Loading...
HomeMy WebLinkAboutRIVER DISTRICT BLOCK 8 MIXED-USE - FDP - FDP160025 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSLINCOLN AVE LINDEN ST COLLEGE AVE (US 287) JEFFERSON ST WILLOW ST MOUNTAIN AVE MULBERRY ST LEMAY AVE 35' EOA - EOA 18' FL - CL 17' FL - CL \A1;17' FL - CL 50.5' PARKWAY EXISTING 100' ROW 70' FL - FL 35' FL - CROWN 35' FL - CROWN \A1;35' FL - CROWN 15' PARKWAY EXISTING WILLOW STREET (100' ROW) 11' TRAVEL 11' TRAVEL EXISTING RR TRACKS INTERIM WILLOW STREET (100' ROW) 6.5' SHOULDER 6' SHOULDER ULTIMATE WILLOW STREET (100' ROW) PROPOSED BUILDING 19' DIAGONAL PARKING 16' TRAVEL/ BIKE 19' DIAGONAL PARKING VERTICAL CURB & GUTTER VERTICAL CURB & GUTTER EXISTING 100' ROW 34.5' EOA - FL 16.5' FL - CROWN \A1;16.5' FL - CROWN 50.5' PARKWAY 15' PARKWAY 12' TRAVEL PROPOSED BUILDING 5' AMENITY ZONE 6' BIKE LANE VERTICAL CURB & GUTTER EXISTING 100' ROW EXISTING RR TRACKS 18' FL - CROWN 12' TRAVEL 4.5' SHOULDER EXISTING UNIMPROVED PARKWAY EXISTING EDGE C001 CONSTRUCTION NOTES GENERAL & A. Reese B. Ruch N/A No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\838-013_COVER.dwg LAYOUT NAME: C001 DATE: May 25, 2016 - 8:00am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: G E E VAULT ELEC W C S T ELEC W C S TH TH TH TH TH TH T GAS X X X X X X X X X X X X X X X X X X X X G G G G G G G G G G G G T T T T T T T T T T T T T T W W W T E X X X X X X X X X X X X X X X X X X X X X X OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 X X X X X X X X X X X X X X X X G E E VAULT ELEC W C S T ELEC W C S T GAS X X X X X X X X X X X X X X X X X X X X W W W E E E E E E E X X E E E E E E E E E T W W FO FO FO FO FO FO G SS SS SS SS SS SS SS G E E VAULT ELEC W C S T ELEC W C S T GAS X X X X X X X X X X X X X X X X X X X X W W W E E E E E E E X X E E E E E E E E E T W W FO FO FO FO FO FO G SS SS SS SS SS X X X X X X X X X X X X X X X X X X X X X X D LOT 1 LOT 3 X X X X X X X X LOT 2 X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / S 24" SS 24" SS D 6" W 6" W H Y D LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (PUBLIC ROW VARIES) PROPOSED STORM INLET EXISTING 4960 4965 4970 4975 4980 4960 4965 4970 4975 4980 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 4970.89 4970.19 4969.54 4968.57 4967.49 4971.07 4970.70 4970.51 4970.35 4970.02 4969.86 4969.70 4969.37 4969.21 4968.92 4968.19 4967.83 4967.58 4967.62 4967.74 4967.87 -0.78% -0.75% -0.65% 0.50% 0.50% -0.90% -0.50% -1.05% -1.40% -1.70% -1.30% PVI STA = 10+52.21 PVI ELEV = 4971.25 PVI STA = 10+62.24 PVI ELEV = 4971.17 PVI STA = 11+49.81 PVI ELEV = 4970.51 PVI STA = 13+48.77 PVI ELEV = 4969.22 PVI STA = 15+45.66 PVI ELEV = 4967.72 PVI STA = 15+92.46 PVI ELEV = 4967.96 PVI STA = 14+75.66 PVI ELEV = 4967.57 PVI STA = 14+95.66 PVI ELEV = 4967.47 PVI STA = 13+68.77 G M M T T W C S T GAS T X X X W W W W T T T T T E E E E E E E E E E E E E X X X X X X X E E E E X X X X X D 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / M M T T W C S T T X X X W W W W T T T T T X X X X X X X X X X X X D 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 M M T T W C S T T X X X W W W W T T T T T X X X X X X X X X X X X D 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 G M M GAS X X X X X X X X X X X X X X X X X X X X X X X X X X X OWNER W AND T LEASING 131 E LINCOLN AVE FORT COLLINS, CO 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 FEEDERS SUPPLY LLC OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / C600 WATER DETAILS A. Reese B. Ruch N/A NOT TO SCALE 102 C600 FIRE HYDRANT INSTALLATION All residential water service shall be installed in the center of the lot All water and sanitary sewer service shall have a minimum of the curb stop and meter pit, and no trees within 10 feet of curb and meter pit. No landscaping (shrubs, boulders, etc.), retaining walls or fences allowed within 4 feet Use type K copper for the service from the corporation stop to a minimum of 5 feet up to and including the curb stop. The owner is responsible for service from the The City is responsible for maintaining the water main, corporation stop, and service piping Locate curb box and meter pit according to the approved utility drawings. Install 1 1/2 inch and 2 inch services with tapped tee and corporation stop at time of Use direct tap (as shown) for 3/4 inch and 1 inch services unless water main is PVC, unless otherwise approved by the Utility. horizontal separation of ten feet. No couplings allowed between curb stop and meter setting. curb stop, including the outlet coupling to the building. construction or use a tapping saddle. in which case, use a tapping saddle. GENERAL NOTES 9. 8. 4. 6. 7. 5. WATER MAIN 3. 2. 1. IN FACE OF CURB CUT 4 INCH CROSS CORPORATION STOP FOR PAVEMENT CURB STOP CURB BOX 66 INCH MAX. 54 INCH MIN. CURB, GUTTER AND SIDEWALK DISTANCE VARIES 1 FT. PROPERTY OR EASEMENT LINE GRADE FINAL LANDSCAPED REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 C601 WATER DETAILS A. Reese B. Ruch N/A NOT TO SCALE 109 C601 NOT TO SCALE 107 C601 STANDARD SETTING FOR 3" & 4" WATER METERS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner NOT TO SCALE 108 C601 STANDARD SETTING FOR 3" & 4" WATER METERS NOT TO SCALE 110 C601 CP TEST AND LOCATOR STATION BOX NOT TO SCALE 111 C601 PVC WATER MAIN TRACER WIRE DETAIL No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: C602 SANITARY SEWER DETAILS A. Reese B. Ruch N/A NOT TO SCALE 200 C602 BEDDING REQUIREMENTS COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 LOWER LIMIT OF TRENCH WALL SLOPING INITIAL LIFT * 12 IN. MIN. PIPE O.D. 4 IN. MIN. TRENCH WIDTH AS SPECIFIED IN SECTION 02221 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 * DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL BEDDING REQUIRMENTS WW-1 NBJ 4/11/11 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner NOT TO SCALE 201 C602 STANDARD MANHOLE No. Revisions: C603 SITE DETAILS A. Reese B. Ruch N/A CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NOT TO SCALE 300 C603 CURB AND GUTTER 301 CURB AND GUTTER / SIDEWALK STANDARD DRIVEWAY APPROACH (TYPES III & IV) C603 302 C603 6" 2"R. 2" 6" 6" 12" 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0.5" 4.5" 18" 3.63" 21.75" R 0.13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) Gutter edge may be tapered or battered. (Typical for all Curb & & Gutter Types) DATE: 03/01/02 CURB AND GUTTER URBAN AREA STREET STANDARDS LARIMER COUNTY CONSTRUCTION DRAWINGS REVISION NO: 1 701 DRAWING 7 3/8" (L) 1 3/8" 17" 6" 3 3/8" 14" C604 SITE DETAILS A. Reese B. Ruch N/A CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NOT TO SCALE 307 C604 SIGN POST Max. Sign Panel 1. Attach the sign panels tightly to the post and use oversized washers to keep the sign from breaking loose from the post when hit by a vehicle. 2. Sign panels should be mounted a minimum of 7 feet above the pavement or ground. Cross section of post 3" - 6" ABOVE GRADE 2 1/4" Anchor 3. Signs larger than 36 inches in length or width require wind bracing and special post design. NOTES: 4. Anchor Stub and post are square steel tube (perforated). Anchor/Stub Post Size CRITERIA FOR SINGLE POST 36" x 36" 2.25" x 2.25" x 3'-0" 2" x 2" x 12'-0" 5. All "No Parking" signs shall be installed at 45° from Flow Line. * * 2" x 2" x 10' OR 12' 12 GAUGE TELESPAR POST (22F12A31) 7'-0" MIN. CLEARANCE 2' - 3' FROM F Street Curb REVISION NO: 1 DATE: 04/01/07 STREET STANDARDS CONSTRUCTION DRAWINGS SIGN POST URBAN AREA LARIMER COUNTY DRAWING 1401 See Figure 16-1 SW SAMPLE AVE 2400 R1-1 "STOP" SIGN 30" HIGH DENSITY/DIAMOND GRADE. SIGN MOUNTED TO POST WITH 1 EACH DRIVE RIVET WITH NYLON WASHER AGAINST SIGN FACE (ON TOP OF THE SIGN). THE BOTTOM OF THE SIGN SHALL BE MOUNTED WITH 1 EACH 5/16"x2-1/2" HEW BOLT WITH METAL AND FROM NYLON WASHERS (NYLON WASHER AGAINST SIGN FACE) AND SECURED WITH 1 EACH 5/16" HEX NUT ON THE BACK SIDE OF POST. L 2-1/4" x 2-1/4" x 3' ANCHOR/STUB 2 EACH 8" BLADES MOUNTED TO POST C605 DRAINAGE DETAILS A. Reese B. Ruch N/A NOT TO SCALE 400 C605 STORM BEDDING REQUIREMENTS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CLASS B BEDDING LOWER LIMIT OF UNIFORM GRADED CLASS A BEDDING LOWER LIMIT OF LOWER LIMIT OF MATERIAL TRENCH WIDTHS SHALL BE AS SPECIFIED ON PLANS. REFER TO THE STORM SRAINAGE CONSTRUCTION STANDARDS, SECTION 6, "BEDDING MATERIALS" FOR GRADATIONS. SUBDRAIN DETAIL TRENCH WIDTH AS SPECIFIED TRENCH WIDTH AS SPECIFIED ROCK EXCAVATION TRENCH WIDTH AS SPECIFIED GRANULAR MATERIAL UNSTABLE SUBGRADE TRENCH WIDTH AS SPECIFIED ROCK 1 1/2 IN. COMPACTED GRANULAR OR TRENCH WALL SLOPE COMPACTED C606 DRAINAGE DETAILS A. Reese B. Ruch N/A CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Details\838-013_DETAILS.dwg LAYOUT NAME: C606 DATE: May 25, 2016 - 8:05am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G X X X X X X X X X X X X X X X X X X X X X X D W WV WV WV WV W W WV / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 4366 CO W S O D H Y D CO H Y D LOT 1 LOT 3 LOT 2 ADJACENT BUILDING ADJACENT BUILDING EXISTING 1 STORY CONCRETE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Drng\838-013_EROS.dwg LAYOUT NAME: C701 DATE: May 25, 2016 - 8:06am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xEXST] [838-013_xSITE] [838-013_xTOPO] [838-013_xUTIL] [838-013_xGRAD] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C701 EROSION CONTROL DETAILS A. Reese B. Ruch N/A VEHICLE CONTROL TRACKING PAD WATTLE INSTALLATION %%UWATTLES - DETAIL A FLOW 3'-4' ADJACENT ROLLS SHALL TIGHTLY ABUT W1 NOTES: INSTALLATION: WHEN INSTALLING RUNNING LENGTHS OF WATTLES, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST, DO NOT OVERLAP THE ENDS. STAKE THE WATTLES AT EACH END AND FOUR FOOT ON CENTER. FOR EXAMPLE: A 25 FOOT WATTLE USES 6 STAKES A 20 FOOT WATTLE USES 5 STAKES A 12 FOOT WATTLE USES 4 STAKES STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE. LEAVING 2 - 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. A HEAVY SEDIMENT LOAD WILL TEND TO PICK THE WATTLE UP AND COULD PULL IT OFF THE STAKES IF THEY ARE DRIVEN DOWN TOO LOW. IT MAY BE NECESSARY TO MAKE A HOLE IN THE WATTLE WITH A PICK END OF YOUR LOT 1 LOT 3 D N LOT 2 X X X X X X X X X X X X X X X X X X X X X X D / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W S O S D H Y D CO H Y D LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (PUBLIC ROW VARIES) EXISTING 1 STORY CONCRETE BUILDING EXISTING 1 STORY METAL BUILDING 70 69 71 70 68 69 71 72 72 72 72 70 69 71 72 72 70 72 73 72 PROPOSED STORM DRAIN 18" HDPE STORM DRAIN PROPOSED STORM DRAIN INLET OS1 0.13 OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 30" RCP STORM DRAIN 2 0.07 2 OS1 3 0.013 BUILDING 2 BUILDING 1 1 PROPOSED SPILL CONTAINMENT AREA PROPOSED DRAIN BASIN PROPOSED TRENCH DRAIN PROPOSED DRAIN BASIN PROPOSED DRAIN BASIN PROPOSED DRAIN BASIN PROPOSED DRAIN BASIN PROPOSED DRAIN BASIN PROPOSED DRAIN BASIN 1 1.01 3 0.17 PROPOSED DRAIN BASIN EXISTING 24" RCP STORM DRAIN EXISTING STORM DRAIN INLETS EXISTING 24" RCB STORM DRAIN DOWNSPOUTS PIPED TO TREE GRATES (TYP.) EXISTING 42" RCP STORM DRAIN CONNECT TO EXISTING MANHOLE ROOF DRAIN SYSTEM (TYP.) ROOF DRAIN SYSTEM (TYP.) PROPOSED OUTLET CONTROL STRUCTURE PROPOSED STORMTECH CHAMBERS ROOF DRAIN SYSTEM (TYP.) CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C800 DRAINAGE EXHIBIT A. Reese B. Ruch 1"=30' BENCHMARK PROJECT DATUM: NAVD88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 03-00 ON A PARAPET WALL AT THE NORTHWEST END OF THE LINCOLN AVE. BRIDGE NEAR THE NORTHEAST CORNER OF LINCOLN AVE. AND WILLOW ST. ELEVATION=4967.33 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 05-00 ON THE TOP OF CURB AT THE SIGNAL POLE BASE AT THE NORTHWEST CORNER OF LINDEN ST. AND JEFFERSON ST. ELEVATION=4978.05 PLEASE NOTE: THIS PLAN SET IS USING NAVD 88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD 29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD 29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD 29 UNADJUSTED = NAVD 88 - 3.18' BASIS OF BEARING THE BASIS OF BEARINGS IS THE SOUTHEASTERLY LINE OF BLOCK 9, TOWN OF FORT COLLINS AS BEARING S41°40'49"W (ASSUMED BEARING). NOTES: 1. REFER TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR RIVER DISTRICT BLOCK EIGHT MIXED-USE DATED MAY 25, 2016 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 120 No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Drng\838-013_DRNG.dwg LAYOUT NAME: C801 DATE: May 25, 2016 - 8:06am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xEXST] [838-013_xSITE] [838-013_xTOPO] [838-013_xUTIL] [838-013_xGRAD] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C 0.60 ac LEGEND: 4953 PROPOSED CONTOUR PROPOSED STORM SEWER EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET DESIGN POINT A FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY BASIN DESIGNATION BASIN AREA (AC) DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C10 C100 10-yr Tc (min) 100-yr Tc (min) Q10 (cfs) Q100 (cfs) 1 1 1.01 0.88 1.00 5.2 5.0 4.4 10.1 2 2 0.07 0.92 1.00 5.0 5.0 0.3 0.7 3 3 0.17 0.92 1.00 5.0 5.0 0.7 1.6 OS1 OS1 0.13 0.81 1.00 5.0 5.0 0.5 1.3 MADDOX IN ORDER TO GET THE STAKE THROUGH THE STRAW. WHEN STRAW WATTLES ARE USED FOR FLAT GROUND APPLICATIONS, DRIVE THE STAKES STRAIGHT DOWN; WHEN INSTALLING WATTLES ON SLOPES, DRIVE THE STAKES PERPENDICULAR TO THE SLOPE. DRIVE THE FIRST END STAKE OF THE SECOND WATTLE AT AN ANGLE TOWARD THE FIRST WATTLE IN ORDER TO HELP ABUT THEM TIGHTLY TOGETHER. IF YOU HAVE DIFFICULTY DRIVING THE STAKE INTO EXTREMELY HARD OR ROCKY SLOPES, A PILOT BAR MAY BE NEEDED TO BEGIN THE STAKE HOLE. 1"x 1" WOOD STAKES 18"-24" BAILING WIRE OR NYLON ROPE WATTLE "A" WATTLE "B" 1' 2' TYP. 1' 1' %%UWATTLES - DETAIL B W2 NOTES: INSTALLATION: STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. WHEN INSTALLING RUNNING LENGTHS OF WATTLES, TO PREVENT SHIFTING, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST. DO NOT OVERLAP THE ENDS. STAKES SHOULD BE DRIVEN 1 FT. FROM END, ACROSS FROM AND ON EACH SIDE OF WATTLE LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO STAKES IN AN HOUR GLASS FORMATION (FRONT TO BACK OF WATTLE "A", ACROSS TO FRONT OF WATTLE "B", ACROSS TO BACK AND BACK TO FRONT OF WATTLE "A"). STAKES SHOULD THEN BE DRIVEN IN UNTIL BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. SEDIMENT DEPOSITION ZONE STORM WATER LINE WEIGHTED WATTLE LIP OF GUTTER SIDEWALK EXISTING OR PROPOSED INLET TOP BACK CURB FLOW LINE %%uCURB INLET WATTLE PROTECTION SETUP%%u SEDIMENT DEPOSITION ZONE STORM WATER LINE LIP OF GUTTER WEIGHTED WATTLE AT 45 DEG. TO CURB SIDEWALK TOP BACK CURB FLOW LINE SIDEWALK TOP BACK CURB FLOW LINE W4 NOTES: 1. NUMBER OF WATTLES AND SPACING SHOULD BE DETERMINED BY THE SLOPE AND SITE CONDITIONS. 