Loading...
HomeMy WebLinkAboutGEICO OFFICE BUILDING - PDP - PDP130039 - CORRESPONDENCE - (3)Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview March 24, 2014 Cathy Mathis TB Group 444 Mountain Ave Fort Collins, CO 80525 RE: Geico Office Building, PDP130039, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com. Comment Summary: Department: Current Planning Contact: Jason Holland, 970-224-6126, jholland@fcgov.com Topic: General Comment Number: 6 Comment Originated: 01/15/2014 01/15/2014: Landscape Plan: Is there a sheet L-1? Landscape plan needs to be drawn at 1:10 to be able to show all of the information. Landscape plan will also need to show tree mitigation information. Please see redlines for additional comments and notations. Verify species diversity. Add a dashed line on the site plan showing the defined parking lot area and list the parking lot percentage coverage based on the defined area. Comment Number: 7 Comment Originated: 01/15/2014 01/15/2014: Please provide an equal to/better than modification request for the HC setback and the plan will need to be updated/designed to include shrubs, perennials, berms, stone walls and boulders in order to justify the HC landscape setback reduction from 50 feet to 15 feet. Turf grass can be used along the Timberline frontage, the remainder of the site needs to be shrub beds at a high quality to support the modification. Building needs foundation planting evergreen tree accents. Comment Number: 8 Comment Originated: 01/15/2014 01/15/2014: We need to confirm that Transfort and Ditch Co. have no comments prior to hearing. Comment Number: 9 Comment Originated: 03/18/2014 03/18/2014: Refer to redlines for site and landscape plan comments Comment Number: 10 Comment Originated: 03/19/2014 03/19/2014: Utility Plans, comments from Century Link: There is an existing copper cable, pedestal, and terminal that served the building prior to demolishment. It can be re-used to feed the proposed building. For the new structure CTL will require an entrance conduit (preferably 2 –one for copper feed, one for future fiber. More cost effective to place spare conduits during construction than down the road when landscaping and parking lot present. ) Please have applicant contact our Engineering office for onsite meet when plan approved to determine conduit length, terminal location and other requirements necessary to serve this structure. If any telco relocates are necessary due what is proposed, all associated relocation costs are to the developer. We suggest they contact engineering for review and billing with as much lead time as possible to meet the applicants construction time lines. CTL’s special construction billing process can be lengthy. Comment Number: 11 Comment Originated: 03/19/2014 03/19/2014: From GIS: Addresses will be assigned by the GIS Department after the plans have met final approval through Development Review and are recorded with the City. Department: Engineering Development Review Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com Topic: General Comment Number: 2 Comment Originated: 01/14/2014 01/14/2014: A repay is due to the city for the E Harmony Rd frontage improvements previously completed by the city in 2012. The repay for completed frontage improvements is typically due prior to the issuance of building permit. Once calculated, the repay amount will be communicated to the applicant. Comment Number: 13 Comment Originated: 01/14/2014 01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- Need to clarify the pavement type and section for the connection of the parking to Harmony. This appears to be concrete. If no, a pan will be necessary and would be preferably carried north of the sidewalk. Comment Number: 18 Comment Originated: 03/18/2014 03/18/2014: Please add the Fort Collins- Loveland Water District signature block to sheets C1 and C3 for sign off on the water service abandonment. Comment Number: 19 Comment Originated: 03/18/2014 03/18/2014: Please submit the information for Development Agreements document so I can begin to draft the development agreement for the project. Contact me for additional information or visit the Engineering Development Review Website: http://www.fcgov.com/engineering/devrev.php Comment Number: 20 Comment Originated: 03/18/2014 03/18/2014: Please submit the project quantities and cost estimate sheet to determine if a DCP will be required for this project. Contact me for additional information or visit the Engineering Development Review Website: http://www.fcgov.com/engineering/devrev.php