HomeMy WebLinkAboutTHE SLAB - PDP - PDP150016 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH 808 West Prospect Road TIS, September 2015
ASSOCIATES
Road/Prospect Lane intersection. The Prospect Road/Prospect Lane intersection
currently meets the City of Fort Collins Motor Vehicle LOS Standards during the
morning and afternoon peak hours with existing control and geometry. Calculation
forms are provided in Appendix C. A description of level of service for unsignalized
intersection from the 2010 Highway Capacity Manual is provided in Appendix C. Table
4-3 (revised per staff comments regarding type of intersection) showing the Fort Collins
Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. The 808
West Prospect Road site is in an area termed “mixed use districts.” In areas termed
“mixed use districts,” acceptable operation at unsignalized intersections, acceptable
operation is considered to be at level of service F for any approach leg for an
arterial/arterial, arterial/collector and arterial/local intersections. In such areas, it is
expected that there would be substantial delays to the minor street movements at
unsignalized intersections during the peak hours. This is considered to be normal in
urban areas. At unsignalized collector/local intersections, acceptable operation is
considered to be at level of service C for any approach leg.
Figure 4 shows the site plan for the development at 808 West Prospect Road.
The development at 808 West Prospect Road is a 70 bed apartment complex.
Currently the site is vacant (foundation slab). Access to the site will be via a right-
in/right-out access to/from Prospect Road. There will be emergency access to Lake
Street that will, also, serve pedestrians and bicyclists. Trip generation is important in
considering the impact of a development such as this upon the existing and proposed
street system. A compilation of trip generation information contain in Trip Generation, 9th
Edition, ITE is customarily used to estimate the trips that would be generated by the
proposed/expected uses at a site. However, the City of Fort Collins has performed a trip
generation study for apartments in Fort Collins. Therefore, the trip generation rates
calculated by the City will be used. A person/bed was used as the trip generation variable.
A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows
the expected trip generation on a daily and peak hour basis. The trip generation of the
808 West Prospect Road development resulted in 186 daily trip ends; 14 morning peak
hour trip ends; and 30 afternoon peak hour trip ends.
Directional distribution of the generated trips was determined for 808 West
Prospect Road site and is shown in Figure 5. Figure 6 shows the site generated peak
hour traffic assignment of 808 West Prospect Road.
Figure 7 shows the short range (2020) background morning and afternoon peak
hour traffic at the Prospect Road/Prospect Lane intersection. Background traffic volume
forecasts for the short range (2020) future were obtained by reviewing traffic studies for
other developments in this area and reviewing historic counts in the area. Traffic
volumes at the Prospect Road/Prospect Lane intersection were increased at a rate of
2.0 percent per year. Table 3 shows the short range (2020) background morning and
afternoon peak hour operation at the Prospect Road/Prospect Lane intersection.
Calculation forms are provided in Appendix D. The Prospect Road/Prospect Lane
intersection will meet the City of Fort Collins Motor Vehicle LOS Standards during the
morning and afternoon peak hours with the existing control and geometry in the short
range (2020) future.
DELICH 808 West Prospect Road TIS, September 2015
ASSOCIATES
Figure 8 shows the short range (2020) total morning and afternoon peak hour
traffic at the Prospect Road/Prospect Lane and Prospect Road/Site Access
intersections. Table 4 shows the short range (2020) total morning and afternoon peak
hour operation at the key intersections. Calculation forms are provided in Appendix E.
The Prospect Road/Prospect Lane and Prospect Road/Site Access intersection will
meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and
afternoon peak hours with the existing control and geometry.
The recommended short range (2020) geometry is shown in Figure 9. The right-
in/right-out access should be designed to discourage other traffic movements. This is
the existing geometry. A westbound right-turn lane is not required based on Figure 8-4
in LCUASS. According to Figure 8-1 in LCUASS, left-turn lanes are required on all
arterial streets. This segment of Prospect Road is constrained and does not have a left-
turn lane. This is addressed by the City of Fort Collins in the “West Central Area Plan”
(adopted March 17, 2015).
