March 24, 2014
Cathy Mathis
TB Group
444 Mountain Ave
Fort Collins, CO 80525
RE: Geico Office Building, PDP130039, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126
or jholland@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 01/15/2014
01/15/2014: Landscape Plan: Is there a sheet L-1? Landscape plan needs to be drawn at 1:10
to be able to show all of the information. Landscape plan will also need to show tree mitigation
information. Please see redlines for additional comments and notations. Verify species
diversity. Add a dashed line on the site plan showing the defined parking lot area and list the
parking lot percentage coverage based on the defined area.
Comment Number: 7 Comment Originated: 01/15/2014
01/15/2014: Please provide an equal to/better than modification request for the HC setback
and the plan will need to be updated/designed to include shrubs, perennials, berms, stone
walls and boulders in order to justify the HC landscape setback reduction from 50 feet to 15
feet. Turf grass can be used along the Timberline frontage, the remainder of the site needs to
be shrub beds at a high quality to support the modification. Building needs foundation planting
evergreen tree accents.
Comment Number: 8 Comment Originated: 01/15/2014
01/15/2014: We need to confirm that Transfort and Ditch Co. have no comments prior to
hearing.
Comment Number: 9 Comment Originated: 03/18/2014
03/18/2014: Refer to redlines for site and landscape plan comments
Comment Number: 10 Comment Originated: 03/19/2014
03/19/2014: Utility Plans, comments from Century Link: There is an existing copper cable,
pedestal, and terminal that served the building prior to demolishment. It can be re-used to
feed the proposed building.
For the new structure CTL will require an entrance conduit (preferably 2 –one for copper feed,
one for future fiber. More cost effective to place spare conduits during construction than down
the road when landscaping and parking lot present. )
Please have applicant contact our Engineering office for onsite meet when plan approved to
determine conduit length, terminal location and other requirements necessary to serve this
structure.
If any telco relocates are necessary due what is proposed, all associated relocation costs are
to the developer. We suggest they contact engineering for review and billing with as much
lead time as possible to meet the applicants construction time lines. CTL’s special construction
billing process can be lengthy.
Comment Number: 11 Comment Originated: 03/19/2014
03/19/2014: From GIS: Addresses will be assigned by the GIS Department after the plans
have met final approval through Development Review and are recorded with the City.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: A repay is due to the city for the E Harmony Rd frontage improvements previously
completed by the city in 2012. The repay for completed frontage improvements is typically
due prior to the issuance of building permit. Once calculated, the repay amount will be
communicated to the applicant.
Comment Number: 13 Comment Originated: 01/14/2014
01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- Need to clarify the pavement
type and section for the connection of the parking to Harmony. This appears to be concrete. If
no, a pan will be necessary and would be preferably carried north of the sidewalk.
Comment Number: 18 Comment Originated: 03/18/2014
03/18/2014: Please add the Fort Collins- Loveland Water District signature block to sheets C1
and C3 for sign off on the water service abandonment.
Comment Number: 19 Comment Originated: 03/18/2014
03/18/2014: Please submit the information for Development Agreements document so I can
begin to draft the development agreement for the project. Contact me for additional information
or visit the Engineering Development Review Website:
http://www.fcgov.com/engineering/devrev.php
Comment Number: 20 Comment Originated: 03/18/2014
03/18/2014: Please submit the project quantities and cost estimate sheet to determine if a DCP
will be required for this project. Contact me for additional information or visit the Engineering
Development Review Website: http://www.fcgov.com/engineering/devrev.php
Comment Number: 21 Comment Originated: 03/18/2014
03/18/2014: Please update General Note #5
Comment Number: 22 Comment Originated: 03/18/2014
03/18/2014: Please update General Note #34
Topic: Plat
Comment Number: 14 Comment Originated: 03/18/2014
03/21/2014: A drainage easement is needed for the parking lot area that you are using for
detention. Please add the easement limits to the plat
03/18/2014: A drainage easement may need to be added to the plat for the trickle pan at the
corner of the site. See redlines
Comment Number: 15 Comment Originated: 03/18/2014
03/18/2014: It does not appear that utility easements exist along the east lot along Harmony
and Timberline Rd. See plat redlines. To meet current street standards a 15ft utility easement
would be required along both arterial streets, however, coordination with the utility providers will
be needed and if the standard 15ft utility easements are not needed then this requirement may
be reduced in width or waived.
Comment Number: 16 Comment Originated: 03/18/2014
03/18/2014: The ditch company will need to sign the plat if a ditch easement is being
dedicated. Please add signature block to the plat.
Comment Number: 17 Comment Originated: 03/18/2014
03/18/2014: The access easement will need to be expanded to the parking lot and extend to
the west property line. See plat redlines
Department: Environmental Planning
Contact: Kate Rentschlar, 970-224-6086, krentschlar@fcgov.com
Topic: General
Comment Number: 10 Comment Originated: 03/18/2014
The buffer zone only extends as far from the top-of-bank as the vegetation goes, so the parking
lot would not be included. The buffer zone also includes the ditch itself. Please redraw the
buffer zone to show it extending north from the parking lot and building to the edge of the
property.