Comment Number: 21 Comment Originated: 03/18/2014 03/18/2014: Please update General Note #5 Comment Number: 22 Comment Originated: 03/18/2014 03/18/2014: Please update General Note #34 Topic: Plat Comment Number: 14 Comment Originated: 03/18/2014 03/21/2014: A drainage easement is needed for the parking lot area that you are using for detention. Please add the easement limits to the plat 03/18/2014: A drainage easement may need to be added to the plat for the trickle pan at the corner of the site. See redlines Comment Number: 15 Comment Originated: 03/18/2014 03/18/2014: It does not appear that utility easements exist along the east lot along Harmony and Timberline Rd. See plat redlines. To meet current street standards a 15ft utility easement would be required along both arterial streets, however, coordination with the utility providers will be needed and if the standard 15ft utility easements are not needed then this requirement may be reduced in width or waived. Comment Number: 16 Comment Originated: 03/18/2014 03/18/2014: The ditch company will need to sign the plat if a ditch easement is being dedicated. Please add signature block to the plat. Comment Number: 17 Comment Originated: 03/18/2014 03/18/2014: The access easement will need to be expanded to the parking lot and extend to the west property line. See plat redlines Department: Environmental Planning Contact: Kate Rentschlar, 970-224-6086, krentschlar@fcgov.com Topic: General Comment Number: 10 Comment Originated: 03/18/2014 The buffer zone only extends as far from the top-of-bank as the vegetation goes, so the parking lot would not be included. The buffer zone also includes the ditch itself. Please redraw the buffer zone to show it extending north from the parking lot and building to the edge of the property. Topic: Landscape Plans Comment Number: 11 Comment Originated: 03/18/2014 03/18/2014: The alpine currant is not a native plant to Fort Collins. Please switch it out for a native plant such as three-leaf sumac or rubber rabbitbrush. Other native species can be found in the Fort Collins Native Plants guide on our website. Comment Number: 12 Comment Originated: 03/18/2014 03/18/2014: The trees and shrubs planted in the buffer zone need to be laid out in a more natural way. Clump vegetation together in patches. Comment Number: 13 Comment Originated: 03/18/2014 03/18/2014: The smooth river cobble needs to be removed from the buffer zone. Because the buffer width is already reduced, it is important for there to be as much grass as possible. When planting grass along the parking lot use plugs instead of seeds to establish cover faster. I would recommend needle and thread or western wheatgrass as the species used for the plugs. Comment Number: 14 Comment Originated: 03/18/2014 03/18/2014: Please show the limits of development on the landscape plan. Comment Number: 15 Comment Originated: 03/19/2014 03/19/2014: Please fix the scale on the landscape plan. It should be 1'' - 10'. Topic: Lighting Plan Comment Number: 9 Comment Originated: 01/14/2014 01/14/2014: Light spillage into the buffer zone is not permitted. Please consider the addition of shielding on your lights or increased screening of the buffer zone with vegetation. 3/18/2014: The photometric plan still shows light spillage in to the buffer area. Please use back shielding on lights. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 01/15/2014 01/15/2014: Contact the City Forester and Environmental Planner for an on-site meeting to evaluate existing trees and obtain species, condition and mitigation information. All existing trees need to be inventoried and recorded by number in a table. Each tree needs to be identified by species, condition size and mitigation. Significant trees need to be retained to the extent reasonably feasible. Comment Number: 2 Comment Originated: 01/15/2014 01/15/2014: Provide street trees in the parkway between the sidewalks and curb in areas along Harmony and Timberline at 40 foot spacing. Select street trees from the City of Fort Collins Street Tree List. Comment Number: 3 Comment Originated: 01/15/2014 01/15/2014: Review Parking lot Perimeter Landscaping LUC 3.2.1 E 4 and provide tree spacing and densities in parking lot perimeter areas. Existing retained significant trees can be applied to this standard. Comment Number: 4 Comment Originated: 01/15/2014 01/15/2014: Attempt to retain the east existing street tree on Harmony currently shown to be removed unless it is of a poor condition or an undesirable species. If sidewalk