2. TUBULAR MARKERS SHALL MEET THE REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 3. CITY RECOMMENDS INSTALLING AT LEAST 3 CHECKDAMS WHEN USING THIS SETUP. LIP OF GUTTER WEIGHTED WATTLE W1 & W2 INSTALLATION NOTES: 1. THE LOCATION AND LENGTH OF WATTLE IS DEPENDENT ON THE CONDITIONS OF EACH SITE. 2. WATTLES SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. 3. WATTLES SHALL CONSIST OF STRAW, COMPOST, EXCELSIOR, OR COCONUT FIBER. 4. NOT FOR USE IN CONCENTRATED FLOW AREAS. 5. THE WATTLES SHALL BE TRENCHED INTO THE GROUND A MINIMUM OF TWO (2) INCHES. 6. WATTLES SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 7. ON SLOPES, WATTLES SHOULD BE INSTALLED ON CONTOUR WITH A SLIGHT DOWNWARD ANGLE AT THE END OF THE ROW IN ORDER TO PREVENT PONDING AT THE MID SECTION. 8. RUNNING LENGTHS OF WATTLES SHOULD BE ABUTTED FIRMLY TO ENSURE NO LEAKAGE AT THE ABUTMENTS. 9. SPACING - DOWNSLOPE: 10. VERTICAL SPACING FOR SLOPE INSTALLATIONS SHOULD BE DETERMINED BY SITE CONDITIONS. SLOPE GRADIENT AND SOIL TYPE ARE THE MAIN FACTORS. A GOOD RULE OF THUMB IS: 1:1 SLOPES = 10 FEET APART 2:1 SLOPES = 20 FEET APART 3:1 SLOPES = 30 FEET APART 4:1 SLOPES = 40 FEET APART, ETC. 11. HOWEVER, ADJUSTMENTS MAY HAVE TO BE MADE FOR THE SOIL TYPE: FOR SOFT, LOAMY SOILS - ADJUST THE ROWS CLOSER TOGETHER; FOR HARD, ROCKY SOILS - ADJUST THE ROWS FURTHER APART. A SECONDARY WATTLE PLACED BEHIND THE ABUTMENT OF TWO WATTLES IS ENCOURAGED ON STEEP SLOPES OR WHERE JOINTS HAVE FAILED IN THE PAST. 12. STAKING: THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES. 1/2" TO 5/8" REBAR IS ALSO ACCEPTABLE. BE SURE TO USE A STAKE THAT IS LONG ENOUGH TO PROTRUDE SEVERAL INCHES ABOVE THE WATTLE: 18" IS A GOOD LENGTH FOR HARD, ROCKY SOIL. FOR SOFT LOAMY SOIL USE A 24" STAKE. 4"-6" ABOVE WATTLE AFTER BAILING WIRE OR NYLON ROPE IS ATTACHED. STAKES NEED TO BE TAMPED UNTIL WIRE/ROPE IS SNUG WITH WATTLE. W3 NOTE: IF THE AREA BEHIND THE INLET IS NOT STABILIZED, A BMP SHOULD BE USED TO PREVENT SEDIMENT FROM ENTERING THE INLET 1"x 1" WOOD STAKES 18"-24" W1 THE CONTRACTOR SHALL INSPECT WATTLES EVERY TWO WEEKS AND AFTER ANY SIGNIFICANT STORM EVENT AND MAKE REPAIRS OR REMOVE SEDIMENT ACCUMULATED BEHIND WATTLE AS NECESSARY. SEDIMENT ACCUMULATED BEHIND WATTLE SHALL BE REMOVED WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DIAMETER OF THE WATTLE. WATTLES SHALL REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND IS ACCEPTED BY THE CITY. WATTLE MAINTENANCE NOTES: 1. 2. 3. ENDS SHALL ABUT TIGHTLY TO BACK OF CURB END SHALL ABUT TIGHTLY TO BACK OF CURB ENDS OF ADJACENT WATTLES SHALL BE TIGHTLY ABUTTED TO PREVENT SEDIMENT BYPASS 4' MAX. {\LPERVIOUS INSTALLATION} {\LIMPERVIOUS INSTALLATION} SEDIMENT DEPOSITION ZONE W3 W2 NOTE: ONLY WATTLES MADE WITH COCONUT FIBERS SHALL BE USED WHEN INSTALLATION COMES IN CONTACT WITH A WATER BODY. SIDEWALK CULVERT/CHASE/PAN W4 W3, W4 & W5 NOTES: 1. WHEN USING STRAW WATTLE, THE STRAW WATTLE MUST HAVE A WEIGHTED CORE. 2. ALL PRODUCTS SHALL BE INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS. 3. OTHER PRODUCTS MAY BE USED IN PLACE OF WEIGHTED WATTLES UPON WRITTEN APPROVAL FROM THE CITY. NOTE: A COPY OF DETAILS AND SPECIFICATIONS WILL NEED TO BE INCORPORATED INTO THE SWMP. END SHALL TIGHTLY ABUT TO BACK OF CURB SEDIMENT DEPOSITION ZONE W5 TUBULAR MARKER EXISTING OR PROPOSED INLET %%UCONCRETE CHASE/TRICKLE CHANNEL SETUP END SHALL TIGHTLY ABUT TO BACK OF CURB %%UCURBSIDE CHECKDAMS SETUP VEHICLE TRACKING CONTROL PAD SHALL BE LOCATED AT EVERY ACCESS POINT TO THE CONSTRUCTION SITE. A SIGN SHALL BE PLACED NEXT TO THE VEHICLE TRACKING CONTROL PAD TO DESIGNATE THE LOCATION AS THE CONSTRUCTION ENTRANCE/EXIT. VEHICLE TRACKING CONTROL PADS SHALL CONSIST OF HARD, DENSE, DURABLE STONE, ANGULAR IN SHAPE AND RESISTANT TO WEATHERING. ROUNDED STONE (i.e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x4'S, PIPES, DIRT, GRAVEL OR ASPHALT, SHALL BE PLACED IN GUTTER TO FACILITATE MOUNTING CURB; HOWEVER, CURB MAY BE CUT DOWN TO A HEIGHT OF 2" OR HIGHER FOR EASIER ACCESS AND REPLACED AT PROJECT COMPLETION. OTHER ACCESS DEVICES MAY BE USED AS ACCEPTED BY THE CITY. 3" - 6" ROCK CURB CUT 50' MIN. 2" MIN. 6" MIN. 6" MIN. ALTHOUGH NOT NORMALLY USED, THE CITY RESERVES THE RIGHT TO REQUIRE VEHICLE TRACKING CONTROL WITH A TEMPORARY CATTLE GUARD AND/OR WHEEL WASH FACILITIES AT SITES WHERE TRACKING ONTO PAVED AREAS BECOMES A SIGNIFICANT PROBLEM AS DETERMINED BY THE CITY INSPECTOR. IF VEHICLE TRACKING CONTROL WITH WHEEL WASH FACILITIES ARE REQUIRED, ALL WHEELS ON EVERY VEHICLE LEAVING THE SITE SHALL BE CLEANED OF MUD USING A PRESSURE-WASHER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A WATER SOURCE AND CONSTRUCTING A WASHWATER SEDIMENT TRAP. 5. 6. IF VEHICLE WHEEL WASH FACILITIES ARE REQUIRED, CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL AND WHEEL WASH FACILITIES DAILY. ACCUMULATED SEDIMENTS SHALL BE REMOVED FROM THE PAD SURFACE. ACCUMULATED SEDIMENT IN THE WASHWATER/SEDIMENT TRAP SHALL BE REMOVED WHEN THE SEDIMENT REACHES AN AVERAGE DEPTH OF 12-INCHES. 4. 5. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. LOCATION OF CONCRETE WASHOUT AREA IS CONCEPTUAL ONLY. FINAL LOCATION TO BE DETERMINED IN THE FIELD AT CONTRACTOR'S DISCRETION. {NOTES: }1. 2. 3. 4. 5. 6. 7. 3H:1V OR FLATTER SIDE SLOPES \A1;12" MIN 8'x 8' MIN OR AS REQUIRED TO CONTAIN WASTE CONCRETE \A1;12" \A1;2'-0" MIN. COMPACTED EMBANKMENT MATERIAL, TYP. BERM AROUND PERIMETER GROUND SURFACE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA CONCRETE WASHOUT AREA WIRE ENCLOSED 1 1/2" CRUSHED ROCK DROP INLET PERIMETER PLACED AROUND CINDER BLOCKS 1 1/2" CRUSHED ROCK WIRE ENCLOSED DROP INLET BLOCK INLET DROP RUNOFF FILTERED OVERFLOW %%USECTION A-A %%UPLAN VIEW STACKED 24" HIGH (2) CINDER BLOCKS %%UAND GRAVEL FILTER A A DROP INLET WITH GRATE WITH NO GAPS (TYP.) TIGHTLY ABUTTING %%UWATTLE FILTER DROP INLET INLET %%UPLAN VIEW \A1;ENTRENCH 3" CORNERS. EXCESS AT FRAME. GATHER AND STAPLE TO WITH GEOTEXTILE WRAP WOOD FRAME WOOD FRAME WOOD FRAME 2'' X 4'' WITH GRATE DROP INLET 3' 0'' 1' 6'' MAX. A DEPTH OF 6'' X 6'' BURY GEOTEXTILE AT %%uDROP INLET SILT FENCE BOX FLOW FLOW NOTE: ENTRENCH WATTLE 3" INTO NATURAL GROUND AT THE OUTSIDE EDGE OF CONCRETE APRON INLET PROTECTION AT AREA INLETS SHALL BE INSTALLED WITHIN 48 HOURS OF POURING INLET. CRUSHED ROCK SHALL BE FRACTURED FACE (ALL SIDES) AND SHALL COMPLY WITH A 1-1/2" MINUS GRADATION. RECYCLED CONCRETE MEETING THIS GRADATION MAY BE USED. WIRE MESH SHALL BE FABRICATED OF 10 GAUGE WIRE TWISTED INTO A MESH WITH A MAXIMUM OPENING OF 1" (COMMONLY TERMED "CHICKEN WIRE"). ROLL WIDTH SHALL BE 48". IT IS RECOMMENDED THAT FILTER FABRIC, SUCH AS GRATE MATES OR EQUIVALENT, OR OTHER TEMPORARY BMP BE PLACED BENEATH THE INLET GRATE AND MAINTAINED UNTIL THE SURROUNDING AREA DRAINING TO THE INLET IS SUFFICIENTLY STABILIZED. OTHER AREA INLET PROTECTION METHODS WILL BE ALLOWED IF ACCEPTED BY THE CITY. { GENERAL NOTES: }1. 2. 3. 4. 5. THE CONTRACTOR SHALL INSPECT INLET PROTECTION EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF INLET PROTECTION SHALL BE REMOVED WHEN THE SEDIMENT DEPTH REACHES 1/2 OF THE DESIGN DEPTH. TO PREVENT CLOGGING, INLET GRATE FILTER FABRIC SHOULD BE CLEANED OR REPLACED PERIODICALLY. INLET PROTECTION IS TO REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED. WHEN INLET PROTECTION AT AREA INLETS ARE REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. {MAINTENANCE NOTES: }1. 2. 3. 4. 5. WATTLE WATTLE OR NOTE: INSTALLATION OF WATTLE STAKES MAY VARY (10" MIN. DIAMETER) DROP INLET PROTECTION MANHOLE ROCK BERM SHALL 2"x 4" WOOD STUD EXTENDED INTO CONCRETE BLOCKS WIRE ENCLOSED 1 1/2" WASHED ROCK CONCRETE BLOCKS CURB INLET GRAVEL FILTER WIRE SHALL ENCLOSED BE 2"x4" WOOD STUD OVERFLOW FILTERED RUNOFF %%uSECTION A-A A A %%uPLAN VIEW {CURB INLET GRAVEL FILTER (CONTINUOUS GRADE)} %%uSECTION B-B %%uPLAN VIEW B B ROCK BERM SHALL BE PLACED TIGHTLY AGAINST CURB FACE WIRE ENCLOSED 1 1/2" WASHED ROCK CURB AND GUTTER CURB AND GUTTER BE PLACED TIGHTLY AGAINST CURB FACE GRAVEL FILTER 1/2" TO 1" BELOW TOP OF CURB TUBULAR MARKER IF AREA ADJACENT TO CURB INLET BOX IS NOT STABILIZED, INSTALL A TEMPORARY SEDIMENT/EROSION CONTROL BMP UNTIL THE SURROUNDING AREA IS SUFFICIENTLY STABILIZED. TUBULAR MARKER TUBULAR MARKER \A1;3' \A1;2' CURB INLET WIRE ENCLOSED SETTLED RUNOFF GRAVEL FILTER CURB INLET MANHOLE {CURB INLET BLOCK AND GRAVEL FILTER (INLET IN SUMP)} INTERIM CONFIGURATION INLET PROTECTION IN STREETS SHALL BE INSTALLED WITHIN 48 HOURS OF POURING INLET. INLET PROTECTION (AFTER PAVING) SHALL BE INSTALLED WITHIN 48 HOURS AFTER PAVING IS PLACED. WASHED ROCK SHALL COMPLY WITH A 1-1/2" MINUS GRADATION. WIRE MESH SHALL BE FABRICATED OF 10 GAUGE WIRE TWISTED INTO A MESH WITH A MAXIMUM OPENING OF 1" (COMMONLY TERMED "CHICKEN WIRE"). ROLL WIDTH SHALL BE 48". TUBULAR MARKERS SHALL MEET REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). OTHER CURB INLET PROTECTION METHODS WILL BE ALLOWED IF ACCEPTED BY THE CITY. {GENERAL NOTES: }1. 2. 3. 4. 5. THE CONTRACTOR SHALL INSPECT INLET PROTECTION EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF INLET PROTECTION SHALL BE REMOVED WHEN THE SEDIMENT DEPTH UPSTREAM OF ROCK BERM IS 2 1/2" OF THE CREST. INLET PROTECTION IS TO REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED. UNLESS THE CITY ACCEPTS EARLIER REMOVAL OF INLET PROTECTION IN STREETS. {MAINTENANCE NOTES: }1. 2. 3. 4" MIN 5" MAX \A1;BMP WIDTH VARIES \A1;BMP WIDTH VARIES \A1;BMP WIDTH VARIES \A1;BMP WIDTH VARIES TUBULAR MARKER TUBULAR MARKER CURB INLET PROTECTION W VTC RS CWA IP IP CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner 0" ON BEDROCK OR HARD SURFACE, 2" IN SOIL ROCK SOCK SECTION ROCK SOCK PLAN 4" TO 6" MAX AT CURBS, OTHERWISE 6"-10" DEPENDING ON EXPECTED SEDIMENT LOADS ROCK SOCK JOINTING \A1;12" \A1;12" {ROCK SOCK INSTALLATION NOTES }1.SEE PLAN VIEW FOR: - LOCATION (S) OF ROCK SOCKS. 2.CRUSHED ROCK SHALL BE 1{}" (MINUS) IN SIZE WITH A FRACTURED FACE (ALL SIDES) AND SHALL COMPLY WITH GRADATION SHOWN ON THIS SHEET (1{}" MINUS). 3.WIRE MESH SHALL BE FABRICATED OF 10 GAGE POULTRY MESH, OR EQUIVALENT, WITH A MAXIMUM OPENING OF {}", RECOMMENDED MINIMUM ROLL WIDTH OF 48". 4.WIRE MESH SHALL BE SECURED USING "HOG RINGS" OR WIRE TIES AT 6" CENTERS ALONG ALL JOINTS AND AT 2" CENTERS ON ENDS OF SOCKS. 5.SOME MUNICIPALITIES MAY ALLOW THE USE OF FILTER FABRIC AS AN ALTERNATIVE TO WIRE MESH FOR THE ROCK ENCLOSURE. GRADATION TABLE SIEVE SIZE MASS PERCENT PASSING SQUARE MESH SIEVES NO. 4 2" 100 1-1/2" 90-100 1" 20-55 3/4" 0-15 3/8" 0-5 MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE, ALL SIDES ROCK SOCK NOT TO SCALE 001 C701 NOT TO SCALE 002 C701 NOT TO SCALE 003 C701 NOT TO SCALE 004 C701 NOT TO SCALE 005 C701 NOT TO SCALE 006 C701 007 C701 NOT TO SCALE WIRE ENCLOSED 1 1/2" WASHED ROCK CURB AND GUTTER TUBULAR MARKER \A1;2' TEMPORARY CONSTRUCTION FENCE w/ ROCK SOCK TEMPORARY CHAIN-LINK FENCE ROCK SOCK TEMPORARY CHAIN-LINK FENCE ROCK SOCK SIDE VIEW CF X BUILDING EXISTING 1 STORY METAL BUILDING 70 69 71 70 68 69 71 72 72 72 72 70 69 71 72 72 70 72 73 72 CWA X X X X X X X X X X X X X X X CONSTRUCTION FENCE w/ ROCK SOCK CONSTRUCTION FENCE w/ ROCK SOCK X X X X X X X X X X X X X X LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (PUBLIC ROW VARIES) RS IP IP IP RS VTC RS RS RS RS OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 IP X X X BUILDING 2 BUILDING 1 CF CF CF CF IP W IP W W W W W W IP IP W IP IP IP IP IP IP IP IP C700 EROSION CONTROL PLAN A. Reese B. Ruch 1"=30' 1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 10. