Loading...
HomeMy WebLinkAboutGATEWAY AT PROSPECT AMENDED ODP - ODP160001 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWPage 1 of 8 City of Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221 .6750 970.224.6134 - fax fcgov.com December 10, 2014 Mike Cooper Century Communities 8390 E Crescent Parkway Suite 650 Greenwood Village, CO 80111 Re: Prospect Gateway - Residential Description of project: This is a request to construct a series of single-family attached and detached units (parcel #s 8716400001 and 8716400010). The site will be comprised of 396 lots at the northwest corner of 1-25 and Prospect. The site is located in the Employment (E) and Low Density Mixed-Use (LMN) zone districts. This project will be subject to Planning & Zoning Board (Type II) review. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Clark Mapes, at 970-221-6225 or cmapes@fcgov.com. Comment Summary: Department: Zoning Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com 1. No Comment Department: Water-Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com 1 . Water and wastewater services in this area are provided by the ELCO Water District (493-2044) and the Boxelder Sanitation District (498-0604). RESPONSE: Acknowledged. Department: Traffic Operations Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com 1. A full traffic study will be needed. The study will need to address (and analyze) the access to the development (proposed as a roundabout), as well as, at a minimum, the intersection of the Frontage Road Page 2 of 10 and Prospect. RESPONSE: Acknowledged. A TIS has been provided with this ODP/APU submittal. 2. Multi-modal level of service will need to be evaluated with the TIS, especially since this area does not yet have good bike and ped connections. RESPONSE: Acknowledged. 3. Review the approved North 1-25 EIS to ensure that this development doesn't preclude those future improvements. RESPONSE: Acknowledged. 4. Close coordination with COOT will be important (they will need to provide access permits). RESPONSE: Acknowledged. Department: Stormwater Engineering Contact: Mark Taylor, 970-416-2494, mtaylor@fcgov.com 1. Floodplain Comments: A significant portion of this property is in the FEMA-regulatory 100-year Boxelder and Cooper Slough Floodplains and must comply with the safety regulations of Chapter 10 of City Municipal Code. A FEMA Flood Risk Map is attached. RESPONSE: Acknowledged. 2. Residential and mixed-use buildings may not be constructed in a FEMA-regulated floodway. RESPONSE: Acknowledged. 3. Non-residential structures are allowed in the floodway, provided that they are proven by a registered professional engineer (P.E.) to cause no change in the base flood elevation (BFE) and no change to the floodway boundary, all as documented by technical analysis. New non-residential structures must also be either elevated 18-inches above the Base Flood Elevation (BFE), or floodproofed to that same elevation. That elevation is known as the Regulatory Flood Protection Elevation (RFPE = BFE + 18"). RESPONSE: Acknowledged. 4. Nonstructural development (fences, detention ponds, hard surface paths, fill, driveways, parking areas, vegetation, etc.) is allowed within the floodway as long as it can be proven by a P.E. that the development will not cause a change to the BFE or a change to the floodway or flood fringe boundaries. All technical analyses must be prepared using modeling and mapping techniques consistent with current floodplain modeling guidelines and standards. RESPONSE: Acknowledged. 5. Residential, non-residential and mixed use structures are allowed in a FEMA-regulatory 100-year flood fringe, as long they are elevated to the RFPE. Non-residential structures may be floodproofed in lieu of elevation. RESPONSE: Acknowledged. 6. Basements may not be constructed below the RFPE in a residential structure within the flood fringe. RESPONSE: Acknowledged. 7. Nonstructural development is not restricted within the flood fringe. RESPONSE: Acknowledged. Page 3 of 10 8. In addition to the floodplain restrictions for this property, Boxelder Creek has an erosion buffer zone along the adjacent banks. That buffer is shown on the attached Flood Risk Map. New residential, non- residential and mixed-use structures may not be constructed within the buffer. Utility construction, fencing, trails, walkways, bridges, grading and vegetation must be designed under current Chapter 10 standards and specifications. Prohibited uses in the erosion buffer include detention ponds, water quality ponds, fill, outdoor storage, driveways and parking areas. Any work within the buffer zone must be preceded by a channel stability analysis prepared by a P.E. RESPONSE: Acknowledged. 9. Any construction activities in the 100-year flood fringe---structures, fencing, paving, sidewalk, curb & gutter, utility installation or relocation, landscaping, etc.---must be preceded by an approved floodplain use permit, and the appropriate permit application fees. Permit forms, as well as no-rise certification forms for work in the floodway, can be found at http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents. RESPONSE: Acknowledged. 