January 21, 2014
Cathy Mathis
TB Group
444 Mountain Ave
Fort Collins, CO 80525
RE: Geico Office Building, PDP130039, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126
or jholland@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014: Site Plan: Please see redlines for additinal comments, dimensions and notes to
be added. Land sue table needs to break down parking by standard, compact, and
accessable. Show the compact parking percentage. Show light pole locations, buffer line,
etc.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014: 3 parking stalls to the west need to be adjusted or removed.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014: Need a letter requesting alt. compliance for the added parking, which needs to be
based on the criteria. It's not clear whether the added parking meets the criteria.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014: Applicant may want to consider proposing additional uses in the land use table.
Comment Number: 5 Comment Originated: 01/15/2014
01/15/2014: Building Elevations: Please add a canopy over the east-facing door. Please
identify the material and color for both the stone and brick cap course. Is this precast? Please
label the fascia material.
Comment Number: 6 Comment Originated: 01/15/2014
01/15/2014: Landscape Plan: Is there a sheet L-1? Landscape plan needs to be drawn at 1:10
to be able to show all of the information. Landscape plan will also need to show tree mitigation
information. Please see redlines for additional comments and notations. Verify species
diversity. Add a dashed line on the site plan showing the defined parking lot area and list the
parking lot percentage coverage based on the defined area.
Comment Number: 7 Comment Originated: 01/15/2014
01/15/2014: Please provide an equal to/better than modifiaction request for the HC setback
and the plan will need to be updated/designed to include shrubs, perennials, berms, stone
walls and boulders in order to justify the HC landscape setback redustion from 50 feet to 15
feet. Turf grass can be used along the Timberline frontage, the remainder of the site needs to
be shrub beds at a high quality to support the modification. Building needs foundation planting
evergreen tree accents.
Comment Number: 8 Comment Originated: 01/15/2014
01/15/2014: I need to confirm that Transfort and Ditch Co. have no comments prior to hearing.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: Due to the removal of the existing building, the site and parking lot will need to be
redesigned to function using the exiting western access point. The proposed right out only
access was agreed upon due to the constraints of the exiting building on-site in relation to the
new proposed office building. By removing the existing building as part of this development
project, the existing access should be adequate to serve the proposed development without
the additional right out only access.
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: A repay is due to the city for the E Harmony Rd frontage improvements previously
completed by the city in 2012. The repay for completed frontage improvements is typically
due prior to the issuance of building permit. Once calculated, the repay amount will be
communicated to the applicant.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Profile of the sewer service that crosses under Timberline will be needed at final
development plan submittal. Please note the minimum cover under the roadway is 3ft.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: On the Utility plan sheet (C2.00) show the sidewalk removal limits needed to trench
the fire line and extend the water service into the site. See redlines
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: On the Utility plan sheet (C2.00) show and label the concrete repairs needed in the
median for the fire line connection. Add a note to the utility plan that the median is exposed,
colored concrete to match existing.
Comment Number: 6 Comment Originated: 01/14/2014
01/14/2014: Show the abandonment of the existing FCLWD water service (on Harmony Rd) on
the Utility plan sheet (C2.00) and show approximate asphalt patching limits
Comment Number: 7 Comment Originated: 01/14/2014
01/14/2014: Show and label the (2) existing driveways off of Harmony Rd to be removed and
replaced with curb and gutter. Show approximate asphalt patching limits
Comment Number: 8 Comment Originated: 01/14/2014
01/14/2014: The demo plan references the existing sidewalk to be removed at the eastern
existing access point that is to be removed. Show and note on the utility plan if the sidewalk is
to be removed and replaced. Update the demo plan if the sidewalk is to remain. Further
evaluation may be necessary to determine if the existing sidewalk meets cross slope
standards. If not, the sidewalk will need to be removed and replaced.
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: Label the existing bus stop along Harmony Rd on the Utility plan sheet (C2.00)
Comment Number: 10 Comment Originated: 01/14/2014
01/14/2014: Please add the following sidewalk note to the Utility plan sheet (C2.00):
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy.
Comment Number: 11 Comment Originated: 01/14/2014
01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- The soils appear to have
significant swell potential. Mitigation will be require for those improvements/reconstruction in
the ROW.
Comment Number: 12 Comment Originated: 01/14/2014
01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- We would prefer that the fire
supply connection is made via directional boring since they are doing that for the sewer across
timberline.
Comment Number: 13 Comment Originated: 01/14/2014
01/14/2014: COMMENT FROM THE STREETS DEPARTMENT- Need to clarify the pavement
type and section for the connection of the parking to Harmony. This appears to be concrete. If
no, a pan will be necessary and would be preferably carried north of the sidewalk.