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 03/18/2014
03/18/2014: The alpine currant is not a native plant to Fort Collins. Please switch it out for a
native plant such as three-leaf sumac or rubber rabbitbrush. Other native species can be found
in the Fort Collins Native Plants guide on our website.
Comment Number: 12 Comment Originated: 03/18/2014
03/18/2014: The trees and shrubs planted in the buffer zone need to be laid out in a more
natural way. Clump vegetation together in patches.
Comment Number: 13 Comment Originated: 03/18/2014
03/18/2014: The smooth river cobble needs to be removed from the buffer zone. Because the
buffer width is already reduced, it is important for there to be as much grass as possible. When
planting grass along the parking lot use plugs instead of seeds to establish cover faster. I
would recommend needle and thread or western wheatgrass as the species used for the
plugs.
Comment Number: 14 Comment Originated: 03/18/2014
03/18/2014: Please show the limits of development on the landscape plan.
Comment Number: 15 Comment Originated: 03/19/2014
03/19/2014: Please fix the scale on the landscape plan. It should be 1'' - 10'.
Topic: Lighting Plan
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: Light spillage into the buffer zone is not permitted. Please consider the addition of
shielding on your lights or increased screening of the buffer zone with vegetation.
3/18/2014: The photometric plan still shows light spillage in to the buffer area. Please use back
shielding on lights.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014:
Contact the City Forester and Environmental Planner for an on-site meeting to evaluate existing
trees and obtain species, condition and mitigation information. All existing trees need to be
inventoried and recorded by number in a table. Each tree needs to be identified by species,
condition size and mitigation. Significant trees need to be retained to the extent reasonably
feasible.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014:
Provide street trees in the parkway between the sidewalks and curb in areas along Harmony
and Timberline at 40 foot spacing. Select street trees from the City of Fort Collins Street Tree
List.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014:
Review Parking lot Perimeter Landscaping LUC 3.2.1 E 4 and provide tree spacing and
densities in parking lot perimeter areas. Existing retained significant trees can be applied to
this standard.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014:
Attempt to retain the east existing street tree on Harmony currently shown to be removed
unless it is of a poor condition or an undesirable species. If sidewalk placement is the cause
for removal of this tree move sidewalk away from the tree as it passes. If this tree is not to be
retained provide an explanation why it is not feasible to retain it.
Comment Number: 5 Comment Originated: 01/15/2014
01/15/2014:
Please edit landscape note number 6. There is not a tree separation standard for electric and
phone so that is not a LUC requirement. The 10 feet separation is for water and sewer main
lines.
Comment Number: 6 Comment Originated: 01/15/2014
01/15/2014:
Please show street light locations and provide street tree separations.
Comment Number: 7 Comment Originated: 01/15/2014
01/15/2014:
Tree protection Notes Changes:
Current tree protection note number 6 should be changed to be the same as LUC 3.2.1 G 2.
Add these two tree protection specification LUC 3.2.1 6 and 7 and be sure and include the
table that is associated with specification number 7.
Comment Number: 8 Comment Originated: 01/15/2014
01/15/2014:
Please add the following street tree planting notes:
Street Trees shall be supplied and planted by the developer using a qualified landscape
contractor.
The Developer shall replace dead or dying street trees after planting until final maintenance
inspection and acceptance by the City of Fort Collins Forestry Division. All street trees in the
project must be established, of an approved species and of acceptable condition prior to
acceptance.
Comment Number: 9 Comment Originated: 01/15/2014
01/15/2014:
Will irrigated lawn be provided in the parkway between the sidewalk and curb and shown in the
City Streetscape and median standards. Review this requirement with the City Planner.
Comment Number: 10 Comment Originated: 03/19/2014
03/19/2014:
Previous notes number 1 and number 3 are continued.
Set up onsite meeting when read.
Evaluate adding additional trees between parking lot and sidewalk to meet code requirement.
See new note number 13.
Comment Number: 11 Comment Originated: 03/19/2014
03/19/2014:
Using a canopy shade tree in place of Crimson Spire Oak would be more aligned with code
requirements for parking lots and street trees. Crimson Spire is a narrow pyramid tree that will
not develop a broader canopy. Evaluate changing Crimson spire to a canopy shade tree at the
parking lot entrance and where used as a street tree along the Harmony frontage.
Comment Number: 12 Comment Originated: 03/19/2014
03/19/2014:
Evaluate adding a canopy tree at the west peninsula to the parking entrance from Harmony.
Comment Number: 13 Comment Originated: 03/19/2014
03/19/2014:
Evaluate adding additional trees in the landscape area between the parking lot and sidewalk to
meet (LUC E 4 a) with one tree per twenty-five lineal feet along a public street. A suitable
ornamental tree could be considered for this location, such as the native Canyon Maple.
Comment Number: 14 Comment Originated: 03/19/2014
03/19/2014:
Tree protection note 10 has information from another project that does not apply to this project.
