January 08, 2015
Stephanie Sigler
Ripley Design, Inc.
401 W. Mountain Ave.
Fort Collins, CO 80521
RE: Fox Grove Phase One, FDP140030, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126
or jholland@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/31/2014
12/31/2014: Driveway Locations: Each individual driveway location must be shown on the site
and landscape plans. The driveways/curb cuts are a significant element to the space planning
exercise and coordinating their locations at a later time will cause problems. Spring Creek
Farms North Filing 4 is a good graphic example.
Comment Number: 2 Comment Originated: 12/31/2014
12/31/2014: Housing models: Please provide me a note for review discussing how at least 7
housing models from the ODP will be incorporated into phases 1 and 2. Also provide
reference notes describing the modifications and conditions approved with the ODP and PDP.
Comment Number: 3 Comment Originated: 12/31/2014
12/31/2014: Please refer to the attached comment letters for additional utility comments.
Comment Number: 4 Comment Originated: 12/31/2014
12/31/2014: Fencing: Would recommend lowering the privacy fencing to 5 feet. Plan needs to
show column locations so that their locations are not decided / coordinated at a later time.
Comment Number: 5 Comment Originated: 12/31/2014
12/31/2014: 3 rail fence detail – please show where is this located on the plans.
Comment Number: 6 Comment Originated: 12/31/2014
12/31/2014: Landscape plant list must show total quantities and species diversity.
Comment Number: 7 Comment Originated: 12/31/2014
12/31/2014: In addition to comments from forestry, please change the Skymaster Oak
selection to a shade tree that provides more canopy for a more consistent form along the
streets.
Comment Number: 8 Comment Originated: 12/31/2014
12/31/2014: Toned linework- please eliminate this. If used, try dialing it back to 60% solid.
Comment Number: 9 Comment Originated: 12/31/2014
12/31/2014: Show on the site plan that Tract A / Phase 2 to be submitted as a separate PDP.
Comment Number: 10 Comment Originated: 12/31/2014
12/31/2014: Add standard planting details to the landscape plans.
Comment Number: 11 Comment Originated: 12/31/2014
12/31/2014: Label Outlot H as a Small Neighborhood Park.
Comment Number: 12 Comment Originated: 12/31/2014
12/31/2014: What is happening in terms of common landscaping and fencing along Carriage
Parkway and in all locations where lots back up to open space? Landscaping and fencing
transition must be provided.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/19/2014
12/19/2014: The (4) off-site easement dedication documents have been received. An
additional TDRF fee of $1,000 is needed to dedicate easements by separate document. Once
approved, a recording fee to record the documents at the Larimer County Clerk and Recorder’s
Office will be needed. The recording fee will be calculated and communicated when the
dedication documents are final.
Comment Number: 2 Comment Originated: 12/19/2014
12/19/2014: Carriage Parkway: The vertical curve at station 16+08.11 does not meet minimum
curve length or k value for a collector road. Please reference table 7-3 and figure 7-17. See
redlines on sheet R1
Comment Number: 3 Comment Originated: 12/19/2014
12/19/2014: Carriage Parkway: The vertical curve flowline (station 14+61.66) on Carriage
Parkway does not meet minimum flowline grade of 0.5% into proposed inlets. See redlines on
sheet R1
Comment Number: 4 Comment Originated: 12/19/2014
12/19/2014: Carriage Parkway: Please label the slope of existing Carriage Pkwy on plan and
profiles on sheet R1- see redlines. Also, please label the slope where Carriage Pkwy ends at
the interim tie-in point along the south property line. See redlines
Comment Number: 5 Comment Originated: 12/19/2014
12/19/2014: Carriage Parkway: Rip rap is needed where the curb and gutter terminates on
Carriage Parkway at the south property line. See sheet R1
Comment Number: 6 Comment Originated: 12/19/2014
12/19/2014: Huntsman Drive: The minimum flowline grade of 0.5% is not being met on
Huntsman Dr. Please revise. See sheet R4
Comment Number: 7 Comment Originated: 12/19/2014
12/19/2014: Huntsman Drive: You are exceeding the maximum 0.4% single point grade break
on the Huntsman outside flowline. Please revise. See sheet R4. See other minor redline
comments on sheet R4.