10. Development review checklists for floodplain requirements can be obtained at http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents. Please utilize these documents when preparing your plans for submittal. Please contact Shane Boyle of Stormwater Master Planning at sboyle@fcgov.com for floodplain CAD line work as required per the floodplain development review check list. RESPONSE: Acknowledged. 11. Please contact Mark Taylor, 970.416.2494, mtaylor@fcgov.com with any questions. RESPONSE: Acknowledged. 12. Stormwater Development Review Comments: A drainage report, erosion control report, and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. The drainage report must address the four-step process for selecting structural BMPs. Standard operating procedures (SOPs) for all onsite drainage facilities need to be prepared by the drainage engineer and there is a final site inspection required when the project is complete and the maintenance is handed over to an HOA or another maintenance organization. The erosion control report requirements are in the Fort Collins Stormwater Manual, Section 1.3.3, Volume 3, Chapter 7 of the Fort Collins Amendments. If you need clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or jschlam@fcgov.com. RESPONSE: A drainage report, erosion control report and construction plans will be provided at PDP and FDP. 13. The standard requirement for onsite detention is to detain for the runoff volume difference between the 100 year developed inflow rate and the 2 year historic release rate. However due to the location of this site with respect to being adjacent to Box Elder Creek and being close to the confluence of the creek with the Cache La Poudre river there is the full spectrum detention option available. This might be the only location in all of the Fort Collins drainage basins where full spectrum detention can be applied. Normally all of the basins rely on the 2 year historic release rate in sizing the conveyances in the basin but, in that is not the case for this site. The applicant's engineer will need to run the basin model with the site improvements added to it to prove it is not having a negative effect on the stream. Another option that was being considered in the past was a multi-staged release to mimic the existing site released into the stream by controlling the 2, 10, 50 and 100 year storm flows. However that was before Urban Drainage added the full spectrum detention to the criteria Manual. RESPONSE: Full Spectrum detention is proposed with this site. 14. Fifty percent of the site runoff is required to be treated using the standard water quality treatment as Page 4 of 10 described in the Fort Collins Stormwater Manual, Volume 3 - Best Management Practices (BMPs). (http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/ stormwater-criteria) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. RESPONSE: Acknowledged. 15. Low Impact Development (LID) requirements are now required when the impervious area is increased or a site is required to be brought into compliance with the Land Use Code. These require a higher degree of water quality treatment for 50% of the new impervious area and 25% of new paved areas must be pervious. Please contact Basil Hamdan at 224-6035 or bhamdan@fcgov.com for more information. There is also more information on the EPA web site at: http://water.epa.gov/polwaste/green/bbfs.cfm? goback=.gde_ 4605732_member_219392996. LID design information can be found on the City's web site at: http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/ stormwater-criteria. RESPONSE: Acknowledged. 16. The outfall for the site is Boxelder Creek. RESPONSE: Acknowledged. 17. Please contact Jay Rose, jmrose@fcgov.com, ph. 224-6106 at Utilities Capital Projects to discuss the proposed Boxelder Bridge Replacement and Stormwater Overflow Channel project near Prospect Road and Boxelder Creek. RESPONSE: The applicant and Northern Engineering has been in contact with Jay Rose and will continue to coordinate at the project plans and construction progress. 18. The city wide Stormwater development fee (PIF) is $7,817/acre ($0.1795 sq.-ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees o r contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. RESPONSE: Acknowledged. 19. The design of this site must conform to the drainage basin design of the Boxelder/Cooper Slough Master Drainage Plan as well the Fort Collins Stormwater Manual. RESPONSE: Acknowledged. 20. At the conceptual review meeting the applicant had asked where this site was on the priority list for stream rehabilitation and it is actually #35 on a list of 61 projects. As a result of this development proposal the Stormwater Master Planning division is now considering moving it up in the priority list and possibly include it with the improvements being designed for the proposed Boxelder Bridge Replacement and Stormwater Overflow Channel project. RESPONSE: Acknowledged. Department: Fire Authority Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Page 5 of 10 1. FIRE LANES Fire Lanes shall be provided to within 150' of all portions of all buildings, as measured by an approved route around the exterior of the building. RESPONSE: Acknowledged. 2. FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be designated on the plat as an Emergency Access Easement. > Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. > The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by painting and/or signage, and maintained unobstructed at all times. International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006 and Local Amendments. RESPONSE: Acknowledged. 3. DEAD-END FIRE LANES FCLUC 3.6.2(B)2006; 061FC 503.2.5 and Appendix D: Dead-end fire apparatus access roads cannot exceed 660 feet in length. Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. RESPONSE: Acknowledged. 4. CUL-DE-SACS FCLUC 3.6.2(B): Cul-de-sacs are permitted only if they do not exceed 660 feet in length and have a turnaround at the end with a minimum outside turning radius of 50 feet (100 foot diameter). RESPONSE: Acknowledged. 5. TURNING RADII 20121FC 503.2.4 and Local Amendments: The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. RESPONSE: Acknowledged. 6. WATER SUPPLY Hydrant spacing and flow must meet minimum requirements based on type of occupancy. 061FC 508.1 and Appendix B: RESIDENTIAL REQUIREMENTS: Within the Urban Growth Area, hydrants to provide 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. Outside the Urban Growth Area, hydrants to provide 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. RESPONSE: Acknowledged. 7. SECOND POINT OF ACCESS Dead-end roads in excess of 660' are required to have second point of access. When a second point of access is required, the access points shall be placed a distance apart equal to not less than one-half of the length of the maximum overall diagonal dimension of the area being developed. Although the constraints of this site are recognized, the secondary access point proposed is too close to the primary Page 6 of 10 access point. At the discretion of the fire marshal, the proposed plan may be acceptable if all residences are provided with residential fire sprinkler systems. Further discussion is advised. Refer to 2012 IFC Appendix D104.3 and D107 for more information. RESPONSE: Acknowledged. 8. PREMISE IDENTIFICATION A plan for street naming and numbering shall be submitted for review and approval. For identification purposes, residences fronting a private drive (alley, etc.) shall be named. 2012 IFC 505.1: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible, visible from the street or road fronting the property, and posted with a minimum of six-inch numerals on a contrasting background. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. RESPONSE: Acknowledged. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com 1. An Ecological Characterization Study is required by Section 3.4.1 (D)(1) as the site is within 500 feet of a known natural habitat (canals, Boxelder Creek, and grasslands). Please note the buffer zone standards range from 50-100' for these features, as identified in Section 3.4.1(E) of the Land Use Code, as you proceed with your site design process. Please note that the Ecological Characterization Study is due a minimum of 10 days prior to the PDP submittal. RESPONSE: Acknowledged. 2. Within the buffer zone, according to Article 3.4.1(E)(1)(g), the City has the ability to determine if the existing landscaping within the buffer zone is incompatible with the purposes of the buffer zone. Please ensure that your ECS discusses the existing vegetation and identifies potential restoration options. If it is determined to be insufficient, then restoration and mitigation measures will be required. RESPONSE: Acknowledged. 3. With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4(D)(6) requires that "natural areas and natural features shall be protected from light spillage from off site sources." Thus, lighting from the parking areas or other site amenities shall not spill over to the buffer areas. RESPONSE: Acknowledged. 4. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or re landscaping and reduce bluegrass lawns as much as possible. RESPONSE: Acknowledged. 5. Please be aware, the creation or enforcement of covenants that prohibit or limit xeriscape or drought- tolerant landscapes, or that require primarily turf-grass are prohibited by both the State of Colorado and the City of Fort Collins. RESPONSE: Acknowledged. Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Page 7 of 10 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. RESPONSE: Acknowledged. 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php RESPONSE: Acknowledged. 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. RESPONSE: Acknowledged. 4. Please contact the City's Traffic Engineer, Martina Wilkinson (221-6887) to schedule a scoping meeting and determine if a traffic study is needed for this project. In addition, please contact Transportation Planning for their requirements as well. RESPONSE: The scoping meeting was held on 2/11/16, attended by Martina Wilkinson and Sheri Langenberger (City of Fort Collins), and Gloria Hice-Idler, CDOT. This was followed by submission of a base assumptions packet dated 2/17/16. 