Department: Environmental Planning
Contact: Kate Rentschlar, 970-224-6086, krentschlar@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/13/2014
A top-of-bank line needs to be added for the Dixon Canyon lateral on the site/landscaping/utility
plan.
Comment Number: 2 Comment Originated: 01/13/2014
The natural habitat buffer zone needs to be delineated and labeled on the
site/landscaping/utility/grading plan.
Comment Number: 3 Comment Originated: 01/13/2014
01/13/2014: Please add the following statement to the notes on the Utility and Grading overall
plans, and on any sheets that show the Dixon Canyon lateral buffer: Please see Section 3.4.1
of the Land Use Code for allowable uses within the buffer zone.
Topic: General
Comment Number: 6 Comment Originated: 01/13/2014
After reviewing the site plan and the ECS, the width of the 50' buffer can be reduced to the
current distance shown on the plans of about 20'. To mitigate for this loss, more landscaping
will be required in the buffer zone than is currently present to protect the function of the riparian
and aquatic habitat.
Comment Number: 7 Comment Originated: 01/13/2014
01/13/2014: Although it is not required, I'd recommend the addition of a sitting area (bench,
etc) in the buffer zone to encourage interaction between employees and the natural habitat.
Comment Number: 8 Comment Originated: 01/14/2014
Section 3.4.1 (G)(2) restricts the use of rip-rap for streambank stabilization to locations where
the use of native vegetation instead is not feasible. Please naturalize the section you have
identified as rip-rap to the maximum extent feasible.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 01/13/2014
01/13/2014: Please add a note to the landsacape plan stating: The objective of the buffer zone
is to protect the ecological character of the natural habitat from the impacts of the activities
associated with development and should be maintained as a native landscape.
Comment Number: 5 Comment Originated: 01/13/2014
01/13/2014: Please fix the number of shrubs and ornamental grasses estimated on the plant list
or show them on the plan.
Topic: Lighting Plan
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: Light spillage into the buffer zone is not permitted. Please consider the addition of
shielding on your lights or increased screening of the buffer zone with vegetation.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014:
Contact the City Forester and Environmental Planner for an on-site meeting to evaluate existing
trees and obtain species, condition and mitigation information. All existing trees need to be
inventoried and recorded by number in a table. Each tree needs to be identified by species,
condition size and mitigation. Significant trees need to be retained to the extent reasonably
feasible.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014:
Provide street trees in the parkway between the sidewalks and curb in areas along Harmony
and Timberline at 40 foot spacing. Select street trees from the City of Fort Collins Street Tree
List.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014:
Review Parking lot Perimeter Landscaping LUC 3.2.1 E 4 and provide tree spacing and
densities in parking lot perimeter areas. Existing retained significant trees can be applied to
this standard.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014:
Attempt to retain the east existing street tree on Harmony currently shown to be removed
unless it is of a poor condition or an undesirable species. If sidewalk placement is the cause
for removal of this tree move sidewalk away from the tree as it passes. If this tree is not to be
retained provide an explanation why it is not feasible to retain it.
Comment Number: 5 Comment Originated: 01/15/2014
01/15/2014:
Please edit landscape note number 6. There is not a tree separation standard for electric and
phone so that is not a LUC requirement. The 10 feet separation is for water and sewer main
lines.
Comment Number: 6 Comment Originated: 01/15/2014
01/15/2014:
Please show street light locations and provide street tree separations.
Comment Number: 7 Comment Originated: 01/15/2014
01/15/2014:
Tree protection Notes Changes:
Current tree protection note number 6 should be changed to be the same as LUC 3.2.1 G 2.
Add these two tree protection specification LUC 3.2.1 6 and 7 and be sure and include the
table that is associated with specification number 7.
Comment Number: 8 Comment Originated: 01/15/2014
01/15/2014:
Please add the following street tree planting notes:
Street Trees shall be supplied and planted by the developer using a qualified landscape
contractor.
The Developer shall replace dead or dying street trees after planting until final maintenance
inspection and acceptance by the City of Fort Collins Forestry Division. All street trees in the
project must be established, of an approved species and of acceptable condition prior to
acceptance.
Comment Number: 9 Comment Originated: 01/15/2014
01/15/2014:
Will irrigated lawn be provided in the parkway between the sidewalk and curb and shown in the
City Streetscape and median standards. Review this requirement with the City Planner.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/07/2014
01/07/2014: Light & Power has existing electric facilities along the N. side of Harmony and the
W. side of Timberline adjacent to this site. Any modification or relocation to existing electric
facilities will be at the developers expense.
Comment Number: 2 Comment Originated: 01/07/2014
01/07/2014: The landscape plan shows the routing for the electric primary running around the
N. end of the building. This route may be problematic with the retaining wall, the staircase and
elevation change. It maybe necessary to go around the south end of the building.