Comment Number: 8 Comment Originated: 12/19/2014
12/19/2014: Fox Grove Drive: You are exceeding the maximum 0.4% single point grade
break on Fox Grove Drive at multiple locations. See redlines on sheets R5 and R7.
Comment Number: 9 Comment Originated: 12/19/2014
12/19/2014: Vixen Drive: Please label the slope where Vixen ends at the interim tie-in point
along the south property line. See sheet R9
Comment Number: 10 Comment Originated: 12/19/2014
12/19/2014: Vixen Drive: Rip rap is needed where the curb and gutter terminates on Vixen Dr
at the south property line. See sheet R1
Comment Number: 11 Comment Originated: 12/19/2014
12/19/2014: Additional spot elevation points are needed on all intersection details. Please
reference LCUASS drawings 727 and 728. Also, please label the slope of the curb returns as
noted. See sheet R10 and R11 redlines.
Comment Number: 12 Comment Originated: 12/19/2014
12/19/2014: Please label the transition from vertical curb and gutter on Carriage Pkwy to
roll-over curb and gutter on Kit Den Dr and also on Fox Grove Dr.
Comment Number: 13 Comment Originated: 12/19/2014
12/19/2014: There are a few of the storm drain MH along Fox Grove Dr that are located in the
curb and gutter. Please relocate the MH into the road away from the concrete gutter pan. See
sheet ST1.
Comment Number: 14 Comment Originated: 12/19/2014
12/19/2014: 14.Please label the amount of cover over storm drain line 7. See sheet ST4
Comment Number: 15 Comment Originated: 12/19/2014
12/19/2014: Please label the concrete sidewalk culvert on the Utility Plan (sheet U2) and on
sheet G3. See redlines. Also, please add Storm water construction detail D-12B to the details
sheet for the concrete sidewalk culvert. Contact me if you need this detail.
Comment Number: 16 Comment Originated: 12/19/2014
12/19/2014: See other minor redline comments in the Utility Plan set and contact me with any
questions.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/30/2014
12/30/2014:
Celebration Maple is used as a street tree with the label UAM. It is not on the City Street Tree
List. Celebration maple is a Hybrid maple cross between Red Maple and Silver Maple which
is not adapted to the soils in Fort Collins and does not survive or thrive long term. Please
change this to a species on the City of Fort Collins Street Trees list. Accolade Elm might be
one species to consider as a replacement for the 34 Celebration Maples.
Comment Number: 2 Comment Originated: 12/30/2014
12/30/2014:
Radiant Crab is used as a street tree on lots 60 and 61 by the street light. Please change
Radiant Crab to Chanticleer Pear or Red Baron Crabapple that has a more upright canopy.
Comment Number: 3 Comment Originated: 12/30/2014
12/30/2014:
Only one street tree per lot is feasible on narrow lots that are 60 feet or less in front width to
meet driveway and utility separation standards LUC 3.2.1 D2 a. The following narrow lots appear
to have two trees per lot. (20, 23 31, 35, 40, 43, 49, 51, 53, 57) Reduce trees to one per lot at
these locations and adjust rows for preferred spacing or evaluate these individual lots for actual
driveway and utility separation standards to determine if any extra trees are feasible for some of
these listed lots.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/31/2014
12/31/2014: Please see minor comments on the redlined plans.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 12/29/2014
12/29/2014: Please tie all coordinate values to the project boundary. See redlines.
Comment Number: 2 Comment Originated: 12/29/2014
12/29/2014: There are line over text issues. See redlines.
Comment Number: 3 Comment Originated: 12/29/2014
12/29/2014: There is text that needs to be rotated 180 degrees. See redlines.
Comment Number: 4 Comment Originated: 12/29/2014
12/29/2014: There are text over text issues. See redlines.
Comment Number: 5 Comment Originated: 12/29/2014
12/29/2014: There are cut off text issues. See redlines.