placement is the cause for removal of this tree move sidewalk away from the tree as it passes. If this tree is not to be retained provide an explanation why it is not feasible to retain it. Comment Number: 5 Comment Originated: 01/15/2014 01/15/2014: Please edit landscape note number 6. There is not a tree separation standard for electric and phone so that is not a LUC requirement. The 10 feet separation is for water and sewer main lines. Comment Number: 6 Comment Originated: 01/15/2014 01/15/2014: Please show street light locations and provide street tree separations. Comment Number: 7 Comment Originated: 01/15/2014 01/15/2014: Tree protection Notes Changes: Current tree protection note number 6 should be changed to be the same as LUC 3.2.1 G 2. Add these two tree protection specification LUC 3.2.1 6 and 7 and be sure and include the table that is associated with specification number 7. Comment Number: 8 Comment Originated: 01/15/2014 01/15/2014: Please add the following street tree planting notes: Street Trees shall be supplied and planted by the developer using a qualified landscape contractor. The Developer shall replace dead or dying street trees after planting until final maintenance inspection and acceptance by the City of Fort Collins Forestry Division. All street trees in the project must be established, of an approved species and of acceptable condition prior to acceptance. Comment Number: 9 Comment Originated: 01/15/2014 01/15/2014: Will irrigated lawn be provided in the parkway between the sidewalk and curb and shown in the City Streetscape and median standards. Review this requirement with the City Planner. Comment Number: 10 Comment Originated: 03/19/2014 03/19/2014: Previous notes number 1 and number 3 are continued. Set up onsite meeting when read. Evaluate adding additional trees between parking lot and sidewalk to meet code requirement. See new note number 13. Comment Number: 11 Comment Originated: 03/19/2014 03/19/2014: Using a canopy shade tree in place of Crimson Spire Oak would be more aligned with code requirements for parking lots and street trees. Crimson Spire is a narrow pyramid tree that will not develop a broader canopy. Evaluate changing Crimson spire to a canopy shade tree at the parking lot entrance and where used as a street tree along the Harmony frontage. Comment Number: 12 Comment Originated: 03/19/2014 03/19/2014: Evaluate adding a canopy tree at the west peninsula to the parking entrance from Harmony. Comment Number: 13 Comment Originated: 03/19/2014 03/19/2014: Evaluate adding additional trees in the landscape area between the parking lot and sidewalk to meet (LUC E 4 a) with one tree per twenty-five lineal feet along a public street. A suitable ornamental tree could be considered for this location, such as the native Canyon Maple. Comment Number: 14 Comment Originated: 03/19/2014 03/19/2014: Tree protection note 10 has information from another project that does not apply to this project. Please remove this non related text from this note. Department: Internal Services Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 01/22/2014 01/22/2014: The building as shown on the site plan is closer than 10ft to the north property line and therefore will have fire rated wall protection and opening requirements. Please schedule a pre-submittal meeting with Russ at 970-416-2341 in early design phase. Department: Light And Power Contact: Justin Fields, 970-224-6150, jfields@fcgov.com Topic: General Comment Number: 6 Comment Originated: 03/17/2014 03/17/2014: If the existing electric line along Harmony is under the park strip, Light and Power can intercept this line and trench directly north to the transformer location. This will reduce the amount of trenching needed to provide service. Field locates will need to be provided to verify that this option is possible. Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General Comment Number: 3 Comment Originated: 01/07/2014 01/07/2014: The existing electrical vault along Timberline is at capacity for 3-phase. If this site will require 3-phase power it will be necessary to install a new vault either next to the existing vault or along Harmony splicing into the existing duct line provided it's not under the asphalt. Field locating this line will be necessary. Comment Number: 4 Comment Originated: 01/07/2014 01/07/2014: Transformer location looks good. A C-1 Form and One-line diagram must be submitted to Light & Power Engineering with your load requirements. