HomeMy WebLinkAboutGEICO OFFICE BUILDING - FDP - FDP140013 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORT (3)M
�
ST
X X X X
X
X X X
X
M
ST
UD UD UD UD UD UD UD UD UD UD UD
VAN
SF
SF
SF SF SF SF
SF
SF
SF SF
SF
SF SF SF SF SF
SF
SF SF
SF SF SF
SF
SF
SF
SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF SF SF SF
SF
SF
CWA
LOD
LOD
LOD LOD
LOD LOD
LOD LOD
LOD LOD
LOD LOD
LOD LOD
LOD
LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
M
�
ST
X X X X
X
X X X
X
M
ST
UD UD UD UD UD UD UD UD UD UD UD
VAN
LOD
LOD
LOD LOD
LOD LOD
LOD LOD
LOD LOD
LOD LOD
LOD LOD
LOD
LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD LOD
LOD
LOD
LOD LOD LOD
LOD
LOD
LOD
S����
O� 13 S�����
GEICO OFFICE BUILDING
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
S����
O� 13 S�����
GEICO OFFICE BUILDING
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C5.01
CONSTRUCTION DETAILS
EROSION CONTROL
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'������.
C��� ������ ��� ���.
R
VEHICLE CONTROL TRACKING PAD
CURB INLET PROTECTION
IP
WATTLE INSTALLATION
FLOW
3'-4'
ADJACENT ROLLS SHALL
TIGHTLY ABUT
W1 NOTES:
INSTALLATION:
WHEN INSTALLING RUNNING LENGTHS OF WATTLES, BUTT THE SECOND
WATTLE TIGHTLY AGAINST THE FIRST, DO NOT OVERLAP THE ENDS. STAKE
THE WATTLES AT EACH END AND FOUR FOOT ON CENTER. FOR EXAMPLE:
A 25 FOOT WATTLE USES 6 STAKES
A 20 FOOT WATTLE USES 5 STAKES
A 12 FOOT WATTLE USES 4 STAKES
STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE.
LEAVING 2 - 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. A
HEAVY SEDIMENT LOAD WILL TEND TO PICK THE WATTLE UP AND COULD
PULL IT OFF THE STAKES IF THEY ARE DRIVEN DOWN TOO LOW. IT MAY BE
NECESSARY TO MAKE A HOLE IN THE WATTLE WITH A PICK END OF YOUR
MADDOX IN ORDER TO GET THE STAKE THROUGH THE STRAW. WHEN
STRAW WATTLES ARE USED FOR FLAT GROUND APPLICATIONS, DRIVE THE
STAKES STRAIGHT DOWN; WHEN INSTALLING WATTLES ON SLOPES, DRIVE
THE STAKES PERPENDICULAR TO THE SLOPE.
DRIVE THE FIRST END STAKE OF THE SECOND WATTLE AT AN ANGLE
TOWARD THE FIRST WATTLE IN ORDER TO HELP ABUT THEM TIGHTLY
TOGETHER. IF YOU HAVE DIFFICULTY DRIVING THE STAKE INTO EXTREMELY
HARD OR ROCKY SLOPES, A PILOT BAR MAY BE NEEDED TO BEGIN THE
STAKE HOLE.
1"� 1" WOOD STAKES
18"-24"
BAILING WIRE OR
NYLON ROPE
WATTLE "A" WATTLE "B"
1' 2'
TYP.
1' 1'
W2 NOTES:
INSTALLATION:
STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER
AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF
STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR
NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS
THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE
BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO
THE WATTLE.
WHEN INSTALLING RUNNING LENGTHS OF WATTLES, TO
PREVENT SHIFTING, BUTT THE SECOND WATTLE TIGHTLY
AGAINST THE FIRST. DO NOT OVERLAP THE ENDS. STAKES
SHOULD BE DRIVEN 1 FT. FROM END, ACROSS FROM AND
ON EACH SIDE OF WATTLE LEAVING 4"-6" OF STAKE
PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR
NYLON ROPE SHOULD BE TIED TO STAKES IN AN HOUR
GLASS FORMATION (FRONT TO BACK OF WATTLE "A",
ACROSS TO FRONT OF WATTLE "B", ACROSS TO BACK AND
BACK TO FRONT OF WATTLE "A"). STAKES SHOULD THEN BE
DRIVEN IN UNTIL BAILING WIRE OR NYLON ROPE IS
SUFFICIENTLY SNUG TO THE WATTLE.
