elevation of benchmark 8-94. See redlines. Comment Number: 14 Comment Originated: 10/14/2013 Topic: Landscape Plans 10/14/2013: No comments. Comment Number: 15 Comment Originated: 10/14/2013 Topic: Lighting Plan 10/14/2013: No comments. Comment Number: 16 Comment Originated: 10/14/2013 Topic: Plat 10/15/2013: Please remove the P.U.D. from the title of this plat. Comment Number: 17 Comment Originated: 10/15/2013 10/15/2013: Please correct the section number in the Statement Of Ownership And Subdivision. See redlines. Comment Number: 18 Comment Originated: 10/15/2013 10/15/2013: Please make the Datum consistent between the Statement Of Ownership And Subdivision and the Basis Of Bearings Statement. See redlines. Comment Number: 19 Comment Originated: 10/15/2013 10/15/2013: Are there any Lienholders? If so, or if you are not certain, please add a signature block. This can be removed later if necessary. If not, please add a note stating that there are no Lienholders. Comment Number: 20 Comment Originated: 10/15/2013 10/15/2013: Please add a space between "December" and "13" in the Title Commitment Note. See redlines. Comment Number: 21 Comment Originated: 10/15/2013 10/15/2013: Please update the title commitment as new issues come out. Comment Number: 22 Comment Originated: 10/15/2013 10/15/2013: Is the found #4 rebar with a yellow plastic cap stamped LS 14833 in the legend, supposed to be LS 14823? See redlines. Comment Number: 23 Comment Originated: 10/15/2013 10/15/2013: Please provide current acceptable monument records for the aliquot corners shown. Comment Number: 24 Comment Originated: 10/15/2013 10/15/2013: Please move the Point Of Commencement & Point Of Beginning as shown on the boundary. See redlines. Comment Number: 25 Comment Originated: 10/15/2013 10/15/2013: Please change the direction of the Basis Of Bearings shown along the section line, to match the Basis Of Bearings Statement. See redlines. Comment Number: 26 Comment Originated: 10/15/2013 Page 8 of 10 10/15/2013: Please change the curve/line tables so the data reads the same direction as in the legal description. See redlines. Comment Number: 27 Comment Originated: 10/15/2013 10/15/2013: Please make note to the effect that all easements shown outside of the boundary of the plat are existing easements. If that is not the case, then "to be dedicated by separate document, Reception No._______________" should be added to the text identifying the easement. Comment Number: 28 Comment Originated: 10/15/2013 10/15/2013: There are line over text issues. See redlines. Comment Number: 29 Comment Originated: 10/15/2013 10/15/2013: Please label the dashed lines shown at the northeast corner of the property. See redlines. Comment Number: 30 Comment Originated: 10/15/2013 10/15/2013: Please add a arrow to the 5' utility easement shown at the northeast corner of the property. See redlines. Comment Number: 31 Comment Originated: 10/15/2013 10/15/2013: Please check the width of the Emergency Access Easement where marked. It is labeled as 25', but it scales 28'. See redlines. Comment Number: 32 Comment Originated: 10/15/2013 10/15/2013: Please correct the sheet numbering. See redlines. Comment Number: 33 Comment Originated: 10/15/2013 Topic: Site Plan 10/14/2013: This has been addressed, but there is new text to be rotated. See redlines. 09/03/2013: Please rotate the street names marked on sheet 1 180 degrees to read from the right side of the plan sheet. See redlines. Comment Number: 9 Comment Originated: 09/03/2013 10/14/2013: There are new line over text issues on sheet 1. See redlines. 09/03/2013: There are line over text issues on sheet 1. See redlines. Comment Number: 10 Comment Originated: 09/03/2013 10/15/2013: Please move the legal description to sheet 1. See redlines. Comment Number: 34 Comment Originated: 10/15/2013 10/15/2013: Please increase the text size of the dimensions in the Trash Enclosure Detail on sheet 2. See redlines. Comment Number: 35 Comment Originated: 10/15/2013 10/15/2013: Please mask the text marked on sheet 3. See redlines. Comment Number: 36 Comment Originated: 10/15/2013 Department: Transportation Planning Contact: Emma McArdle, 970-224-6197, emcardle@fcgov.com Topic: General Page 9 of 10 09/09/2013: Thank you for providing the bus stop as I requested in the Conceptual Review. Please make a change to it for me though, the stop needs to be connected to the curb with a 5' wide path, please add a 5' path from the curb to the sidewalk on the rear of the bus stop to accommodate this. Please feel free to contact me if you have any questions. Comment Number: 1 Comment Originated: 09/09/2013 Department: Water-Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: Construction Drawings 10/15/2013: Fire hydrant must be in a utility easement. Comment Number: 4 Comment Originated: 10/15/2013 Topic: Landscape Plans 09/03/2013: Adjust plantings to provide the required separation distances from water/sewer lines. Comment Number: 1 Comment Originated: 09/03/2013 Page 10 of 10