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm RESPONSE: Acknowledged. 6. This project is responsible for dedicating any right-of-way and easements that are necessary for this project. RESPONSE: Acknowledged. 7. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. RESPONSE: Acknowledged. 8. This site is adjacent to COOT roadway and all access to the site off of the frontage road is subject to COOT approval. Plans will be routed to COOT for review and approval and the applicant may need to obtain access permits from COOT. RESPONSE: Acknowledged. 9. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. RESPONSE: Acknowledged. 10. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending on parking design. RESPONSE: Acknowledged. 11. Improvements to the Frontage Road (classified as a Collector on the Master Street Plan) and Prospect Road (a 4-lane arterial) will be required at the time of development of the property. All developments are required to have an improved connection to the arterial roadway system based on where the traffic will be going, so even if this project doesn't have physical frontage on Prospect Road, improvements will be needed to meet this standard. Per Section 3.3.2(F) the LUC requires that all developments must have adequate access to the City's Improved Arterial Street Network. Currently the stretch of Prospect Road between Summit View and the Interstate is not considered Improved. RESPONSE: Acknowledged. 12. If there is the ability to connect to the development to the West then the LUC would identify that all existing street stubs should be connected to. This would be connections to Surrey Ln, Boxelder Dr, Page 8 of 10 Kenwood Dr, and Locust St. These areas are currently in the County they maintain their own streets. As such the neighborhoods may have concerns with additional traffic on streets that they maintain. RESPONSE: A connection to existing roads to the west will not be possible for this development as the existing neighborhood to the West purchased a permanent open space buffer between the Gateway at Prospect site and their neighborhood. 13. The LUC identifies that street connections need to be made to adjacent developable property. Since this proposal does not look to be including all the land within the proposal connections to the adjacent developable parcels it looks like street connections would need to be provided to the north and the south. The road shown along the east edge of this site would serve as a connection to this parcel. RESPONSE: Due to the permanently dedicated open space between this property and the neighborhood to the east, no vehicular connections are proposed to the east. Pedestrian connections are proposed to the north. Street connections are shown to Prospect Road and the Frontage Road. 14. Any additional off-site improvements that may be needed to be Level of Service standards, COOT standards or City standards will need to be designed and completed with this project and may include off-site work. RESPONSE: Acknowledged. 15. As shown the site is one big cul-de-sac and does not meet the LUC requirements for maximum cul-de- sac length, LCUASS for interconnectivity, and one access point may not be able to physically support this amount of traffic. RESPONSE: Acknowledged. A specific street/lot layout will be provided with future entitlement packages. 16. When this site has been looked at before it appeared that most likely off-site row along Prospect to the west of the site would be needed in order to accommodate the widening needed on Prospect to provide for the left turn lane into the site. RESPONSE: Associated street widening and grading required for the left turn lane will generally fit within the existing ROW. Additional grading easements may be required for tie into existing. 17. It is unlikely that the access point into the site off of Prospect would ever be signalized. The spacing of the access point would not meet typical spacing needs. RESPONSE: Acknowledged. 18. In the layout provided there are some areas identified as alley lots. Public alleys cannot be used as this development would not meet the criteria for utilizing them, but private drives can be used. As shown some of the street layout may not meet standards and will need to be modified so that standards can be met. RESPONSE: Acknowledged. This is not applicable to the ODP submittal but will be considered for future entitlement packages. Department: Electric Engineering Contact: Jim Spaulding, 970·416·2772, jspaulding@fcgov.com Page 9 of 10 1. Please include locations of any pumps, if necessary. RESPONSE: Acknowledged. These will be provided with future entitlement packages. 2. We will need one-line diagrams and meter locations for all multi-family units. RESPONSE: Acknowledged. These will be provided with future entitlement packages. 3. Light & Power requires 3' of separation from gas utilities and prefers meters to be on opposite sides of buildings. RESPONSE: Acknowledged. These will be provided with future entitlement packages. 4. Services are required to be metered on the same side of the stubbed conduit. RESPONSE: Acknowledged. These will be provided with future entitlement packages. 