SEDIMENT
DEPOSITION
ZONE
STORM WATER LINE
ROCK WATTLE
LIP OF GUTTER
SIDEWALK EXISTING OR
PROPOSED INLET
TOP BACK CURB
FLOW LINE
SEDIMENT
DEPOSITION
ZONE
STORM WATER LINE
LIP OF GUTTER
ROCK WATTLE
AT 45 DEG. TO CURB
SIDEWALK
TOP BACK CURB
FLOW LINE
SIDEWALK
TOP BACK CURB
FLOW LINE
W4 NOTES:
1. NUMBER OF WATTLES AND SPACING SHOULD BE DETERMINED BY THE SLOPE AND SITE CONDITIONS.
2. TUBULAR MARKERS SHALL MEET THE REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
3. CITY RECOMMENDS INSTALLING AT LEAST 3 CHECKDAMS WHEN USING THIS SETUP.
LIP OF GUTTER
ROCK WATTLE
W1 & W2 INSTALLATION NOTES:
1. THE LOCATION AND LENGTH OF WATTLE IS DEPENDENT ON THE CONDITIONS OF EACH SITE.
2. WATTLES SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES.
3. WATTLES SHALL CONSIST OF STRAW, COMPOST, EXCELSIOR, OR COCONUT FIBER.
4. NOT FOR USE IN CONCENTRATED FLOW AREAS.
5. THE WATTLES SHALL BE TRENCHED INTO THE GROUND A MINIMUM OF TWO (2) INCHES.
6. WATTLES SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS.
7. ON SLOPES, WATTLES SHOULD BE INSTALLED ON CONTOUR WITH A SLIGHT DOWNWARD ANGLE AT THE END OF THE ROW IN ORDER TO PREVENT
PONDING AT THE MID SECTION.
8. RUNNING LENGTHS OF WATTLES SHOULD BE ABUTTED FIRMLY TO ENSURE NO LEAKAGE AT THE ABUTMENTS.
9. SPACING - DOWNSLOPE:
10. VERTICAL SPACING FOR SLOPE INSTALLATIONS SHOULD BE DETERMINED BY SITE CONDITIONS. SLOPE GRADIENT AND SOIL TYPE ARE THE MAIN
FACTORS. A GOOD RULE OF THUMB IS:
1:1 SLOPES = 10 FEET APART
2:1 SLOPES = 20 FEET APART
3:1 SLOPES = 30 FEET APART
4:1 SLOPES = 40 FEET APART, ETC.
11. HOWEVER, ADJUSTMENTS MAY HAVE TO BE MADE FOR THE SOIL TYPE: FOR SOFT, LOAMY SOILS - ADJUST THE ROWS CLOSER TOGETHER; FOR HARD,
ROCKY SOILS - ADJUST THE ROWS FURTHER APART. A SECONDARY WATTLE PLACED BEHIND THE ABUTMENT OF TWO WATTLES IS ENCOURAGED ON
STEEP SLOPES OR WHERE JOINTS HAVE FAILED IN THE PAST.
12. STAKING: THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES. 1/2" TO 5/8" REBAR IS ALSO ACCEPTABLE. BE SURE TO USE A
STAKE THAT IS LONG ENOUGH TO PROTRUDE SEVERAL INCHES ABOVE THE WATTLE: 18" IS A GOOD LENGTH FOR HARD, ROCKY SOIL. FOR SOFT LOAMY
SOIL USE A 24" STAKE.
SNUG WITH WATTLE.
W3 NOTE:
IF THE AREA BEHIND THE INLET IS NOT STABILIZED, A
BMP SHOULD BE USED TO PREVENT SEDIMENT FROM
ENTERING THE INLET
1"� 1" WOOD STAKES
18"-24"
THE CONTRACTOR SHALL INSPECT WATTLES EVERY TWO WEEKS AND AFTER ANY SIGNIFICANT STORM EVENT AND MAKE REPAIRS OR REMOVE SEDIMENT
ACCUMULATED BEHIND WATTLE AS NECESSARY.
SEDIMENT ACCUMULATED BEHIND WATTLE SHALL BE REMOVED WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DIAMETER OF THE WATTLE.
WATTLES SHALL REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND IS ACCEPTED BY THE CITY.
WATTLE MAINTENANCE NOTES:
1.
