December 29, 2014
Jason Holland
City of Fort Collins Planning
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Case Number: 04-S2309
Title: Fox Grove
Engineering/Survey: Northern Engineering
Engineer Contact: Nick Haws
Parcel Number(s): FDP140030
On behalf of the Boxelder Sanitation District (BSD), Farnsworth Group has reviewed the Final
Development Plan identified as:
Final Development Plan (FDP) review for a 21.87 acre property consisting of a 67 single family
lot subdivision. Existing zoning for this subdivision is classified as a LMN. The Utility Plan
proposes 8-inch sanitary sewers throughout the project with two connections into BSD’s existing
12-inch sanitary sewer just south of the subdivision.
The District hereby advises as follows:
There is no objection to this proposal with the exception of the comments below.
The District will respond at the hearing date of _____________.
Comments:
1) Any sanitary sewer services shown connecting into a manhole will need to be realigned to
connect to the sanitary sewer main. BSD will not allow any services to flow directly into a manhole.
2) Boxelder Sanitation District’s existing 12 inch sanitary sewer just south of the proposed property
needs adequate easements and driving surfaces for BSD maintenance equipment to access every
manhole. The trail shown along the existing 12 inch sanitary sewer needs to have adequate width
to safely have BSD maintenance vehicles drive on.
3) Manhole SSMH A4s-5 has a depth of 8.78 feet. If most houses have a basement, this depth
may not be deep enough to provide gravity service line.
The District has more than adequate capacity to service the property referenced above. The District is
in full compliance with federal and state water quality requirements. We look forward to review future
submittals on this project. Please feel free to contact me if you have any questions.
Sincerely,
Brian Zick, P.E.
District Engineer
CC: Karen Reynolds, Boxelder Sanitation District’s General Manager