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 11. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 12. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 13. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 14. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 15. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. EROSION CONTROL NOTES: City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: River District Block Eight MIxed-Use CONSTRUCTION PHASE PHASE I PHASE II PHASE III PHASE IV Grading (Include Offsite) Overlot Pipeline Installation Stormwater Concrete Installation Site Walls Building Structure Miscellaneous Hardscape Amenities BEST MANAGEMENT PRACTICES Temporary Inlet Protection (IP) Vehicle Tracking Control (VTC) Flow Barriers (Bales, Wattles, etc.) (WD) Concrete Washout Area (CWA) Preventative Maintenance Activities/Meetings/etc. Construction Fence w/ Rock Sock (CF) Permanent Mulching/Sealant Sewer Service Water Service Curb and Gutter FIELD SURVEY BY: BENCHMARKS: PROJECT DATUM: NAVD88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 03-00 ON A PARAPET WALL AT THE NORTHWEST END OF THE LINCOLN AVE. BRIDGE NEAR THE NORTHEAST CORNER OF LINCOLN AVE. AND WILLOW ST. ELEVATION=4967.33 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 05-00 ON THE TOP OF CURB AT THE SIGNAL POLE BASE AT THE NORTHWEST CORNER OF LINDEN ST. AND JEFFERSON ST. ELEVATION=4978.05 PLEASE NOTE: THIS PLAN SET IS USING NAVD 88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD 29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD 29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD 29 UNADJUSTED = NAVD 88 - 3.18' BASIS OF BEARING THE BASIS OF BEARINGS IS THE SOUTHEASTERLY LINE OF BLOCK 9, TOWN OF FORT COLLINS AS BEARING S41°40'49"W (ASSUMED BEARING). CONSTRUCTION FENCE w/ ROCK SOCK CF INLET PROTECTION IP WATTLE PROTECTION W ROCK SOCK RS VEHICLE TRACKING PAD VTC X 1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS (AS APPLICABLE). 2. TOTAL DISTURBED AREA = 1.64 ACRES 3. SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 5. SEE "GRADING & EROSION CONTROL NOTES" ON SHEET C001 OF THE UTILITY PLAN SET FOR RIVER DISTRICT BLOCK EIGHT MIXED-USE PREPARED BY NORTHERN ENGINEERING DATED MAY 25, 2016 FOR ADDITIONAL INFORMATION. 6. REFER TO THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR RIVER DISTRICT BLOCK EIGHT MIXED-USE DATED MAY 25, 2016 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. GENERAL NOTES: CWA CONCRETE WASHOUT AREA NOTE: ALL BMP'S SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR AND DOCUMENTED ON THE DYNAMIC SITE PLAN. LEGEND: 4953 PROPOSED CONTOUR PROPOSED STORM SEWER EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 838-013 DATE: JULY 2014 No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Drng\838-013_EROS.dwg LAYOUT NAME: C700 DATE: May 25, 2016 - 8:06am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xEXST] [838-013_xSITE] [838-013_xTOPO] [838-013_xUTIL] [838-013_xGRAD] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET DWG SIZE A SCALE 1:40 SHEET 1 OF 1 DWG NO. 7001-110-042 REV C 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 8 IN - 30 IN TYPICAL INSTALLATION OPTIONS TITLE PROJECT NO./NAME MATERIAL DATE APPD BY DATE 8-10-00 THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH DRAWN BY AWA NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 8-10-00 CJA DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST T S A L P O L Y N D U C T I L E I R O N T S A L P O L Y N D U C T I L E I R O N DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST WHEN ARE DRAIN BASINS USED? 2808AG _ _ X 2810AG _ _ X 2812AG _ _ X 2815AG _ _ X 2818AG _ _ X 2824AG _ _ X 2830AG _ _ X WHEN ARE INLINE DRAINS USED? 2708AG _ _ X 2710AG _ _ X 2712AG _ _ X 2715AG _ _ X 2718AG _ _ X 2724AG _ _ X 2730AG _ _ X TYPICAL INSTALLATIONS TYPICAL INSTALLATION OF NYLOPLAST DRAIN BASIN AND INLINE DRAIN 1: TO ENTER AN EXISTING LINE USING A TEE & RISER 2: AT THE BEGINNING OF A DRAIN LINE USING AN ELBOW & RISER TEE ELBOW 12" DRAIN BASIN 2 INLET & OUTLET ADAPTERS CAN BE PUT ON ANY ANGLE 1: TO CHANGE ELEVATION 2: TO CHANGE PIPE DIAMETER 3: TO CHANGE PIPE TYPE 4: FOR SHALLOW APPLICATIONS 5: TO CHANGE DIRECTION A° RISER DRAIN BASIN INLINE DRAIN 10" INLINE DRAIN 10" INLINE DRAIN 3 VARIABLE ELEVATION WATERTIGHT ADAPTERS AVAILABLE FOR MOST COMMON PLASTIC PIPING SYSTEMS 8" 6" CORRUGATED HDPE PIPE SMOOTH WALL PVC 1 - STRUCTURES & ADAPTERS AVAILABLE IN SIZES 8" - 30" 2 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°, TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-012, 7001-110-013, & 7001-110-014 3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS SEE DRAWING NO. 7001-110-065 NOT TO SCALE 407 C606 TYPICAL BASIN INSTALLATION OPTIONS STORMTECH GENERAL NOTES 1. STORMTECH REQUIRES INSTALLING CONTRACTORS TO USE AND UNDERSTAND STORMTECH'S LATEST INSTALLATION INSTRUCTIONS PRIOR TO BEGINNING SYSTEM INSTALLATION. 2. OUR TECHNICAL SERVICES DEPARTMENT OFFERS INSTALLATION CONSULTATIONS TO INSTALLING CONTRACTORS. CONTACT OUR TECHNICAL SERVICES REPRESENTATIVE AT LEAST 30 DAYS PRIOR TO SYSTEM INSTALLATION TO ARRANGE A PRE-INSTALLATION CONSULTATION. OUR REPRESENTATIVES CAN THEN ANSWER QUESTIONS OR ADDRESS COMMENTS ON THE STORMTECH CHAMBER SYSTEM AND INFORM THE INSTALLING CONTRACTOR OF THE MINIMUM INSTALLATION REQUIREMENTS BEFORE BEGINNING THE SYSTEM'S CONSTRUCTION. CALL 1-888-892-2694 TO SPEAK TO A TECHNICAL SERVICES REPRESENTATIVE OR VISIT WWW. STORMTECH.COM TO RECEIVE A COPY OF OUR INSTALLATION INSTRUCTIONS. 3. STORMTECH'S REQUIREMENTS FOR SYSTEMS WITH PAVEMENT DESIGN (ASPHALT, CONCRETE PAVERS, ETC.):MINIMUM COVER IS 18" [457 mm] NOT INCLUDING PAVEMENT; MAXIMUM COVER IS 96" [2438 mm] INCLUDING PAVEMENT. FOR INSTALLATIONS THAT DO NOT INCLUDE PAVEMENT, WHERE RUTTING FROM VEHICLES MAY OCCUR, MINIMUM REQUIRED COVER IS 24" [610 mm], MAXIMUM COVER IS 96" [2.438 m]. 4. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE DESIGN ENGINEER. 5. AASHTO M288 CLASS 2 NON-WOVEN GEOTEXTILE (FILTER FABRIC) MUST BE USED AS INDICATED IN THE PROJECT PLANS. 6. STONE PLACEMENT BETWEEN CHAMBERS ROWS AND AROUND PERIMETER MUST FOLLOW INSTRUCTIONS AS INDICATED IN THE MOST CURRENT VERSION OF STORMTECH'S INSTALLATION INSTRUCTIONS. 7. BACKFILLING OVER THE CHAMBERS MUST FOLLOW REQUIREMENTS AS INDICATED IN THE MOST CURRENT VERSION OF STORMTECH'S INSTALLATION INSTRUCTIONS. 8. THE CONTRACTOR MUST REFER TO STORMTECH'S INSTALLATION INSTRUCTIONS FOR A TABLE OF ACCEPTABLE VEHICLE LOADS AT VARIOUS DEPTHS OF COVER. THIS INFORMATION IS ALSO AVAILABLE AT STORMTECH'S WEBSITE: WWW.STORMTECH.COM. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING VEHICLES THAT EXCEED STORMTECH'S REQUIREMENTS FROM TRAVELING ACROSS OR PARKING OVER THE STORMWATER SYSTEM. TEMPORARY FENCING, WARNING TAPE AND APPROPRIATELY LOCATED SIGNS ARE COMMONLY USED TO PREVENT UNAUTHORIZED VEHICLES FROM ENTERING SENSITIVE CONSTRUCTION AREAS. 9. THE CONTRACTOR MUST APPLY EROSION AND SEDIMENT CONTROL MEASURES TO PROTECT THE STORMWATER SYSTEM DURING ALL PHASES OF SITE CONSTRUCTION PER LOCAL CODES AND DESIGN ENGINEER'S SPECIFICATIONS. 10. STORMTECH PRODUCT WARRANTY IS LIMITED. SEE CURRENT PRODUCT WARRANTY FOR DETAILS. TO ACQUIRE A COPY CALL STORMTECH AT 1-888-892-2694 OR VISIT WWW.STORMTECH.COM DRAWN BY: SCALE: DATE: CHECKED: THE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND ADVANCED DRAINAGE SYSTEMS, INC. PROJECT REQUIREMENTS. R 70 INWOOD ROAD, SUITE 3 | ROCKY HILL, CT 06067 PHONE: 888-892-2694 | FAX: 866-328-8401 Detention Retention Recharge Subsurface Stormwater ManagementSM WWW.STORMTECH.COM STORMTECH GENERAL NOTES N/A 3/30/10 KLJ NOT TO SCALE 408 C606 STORMTECH GENERAL NOTES NOT TO SCALE 409 C606 STORMTECH CROSS SECTION NOT TO SCALE 410 C606 STORMTECH ISOLATOR ROW DETAILS NOT TO SCALE 411 C606 STORMTECH TECHNICAL SPECIFICATIONS SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 1-800-733-7473 ADVANCED DRAINAGE SYSTEMS, INC. R REV DRW CHK DESCRIPTION 01/19/16 JLM JLM UPDATE MC-3500 STANDARD CROSS SECTION 11/18/14 JLM 1 1 JLM 70 INWOOD ROAD, SUITE 3 | ROCKY HILL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. NOTES: 1. MC-3500 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS. 4. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 4 A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 4 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE. ² ³ 45" (1140 mm) 24" (600 mm) MIN* 8' (2.4 m) MAX 77" (1950 mm) 12" (300 mm) TYP ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS SUBGRADE SOILS (SEE NOTE 4) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) MC-3500 END CAP 12" (300 mm) MIN 9" (230 mm) MIN DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 9" (230 mm) MIN D C B A *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 30" (750 mm). PERIMETER STONE (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 6" (150 mm) MIN \A1;6" (150 mm) MIN NO COMPACTION REQUIRED. SHEET OF DATE: PROJECT #: DRAWN: CHECKED: THIS DRAWING HAS BEEN PREPARED BASED ON INFORMATION PROVIDED TO ADS UNDER THE DIRECTION OF THE SITE DESIGN ENGINEER OR OTHER PROJECT REPRESENTATIVE. THE SITE DESIGN ENGINEER SHALL REVIEW THIS DRAWING PRIOR TO CONSTRUCTION. IT IS THE ULTIMATE RESPONSIBILITY OF THE SITE DESIGN ENGINEER TO ENSURE THAT THE PRODUCT(S) DEPICTED AND ALL ASSOCIATED DETAILS MEET ALL APPLICABLE LAWS, REGULATIONS, AND PROJECT REQUIREMENTS. 4640 TRUEMAN BLVD HILLIARD, OH 43026 1-800-733-7473 ADVANCED DRAINAGE SYSTEMS, INC. R REV DRW CHK DESCRIPTION 01/19/16 JLM JLM UPDATE MC-3500 ISOLATOR ROW DETAILS 11/18/14 JLM 1 1 JLM 70 INWOOD ROAD, SUITE 3 | ROCKY HILL | CT | 06067 860-529-8188 |888-892-2694 | WWW.STORMTECH.COM Detention Retention Water Quality INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR ROWS B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-CORED END CAP PART #: MC3500IEPP24BC TWO LAYERS OF ADS GEOSYNTHETICS 315WTM WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS CATCH BASIN OR MANHOLE COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE MC-3500 CHAMBER MC-3500 END CAP MC-3500 ISOLATOR ROW DETAIL NTS OPTIONAL INSPECTION PORT STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES MC-3500 CHAMBER 18" (450 mm) MIN WIDTH CONCRETE SLAB 8" (200 mm) MIN THICKNESS PAVEMENT FLEXSTORM CATCH IT PART# 6212NYFX WITH USE OF OPEN GRATE 12" (300 mm) NYLOPLAST INLINE DRAIN BODY W/SOLID HINGED COVER OR GRATE PART# 2712AG6IP SOLID COVER: 1299CGC GRATE: 1299CGS CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 6" (150 mm) INSERTA TEE PART#6IPSSWST35IP INSERTA TEE TO BE CENTERED ON CORRUGATION CREST MC-3500 6" INSPECTION PORT DETAIL NTS 6" (150 mm) DWV SCH40 PIPE (BY OTHERS) CONCRETE COLLAR PART # STUB B C MC3500IEPP06T 6" (150 mm) 33.21" (844 mm) --- MC3500IEPP06B --- 0.66" (17 mm) MC3500IEPP08T 8" (200 mm) 31.16" (791 mm) --- MC3500IEPP08B --- 0.81" (21 mm) MC3500IEPP10T 10" (250 mm) 29.04" (738 mm) --- MC3500IEPP10B --- 0.93" (24 mm) MC3500IEPP12T 12" (300 mm) 26.36" (670 mm) --- MC3500IEPP12B --- 1.35" (34 mm) MC3500IEPP15T 15" (375 mm) 23.39" (594 mm) --- MC3500IEPP15B --- 1.50" (38 mm) MC3500IEPP18TC 18" (450 mm) 20.03" (509 mm) --- MC3500IEPP18BC --- 1.77" (45 mm) MC3500IEPP24TC 24" (600 mm) 14.48" (368 mm) --- MC3500IEPP24BC --- 2.06" (52 mm) MC3500IEPP30BC 30" (750 mm) --- NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³) MINIMUM INSTALLED STORAGE* 178.9 CUBIC FEET (5.06 m³) WEIGHT 135.0 lbs. (61.2 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 22.5" (1956 mm X 1143 mm X 571 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE* 46.0 CUBIC FEET (1.30 m³) WEIGHT 50.0 lbs. (22.7 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION AND BETWEEN CHAMBERS, 12" (305 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION NTS 90.0" (2286 mm) ACTUAL LENGTH 86.0" (2184 mm) INSTALLED BUILD ROW IN THIS DIRECTION NOTE: ALL DIMENSIONS ARE NOMINAL CUSTOM PRECORED INVERTS ARE AVAILABLE UPON REQUEST. INVENTORIED MANIFOLDS INCLUDE 12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm) ECCENTRIC MANIFOLDS. CUSTOM INVERT LOCATIONS ON THE MC-3500 END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES GREATER THAN 10" (250 mm) THE INVERT LOCATION IN COLUMN 'B' ARE THE HIGHTEST POSSIBLE FOR THE PIPE SIZE. LOWER JOINT CORRUGATION WEB CREST CREST STIFFENING RIB VALLEY STIFFENING RIB B C 77.0" (1956 mm) 45.0" (1143 mm) 25.7" (653 mm) FOOT 77.0" (1956 mm) 45.0" (1143 mm) STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" UPPER JOINT CORRUGATION 22.5" (571 mm) INSTALLED MATERIAL GRANULAR %%UNOTES: 2. 1. 