Topic: Easements
Comment Number: 6 Comment Originated: 12/30/2014
12/30/2014: We get a different square footage & acreage for the Access Easement on Lot 1,
Lee MLD. Please provide a closure report to verify the information shown on the legal
description & sketch.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 12/30/2014
12/30/2014: The title in the title blocks do not match the main title on the cover sheet. See
redlines.
Comment Number: 8 Comment Originated: 12/30/2014
12/30/2014: There are sheet titles running under the linework of the title blocks. Please reduce
or rearrange the titles to fit the space. See redlines.
Topic: Plat
Comment Number: 9 Comment Originated: 12/30/2014
12/30/2014: Please add new title commitment information as available.
Comment Number: 10 Comment Originated: 12/30/2014
12/30/2014: The text in the Land Use Table is fuzzy. Please clean it up. See redlines.
Comment Number: 11 Comment Originated: 12/30/2014
12/30/2014: Tract A's use in the Land Use Table on sheet 2 does not match what is shown on
sheet 3. Please rectify. See redlines.
Comment Number: 12 Comment Originated: 12/30/2014
12/30/2014: Curve C102 is missing from the Curve Table on sheet 2. See redlines.
Comment Number: 13 Comment Originated: 12/30/2014
12/30/2014: All reception numbers for documents recorded by separate document, must be
added prior to producing mylars.
Comment Number: 14 Comment Originated: 12/30/2014
12/30/2014: There are line over text issues. See redlines.
Comment Number: 15 Comment Originated: 12/30/2014
12/30/2014: The 20' Sewer Easement per Lee MLD at the northwest corner of the plat, needs
to be tied to the outer boundary. See redlines.
Comment Number: 16 Comment Originated: 12/30/2014
12/30/2014: Please check the distance along the north line of the property. It does not scale
what is shown. See redlines.
Comment Number: 17 Comment Originated: 12/30/2014
12/30/2014: There are several lines that need to be labeled in multiple locations. See redlines.
Comment Number: 18 Comment Originated: 12/30/2014
12/30/2014: Please add bearings, distances & curves as marked. See redlines.
Comment Number: 19 Comment Originated: 12/30/2014
12/30/2014: All easements must be labeled & locatable. See redlines.
Comment Number: 20 Comment Originated: 12/30/2014
12/30/2014: Is the 20' Drainage Easement between Lots 43 & 44 necessary? All of Outlot E is a
Drainage Easement.
Comment Number: 21 Comment Originated: 12/30/2014
12/30/2014: Please remove the bearing & distance shown (marked) along the south boundary.
See redlines.
Comment Number: 22 Comment Originated: 12/30/2014
12/30/2014: There is an arrow defining a 6' Utility Easement on sheet 4, and it is not certain
which line the arrow points to. See redlines.
Comment Number: 23 Comment Originated: 12/30/2014
12/30/2014: Are the rear lines of Lots 64-67 meant to be different from the north line of the 20'
Sewer Easement per Lee MLD? See redlines.
Comment Number: 24 Comment Originated: 12/30/2014
12/30/2014: Please label the use of Outlot G. See redlines.
Comment Number: 25 Comment Originated: 12/30/2014
12/30/2014: Please review the deed & verify Dimensions and other information for the Carriage
Parkway dedication.
Topic: Site Plan
Comment Number: 26 Comment Originated: 12/30/2014
12/30/2014: The title in the title blocks do not match the main title on the cover sheet. See
redlines.
Comment Number: 27 Comment Originated: 12/30/2014
12/30/2014: There are line over text issues. See redlines.
Comment Number: 28 Comment Originated: 12/30/2014
12/30/2014: There are duplicated text issues. See redlines.
Comment Number: 29 Comment Originated: 12/30/2014
12/30/2014: Please remove the "Lot 2" shown on Lots 29 & 30. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 12/29/2014
12/29/2014: For the intersection detail sheets, each intersection needs only one set of street
name signs (not signs on both stop signs). But the street name signs need to include both
street names (criss-crossed above the stop sign). If this is confusing, let me know and I can
explain over the phone.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/29/2014
12/29/2014: The Planning signature block on the plat needs to updated to match the Planning
signature block on the site plan, specifically to read Director of Community Development and
Neighborhood Services.