The 808 West Prospect Road site is in an area within which the City requires
pedestrian and bicycle level of service evaluations. Appendix F shows a map of the
area that is within 1320 feet of the 808 West Prospect Road site. The 808 West
Prospect Road site is located within an area termed as “pedestrian district,” which sets
the pedestrian level of service threshold at LOS A for all measured categories, except
for Street Crossing at LOS B. There are three destination areas within 1320 feet of the
proposed development at 808 West Prospect Road: 1) the residential area to the west,
2) the residential area to the south, and 3) Colorado State University to the north. The
primary pedestrian destination is CSU. There is not likely to be a significant pedestrian
affinity between this site and the other residential areas shown. Pedestrians will have
direct access to Lake Street via the emergency access. The adopted plan for this
corridor shows a multi-use path on the north side of Prospect Road. It is assumed that
this multi-use path will be implemented. Practically speaking, the only significant
pedestrian destination is CSU. For that reason, it is suggested that CSU be the only
pedestrian destination considered in this evaluation. With the availability of the
emergency access to Lake Street, the pedestrian level of service will be met for CSU.
This development will build the 10 foot multi-use path along the site frontage. Appendix
F contains a Pedestrian LOS Worksheet.
Based upon Fort Collins Bicycle LOS criteria, there is one destination area within
1320 feet of the 808 West Prospect Road site: Colorado State University to the north.
Appendix F contains a Bicycle LOS Worksheet. Bicyclists will have access to Lake
Street via the emergency access. Lake Street has on street bike lanes. With the multi-
use path and direct access to Lake Street, the bicycle level of service will be met.
Currently, this area is not served by Transfort. The nearest bus stop is at the
Prospect Road/Shields Street intersection.
It is concluded that, with development of the 808 West Prospect Road, the future
level of service at the key intersections will be acceptable. The Prospect/Site Access
intersection should be designed as a right-in/right-out access.
Spring Creek Trail
SCALE: 1"=500'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
808 West
Prospect Road
Lake Street
Prospect Road
Prospect Lane
Shields Street
Whitcomb Street
Sheeley Street
CURRENT GEOMETRY Figure 2
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
Prospect Lane
Prospect Road
- Denotes Lane
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
Prospect Lane
Prospect Road
AM/PM
478/1138
0/3
970/753
4/7
4/4
5/1
DELICH 808 West Prospect Road TIS, September 2015
ASSOCIATES
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect Road/Prospect Lane
(stop sign)
EB LT/T A A
NB LT/RT C E
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
220 Apartment 70 Beds/Persons 2.65 186 0.04 3 0.15 11 0.27 19 0.15 11
SITE PLAN Figure 4
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
AM/PM
Spring Creek Trail
SCALE: 1"=500'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
808 West
Prospect Road
Lake Street
Prospect Road
Prospect Lane
Shields Street
Whitcomb Street
Sheeley Street
5% 55%
25%
15%
SITE GENERATED
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
Prospect Lane
Prospect Road
AM/PM
3/19
11/11
3/19
Site Access
SHORT RANGE (2020) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
Prospect Lane
Prospect Road
AM/PM
528/1256
0/3
1071/831
4/7
4/4
5/1
DELICH 808 West Prospect Road TIS, September 2015
ASSOCIATES
TABLE 3
Short Range (2020) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect Road/Prospect Lane
(stop sign)
EB LT/T A A
NB LT/RT D E
TABLE 4
Short Range (2020) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Prospect Road/Prospect Lane
(stop sign)
EB LT/T A B
NB LT/RT D E
Prospect Road/Site Access
(stop sign) SB RT B C
SHORT RANGE (2020) TOTAL
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
808 West Prospect Road TIS, September 2015
Prospect Lane
Prospect Road
AM/PM
531/1275
0/3
1071/831
4/7
4/4
5/1
11/11
3/19
532/1260
Site Access
1075/838
4