6 IN. MIN. 4 IN. MIN. \A1;1/8 PIPE O.D. OR 4 IN. MIN. SLOTTED PIPE PERFORATED OR GRAVEL FILTER BACKFILL COMPACTED DENSELY TRENCH WIDTH AS SPECIFIED CLASS C BEDDING TRENCH WIDTH AS SPECIFIED \A1;1/4 PIPE O.D. SLOPE MATERIAL COMPACTED TRENCH DENSELY WALL \A1;PIPE O.D. + 8 IN. \A1;1/4 PIPE O.D. MATERIAL COMPACTED DENSELY SLOPE TRENCH WALL MATERIAL \A1;PIPE O.D. OR 6 IN. MIN. \A1;1/8 PIPE O.D. 3000 CONCRETE P.S.I. TRENCH WALL LOWER LIMIT OF UNIFORMLY SELECTED GRADED SLOPE GRADED COMPACTED ROCK OR MATERIAL GRANULAR COMPACTED \A1;PIPE O.D. TRENCH WALL LOWER LIMIT OF SLOPE COMPACTED DENSELY FILTER 6 IN. MIN. \A1;PIPE O.D. \OR A1;4 1/IN. 8 PIPE MIN. O.D. \A1;PIPE O.D. BROKEN LARGE (IF CONCRETE, REQUIRED) STONES, ETC. MATERIAL LOWER LIMIT OF TRENCH WALL SLOPE DETAIL FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED: DATE: DRAWN BY: STORMWATER BEDDING REQUIREMENTS 1/12/00 D-1 SKC No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Details\838-013_DETAILS.dwg LAYOUT NAME: C605 DATE: May 25, 2016 - 8:05am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET NOT TO SCALE 401 STANDARD MANHOLE C605 NOT TO SCALE NOT TO SCALE PRIVATE UNDERDRAIN CLEANOUT BASIN EXTEND MIN. 6" INTO SUBGRADE 8" VARIES (REFER TO STORM DRAIN PLAN) NOTES: 1 - GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 2 - FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS SEE DRAWING NO. 7001-110-065 4 - PERFORATIONS SHOULD NOT BE ON OR WITHIN 1" OF ADAPTERS. 5 - HOLES SHOULD BE STAGGERED EVERY OTHER ROW, AS SHOWN. 6 - MIN. 90° SEPARATION BETWEEN HOLES (MAX. 4 HOLES PER ROW) 2" MIN Ø .375" MAX SIDE VIEW HOLE SIZE & LOCATION NTS ENLARGED TO SHOW DETAIL 6" THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. TOP 12" TO BE SOLID, WITHOUT PERFORATIONS 12" SOLID TOP NO PERFORATIONS WITHIN 1" OF ADAPTORS OPEN BOTTOM (NO BOTTOM CAP) ROOFDRAIN DOWNSPOUT DISCHARGE BASIN 8" NOTES: 1 - GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 2 - FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS SEE DRAWING NO. 7001-110-065 4 - PERFORATIONS SHOULD NOT BE ON OR WITHIN 1" OF ADAPTERS. 5 - HOLES SHOULD BE STAGGERED EVERY OTHER ROW, AS SHOWN. 6 - MIN. 90° SEPARATION BETWEEN HOLES (MAX. 4 HOLES PER ROW) 2" MIN Ø .375" MAX SIDE VIEW HOLE SIZE & LOCATION NTS ENLARGED TO SHOW DETAIL 6" THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. TRAFFIC LOADS: CONCRETE SLAB DIMENSIONS ARE FOR GUIDELINE PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, TRAFFIC LOADING, & OTHER APPLICABLE DESIGN FACTORS. TOP 12" TO BE SOLID, WITHOUT PERFORATIONS 6" SOLID BOTTOM NO PERFORATIONS WITHIN 1" OF ADAPTORS BOTTOM 6" TO BE SOLID, WITHOUT PERFORATIONS (BOTTOM CAP TO BE FLUSH WITH SUBGRADE) {NOTE}: CONTRACTOR SHALL USE SQUARE COLLAR IN PERMEABLE PAVER AREAS. COLLAR SHALL BE ORIENTED WITH PAVERS SO AS TO REDUCE IRREGULAR CUTS OR PAVER SHAPES. {NOTE}: CONTRACTOR SHALL USE SQUARE COLLAR IN PERMEABLE PAVER AREAS. COLLAR SHALL BE ORIENTED WITH PAVERS SO AS TO REDUCE IRREGULAR CUTS OR PAVER SHAPES. 403 C605 8" MIN. THICKNESS GUIDELINE 12" MIN WIDTH GUIDELINE TRAFFIC LOADS: CONCRETE SLAB DIMENSIONS ARE FOR GUIDELINE PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, TRAFFIC LOADING, & OTHER APPLICABLE DESIGN FACTORS. 8" MIN. THICKNESS GUIDELINE 12" MIN WIDTH GUIDELINE VARIES (REFER TO STORM DRAIN PLAN) 406 C605 DETAIL FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED: DATE: DRAWN BY: STANDARD MANHOLE 11/7/00 D-3 NBJ MANHOLE SHALL BE AS FOLLOWS: NOTE: MINIMUM INSIDE DIAMETER OF 27 IN. TO 42 IN. (INCL.) 24 IN. OR LESS VARIABLE ALTERNATE BASE 8 IN. MIN. 6 IN. 1 SLOPE IN./FT. RECAST MANHOLE BASE OVER 42 IN. PIPE SIZE 2 IN. MIN. POURED INVERT 8 IN. MIN. 1 FT. 1 IN./FT. SLOPE 2 IN. 18 IN. MAX 48 IN. MAX. DEPTH 30 IN. MIN. DEPTH 5 FT. MIN. DEPTH RUNGS 12" O.C. MANHOLE 8 IN. SEE NOTE 24 IN. 24 IN. RING AND COVER - 400 LB. OR APPROVED EQUAL DENVER HEAVY BY MACLEAR FINISHED GRADE 16 IN. MAX 28 IN. MAX 48 IN. 72 DIAMETER 60 IN. IN. MIN. MANHOLE POURED CONCRETE INSIDE AND OUT GROUT BASE TO CONE BASE MANHOLE SECTIONS ASTM C-478 INSIDE AND OUT GROUT SHIPLAP JOINT ECCENTRIC CONE ASTM C-478 GROUTED INSIDE AND OUT ADJUSTMENT SHIM BRICK &/OR CONCRETE NOT TO SCALE 402 MANHOLE CHANNELING C605 BEND WITH CURVED DEFLECTOR STRAIGHT DEFLECTOR BEND WITH INLINE UPSTREAM MAIN & 90 LATERAL WITH DEFLECTOR WITH DEFLECTOR DIRECTLY OPPOSED LATERAL (HEAD LOSSES ARE STILL EXCESSIVE WITH THIS METHOD, BUT ARE SIGNIFICANTLY MORE THAN WHEN NO DEFLECTOR EXISTS) DETAIL FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED: DATE: DRAWN BY: NJB 11/9/00 D-5 CHANNELING DETAILS FOR MANHOLES o 3" 5" 4-1/2" %%USUPPORT BEAM POCKET DETAIL AND ASTM C858-83. 2. DESIGNED ACCORDING TO ASTM C857-87 1. DESIGNED FOR AASHTO HS-20 LOADING. NOTES: IF RISER IS REQUIRED THE BASE IS POURED WITH A "SHIP-LAP" JOINT. 2'-0" 6'-1" GRATING (SEE DETAIL, THIS DRAWING) %%UGRATING DETAIL 3. 2. WEIGHT: 1100 LBS 1. %%UNOTES:%%U %%uISOMETRIC VIEW N.T.S. \A1;7'-\1" A1;6" \A1;6" \A1;2' \A1;6" N.T.S. \A1;6" 5'-8" MAX 3'-0" MIN M.A. STEPS @12" O.C. 4 TON P52 SL ANCHORS (NUMBER REQ'D VARIES WITH HEIGHT) 5'-8" MAX 3'-0" MIN \A1;6" N.T.S. %%USECTION B-B \\A1;A1;6" 6'-1" POCKET FOR SUPPORT BEAM (SEE DETAIL, THIS DRAWING) 3) STEEL REINFORCEMENT: 4) CEMENT: ASTM C-150 SPECIFICATIONS 1) 4 TON P-52 SL ANCHORS (8 REQ'D) A. AASHTO HS-20-44, W/ IMPACT C. EQUIVALENT FLUID PRESSURE = 45 PCF D. 80 PSF LATERAL LIVE LOAD SURCHARGE B. SOIL WEIGHT = 120 PSF 2) CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE %%UDESIGN NOTES: 4500 PSI (MIN.) 1) DESIGN LOADINGS: %%ULIFTING NOTES: FRAME & GRATING NOT SHOWN 4 TON P-52 SL ANCHORS FOR SETTING A. REBAR, ASTM A-615 GRADE 60, MIN. OF 2" CLR. B. MESH, ASTM A-497 GRADE 80 DATE DRAWN: 3/3/05 D44.dwg DRAWN BY: T. COX DOUBLE CURB INLET CITY OF FORT COLLINS UTILITIES P.O. BOX 580, FORT COLLINS, CO. 80522 (970) 221-6700 STORMWATER UTILITY CAD FILE NAME: N.T.S. N.T.S. N.T.S. CURB ADJUSTS 4" 2'-7" 6'-8" 3 1/4" TO 9" 6" DESIGNED ACCORDING TO ASTM C857-87 AND ASTM C858-83 DESIGNED FOR AASHTO HS-20 LOADING EAST JORDON IRON WORKS CURB INLET 7031 (OR EQUAL) TYPE M2 GRATE AND T1 BACK COMBINATION. \A1;3' GRATING (SEE DETAIL, THIS DRAWING) POCKET FOR SUPPORT BEAM (SEE DETAIL, THIS DRAWING) PIPE(S) SIZE, SHAPE AND LOCATION VARIES A A %%USECTION A-A B B A A DIRECTION SECTION IS VIEWED) SECTION LINE A-A (ARROWS POINT IN LEGEND PIPE(S) SIZE, SHAPE AND LOCATION VARIES 6" THICK CONCRETE WALL OPEN AREA: 520 SQ. IN. DETAIL D-44 404 C605 DOUBLE CURB INLET NOT TO SCALE 405 TRENCH DRAIN C605 80"; 6.67' \A1;INVERT 4"[102mm] MIN. \A1;6 1/4 " 4"[102mm] MIN. Z886 CHANNEL X-SECTION 1. USE ZURN {Z886 PERMA-TRENCH 6" HDPE TRENCH DRAIN}; SECTIONS/TRENCH No.s {8615-8606} (12-80"/6.67') SECTIONS WITH BUILT IN 0.75% {} SLOPE) WITH {"HPP"} HDPE 20"x6" GRATE (HEEL-PROOF POLYETHLENE, SLOTTED, ADA); OR APPROVED EQUAL. 2. MINIMUM CONCRETE MIX SHALL BE 5 1/2 SACK, 3000 PSI. CONCRETE TO BE REINFORCED WITH #4 BARS 12" O.C. EACH DIRECTION. 3. CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER FOR GRATE TYPE PRIOR TO PURCHASING AND INSTALLATION. NOTES: (12 SECTIONS) \A1;4" WITH 4 EACH DRIVE RIVETS WITH NYLON WASHERS * 12 Gauge 30" 8" 8" NOT TO SCALE 309 C604 SIDEWALK DETAIL ATTACHED SIDEWALK DETAIL Slope sidewalk to curb 1/4" per foot. NOTE: Construct sidewalk with joints at 10' intervals R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1/4" and aligned with scoring on curb. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4" 1/4 SLAB THICKNESS 1/4" 1/2" Expansion Joint material DETACHED SIDEWALK DETAIL Variable Landscaping Slope sidewalk to curb 1/4" per foot. 2' min. Slope: Minumum 1 4"/ft Maximum 3"/ft CONSTRUCTION SIDEWALK DETAIL LARIMER COUNTY STREET URBAN STANDARDS AREA DRAWINGS 1602 DRAWING REVISION DATE: 04/NO: 01/07 2 NOT TO SCALE 308 C604 STANDARD SIDEWALK City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Details\838-013_DETAILS.dwg LAYOUT NAME: C604 DATE: May 25, 2016 - 8:05am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET NOT TO SCALE 310 C604 ASPHALT PAVEMENT JOINT 02/17/15 STANDARD SIDEWALK URBAN AREA STREET STANDARDS LARIMER COUNTY CONSTRUCTION DRAWINGS REVISION NO: 1601 DRAWING DATE: 4 Driveway Driveway Sidewalk SECTION A-A Detached Sidewalk Attached Sidewalk Detached Attached All Sidewalk Thickness Shall Be 6" minimum. Sidewalk NOTE: 1. Sidewalk grade shall remain consistent across driveway 2. For driveway design requirements, see CONST. DWG. Series 706 & 707 3. This detail applies to Residential & Commercial driveways. 6" 2'-0" 6'-0" T.C. F.L. Lip 1/2" Expansion Joint Material 1/2" Expansion Joint Material 8" Commercial 6" Residential A A Sidewalk Min. NOT TO SCALE NOTE: ” BEGIN FULL DEPTH ASPHALT \A1;3' (MIN.) RIGHT-OF-WAY FL R 16" R 16" DRIVE-OVER CURB, GUTTER AND DETACHED SIDEWALK 31" See Drawing 1601 10 3/4"(L) R 16" DRIVE-OVER CURB, GUTTER AND ATTACHED SIDEWALK 18" 18" 3 3/8" 1 3/8" 6" R 16" FL 14" 6" 17" 1 1/2" 5' (L) 8 5/8" (F.C.) 7 1/4" F.C. 12" (F.C.) Slope to curb 1/4"/Ft. 1' min. (F.C.) 48:1 min. 4:1 max. Excavation Fill 1' min. 2' min. 1/4"/Ft. CURB & GUTTER IN A CUT OR FILL DATE: 03/01/02 CURB AND GUTTER/SIDEWALK URBAN AREA STREET STANDARDS LARIMER COUNTY CONSTRUCTION DRAWINGS REVISION NO: 1 702 DRAWING 6" 3'-9" (F.C.) For Thickness 2' min. (L) City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ASPHALT { PAVEMENT SECTION} 6" HOT BITUMINOUS PAVEMENT (S OR SX) LIGHT DUTY PAVING ASPHALT { PAVEMENT SECTION} HEAVY DUTY PAVING 7" HOT BITUMINOUS PAVEMENT (S OR SX) 7" APPROVED SUBGRADE 8" APPROVED SUBGRADE NOT TO SCALE 303 C603 PAVING SECTIONS (PRIVATE AREAS OUTSIDE ROW) CONCRETE {PAVEMENT SECTION } 6" CONCRETE CONCRETE { PAVEMENT SECTION } 4" CONCRETE 4" HOT BITUMINOUS PAVEMENT (S OR SX) 5" HOT BITUMINOUS PAVEMENT (S OR SX) {\LPERMEABLE PAVER SECTION } 2" BEDDING 12" SUB-BASE (MIN.) SUB-GRADE {}" JOINTS HAND TIGHT 4" BASE FILTRAPAVE (3{}" DEPTH) 1'-6" 1 1/2" 6" 1" 6" 6" 4 1/2" 12" NOT TO SCALE 304 C603 PRIVATE INFLOW VERTICAL CURB & GUTTER No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Details\838-013_DETAILS.dwg LAYOUT NAME: C603 DATE: May 25, 2016 - 8:05am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET NOT TO SCALE 305 C603 PRIVATE OUTFALL VERTICAL CURB & GUTTER 1" 6" 4 1/6" 2" 1 1/2" 1'-6" 6" 12" {NOTES: }1.ALL SITE GRADING, SUBGRADE PREPARATION AND PAVING SHALL FOLLOW THE GEOTECHNICAL RECOMMENDATIONS CONTAINED IN THE SUBSURFACE EXPLORATION REPORT 360 LINDEN STREET FORT COLLINS, COLORADO BY EARTH ENGINEERING CONSULTANTS DATED APRIL 29, 2014 (PROJ. NO. 1142032), AND ANY SUBSEQUENT ADDENDA. 2.REFER TO PLANS BY RIPLEY DESIGN FOR ADDITIONAL HARDSCAPE INFORMATION. 3.FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR PAVER SECTION AND INSTALLATION. (NOTE: SECTION SHALL MEET THE SAME STRUCTURAL REQUIREMENTS AS 'HEAVY DUTY' ABOVE) 4.THE ENTIRE PERIMETER OF THE PERMEABLE PAVER AREAS SHALL RECEIVE SOME FORM OF EDGE RESTRAINT. FOLLOW MANUFACTURER'S RECOMMENDATIONS AND DETAILS ON THIS SHEET. 5.NOTE THAT THESE PAVING SECTIONS ARE TO BE USED ONLY FOR AREAS OUTSIDE OF PUBLIC RIGHT-OF-WAY. PAVING SECTIONS WITHIN PUBLIC RIGHT-OF-WAY WILL BE REQUIRED BY THE CITY OF FORT COLLINS TO BE PER AN APPROVED PAVEMENT DESIGN REPORT. 306 THICKENED CONCRETE EDGE C603 36" MINIMUM d 0.2d OR 2" MIN.** **FOR AREAS ADJACENT TO PERMEABLE PAVING, THICKENED EDGE SHALL BE A MINIMUM OF 10" THICK. NOTES: 1. 6' wide pan for residential streets. 2. All intersections to have access ramps. 3. Standard Curb and Gutter Section, See Standard Drawing 701. 4. 0" Curb Height, See Section A-A 5. All of these pedestrian improvements must be in ROW or a pedestrian or public access easement. 6. Pedestrian landing area, minimum required 4 ft length x 4 ft width, max slope in any direction is 1:50 or 1 4" per foot. 7. Detectable Warning to extend the full width of the landing area and be 2.0' in the direction of travel beginning 6" from flowline. Material to be approved by the local engineer. 