5. Streetlighting design requires 40' of separation from large canopy trees and 15' from small ornamental trees. RESPONSE: Acknowledged. These will be provided with future entitlement packages. 6. Please contact Light & Power Electrical Engineering at 221-6700 if you have any questions. RESPONSE: Acknowledged. These will be provided with future entitlement packages. 7. Normal development charges will apply. RESPONSE: Acknowledged. Planning Services Contact: Clark Mapes, 970·221·6225, cmapes@fcgov.com 1. Context Is Crucial. A first task in any further planning for this property is to show proposed development in context, with a plan showing relationships to adjacent properties, a direct and integral street connection to the Neighborhood Center, Boxelder Road connection to Prospect, floodplains/floodways, natural area buffers, future employment uses, the concept of a park to the north, and so on. RESPONSE: This application is for an ODP and APU. Additional information will be provided with future entitlement packages. 2. Employment Uses. The proposed plan appears to indicate a reduction in land for employment uses, which are already constrained by Boxelder Creek. In showing the plan in context, viable employment sites should be considered as part of a mixed use area. It appears that detention, Boxelder Creek floodplain and buffers, and street connections are constraints that appear to be disproportionately allocated in employment portions of the ODP. RESPONSE: Per this ODP, employment is maintained with the exception of some areas where secondary uses, permitted per the LUC within the E district are show. These areas do not exceed the maximum area permitted for secondary uses per the LUC. 3. 'Boxelder Road'. Access from the 'Boxelder Road' access point on Prospect Road appears to be very important for a number of reasons as a second point of access to the neighborhood other than the Interstate Frontage Road; as part of improving direct access to the Neighborhood Center, and generally adding an interconnection to the street network. RESPONSE: A connection to Boxelder Road will not be possible for this development as the existing neighborhood to the West purchased a permanent open space buffer between the Gateway at Prospect site and their neighborhood. 4. Neighborhood Center Access. Multimodal access from the housing to the Neighborhood Center should consist of a much more direct street connection that is shown on the concept plan. This is integral with the comment about Boxelder Road. RESPONSE: A connection from the multi-family housing to the neighborhood center has been noted on the ODP. Additional details will be provided with future entitlement packages. 5. 'Secondary Access'. As shown, this appears to consist of a rear, indirect driveway rather than a direct street Page 10 of 10 connection. This should be a more direct and formative component of the plan. RESPONSE: A ¾ access from Prospect Road have been provided, per this ODP along the western boundary of the property. Per multiple meetings with City Staff, it was agreed that the access locations provided are appropriate, particularly since connections to existing adjacent streets will not be possible. 6. Locust Street. A connection may be required. This needs further consideration with Land Use Code Section 3.6.3(F) as a key consideration. RESPONSE: Acknowledged. Per multiple meetings with City Staff, we expect strong opposition from the existing neighborhood to the west and have therefore not shown a connection at that location. In addition, a ditch crossing could be very difficult. We have included a pedestrian connection in this location in order to be aligned with the intent of the LUC. 7. Housing Types. Four are required, the plan appears to show three. RESPONSE: N/A. The appropriate number of housing types will be provided at the time of PDP. 8. Model Variety. At least three different models will be required for single family detached houses and townhouses. The emphasis should be on entrances and other features for pedestrian interest. RESPONSE: N/A. The appropriate number of housing types will be provided at the time of PDP. 9. The proposed development project is subject to a Type 2 (Planning and Zoning Board) review and public hearing. The applicant for this development request is required to hold a neighborhood information meeting prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact me, at 221-6750, to assist you in setting a date, time, and location. I and possibly other City staff, would be present to facilitate the meeting. RESPONSE: Acknowledged. 10. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. RESPONSE: Acknowledged. 11. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. RESPONSE: Acknowledged. 12. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. RESPONSE: Acknowledged. 13. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. RESPONSE: Acknowledged. 14. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing Page 11 of 10 agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. RESPONSE: Acknowledged. 15. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. RESPONSE: Acknowledged.