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 01/15/2014 01/15/2014: FIRE LANES In order to meet basic fire access requirements for the proposed building, a fire lane is required. As the site plan remains under consideration and possible revision, please contact me should you require input regarding further fire lane design. Comment Number: 2 Comment Originated: 01/15/2014 01/15/2014: EMERGENCY ACCESS EASEMENTS Emergency access, fire lanes shall be designated on the plat as an Emergency Access Easement. Comment Number: 3 Comment Originated: 01/15/2014 01/15/2014: FDC 06IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA standards. Fire department connections shall be located on the side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access. The location of the FDC shall be approved by the fire department. Comment Number: 4 Comment Originated: 01/15/2014 01/15/2014: KEY BOXES REQUIRED 06IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in approved location(s) on every new building equipped with a required fire sprinkler or fire alarm system. The top shall not be higher than 6 feet above finished floor. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 01/09/2014 01/09/2014: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Comment Number: 5 Comment Originated: 03/14/2014 03/14/2014: A drainage eaement is required for the limits of the porous pavers and underground detention. Comment Number: 6 Comment Originated: 03/14/2014 03/14/2014: Stormwater is ready for a hearing. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings Comment Number: 5 Comment Originated: 01/14/2014 03/18/2014: There is a line over text issue on sheet C3.00. See redlines. 01/14/2014: There is a line over text issue on sheet C1.00. See redlines. Comment Number: 30 Comment Originated: 03/18/2014 03/18/2014: The sheet number in the sheet index and on the Erosion Control Construction Details plan do not match. Topic: Landscape Plans Comment Number: 6 Comment Originated: 01/14/2014 03/18/2014: Please correct the sheet numbering of LS 1. 01/14/2014: No comments. Comment Number: 28 Comment Originated: 03/18/2014 03/18/2014: Please rotate the marked text 180 degrees on sheet LS 1. See redlines. Comment Number: 29 Comment Originated: 03/18/2014 03/18/2014: Please change & sharpen up the small text in the Plant List on sheet LS 1. See redlines. Topic: Lighting Plan Comment Number: 7 Comment Originated: 01/14/2014 03/18/2014: Please move the title down out of the data. See redlines. 01/14/2014: No comments. Topic: Plat Comment Number: 9 Comment Originated: 01/14/2014 03/18/2014: The legal description has been corrected, but the sub-title has not. We have contacted the Surveyor about this, and are waiting to hear back. 01/14/2014: Please correct the sub-title & legal description as marked. See redlines. Comment Number: 31 Comment Originated: 03/19/2014 03/19/2014: THe line table is missing data, and a curve table needs to be added. Comment Number: 32 Comment Originated: 03/19/2014 03/19/2014: Please correct the label for the East 1/4 corner. Topic: Site Plan Comment Number: 25 Comment Originated: 01/15/2014 03/18/2014: The legal description is still incorrect. Please work with your Surveyor to get this corrected. 01/15/2014: Please change the legal description to match the subdivision plat. Comment Number: 27 Comment Originated: 03/18/2014 03/18/2014: Please make sure that the titles of the details at the bottom of sheet LS 00 are correct. See redlines. Department: Water-Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 01/16/2014 03/17/2014: Carried over as a reminder for FDP. 01/16/2014: Get utility locates and show ALL underground utilities on the plans to identify possible conflicts with the sewer service. Department: Zoning Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com Topic: Site Plan Comment Number: 7 Comment Originated: 03/17/2014 03/17/2014: Now that the "New Right Out Only" access has been eliminated a similar problem as to #1 is created. The three vehicles spaces against the building will have difficulty in turning completely around that 32' drive isle (or U-turn) or the must back their vehicle all the way past the the driveway off E Harmony. At least with the right out only plan those vehicles could back up about 25' and turn right on to Harmony. Like the former 3 compact spaces perpendicular and at the west property line these 3 spaces may have to be abandoned. This wouldn't hurt as far as landscaping is concerned. Add'l landscaping here as well as an outside seating area or similar pedestrian plaza effect is welcomed.