8. T = Concrete thickness, 6" for Residential and 8" for Commercial TYPE IV ATTACHED WALK N.T.S. SECTIONS A-A CLASSIFICATION APPROACH TYPE Single Family 12' 24' Commercial I, II, III, or IV Multi Family 24' 36' 24' 36' MINIMUM WIDTH WIDTH MAXIMUM Industrial 24' 36' I, II, III, or IV I or II RESIDENTIAL: * * * * * DRIVEWAY WIDTHS LARIMER COUNTY DRAWINGS CONSTRUCTION REVISION NO: 1 707.DRAWING 2 STREET STANDARDS URBAN AREA DATE: 02/17/15 STANDARD DRIVEWAY APPROACH (HIGH VOLUME DRIVE TYPES IV) High volume driveways (Type III or IV) allowed for 350 or greater trip ends/day. * 30' maximum for 3 car garages. * *No single opening shall exceed 36'. Wider driveways shall be divided w/a median not less than 6' wide. 1/4" per ft. 1" per ft. 1:50 Slope  T Walk Gutter Sidewalk 1:50 (max.) 1:12 A A  1:12 (max) 6' (min.) Retaining Curb (Optional), See Standard Drawing 1603 See Note 3 See Note 4 See Note 7 See Note 5 Ramp if walk continues on Private Property. If Concrete Driveway Expansion Joint NOT TO SCALE 1/4" per ft. 1" per ft. 1" per ft. 1:12 (max.) Pedestian landing area, See note 6 Flare I, II, III, or IV Gutter Sidewalk By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Details\838-013_DETAILS.dwg LAYOUT NAME: C602 DATE: May 25, 2016 - 8:05am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET NOT TO SCALE 202 C602 TRAFFIC RATED CLEANOUT NOT TO SCALE 203 C602 GREASE INTERCEPTOR ALTERNATE BASE POURED INVERT PRECAST MANHOLE BASE 2 IN. MIN. SLOPE 1 IN. MIN. 8 IN. MIN. 6 IN. 15 IN. OR LESS 48 IN. 18 IN. TO 30 IN. 60 IN. OVER 30 INCHES 72 IN. MIN. MANHOLE MINIMUM INSIDE DIAMETER OF DIAMETER MANHOLE SHALL BE AS FOLLOWS: PIPE SIZE 5 FT. MIN. DEPTH CONCRETE ADJUSTMENT SHIMS GROUTED INSIDE ASTM C-478 ECCENTRIC CONE PRE-FORMED PLASTIC GASKET ASTM C-478 MANHOLE SECTIONS GROUT BASE TO BARREL SECTION ON INSIDE PRE-FORMED PLASTIC GASKET CAST-IN-PLACE CONCRETE BASE 16 IN. MAX. FINISHED GRADE 30 IN. MIN. 48 IN. MAX. VARIABLE 28 IN. MAX. 24 IN. SEE TABLE 6 IN. 12 IN. SLOPE 1 IN./FT. 18 IN. MAX. MANHOLE RUNGS 12 IN. O.C. 8 IN. MIN DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL STANDARD MANHOLE WW-3 NBJ 4/11/11 W/ SEWER STAMPED ON LID VALVE BOX \A1;6" MIN \A1;WATER TIGHT SCREW CAP \A1;4" HARD ASPHALT SURFACE OR OTHER FLOW DIRECTION DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL TRAFFIC RATED CLEANOUT WW-15 NBJ 4/11/11 NOT TO SCALE 204 C602 TRAFFIC RATED CLEANOUT PLAN VIEW CROSS VIEW 45 ELBOW SERVICE WYE 8 IN. PVC SEWER PIPE COMPACTED GRANULAR MATERIAL AIR-TIGHT PLUG WITH 4 IN. X 4 IN. MARKER UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR LEAN CONCRETE PVC SEWER PIPE NOTE: WYE CONNECTION NOT ALLOWED ON VCP LEAN CONCRETE o 20 MIN. o 45 MAX. o TRENCH UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR 4 IN. X 4 IN. MARKER AIR-TIGHT PLUG DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL SERVICE WYE DETAIL WW-9 NBJ 4/11/11 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Details\838-013_DETAILS.dwg LAYOUT NAME: C601 DATE: May 25, 2016 - 8:05am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET GENERAL NOTES: 1/4" HOLE IN HANDLE 1 1/2" BALL VALVE 6. %METER %INSTALLATION UPLAN DESIGN FOR 6 VIEW IN. AND LARGER METERS SHALL BE DETERMINED BY THE 1 1/UTILITY. 2" CAP 5. FOR IRRIGATION ONLY SERVICES, NO BYPASS ALLOWED. 4. 3. GATE VALVES MUST OPEN RIGHT AND BE EPOXY COATED, RESILIENT SEAT WITH A HAND WHEEL ASSIST. ALL PIPING WITHIN VAULT SHALL BE D.I.P. WITH FLANGED FITTINGS, EXCEPT FOR THE SOLID SLEEVES. 2. ALL JOINTS OUTSIDE OF VAULT SHALL BE RESTRAINED MECHANICAL JOINTS. (REFERENCE SECTION 02615) 1. THE BUILDING IMMEDIATELY FOLLOWING THE MAIN SHUT OFF VALVE. IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, INSTALL VALVE INSIDE 7. LOCATION AND ALIGNMENT OF AMR POD(S) ON VAULT TOP CAN VARY. %%UTEST-TEE SIDE VIEW SEE DETAIL TEST-TEE BELOW LID) 24" DIA. FOR H-20 BRIDGE LOADING PRECAST CONCRETE VAULT DESIGNED STRAINER 7'-0" 1'-6" 2'-6" METER (PLACED FLOW SLEEVE SOLID VALVE VALVE GATE GATE SLEEVE SOLID 8'-6" AMR POD(S) (FORD YOKE BOX PART #YUC-7 WITH FORD YOKE BOX LID PART #YL-TP WITH 1 27/32" DIA. HOLE AND REMOVABLE PLUG) ANCHOR RODS PROTECTIVE COATING (TYP.) WITH GATE VALVE FLOW FLOW FLOW ACCESS OPENING LADDER RUNG VAULT ACCESS PRECAST CONCRETE OR FOOTING CAST IN PLACE 18" DIA. PERFORATED PIPE SUMP 8. A SEPERATE AMR POD MUST BE INSTALLED FOR EACH METER REGISTER. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD SETTING FOR 3 IN. AND 4 IN. WATER METERS (PLAN VIEW) 17A 4/11/11 1. DO NOT INSTALL IN ANY STREET, ALLEY, PARKING AREA, DRIVEWAY, SIDEWALK DRAINAGE DITCH OR DETENTION BASIN. 2. NO LANDSCAPING (SHRUBS, BOULDERS, ECT.) OR STRUCTURES TO BE WITHIN 4 FT. OR TREES WITHIN 10 FT. OF METER VAULT. 3. SLOPE GROUND SURROUNDING METER VAULT AWAY FROM LID AT 2%%% GRADE OR GREATER. 4. MAKE NO PLUMBING CONNECTIONS (TEES, COUPLINGS, ECT.) IN METER VAULT. 5. GRADE ACCEPTANCE AFTER METER PIT INSTALLATION REQUIRES THAT THE OWNER ADJUST METER VAULT COVER TO 1/2 IN. ABOVE FINAL GRADE. 6. IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, IT SHALL BE INSTALLED INSIDE THE BUILDING, IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALVE. GENERAL NOTES: ADJUSTABLE PIPE SUPPORT UNDER VALVES AND METER 3/4" TO 1-1/2" GRAVEL ASPHALTIC GROUT SOLID PAVING BRICK (TYPICAL) PRE-FORMED PLASTIC GASKETS PIPE ENCASED WITH MASTIC GATE VALVE STRAINER SOLID SLEEVE GATE VALVE MANHOLE RUNGS 12 INCHES O.C. FINISHED GRADE 2% SLOPE INSTALL LID 1/2" ABOVE FINAL GRADE ALUMINUM MANHOLE COVER AND RING WITH LID LOCK MORTAR OR LIFTING HOOK MASTIC FLOW BLOCK-OUT TO BE GROUTED 54" (MIN.) 6" (MAX.) 7" (MIN.) 16" (MAX.) GRADE PRE-RINGS CAST CONCRETE (IF REQUIRED) 10" 30" 8" 8" (TYPICAL) ANCHOR RODS (TYP.) WITH PROTECTIVE 1" (MAX.) CONDUIT THROUGH INTO YOKEBOX VAULT OR PIT TOP 1/2" EMT OR PVC 3" (MAX.) AND REMOVABLE PLUG) YOKE WITH PART BOX #1 YUC-27/LID 32" 7 PART WITH DIA. HOLE FORD #YL-TP AMR POD (FORD YOKE BOX FINISHED GRADE BE 1/2" ABOVE TOP OF AMR LID TO 2' 3/4" ROCK FOR GRADE ADJUSTMENT (MAX.) (IF REQ'D) (TYP.) (TYP.) 66" (MAX.) 12" (TYP.) PRECAST OR CAST IN PLACE CONCRETE FOOTING (TYP.) PIPE 18" SUMP DIA. PERFORATED REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD SETTING FOR 3 IN. AND 4 IN. WATER METERS (SIDE VIEW) 17B 4/11/11 COATING SERVICE LINE BY-PASS 30" 54" (MIN.) 8" 8" 10" 6" (MAX.) 12 INCHES MANHOLE O.RUNGS C. AND RING WITH LID LOCK ALUMINUM MANHOLE COVER MORTAR OR MASTIC PRE-CAST GRADE CONCRETE RINGS (IF PLASTIC GASKETS PRE-FORMED LIFTING HOOK REQUIRED) 3/4" TO 1-1/2" GRAVEL PRECAST OR CAST IN PLACE CONCRETE FOOTING (TYP.) (TYP.) 66" (MAX.) 12" (TYP.) REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD SETTING FOR 3 IN. AND 4 IN. WATER METERS (END VIEW) 17C 4/11/11 STANDARD SETTING FOR 3" & 4" WATER METERS CP TEST STATION U S A \A1;1 1/8" 7/16" 3 1/2" 7 5/16" 5/2" 8" A S U I E J W STATION LOCATOR LID PLAN VIEW LID SECTION VIEW VALVE BOX SECTION VIEW 9" 6 1/8" 10" \A1;7 9/16" 2 1/16" CLOSED PICKHOLE (TYPICAL OPPOSITE SIDE) 1/2" RAISED LETTERING (RECESSED FLUSH) REFERENCE SPECIFICATIONS 02622-2 THROUGH 02622-4 FOR LOCATOR FOR CP TEST STATION INFORMATION. REFERENCE SPECIFICATIONS 16640-5 STATION BOX INFORMATION. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 CP TEST AND LOCATOR STATION BOX 25 4/11/11 W J E I STREET STREET VALVE (TYPICAL) HYDRANT SECONDARY FIRE HYDRANT (TYPICAL) LOCATOR STATION PVC MAIN TRACER WIRE NOTES: 1. TRACER WIRE TO BE PLACED ALONG TOP CENTERLINE OF MAIN AND SECURED AS NECESSARY TO PREVENT MOVEMENT OF WIRE. TRACER WIRE SHALL BE SINGLE CONDUCTOR #12 STRANDED COPPER WITH TYPE THNN OR THWN FOR LOCATOR STATION DETAILS SEE DETAIL 25 2. 3. 4. 800' MAXIMUM DISTANCE BETWEEN LOCATOR STATIONS TRACER WIRES FOR PERPENDICULAR MAINS AT STREET INTERSECTIONS ARE NOT TO BE SPLICED TOGETHER. SEE NOTE 4 (TYPICAL) INSULATION DESIGNATED FOR DIRECT BURY. TRACER WIRE SHALL BE CONTINUOUS (WITHOUT SPLICES) WHENEVER POSSIBLE. WHEN SPLICES ARE REQUIRED, ALL SPLICES OF TRACER WIRE SHALL BE MADE USING BRASS SPLIT-BOLT CONNECTORS AND ROYSTON "MINI SPLICE-RIGHT" SPLICE KITS. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 PVC WATER MAIN TRACER WIRE DETAIL 30 4/11/11 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 TYPICAL WATER SERVICE 11 4/12/11 1 1/2 INCH OR GREATER CORPORATION STOP FOR 3/4 AND 1 INCH SERVICES SERVICES 1 INCH SERVICES NOT TO SCALE 100 C600 WATER MAIN BEDDING REQUIREMENTS BOTTOM OF PIPE AND A MINIMUM OF 12 INCHES ABOVE TOP OF PIPE. GRANULAR BEDDING MATERIAL SHALL BE A MINIMUM OF 4 INCHES BELOW INITIAL 12 IN. LIFT MIN. PIPE O.D. 4 IN. MIN. GRANULAR MATERIAL BEDDING ZONE %%UNOTE: * INITIAL LIFT SHALL NOT EXCEED 2 FEET IN DEPTH. TRENCH WALL LOWER LIMIT OF SLOPING TRENCH IN WIDTH SECTION AS 02221 SPECIFIED * REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 WATER MAIN BEDDING REQUIREMENTS (DIP & PVC) 1 4/8/11 WATER MAIN SEAT VALVE RESILIENT CAST IRON VALVE BOX CAST IRON PER CITY OF FORT COLLINS AND AWWA SPECS. ALL VALVES TO BE 8 MIL POLY WRAPPED. T-BOLTS, NUTS AND RODS ALL VALVE BOXES TO BE OF CAST IRON CONSTRUCTION, TWO PIECE TO BE TAR COATED BEFORE WRAPPED. THREADED ADJUSTABLE DESIGN PER CITY OF FORT COLLINS SPECS. VALVE BOX W\CAST IRON LID MARKED "WATER" ALL VALVES TO BE RESILIENT SEAT, EPOXY COATED INSIDE AND OUT UNEXCAVATED A EARTH SECTION A-A ASPHALT A HAND BACKFILL AND IN TAMP 3" LAYERS OPERATING NUT BACKFILL IN 6" LAYERS AND TAMP 2" SQUARE OPEN RIGHT BACKFILL METHOD DEPENDING ON LOCATION NOT TO SCALE 106 C600 VALVE ASSEMBLY BOX CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PIPE SIZE BENDS TEE OR DEAD END 22 1/2%%D 45%%D 90%%D 6" 8" 12" 1.0 1.5 3.0 1.5 2.5 4.5 2.5 4.5 9.0 4.5 8.0 16.5 3.5 5.5 12.0 MINIMUM BEARING SURFACE AREA (SQ. FT.) Bearing surface areas shown in chart are minimum. All fittings to be wrapped with polyethylene. Pipe installed under conditions different from those normally encountered shall require thrust blocks designed for those particular conditions. Thrust blocks on pipe larger than 16 inches diameter shall be designed for conditions existing at the installation site. Refer to Section 03300 for concrete requirements. 1. 2. 3. 4. 5. GENERAL NOTES: UNDISTURBED SOIL POLYETHYLENE BOND BREAKER UNDISTURBED SOIL BOND BREAKER POLYETHYLENE BEARING SURFACE POLYETHYLENE BOND BREAKER UNDISTURBED SOIL BEARING SURFACE SOIL UNDISTURBED BEARING SURFACE POLYETHYLENE BOND BREAKER BEDDING MATERIAL 2/3 DIA. %%UTEE %%UTYPICAL BEND %%UTYPICAL CROSS-SECTION %%UDEAD END BEARING SURFACES ARE A MINIMUM REQUIREMENT AND DO NOT RELIEVE DESIGN ENGINEER OF RESPONSIBILITY TO DESIGN EACH THRUST BLOCK. 16" 4.8 9.6 18.9 34.7 24.5 REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD CONCRETE THRUST BLOCKS 2 4/8/11 NOT TO SCALE 101 C600 STANDARD THRUST BLOCK NOT TO SCALE 103 C600 TYPICAL WATER SERVICE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Details\838-013_DETAILS.dwg LAYOUT NAME: C600 DATE: May 25, 2016 - 8:05am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET FIRE HYDRANT PIPING, VALVES, ETC. SHALL BE WRAPPED IN WALLS OR FENCES ALLOWED WITHIN 4 FEET OF FIRE HYDRANT. NO LANDSCAPING (TREES, SCRUBS, BOULDERS, ETC.), RETAINING GATE VALVE RESILIENT SEAT POLYETHYLENE 8 MIL SHEET OF MUST REMAIN CLEAR OF 24 INCH MIN. CONCRETE BLOCK (REF. SECTION 02644) THRUST BLOCK 12 IN. POLYETHYLENE. JOINTS RESTRAINED (REF. SECTION 02644) HYDRANT GRAVEL 6 INCH DIA. PIPE OBSTRUCTIONS %%UNOTES 18 IN. 0.1 FT.-0.2 FT. FLOW-FILL 12 IN. OR BACK OF CURB EDGE OF SIDEWALK HYDRANT DRAIN OPENINGS MINIMUM 30 INCHES 66 INCHES 54 INCHES MAXIMUM MINIMUM LOCATOR STATION (SEE DETAIL 25) WATROUS PACER 250 NUMBER A-423 OR MUELLER HYDRANT 22 IN. 18 IN. to THRUST BLOCK SWIVEL TEE SECTION 02641) MAIN ONLY) (PVC WATER TRACER WIRE (REFERENCE VALVE BOX REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 FIRE HYDRANT INSTALLATION 3 4/8/11 NOT TO SCALE 104 C600 STANDARD SETTING FOR 1 1 2" AND 2" WATER METERS 6" CONNECTION COMPRESSION 8" LAYER OF 3/4" TO 1 1/2" GRAVEL SUPPORT METER SETTERS BY (2) 18 INCH LENGTHS OF 1 INCH IRON PIPE INSERTED THROUGH IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, IT SHALL BE INSTALLED INSIDE THE BUILDING, GRADE ACCEPTANCE AFTER METER PIT INSTALLATION REQUIRES THAT THE OWNER ADJUST METER PIT COVER ALL TEES, COUPLINGS AND CONNECTION FITTINGS TO BE A MINIMUM OF 5 FEET FROM METER PIT WALL ON OUTLET NO LANDSCAPING (TREES, SHRUBS, BOULDERS, ETC.) OR RETAINING WALLS TO BE WITHIN 4 FEET OF METER PIT DO NOT INSTALL IN ANY STREET, ALLEY, PARKING AREA, DRIVEWAY, SIDEWALK, DRAINAGE DITCH OR DETENTION AND NO TREES WITHIN 10 FEET. BRACE PIPE EYELETS AND SET ATOP (4) 8 INCH SQUARE CONCRETE BLOCKS. IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALVE. TO 1/2 INCH ABOVE LANDSCAPED FINAL GRADE. MAKE NO PLUMBING CONNECTIONS (TEES, COUPLINGS, ETC.) IN METER PIT. SLOPE GROUND SURROUNDING METER PIT AWAY FROM LID AT 2% GRADE OR GREATER. 9. 8. 7. 6. 5. 1. 3. 2. %%uGENERAL NOTES: 8" 12" (MIN.) PIPE BRACE 1" DIA. IRON (TYP.) 2' (MAX.) 2% SLOPE GRADE RINGS (IF REQUIRED) PRE-CAST CONCRETE BEFORE BACKFILLING AND GROUT KNOCKOUT ARMOUR-FLEX TUBING MANHOLE PRECAST CONCRETE CURB BOX (TYP. ALL JOINTS) PLASTIC GASKETS PRE-FORMED 1-1/2" METERS FLOW 2" METERS 17 1/4" FOR 13 1/4" FOR SETTER METER 12" O.C. MANHOLE RUNGS 48" ALUMINUM MANHOLE RING AND COVER WITH LOCK NUT 24" 54" (MIN.) 66" (MAX.) INSTALL LID 1/2 IN. ABOVE FINAL LANDSCAPED GRADE MASTIC MORTAR OR 16" (MAX.) 7" (MIN.) FINISHED GRADE AMR POD (FORD YOKE BOX PART #YUC-7 WITH FORD YOKE BOX LID PART #YL-TP WITH 1 27/32" DIA. HOLE AND REMOVABLE PLUG) 3" (MAX.) 1" (MAX.) 1/2" EMT OR PVC VAULT OR PIT TOP INTO YOKEBOX 2' (MAX.) 3/4" ROCK FOR GRADE ADJUSTMENT (IF REQ'D) 12" (MIN.) (MAX.) (TYP.) TOP OF AMR LID TO BE 1/2" ABOVE FINISHED GRADE CONDUIT THROUGH 10. A SEPERATE AMR POD MUST BE INSTALLED FOR EACH METER REGISTER. 4. THE METER PIT AND AMR POD(S) MUST REMAIN OPEN AND ACCESSABLE FOR METER READING AND MAINTENANCE. CURB STOP REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD SETTING FOR 1-1/2 IN. AND 2 IN. WATER METERS 16A 4/11/11 SIDE. BASIN. %%UPLAN 48" DIA. VIEW BEFORE BACKFILLING ARMOUR-FLEX TUBING AND GROUT KNOCKOUT BOX CURB FLOW 2' (MAX.) 1" DIA. IRON (TYP) PIPE BRACE MANHOLE RUNGS BELOW LID) METER (PLACED 12" O.C. 24" DIA. PRECAST CONCRETE MANHOLE 8" x 8" CONCRETE BLOCK (TYP.) AND REMOVABLE PLUG) WITH 1 27/32" DIA. HOLE YOKE BOX LID PART #YL-TP PART #YUC-7 WITH FORD AMR POD (FORD YOKE BOX %%uGENERAL NOTES: 1. LOCATION AND ALIGNMENT OF AMR POD ON PIT TOP CAN VARY. 2. SEE DETAIL 16-A FOR ADDITIONAL METER PIT INFORMATION. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD SETTING FOR 1 1/2 IN. AND 2 IN. WATER METERS (PLAN VIEW) 16B 4/11/11 NOT TO SCALE 105 C600 STANDARD SETTING FOR 1 1 2" AND 2" WATER METERS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / LINDEN STREET WILLOW STREET LINCOLN AVENUE 19' DIAGONAL PARKING 16' TRAVEL LANE ULTIMATE 30" CURB & GUTTER ULTIMATE CENTERLINE ULTIMATE 30" CURB & GUTTER PROPOSED 30" CURB & GUTTER ℄ STA.=10+45.30 Offset=0.00' START 2 ULTIMATE 30" CURB & GUTTER ℄ STA.=19+88.60 Offset=0.00' END 2 ℄ STA.=18+66.34 Offset=5.00' START 2 ULTIMATE CENTERLINE 16' TRAVEL LANE 19' DIAGONAL PARKING 19' DIAGONAL PARKING 16' TRAVEL LANE 16' TRAVEL LANE 19' DIAGONAL PARKING 19' DIAGONAL PARKING 16' TRAVEL LANE 16' TRAVEL LANE 19' DIAGONAL PARKING G M M GAS X X X X X X X X X X X X X X X X X X X X X X X X X X X OWNER W AND T LEASING 131 E LINCOLN AVE FORT COLLINS, CO 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 FEEDERS SUPPLY LLC OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / LINDEN STREET WILLOW STREET LINCOLN AVENUE ℄ STA.=10+33.96 Offset=12.75' START 1 ℄ STA.=10+34.00 Offset=0.75' START 2 ℄ STA.=10+34.04 Offset=11.25' START 1 ℄ STA.=17+06.94 Offset=11.25' MATCH EXISTING END 1 ℄ STA.=17+21.41 Offset=0.75' MATCH EXISTING END 2 ℄ STA.=17+21.41 Offset=12.75' END 1 6' BIKE LANE 12' TRAVEL LANE ±4.5' SHOULDER EXISTING STRIPING EXISTING EDGE OF PAVEMENT PROPOSED 30" CURB & GUTTER EXISTING PARKING STALLS EXISTING CURB & GUTTER PROPOSED PARKING STALL STRIPING 12' TRAVEL LANE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Strt\838-013_WILLOW_STRP.dwg LAYOUT NAME: C504 DATE: May 25, 2016 - 8:04am CAD OPERATOR: ben LIST OF XREFS: [838-013_xEXST] [838-013_xSITE] [NES-xborder] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C504 WILLOW STREET STRIPING PLAN A. Reese B. Ruch 1"=40' City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE EXISTING LOT LINE 4" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 1 2 A. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C. ALL SIGNAGE SHALL BE PER CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E. ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD. THE CITY OF FORT COLLINS RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. STRIPING LEGEND: STRIPING NOTES: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner LEGEND: INTERIM STRIPING ULTIMATE STRIPING 16+50 17+00 17+50 18+00 18+50 19+00 19+50 LINDEN STREET (100' PUBLIC ROW) PROPOSED 30" CURB & GUTTER LINDEN STREET (100' PUBLIC ROW) LINCOLN AVENUE (PUBLIC ROW VARIES) ULTIMATE 30" CURB & GUTTER EXISTING 100' ROW ULTIMATE 30" CURB & GUTTER ULTIMATE 30" CURB & GUTTER ULTIMATE CENTER LINE ULTIMATE 100' ROW ULTIMATE 70'  -  CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 16+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 16+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% -1.03% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 17+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% -0.90% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 17+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.29% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 18+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.29% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 18+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.29% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 19+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.29% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 19+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% EXISTING GROUND CONCRETE SIDEWALK VERTICAL CURB AND GUTTER EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE ULTIMATE ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE ULTIMATE ROW LINE ULTIMATE ROW LINE ULTIMATE ROW LINE ULTIMATE ROW LINE ULTIMATE ROW LINE ULTIMATE ROW LINE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Strt\838-013_WILLOW_ULTIMATE_XSECS.dwg LAYOUT NAME: C503 DATE: May 25, 2016 - 8:04am CAD OPERATOR: ben LIST OF XREFS: [838-013_xEXST] [838-013_xSITE] [838-013_xUTIL] [NES-xborder] [838-013_xADJ] [838-013_3D_Roads_Ultimate] [838-013_xEUTIL-FTC] [838-013_KEYMAP] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C503 ULTIMATE CROSS SECTIONS WILLOW STREET A. Reese B. Ruch As Noted CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE NOTES: PROPOSED STORM INLET PROPERTY PROPOSED BOUNDARY LOT LINE EASEMENT LINE EXISTING LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 5. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREP., DESIGN, AND RECOMMENDATIONS. FOR REFERENCE ONLY NOT FOR CONSTRUCTION 16+50 17+00 17+50 18+00 18+50 19+00 19+50 LINDEN STREET (100' PUBLIC ROW) PROPOSED 30" CURB & GUTTER LINDEN STREET (100' PUBLIC ROW) LINCOLN AVENUE (PUBLIC ROW VARIES) ULTIMATE 30" CURB & GUTTER EXISTING 100' ROW ULTIMATE 30" CURB & GUTTER ULTIMATE 30" CURB & GUTTER ULTIMATE CENTER LINE ULTIMATE 100' ROW ULTIMATE 70'  -  CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.20% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.18% -2.20% CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 60 -2.28% -2.20% PROPOSED GROUND EXISTING GROUND CONCRETE SIDEWALK VERTICAL CURB AND GUTTER EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE EXISTING ROW LINE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Strt\838-013_WILLOW_ULTIMATE_XSECS.dwg LAYOUT NAME: C502 DATE: May 25, 2016 - 8:04am CAD OPERATOR: ben LIST OF XREFS: [838-013_xEXST] [838-013_xSITE] [838-013_xUTIL] [NES-xborder] [838-013_xADJ] [838-013_3D_Roads_Ultimate] [838-013_xEUTIL-FTC] [838-013_KEYMAP] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C502 ULTIMATE CROSS SECTIONS WILLOW STREET A. Reese B. Ruch As Noted CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE NOTES: PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE EXISTING LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 5. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREP., DESIGN, AND RECOMMENDATIONS. 3370 CO KEYMAP LOT 1 LOT 2 FOR REFERENCE ONLY NOT FOR CONSTRUCTION / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 10+75 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 PROPOSED 30" CURB & GUTTER LINDEN STREET (100' PUBLIC ROW) LINCOLN AVENUE (PUBLIC ROW VARIES) EXISTING EDGE OF PAVEMENT EXISTING 100 ROW 16.6  - ℄ ±17.6 ℄ -EOP EXISTING CURB & GUTTER EXISTING CURB & GUTTER CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 10+75 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+00 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 CENTER LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+50 4964 4968 4972 4976 4964 4968 4972 4976 -60 -40 -20 0 20 40 PROPOSED GROUND EXISTING GROUND CONCRETE SIDEWALK VERTICAL CURB AND GUTTER ROW LINE ROW LINE -2.43% -2.08% -2.38% -2.35% -2.11% -2.28% -2.86% -3.61% -2.73% -2.26% -2.41% ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE ROW LINE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Strt\838-013_WILLOW_XSECS.dwg LAYOUT NAME: C501 DATE: May 25, 2016 - 8:04am CAD OPERATOR: ben LIST OF XREFS: [838-013_xEXST] [838-013_xSITE] [838-013_xUTIL] [NES-xborder] [838-013_xADJ] [838-013_3D_Roads] [838-013_xEUTIL-FTC] [838-013_KEYMAP] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C501 INTERIM CROSS SECTIONS WILLOW STREET A. Reese B. Ruch As Noted CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE NOTES: PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE EXISTING LOT LINE 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 5. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREP., DESIGN, AND RECOMMENDATIONS. 3370 CO KEYMAP LOT 1 LOT 2 PVI ELEV = 4969.01 PVI STA = 14+15.66 PVI ELEV = 4968.35 PVI STA = 14+35.66 PVI ELEV = 4968.01 PVI STA = 14+55.66 PVI ELEV = 4967.75 EXISTING GROUND PROPOSED GRADE -0.50% PVI STA = 15+45.66 PVI ELEV = 4967.72 PVI STA = 19+59.45 PVI ELEV = 4966.41 75.0' VC HP ELEV = 4968.01 HP STA = 16+21.10 PVI STA = 16+21.10 PVI ELEV = 4968.10 BVCS: 15+83.60 BVCE: 4967.91 EVCS: 16+58.60 EVCE: 4967.91 A.D. = 1.00 K = 75.00 -0.50% PVI STA = 15+45.66 PVI ELEV = 4967.72 PVI STA = 19+59.45 PVI ELEV = 4966.41 ULTIMATE GRADE PROPOSED INLET MATCH EXISTING LIMITS OF CONSTRUCTION MATCH EXISTING EXISTING GROUND PROPOSED GRADE G M M T T W C S T GAS T X X X T T T T T X X X X X X X X X X X X OWNER W AND T LEASING 131 E LINCOLN AVE FORT COLLINS, CO 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 D 3370 CO / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / CO PROPOSED 30" CURB & GUTTER LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (100' ROW) LINCOLN AVENUE (PUBLIC ROW VARIES) EXISTING EDGE OF PAVEMENT ULTIMATE 30" CURB & GUTTER EXISTING 100' ROW 16.5'  - ℄ ±17.9' ℄ -EOP MATCH EXISTING CURB & GUTTER STA.=16+08.41 OFFSET=17.735 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 ULTIMATE 30" EP: 20+14.31 CURB & GUTTER ULTIMATE 30" CURB & GUTTER ULTIMATE CENTER LINE ULTIMATE 100' ROW ULTIMATE 70'  -  R10' STA.=13+68.46 STA.=14+33.40 STA.=15+92.46 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 MATCH EXISTING CURB & GUTTER STA: 10+52.21 EP: 19+30.96 PI: 10+62.43 EXISTING STORM DRAIN EXISTING STORM DRAIN EXISTING STORM DRAIN R10' BUILDING 1 BUILDING 2 R10' PROPOSED STORM INLET 4960 4965 4970 4975 4980 4960 4965 4970 4975 4980 10+25 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 20+50 4971.97 4971.78 4971.59 4971.40 4971.24 4971.08 4970.92 4970.75 4970.59 4970.43 4970.27 4970.10 4969.81 4969.46 4969.10 4968.71 4968.48 4968.41 4968.51 4968.64 4968.76 4968.87 4968.91 4968.87 4968.75 4968.63 4968.50 4968.38 4968.25 4968.13 4968.00 4967.88 4967.75 4967.63 4967.50 4967.38 4967.09 4966.66 1.25% -0.50% -1.75% -0.65% 0.50% -0.75% -0.80% -1.05% -1.40% -1.60% PVI STA = 10+52.21 PVI ELEV = 4972.14 PVI STA = 10+62.24 PVI ELEV = 4972.06 PVI STA = 11+49.81 PVI ELEV = 4971.40 PVI STA = 13+48.77 PVI ELEV = 4970.11 PVI STA = 13+68.77 PVI ELEV = 4969.90 PVI STA = 14+15.66 PVI ELEV = 4969.24 PVI STA = 19+62.37 PVI ELEV = 4967.31 PVI STA = 19+99.80 PVI ELEV = 4966.66 PVI STA = 20+14.27 PVI ELEV = 4966.84 75.0' VC HP ELEV = 4968.91 HP STA = 16+23.91 PVI STA = 16+23.91 PVI ELEV = 4969.01 BVCS: 15+86.41 BVCE: 4968.82 EVCS: 16+61.41 EVCE: 4968.82 A.D. = 1.00 K = 75.00 75.0' VC LOW PT ELEV = 4968.41 LOW PT STA = 14+96.26 PVI STA = 14+76.61 PVI ELEV = 4968.27 BVCS: 14+39.11 BVCE: 4968.87 EVCS: 15+14.11 EVCE: 4968.46 A.D. = 2.10 K = 35.71 EXISTING GROUND ULTIMATE GRADE EXISTING GROUND STA.=19+83.20 INV.= 4961.81 EXISTING 24" CMP MATCH EXISTING ULTIMATE ℄ LINCOLN AVENUE FOR REFERENCE ONLY EXISTING GROUND PROPOSED GRADE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Strt\838-013_WILLOW.dwg LAYOUT NAME: C500 DATE: May 25, 2016 - 8:03am CAD OPERATOR: ben LIST OF XREFS: [838-013_xEXST] [838-013_xSITE] [838-013_xUTIL] [NES-xborder] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C500 PLAN & PROFILE WILLOW STREET A. Reese B. Ruch 1"=40' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED CURB & GUTTER PROPOSED CENTERLINE NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 5. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREP., DESIGN, AND RECOMMENDATIONS. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE EXISTING LOT LINE ULTIMATE CENTER LINE WILLOW STREET SCALE : 1" = 40' (H) 1" = 5' (V) ULTIMATE CURB & GUTTER RIGHT FLOW LINE WILLOW STREET SCALE : 1" = 40' (H) 1" = 5' (V) STORM DRAIN 70 69 71 70 68 69 71 72 72 72 72 70 69 71 72 72 70 72 73 72 FFE=72.20 72.05 EXISTING FFE=69.53 69.69 (71.25) 71.80 (68.04) (72.05) (72.07) 68.95 72.60 72.60 71.63 72.20 70.16 71.30 FFE=72.60 PROPOSED OUTLET CONTROL STRUCTURE (72.05) (71.61) OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 WOOL HAT LLC 119 E LINCOLN AVE OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 72.60 (72.89) (73.19) (72.64) (72.80) (72.78) (72.23) (72.17) 72.20 (72.75) 72.60 72.60 72.20 72.20 72.20 (72.24) 71.28 (68.94) (68.85) 71.53 (71.75) (71.89) (71.77) (70.19) 68.70 68.20 TRASH SPIRIT STORAGE BUILDING 1 BUILDING 2 71.23 71.07 71.36 71.62 71.42 68.14 PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED STORM DRAIN TO TREE GRATES (TYP.) EXISTING STORM DRAIN PROPOSED STORMTECH CHAMBERS 71.08 8.1% 2.0% 1.3% 2.0% 71.16 68.78 71.06 (71.48) PROPOSED TRENCH DRAIN 69.13 69.54 68.84 70.05 70.32 70.18 69.76 69.90 70.57 71.72 71.14 71.68 71.89 71.36 71.63 72.35 73.09 71.53 71.56 70.22 70.15 70.07 72.20 72.28 72.60 72.20 71.98 72.20 PROPOSED STORM PROPOSED STORM DRAIN BASIN DRAIN BASIN PROPOSED STORM DRAIN BASIN PROPOSED STORM DRAIN BASIN PROPOSED STORM DRAIN BASIN PROPOSED STORM DRAIN BASIN PROPOSED STORM PROPOSED STORM DRAIN BASIN DRAIN BASIN 70.30 (72.10) 71.98 71.98 71.98 71.98 72.03 71.50 71.90 71.38 71.78 71.47 72.60 71.40 72.60 72.52 72.96 72.55 (73.02) 71.66 PROPOSED STORM DRAIN BASIN 72.08 PROPOSED STORM DRAIN BASIN PROPOSED STORM DRAIN BASIN EXISTING STORM INLET 2.1% 2.0% 69.79 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R LEGEND: 5013 PROPOSED CONTOUR EXISTING CONTOUR PROPERTY BOUNDARY PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM. NOTES: 2.0%%% EXISTING SPOT ELEVATION (47.45) C400 GRADING PLAN A. Reese B. Ruch 1"=30' PROPOSED STORM DRAIN PROPOSED CURB AND GUTTER PROPOSED AREA DRAIN NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Grad\838-013_GRAD.dwg LAYOUT NAME: C400 DATE: May 25, 2016 - 8:03am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xEXST] [838-013_xUTIL] [838-013_xGRAD] [838-013_xTOPO] [838-013_xADJ] [838-013_3D_Proposed] [838-013_xEUTIL-FTC] [838-013_xSITE] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROPOSED STORM DRAIN SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 D S S S S W F FDC FDC F W W S W W W W W W W W W W W W W W W W W W W W W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W W WV WV 12" W 8" SS 8" SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / S 24" SS 24" SS SSV SSV SSV SSV SSV SSV SSV SSV SSV SSV SSV SSV 6" SS 6" SS 6" SS WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV WSV D E E E E G G G G G G G 6" W 6" W G G 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS W W W W W W W W W W W W W W W W W W W W W LOT 1 LOT 3 X X X X X X X X LOT 2 X X PROPOSED ROOF DRAIN SYSTEM SEE SHEET C300 PROPOSED ROOF DRAIN SYSTEM SEE SHEET C300 LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (PUBLIC ROW VARIES) EXISTING WATER LINE EXISTING 24" RCP STORM DRAIN EXISTING 24" SANITARY SEWER EXISTING STORM DRAIN EXISTING STORM MH EXISTING 6" HDPE EXISTING 12" PVC EXISTING STORM DRAIN INLET PROPOSED FIRE HYDRANT PROPOSED 4" WATER SERVICE PROPOSED 8" FIRE SERVICE APPROXIMATE LOCATION OF EXISTING FIRE HYDRANT UNDERGROUND GRAIN HANDLING UNIT STORM DRAIN TO TREE GRATES (TYP.) EXISTING 8" WATER PROPOSED 2" WATER SERVICE PROPOSED 6" FIRE SERVICE EXISTING SSMH EXISTING 48" RCP STORM DRAIN (PER WILLOW STREET IMPROVEMENTS) PROPOSED 6" WATER LINE BUILDING 1 BUILDING 2 EXISTING 24" RCP STORM EXMH STA 10+00.00 N: 131721.70 E: 196303.81 88.38 LF 30" RCP @ 2.20% INLET 1 STA 10+88.38 N: 131771.30 E: 196230.65 22.11 LF 18" RCP @ 0.40% STMH 2 STA 11+10.50 N: 131754.75 E: 196215.98 59.40 LF 18" HDPE @ 0.40% TEE 3 STA 11+69.90 N: 131794.11 E: 196171.49 WQ STRUCTURE 4 STA 11+74.61 N: 131797.23 E: 196167.96 2.40 LF 8" PVC @ 0.40% CONNECTION 5 STA 11+77.01 N: 131795.43 E: 196166.37 105.1 LF STORMTECH MC-3500 CHAMBERS @ 0.20% CONNECTION 7 STA 12+86.43 N: 131713.47 E: 196093.88 2.40 LF 8" PVC @ 0.50% INLET 8 STA 12+88.83 N: 131711.67 E: 196092.29 87.19 LF 18" HDPE @ 1.40% BASIN 9 STA 13+76.02 N: 131769.44 E: 196026.98 18.82 LF 15" HDPE @ 0.50% 22.5° BEND 10 STA 13+94.84 N: 131775.62 E: 196009.20 42.65 LF 15" HDPE @ 0.50% 19.46 LF 12" HDPE @ 0.50% TEE 12 STA 14+56.95 N: 131816.74 E: 195962.66 TEE 11 STA 14+37.49 N: 131803.86 E: 195977.24 35.54 LF 12" HDPE @ 0.50% TEE 13 STA 14+92.49 N: 131840.27 E: 195936.02 14.77 LF 12" HDPE @ 0.50% TEE 14 STA 15+07.26 N: 131850.05 E: 195924.95 40.23 LF 12" HDPE @ 0.50% TEE 15 STA 15+47.49 N: 131876.68 E: 195894.80 21.81 LF 12" HDPE @ 0.50% TEE 16 STA 15+69.30 N: 131891.12 E: 195878.45 10.73 LF 12" HDPE @ 0.50% INLET 17 STA 15+80.03 N: 131898.23 E: 195870.41 22.19 LF 8" HDPE @ 0.50% INLET 18 STA 16+02.21 N: 131915.08 E: 195884.84 20.00 LF 8" HDPE @ 0.50% INLET 19 STA 16+22.21 N: 131930.08 E: 195898.07 20.00 LF 8" HDPE @ 0.50% INLET 20 STA 16+42.21 N: 131945.07 E: 195911.30 20.00 LF 8" HDPE @ 0.50% INLET 21 STA 16+62.21 N: 131960.07 E: 195924.54 CORE DRILL, CONNECT TO EXISTING MANHOLE, & SEAL INLET 6 STA 11+82.97 N: 131790.96 E: 196162.43 PROPOSED ROOF DRAIN SYSTEM SEE SHEET C300 TRENCH DRAIN SEE SHEET C300 4955 4960 4965 4970 4975 4980 4985 4955 4960 4965 4970 4975 4980 4985 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+50 12" MIN. EXMH STA 10+00.00 RIM 4968.2± INV. IN 4960.86 (NE) INV. IN 4960.86 (NW) INV. OUT 4960.66 (SE) 88.38 LF 30" RCP @ 2.20% INLET 1 STA 10+88.38 FL. EL 4967.5± INV. IN 4962.80 (SW) INV. OUT 4962.80 (SE) 22.11 LF 18" RCP @ 0.40% STMH 2 STA 11+10.50 RIM 4969.1± INV. IN 4962.89 (NW) INV. OUT 4962.89 (NE) TEE 16 STA 15+69.30 INV. 4967.83 (NW) INV. 4967.83 (NE) INV. 4967.83 (SE) 10.73 LF 12" HDPE @ 0.50% INLET 17 STA 15+80.03 FL. EL 4972.0± INV. IN 4967.88 (NW) INV. IN 4967.88 (NE) INV. OUT 4967.88 (SE) 22.19 LF 8" HDPE @ 0.50% INLET 18 STA 16+02.21 FL. EL 4972.0± INV. IN 4967.99 (NE) INV. OUT 4967.99 (SW) 20.00 LF 8" HDPE @ 0.50% INLET 19 STA 16+22.21 FL. EL 4972.0± INV. IN 4968.09 (NE) INV. OUT 4968.09 (SW) 20.00 LF 8" HDPE @ 0.50% INLET 20 STA 16+42.21 FL. EL 4972.0± INV. IN 4968.19 (NE) INV. OUT 4968.19 (SW) 20.00 LF 8" HDPE @ 0.50% INLET 21 STA 16+62.21 FL. EL 4972.0± INV. IN 4968.29 (NW) INV. IN 4968.29 (SE) INV. OUT 4968.29 (SW) 59.40 LF 18" HDPE @ 0.40% TEE 3 STA 11+69.90 INV. 4963.13 (NW) INV. 4963.13 (SW) INV. 4963.13 (SE) 4.71 LF 18" HDPE @ 0.40% WQ STRUCTURE 4 STA 11+74.61 INV. 4965.98 (SW) INV. 4963.15 (SE) 2.40 LF 8" PVC @ 0.40% CONNECTION 5 STA 11+77.01 INV. 4963.16 (SW) INLET 6 STA 11+82.97 FL. EL 4969.2± INV. IN 4963.17 (SW) INV. OUT 4963.17 (NE) CONNECTION 7 STA 12+86.43 INV. 4966.21 (SW) INV. 4963.38 (NE) 2.40 LF 8" PVC @ 0.50% INLET 8 STA 12+88.83 FL. EL 4971.0± INV. IN 4965.64 (NW) INV. OUT 4966.22 (NE) INV. OUT 4967.74 (SE) 87.19 LF 18" HDPE @ 1.40% BASIN 9 STA 13+76.02 INV. 4966.86 (W) INV. 4966.86 (NE) INV. 4966.86 (SE) 18.82 LF 15" HDPE @ 0.50% 22.5° BEND 10 STA 13+94.84 INV. 4966.95 (NW) INV. 4966.95 (E) 42.65 LF 15" HDPE @ 0.50% TEE 11 STA 14+37.49 INV. 4967.17 (NW) INV. 4967.17 (SW) INV. 4967.17 (SE) 19.46 LF 12" HDPE @ 0.50% TEE 12 STA 14+56.95 INV. 4967.27 (NW) INV. 4967.27 (NE) INV. 4967.27 (SE) 35.54 LF 12" HDPE @ 0.50% TEE 13 STA 14+92.49 INV. 4967.44 (NW) INV. 4967.44 (SW) INV. 4967.44 (SE) 14.77 LF 12" HDPE @ 0.50% TEE 14 STA 15+07.26 INV. 4967.52 (NW) INV. 4967.52 (NE) INV. 4967.52 (SE) 40.23 LF 12" HDPE @ 0.50% TEE 15 STA 15+47.49 INV. 4967.72 (NW) INV. 4967.72 (SW) INV. 4967.72 (SE) 21.81 LF 12" HDPE @ 0.50% EXISTING 24" RCP STORM STA.=10+77.85 INV.=4959.01 105.1 LF MC-3500 STORMTECH CHAMBERS @ 0.20% EXISTING 42" RCP STORM DRAIN CONNECT TO EXISTING MANHOLE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Strm\838-013_STRM.dwg LAYOUT NAME: C301 DATE: May 25, 2016 - 8:03am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xUTIL] [838-013_xADJ] [838-013_xEUTIL-FTC] [838-013_xEXST] [838-013_xSITE] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C301 PLAN & PROFILE STORM DRAIN A. Reese B. Ruch 1"=30' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EXISTING RIGHT OF WAY EXISTING WATER MAIN LEGEND: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS AND SERVICES. 6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7. FIRE LINE SHALL BE STUBBED INSIDE THE RISER ROOM AND CAPPED 1' ABOVE THE FINISHED FLOOR ELEVATION. 8. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. W G T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S PROPOSED FIRE SERVICE F EXISTING SANITARY SEWER SS PROPOSED FIRE DEPT. CONN. PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT FDC PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPERTY BOUNDARY NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 EASEMENT LINE City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING FIBER OPTICS FO PROPOSED STORM SEWER PROPOSED WATER MAIN PROPOSED SANITARY SEWER PROPOSED STREET LIGHT W PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=30' STORM DRAIN SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 D S S S W W W W W W W W W W W W W W W W W W W W W 8" SS 8" SS 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W W WV WV WV 12" W 12" W 12" W 12" W WV W W WV 8" SS 8" SS 8" SS 8" SS 8" SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 4366 CO WV W S O WV S 24" SS 24" SS 6" SS 6" SS 6" SS 6" SS 6" SS D G G G G G G G G G G G G G G G G G G G G G G G G G G G H Y D WV WV E E E E E E E E E E T G G G G G G G G G 6" W 6" W G G G G G G 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS CO H Y D LOT 1 LOT 3 LOT 2 S F W F FDC F FDC F W W S LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (PUBLIC ROW VARIES) EXISTING WATER LINE EXISTING 24" RCP STORM DRAIN EXISTING 24" SANITARY SEWER EXISTING STORM DRAIN EXISTING STORM MH CONNECT TO EXISTING STORM DRAIN INLET EXISTING 6" HDPE EXISTING 12" PVC EXISTING STORM DRAIN INLET GRATE = 4969.79 PROPOSED FIRE HYDRANT PROPOSED 4" WATER SERVICE PROPOSED 8" FIRE SERVICE APPROXIMATE LOCATION OF EXISTING FIRE HYDRANT UNDERGROUND GRAIN HANDLING UNIT SPIRIT STORAGE STORM DRAIN TO TREE GRATES (TYP.) BUILDING 1 BUILDING 2 EXISTING 8" WATER PROPOSED 2" WATER SERVICE PROPOSED 6" FIRE SERVICE TRASH ENCLOSURE 6" SANITARY-BUILDING 2 INV.=4958.12 FG=4970.10 24.85 LF 6" PVC @ 1.00% PROPOSED 6" SANITARY SERVICE CONNECT TO EXISTING 2 INV. IN=4955.75 (NW) INV. IN=4957.88 (SW) INV. OUT=4955.75 (SE) FG=4970.02 EXISTING SSMH EXISTING 48" RCP STORM DRAIN (PER WILLOW STREET IMPROVEMENTS) PROPOSED 6" WATER LINE PROPOSED 4" SANITARY SERVICE CONNECT TO EXISTING 1 INV. IN=4956.38 (NW) INV. IN=4958.04 (SW) INV. OUT=4956.38 (SE) FG=??? 29.02 LF 4" PVC @ 2.00% 4" SANITARY-BUILDING 1 INV.=4958.62 FG=4971.63 PROPOSED STORMTECH MC-3500 CHAMBERS CORE DRILL, CONNECT TO EXISTING MANHOLE, & SEAL PROPOSED SPILL CONTAINMENT AREA NOTE: SPECIAL CARE NEEDS TO BE TAKEN WHEN TAPPING. MAIN IS DR18 FUSIBLE PVC THAT WAS HORIZONTALLY- DIRECTIONALLY DRILLED AND CAN BE PRONE TO SPLITTING IF TENSION IS NOT RELIEVED WHEN TAPPING. PLEASE CONTACT WATER FIELD SERVICES AT (970) 221-6700 PRIOR TO TAPPING. RD BASIN 3-1 INV.=4968.32 FG=4972.56 RD 90° BEND 3 INV.=4968.30 FG=4972.49 RD 90 ° BEND 2 INV.=4968.41 FG=4972.49 RD BASIN 4 INV.=4968.01 FG=4972.40 12"x6" TEE INV.=4967.72 FG=4972.09 RD 45° BEND 2-1 INV.=4968.54 FG=4972.07 BASIN 12-1 INV.=4967.29 FG=4972.05 RD 90° BEND 1 INV.=4968.31 FG=4972.05 RD BASIN 4-1 INV.=4968.22 FG=4972.02 RD BASIN 2-2 INV.=4969.49 FG=4972.00 12"x6" TEE INV.=4967.52 FG=4972.00 INLET 20 INLET 18 INLET 21 INV.=4968.29 FG=4971.98 INLET 19 INLET 17 INV.=4967.88 FG=4971.98 12"x6" TEE INV.=4967.44 FG=4971.97 12"x6" TEE INV.=4967.27 FG=4971.93 15"x6" TEE w/ REDUCER (N) INV.=4967.17 FG=4971.92 22.5° BEND BASIN 15-1 INV.=4967.74 FG=4971.63 RD BASIN 1-1 INV.=4968.50 FG=4971.55 BASIN 13-1 INV. OUT=4967.46 (NE) FG=4971.51 BASIN 17-1 INV.=4968.09 FG=4971.40 BASIN 11-1 INV.=4967.19 FG=4971.38 BASIN 9 INV.=4966.86 FG=4971.22 EX INLET INV.=4967.95 FG=??? 90° BEND INV.=4963.70 FG=4971.17 BASIN 14-1 INV.=4967.55 FG=4971.07 INLET 8 INLET 6 STMH 2 CONNECT TO UNDERGROUND DETENTION STRUCTURE WATER QUALITY STRUCTURE 18"x18" TEE INV.=4963.13 FG=4968.97 EXMH TRENCH DRAIN INV.=4967.03 FG=4968.15 INLET 1 30" RCP STORM 18" RCP STORM 18" HDPE STORM 18" HDPE STORM 15" HDPE STORM 42.25 LF 8" HDPE @ 0.50% 8" PVC STORM 8" PVC STORM 18" HDPE STORM 33.94 LF 8" HDPE @ 0.50% 15" HDPE STORM 12" HDPE STORM 12" HDPE STORM 12" HDPE STORM 12" HDPE STORM 8" HDPE STORM 8" HDPE STORM 8" HDPE STORM 8" HDPE STORM 23.90 LF 6" PVC @ 0.50% 25.96 LF 6" PVC @ 0.50% 3.26 LF 6" PVC @ 0.50% 37.30 LF 6" PVC @ 0.50% 42.79 LF 6" PVC @ 0.50% 3.41 LF 6" PVC @ 0.50% 3.50 LF 6" HDPE @ 0.50% 3.50 LF 6" HDPE @ 0.50% 5.00 LF 6" HDPE @ 0.50% 3.50 LF 6" HDPE @ 0.50% 114.22 LF 18" HDPE @ 0.50% 4.71 LF 18" HDPE @ 0.50% 9.10 LF 6" PVC @ 0.50% 11.98 LF 6" PVC @ 0.50% 41.50 LF 6" PVC @ 0.50% 12" HDPE STORM 3.26 LF 8" HDPE @ 0.50% PROPOSED STORM DRAIN SEE SHEET C301 CONNECT TO UNDERGROUND DETENTION STRUCTURE PROPOSED STORM DRAIN SEE SHEET C301 12"x6" TEE INV.=4967.83 FG=4972.14 12" HDPE STORM BASIN 16-1 INV.=4967.85 FG=4972.15 3.37 LF 6" HDPE @ 0.50% EXISTING 24" RCP STORM No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Util\838-013_UTIL.dwg LAYOUT NAME: C300 DATE: May 25, 2016 - 8:02am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xUTIL] [838-013_xEXST] [838-013_xSITE] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET C300 UTILITY PLAN A. Reese B. Ruch 1"=30' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EXISTING RIGHT OF WAY EXISTING WATER MAIN LEGEND: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS AND SERVICES. 6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7. FIRE LINE SHALL BE STUBBED INSIDE THE RISER ROOM AND CAPPED 1' ABOVE THE FINISHED FLOOR ELEVATION. 8. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. W G T E EXISTING STORM SEWER PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S PROPOSED FIRE SERVICE F EXISTING SANITARY SEWER SS PROPOSED FIRE DEPT. CONN. PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT FDC PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPERTY BOUNDARY NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 EASEMENT LINE City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING FIBER OPTICS FO PROPOSED STORM SEWER PROPOSED WATER MAIN PROPOSED SANITARY SEWER W PROPOSED STREET LIGHT X X X X X X OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 4366 CO W S O CO LOT 1 LOT 3 LOT 2 LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (100' ROW) 4' CONCRETE SIDEWALK ADJACENT BUILDING ADJACENT BUILDING EXISTING 1 STORY CONCRETE BUILDING EXISTING 1 STORY METAL BUILDING TRASH ENCLOSURE SPIRIT STORAGE LOADING DOCKS EXISTING 6' CONCRETE SIDEWALK UNDERGROUND GRAIN HANDLING UNIT PROPOSED 30" CURB & GUTTER PROPOSED 15' SIDEWALK EXISTING LANDSCAPE PLANTER (TYP.) MATCH EXISTING PROPOSED DRIVEWAY EXISTING EDGE OF ASPHALT MATCH EXISTING TREE GRATE (TYP.) BUILDING 1 FIRE PIT (TYP.) BUILDING 2 HAMMERMILL ACCESS RAMP BICYCLE RACKS BICYCLE RACKS COURTYARD (SEE RIPLEY DESIGN PLANS FOR DETAIL) SERVICE YARD (SEE SHEET A-105 FOR DETAIL) 16' EMERGENCY ACCESS EASEMENT 10' DRAINAGE EASEMENT 6' UTILITY EASEMENT CONCRETE RETAINING WALLS 12" RIBBON CURB SPILL DRAIN C200 PAVING PLAN A. Reese B. Ruch 1"=30' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R LEGEND: EASEMENTS NOTES: PROPOSED VERTICAL CURB & GUTTER EXISTING RIGHT-OF-WAY NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 PROPERTY BOUNDARY No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Strt\838-013_PAVE.dwg LAYOUT NAME: C200 DATE: May 25, 2016 - 8:01am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xEXST] [838-013_xSITE] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING LOT LINE HEAVY DUTY CONCRETE PAVING PRIVATE CONCRETE PAVING PUBLIC CONCRETE PAVING PROPOSED PARKING STALLS PROPOSED 30" CURB & GUTTER PERMEABLE PAVERS 1. SEE DETAIL SHEETS FOR ADDITIONAL INFORMATION REGARDING CURBS AND PAVEMENT SECTIONS. 2. PAVEMENT MARKINGS SHALL BE PER CITY STANDARDS AND PROJECT SPECIFICATION MANUAL. 3. PERMEABLE PAVER AREAS SHALL HAVE EDGE RESTRAINTS ALONG ENTIRE PERIMETER IN ACCORDANCE WITH DETAILS AND MANUFACTURER RECOMMENDATIONS. 4. EXTRA CARE SHOULD BE TAKEN TO PREVENT THE STORAGE OF SOILS OR OTHER MATERIALS DIRECTLY ON OR ADJACENT TO THE PAVER SURFACE. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 6. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OR FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 7. ALL PUBLIC CONCRETE PAVING SHALL BE 6" THICK. 8. ALL PRIVATE CONCRETE PAVING SHALL HAVE THICKENED EDGE AROUND PERIMETER. 9. FIRE LANE SIGNAGE TO BE PROVIDED AND COORDINATED WITH POUDRE FIRE AUTHORITY. E E E E E E X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X E E E E E E E E E T W W FO FO FO FO FO FO G SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS D S S S W W W W W W W W W W W W W W W W W W W W W 8" SS 8" SS 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W W WV WV WV 12" W 12" W 12" W 12" W WV W W WV 8" SS 8" SS 8" SS 8" SS 8" SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / WV W S O WV S 24" SS 24" SS 6" SS 6" SS 6" SS 6" SS 6" SS D G G G G G G G G G G G G G G G G G G G G G G G G G WV WV E E E E E E E E T G G G G G G G G G 6" W 6" W G G G G G G 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS CO H Y D ADJACENT BUILDING ADJACENT BUILDING EXISTING 1 STORY BRICK BUILDING TO BE REMOVED UNDER SEPARATE PERMIT EXISTING 1 STORY CONCRETE BUILDING TO REMAIN EXISTING 1 STORY METAL BUILDING TO REMAIN 100' ROW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (100' ROW) ADJACENT BUILDING ADJACENT BUILDING / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ADJACENT BUILDING EXISTING 10' MOUNTAIN STATES TELEPHONE & TELEGRAPH CO EASEMENT REC. NO. 90027035 (TO BE VACATED BY SEPARATE DOCUMENT) EXISTING GATE TO BE REMOVED EXISTING TELEPHONE LINE TO BE RELOCATED EXISTING 1' WIDE BLOCK WALL EXISTING 6" HDPE STORM DRAIN EXISTING 12" PVC STORM DRAIN EXISTING ADJACENT BUILDING OVERHANG EXISTING ELECTRIC LINE EXISTING WATER LINE EXISTING STORM INLET TO REMAIN APPROXIMATE EXISTING STORM DRAIN LOCATION EXISTING TREE TO BE REMOVED EXISTING SIGN (TYP.) EXISTING 24" SANITARY EXISTING 24" RCP STORM DRAIN EXISTING GATE EXISTING 24" SANITARY EXISTING GATE EXISTING EDGE OF PAVEMENT EXISTING STORM INLET TO BE REMOVED EXISTING CHAIN LINK FENCE TO BE REMOVED EXISTING CHAIN LINK FENCE TO BE REMOVED EXISTING CHAIN LINK FENCE TO REMAIN EXISTING GATE TO BE REMOVED 24" RCP STORM DRAIN REMOVED BORING B-4 BORING B-4 PIEZOMETER 5A PIEZOMETER 4A EXISTING GAS LINE TO BE RELOCATED BORING B-3 PIEZOMETER 3A BORING B-2 BORING B-1 PIEZOMETER 1A EXISTING GUY WIRE CONCRETE ANCHOR TO BE REMOVED EXISTING 6' SIDEWALK EXISTING 30" VERTICAL CURB, GUTTER & SIDEWALK TO BE REMOVED EXISTING 30" VERTICAL CURB & GUTTER PIEZOMETER 5A PIEZOMETER 2A REMOVE EXISTING DRIVEWAY EXISTING "SPEED LIMIT 25" "NO PARKING ANYTIME" TO BE RELOCATED EXISTING EDGE OF PAVEMENT OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 119 E LINCOLN AVE OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 EXISTING 8" SANITARY EXISTING 12" WATER EXISTING 12" WATER / / / / / / / / / / / / / / / / / / / / COORDINATE REMOVAL OF ABANDONED RADIO TOWER WITH OWNER EXISTING WATER METER FOR ADJACENT PROPERTY EXISTING 8" WATER EXISTING 48" STORM (PER WILLOW STREET IMPROVEMENTS) EXISTING PAVEMENT TO BE REMOVED PAVEMENT REMOVAL AREA PAVEMENT REMOVAL AREA PAVEMENT REMOVAL AREA EXISTING 24" RCP STORM 24" RCP STORM DRAIN TO BE FLOW FILLED & ABANDONED C100 DEMOLITION PLAN EXISTING CONDITIONS & A. Reese B. Ruch 1"=30' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Exist\838-013_ECON.dwg LAYOUT NAME: C100 DATE: May 25, 2016 - 8:15am CAD OPERATOR: ben LIST OF XREFS: [838-013_xTOPO] [NES-xborder] [838-013_xEXST] [838-013_xADJ] [838-013_xUTIL] [838-013_xEUTIL-FTC] [838-013_xSITE] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner LEGEND: EXISTING STORM SEWER EXISTING VALVE EXISTING TELEPHONE PEDESTAL EXISTING TREES FIELD SURVEY BY: NORTHERN ENGINEERING SERVICES, INC. PROJECT NO. 838-013 DATE: JULY 2014 EXISTING GAS G EXISTING TELEPHONE T EXISTING FIBER OPTIC FO EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 H Y D EXISTING PAVEMENT TO BE MILLED AND OVERLAYED S O W EXISTING LOT LINE EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING PAVEMENT TO BE REMOVED No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Exist\838-013_ECON.dwg LAYOUT NAME: C100 DATE: May 25, 2016 - 8:15am CAD OPERATOR: ben LIST OF XREFS: [838-013_xTOPO] [NES-xborder] [838-013_xEXST] [838-013_xADJ] [838-013_xUTIL] [838-013_xEUTIL-FTC] [838-013_xSITE] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET TREE PROTECTION NOTES: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 7. REFER TO LANDSCAPE PLANS FOR TREE PROTECTION AND MITIGATION. 8. ADDITIONAL TREES NOT SHOWN ON THESE PLANS MAY EXIST AND MAY REQUIRE REMOVAL. COORDINATION OF WHICH TREES ARE TO REMAIN AND WHICH ARE TO BE REMOVED SHOULD BE COORDINATED WITH THE CITY FORESTER. REFER TO LANDSCAPE PLANS AND TREE MITIGATION PLAN FOR ADDITIONAL INFORMATION. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. TREE DIAMETER AT BREAST HEIGHT (INCHES) AUGER DISTANCE FROM FACE OF TREE (FEET) 0-2 1 3-4 2 5-9 5 10-14 10 15-19 12 OVER 19 15 1. ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2. WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3. ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4. PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5. DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6. NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7. LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED. 8. THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9. ALL TREE REMOVAL SHOWN SHALL BE COMPLETED OUTSIDE OF THE SONGBIRD NESTING SEASON (FEB 1 - JULY 31) OR CONDUCT A SURVEY OF TREES ENSURING NO ACTIVE NESTS IN THE AREA. CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Final Drainage and Erosion Control Report for River District Block Eight Mixed-Use dated May 25, 2016 by Northern Engineering shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by t he construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD88 BENCHMARK #1: City of Fort Collins Benchmark 03-00 On a parapet wall at the Northwest end of the Lincoln Ave. bridge near the Northeast corner of Lincoln Ave. and Willow St. Elevation=4967.33 BENCHMARK #2: City of Fort Collins Benchmark 05-00 On the top of curb at the signal pole base at the Northwest corner of Linden St. and Jefferson St. Elevation=4978.05 Please Note: This plan set is using NAVD 88 for a vertical datum. Surrounding developments have used NGVD 29 Unadjusted for their vertical datums. If NGVD 29 Unadjusted datum is required for any purpose, the following equation should be used: NGVD 29 Unadjusted = NAVD 88 - 3.18' Basis of Bearing The Basis of Bearings is the Southeasterly line of Block 9, Town of Fort Collins as bearing S41°40'49"W (assumed bearing). 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: a. N/A CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16. For additional information a separate Stormwater Management Plan / Erosion Control Report for River District Block Eight Mixed-Use will be provided at final design. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Final Drainage and Erosion Control Report for River District Block Eight Mixed-Use dated May 25, 2016 by Northern Engineering shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. OF ASPHALT EXISTING UNIMPROVED PARKWAY EXISTING EDGE OF ASPHALT EXISTING UNIMPROVED PARKWAY EXISTING EDGE OF ASPHALT 5' AMENITY ZONE 10' SIDEWALK NORTH RIGHT-OF-WAY NORTH RIGHT-OF-WAY NORTH RIGHT-OF-WAY SOUTH RIGHT-OF-WAY 16' TRAVEL/ BIKE 10' SIDEWALK 5' AMENITY ZONE 15' PARKWAY 10' SIDEWALK Delich Associates 2272 Glen Haven Drive Loveland, Colorado 80538 (970) 669-2061 C000 COVER SHEET A. Reese B. Ruch N/A MAY 2016 I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: VICINITY MAP NORTH 1"=1500' PROJECT DATUM: NAVD88 BENCHMARK #1: City of Fort Collins Benchmark 03-00 On a parapet wall at the Northwest end of the Lincoln Ave. bridge near the Northeast corner of Lincoln Ave. and Willow St. Elevation=4967.33 BENCHMARK #2: City of Fort Collins Benchmark 05-00 On the top of curb at the signal pole base at the Northwest corner of Linden St. and Jefferson St. Elevation=4978.05 Please Note: This plan set is using NAVD 88 for a vertical datum. Surrounding developments have used NGVD 29 Unadjusted for their vertical datums. If NGVD 29 Unadjusted datum is required for any purpose, the following equation should be used: NGVD 29 Unadjusted = NAVD 88 - 3.18' Basis of Bearing The Basis of Bearings is the Southeasterly line of Block 9, Town of Fort Collins as bearing S41°40'49"W (assumed bearing). Northern Engineering Services, Inc. Project No. 838-013 Date: July 2014 ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A PORTION OF BLOCKS 8 & 9, TOWN OF FORT COLLINS, AND VACATED CHESTNUT STREET AND VACATED ALLEY SITUATED IN THE WEST HALF OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO OWNER/DEVELOPER PROJECT TEAM: SITE ENGINEER Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SURVEYOR ARCHITECT CONTACT INFORMATION PROJECT TEAM: TYPICAL SECTIONS E N G I N E E R I N G N O R T H E RN UTILITY PLANS FOR City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. LANDSCAPE ARCHITECT PROJECT LOCATION RIVER DISTRICT BLOCK EIGHT MIXED USE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: May 25, 2016 PROJECT: 838-013 Sheet Of 22 Sheets RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\838-013_COVER.dwg LAYOUT NAME: C000 DATE: May 25, 2016 - 8:00am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 5/25/16 NOT FOR CONSTRUCTION REVIEW SET OZ Architecture 3003 Larimer Street Denver, CO 80205 (303) 861-5704 Blue Ocean Enterprises 401 West Mountain Avenue Fort Collins, Colorado 80521 (970) 419-7420 ■ land planning ■ landscape architecture ■ ■ urban design ■ entitlement ■ Ripley Design, Inc. 419 Canyon Avenue, Suite 200 Fort Collins, CO 80521 (970) 224-5828 Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G (970) 221-4158 N O R T H E RN TRAFFIC GEOTECHNICAL ENGINEERING Earth Engineering Consultants 4396 Greenfield Drive Windsor, Colorado 80550 (970) 545-3908 COVER SHEET SHEET INDEX C000 C001 GENERAL & CONSTRUCTION NOTES C200 PAVING PLAN C400 GRADING PLAN C300 UTILITY PLAN C800 DRAINAGE EXHIBIT C600-C601 WATER DETAILS C100 EXISTING CONDITIONS & DEMOLITION PLAN C603-C604 SITE DETAILS C605-C606 DRAINAGE DETAILS C700 EROSION CONTROL PLAN C701 EROSION CONTROL DETAILS C500 WILLOW STREET PLAN & PROFILE C504 WILLOW STREET STRIPING PLAN C501 WILLOW STREET INTERIM CROSS SECTIONS C502-C503 WILLOW STREET ULTIMATE CROSS SECTIONS C602 SANITARY SEWER DETAILS GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7857 ELECTRIC-------- City of Fort Collins Light & Power-- Janet McTague (970) 224-6154 CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425 TELECOM.--------CenturyLink------------------------------- William Johnson (970) 377-6401 WATER------------ City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 WASTEWATER--City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 STORMWATER- City of Fort Collins Utilities----------- Dan Mogen (970) 224-6192 C301 STORM DRAIN PLAN & PROFILE