Please remove this non related text from this note.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 01/22/2014
01/22/2014: The building as shown on the site plan is closer than 10ft to the north property line
and therefore will have fire rated wall protection and opening requirements. Please schedule a
pre-submittal meeting with Russ at 970-416-2341 in early design phase.
Department: Light And Power
Contact: Justin Fields, 970-224-6150, jfields@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 03/17/2014
03/17/2014: If the existing electric line along Harmony is under the park strip, Light and Power
can intercept this line and trench directly north to the transformer location. This will reduce the
amount of trenching needed to provide service. Field locates will need to be provided to
verify that this option is possible.
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 01/07/2014
01/07/2014: The existing electrical vault along Timberline is at capacity for 3-phase. If this site
will require 3-phase power it will be necessary to install a new vault either next to the existing
vault or along Harmony splicing into the existing duct line provided it's not under the asphalt.
Field locating this line will be necessary.
Comment Number: 4 Comment Originated: 01/07/2014
01/07/2014: Transformer location looks good. A C-1 Form and One-line diagram must be
submitted to Light & Power Engineering with your load requirements.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014: FIRE LANES
In order to meet basic fire access requirements for the proposed building, a fire lane is
required. As the site plan remains under consideration and possible revision, please contact
me should you require input regarding further fire lane design.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014: EMERGENCY ACCESS EASEMENTS
Emergency access, fire lanes shall be designated on the plat as an Emergency Access
Easement.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014: FDC
06IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA
standards. Fire department connections shall be located on the side of buildings, fully visible
and recognizable from the street or nearest point of fire department vehicle access. The
location of the FDC shall be approved by the fire department.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014: KEY BOXES REQUIRED
06IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at
least one key box ("Knox Box") to be mounted in approved location(s) on every new building
equipped with a required fire sprinkler or fire alarm system. The top shall not be higher than 6
feet above finished floor.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 01/09/2014
01/09/2014: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3.
Current Erosion Control Materials Submitted does not meet requirements. Please submit;
Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 03/14/2014
03/14/2014: A drainage eaement is required for the limits of the porous pavers and
underground detention.
Comment Number: 6 Comment Originated: 03/14/2014
03/14/2014: Stormwater is ready for a hearing.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 01/14/2014
03/18/2014: There is a line over text issue on sheet C3.00. See redlines.
01/14/2014: There is a line over text issue on sheet C1.00. See redlines.
Comment Number: 30 Comment Originated: 03/18/2014
03/18/2014: The sheet number in the sheet index and on the Erosion Control Construction
Details plan do not match.
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 01/14/2014
03/18/2014: Please correct the sheet numbering of LS 1.
01/14/2014: No comments.
Comment Number: 28 Comment Originated: 03/18/2014
03/18/2014: Please rotate the marked text 180 degrees on sheet LS 1. See redlines.
Comment Number: 29 Comment Originated: 03/18/2014
03/18/2014: Please change & sharpen up the small text in the Plant List on sheet LS 1. See
redlines.
Topic: Lighting Plan
Comment Number: 7 Comment Originated: 01/14/2014
03/18/2014: Please move the title down out of the data. See redlines.
01/14/2014: No comments.
Topic: Plat
Comment Number: 9 Comment Originated: 01/14/2014
03/18/2014: The legal description has been corrected, but the sub-title has not. We have
contacted the Surveyor about this, and are waiting to hear back.
01/14/2014: Please correct the sub-title & legal description as marked. See redlines.
Comment Number: 31 Comment Originated: 03/19/2014
03/19/2014: THe line table is missing data, and a curve table needs to be added.
Comment Number: 32 Comment Originated: 03/19/2014
03/19/2014: Please correct the label for the East 1/4 corner.
Topic: Site Plan
Comment Number: 25 Comment Originated: 01/15/2014
03/18/2014: The legal description is still incorrect. Please work with your Surveyor to get this
corrected.
01/15/2014: Please change the legal description to match the subdivision plat.
Comment Number: 27 Comment Originated: 03/18/2014
03/18/2014: Please make sure that the titles of the details at the bottom of sheet LS 00 are
correct. See redlines.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/16/2014
03/17/2014: Carried over as a reminder for FDP.
01/16/2014: Get utility locates and show ALL underground utilities on the plans to identify
possible conflicts with the sewer service.
Department: Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
Topic: Site Plan
Comment Number: 7 Comment Originated: 03/17/2014
03/17/2014: Now that the "New Right Out Only" access has been eliminated a similar problem
as to #1 is created. The three vehicles spaces against the building will have difficulty in turning
completely around that 32' drive isle (or U-turn) or the must back their vehicle all the way past
the the driveway off E Harmony. At least with the right out only plan those vehicles could back
up about 25' and turn right on to Harmony. Like the former 3 compact spaces perpendicular
and at the west property line these 3 spaces may have to be abandoned. This wouldn't hurt as
far as landscaping is concerned. Add'l landscaping here as well as an outside seating area or
similar pedestrian plaza effect is welcomed.