2.
3.
ENDS SHALL ABUT TIGHTLY
TO BACK OF CURB
END SHALL ABUT TIGHTLY
TO BACK OF CURB
ENDS OF ADJACENT WATTLES
SHALL BE TIGHTLY ABUTTED
TO PREVENT SEDIMENT BYPASS
4' MAX.
SEDIMENT
DEPOSITION ZONE
W2 NOTE:
ONLY WATTLES MADE WITH COCONUT
FIBERS SHALL BE USED WHEN
INSTALLATION COMES IN CONTACT WITH A
WATER BODY.
SIDEWALK CULVERT/CHASE/PAN
W3, W4 & W5 NOTES:
1. WHEN USING STRAW WATTLE, THE STRAW WATTLE MUST HAVE A WEIGHTED
CORE.
2. ALL PRODUCTS SHALL BE INSTALLED PER THE MANUFACTURER'S
SPECIFICATIONS.
3. OTHER PRODUCTS MAY BE USED IN PLACE OF WEIGHTED WATTLES UPON
WRITTEN APPROVAL FROM THE CITY. NOTE: A COPY OF DETAILS AND
SPECIFICATIONS WILL NEED TO BE INCORPORATED INTO THE SWMP.
END SHALL
TIGHTLY ABUT TO
BACK OF CURB
SEDIMENT
DEPOSITION ZONE
TUBULAR
MARKER
EXISTING OR
PROPOSED INLET
END SHALL
TIGHTLY ABUT TO
BACK OF CURB
VTC
CONCRETE WASHOUT AREA
CWA
6
1
4
2
WP
SILT FENCE
SF SF
3
ROCK SOCK SECTION ROCK SOCK PLAN
ROCK SOCK JOINTING
GRADATION TABLE
SIEVE SIZE
MASS PERCENT
PASSING SQUARE
MESH SIEVES
NO. 4
2" 100
1-1/2" 90-100
1" 20-55
3/4" 0-15
3/8" 0-5
MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR
CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE,
ALL SIDES
5 ROCK SOCK DETAIL
RS
���.�������������������.���
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'������.
C��� ������ ��� ���.
R
C5.01
DYNAMIC PLAN
EROSION CONTROL
NOTES:
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION/REMOVAL
P������: G���� O����� B������� D���: O������ 9��, 2013
C��������� �� ������� ���� ����� �� �������� ���� ������������ ���������� ����� ��� ���� ���� ���������� BMP �� ��������� �� �������.
CONSTRUCTION PHASE (M������) 1 2 3 4 5 6 7 8 9 10 11 12 C�������
G������
O������
P������� I�����������
S���������
C������� I�����������
B������� S��������
M������������
H�������� A��������
BEST MANAGEMENT PRACTICES
T��������
C������ F������ ��� D�������� D���� (R������/D������)
I���� P��������� (IP)
V������ T������� C������ (VTC)
F��� B������� (B����, W������, E��) (WD)
C������� W������ A��� (CWA)
P����������� M���������� A���������/M�������/ ���.
P��������
M�������/S������
P�������� S��� P�������
C��� ��� G�����
C������� P������ ��� D���� A����
P�������� P�����
S��� F���� (SF)
LEGEND:
CWA
SF
LOD
R��� S���
LOD LOD
LOD
LOD
LOD LOD LOD
LOD
LOD
LOD
S����
O� 13 S�����
GEICO OFFICE BUILDING
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'������.
C��� ������ ��� ���.
R
C5.00
STATIC PLAN
EROSION CONTROL
G������
O������
P������� I�����������
S���������
C������� I�����������
B������� S��������
M������������
H�������� A�������� & L����������
BEST MANAGEMENT PRACTICES
T��������
I���� P��������� (IP)
V������ T������� C������ (VTC)
F��� B������� (W������, E��) (WP)
C������� W������ A��� (CWA)
P����������� M���������� A���������/M�������/ ���.
P��������
M�������/S������
P�������� S��� P�������
C��� ��� G�����
C������� P������ ��� D���� A����
P�������� P�����
TABLE OF CONSTRUCTION
SEQUENCE AND BMP APPLICATION
P������: G���� O����� B�������
CONSTRUCTION PHASE PHASE I PHASE II PHASE III PHASE IV
S��� F���� (SF)
D���������
LEGEND:
NOTES:
CWA
SF
LOD
R��� S���