Comment Number: 3 Comment Originated: 01/07/2014
01/07/2014: The existing electrical vault along Timberline is at capacity for 3-phase. If this site
will require 3-phase power it will be necessary to install a new vault either next to the existing
vault or along Harmony splicing into the existing duct line provided it's not under the asphalt.
Field locating this line will be necessary.
Comment Number: 4 Comment Originated: 01/07/2014
01/07/2014: Transformer location looks good. A C-1 Form and One-line diagram must be
submitted to Light & Power Engineering with your load requirements.
Comment Number: 5 Comment Originated: 01/07/2014
01/07/2014: Developer will be responsible for Electric Capacity Fee, Building Site charges and
system modification charges where applicable. Credit will be given for existing services.
Contact Light & Power Engineering @ 970-221-6700 with any questions.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 01/15/2014
01/15/2014: FIRE LANES
In order to meet basic fire access requirements for the proposed building, a fire lane is
required. As the site plan remains under consideration and possible revision, please contact
me should you require input regarding further fire lane design.
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014: EMERGENCY ACCESS EASEMENTS
Emergency access, fire lanes shall be designated on the plat as an Emergency Access
Easement.
Comment Number: 3 Comment Originated: 01/15/2014
01/15/2014: FDC
06IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA
standards. Fire department connections shall be located on the side of buildings, fully visible
and recognizable from the street or nearest point of fire department vehicle access. The
location of the FDC shall be approved by the fire department.
Comment Number: 4 Comment Originated: 01/15/2014
01/15/2014: KEY BOXES REQUIRED
06IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at
least one key box ("Knox Box") to be mounted in approved location(s) on every new building
equipped with a required fire sprinkler or fire alarm system. The top shall not be higher than 6
feet above finished floor.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 01/09/2014
01/09/2014: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3.
Current Erosion Control Materials Submitted does not meet requirements. Please submit;
Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: The site will need a variance for using the irrigation ditch as an outfall. Please
prepare a variance letter detailing the justifications to allow the ditch as the outfall.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Please explain in the text of the drainage report where the Harmony Road
drainage will flow since it will not enter the site as it currently does.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: The riprap is required to be buried.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: There is a text over text issue on sheet A4.1. See redlines.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: Please change the "Southwest" in the sub-title to "Southeast". See redlines.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Please provide benchmark elevations in both NGVD 1929 Datum Unadjusted &
NAVD 1988 Datum. See redlines.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: Please change the "37" in the Basis Of Bearings to a "31". See redlines.
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: There is a line over text issue on sheet C1.00. See redlines.
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 01/14/2014
01/14/2014: No comments.
Topic: Lighting Plan
Comment Number: 7 Comment Originated: 01/14/2014
01/14/2014: No comments.
Topic: Plat
Comment Number: 8 Comment Originated: 01/14/2014
01/14/2014: Plat names cannot begin with addresses and/or numbers. Please change this
name.
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: Please correct the sub-title & legal description as marked. See redlines.
Comment Number: 10 Comment Originated: 01/14/2014
01/14/2014: Please revise the legal description with metes & bounds.
Comment Number: 11 Comment Originated: 01/14/2014
01/14/2014: Please add Subdivision name to the Statement Of Ownership And Subdivision.
Comment Number: 12 Comment Originated: 01/14/2014
01/14/2014: Please provide current acceptable monument records for the aliquot corners
shown. Please email these directly to Jeff County at jcounty@fcgov.com.
Comment Number: 13 Comment Originated: 01/14/2014
01/14/2014: Please revise the title commitment date as newer issues become available.
Comment Number: 14 Comment Originated: 01/14/2014
01/14/2014: Does Book L, Page 21 extend to the east onto the metes & bounds portion of the
Plat?
Comment Number: 15 Comment Originated: 01/15/2014
01/15/2014: Please add the missing bearings & distances along the 15' access & utility
easement. See redlines.
Comment Number: 16 Comment Originated: 01/15/2014
01/15/2014: Please change the linetype on the east line of the 15' access & utility easement.
See redlines.
Comment Number: 17 Comment Originated: 01/15/2014
01/15/2014: Please add "to the City of Fort Collins" to the construction & maintenance
easement note. See redlines.
Comment Number: 18 Comment Originated: 01/15/2014
01/15/2014: Please add record reference for the south half of the Harmony Road & east half of
Timberline Road rights of way. Reference to subdivision plats is acceptable.
Comment Number: 19 Comment Originated: 01/15/2014
01/15/2014: Please show the south right of way line of Harmony Road, and the east right of way
line of Timberline Road.
Comment Number: 20 Comment Originated: 01/15/2014
01/15/2014: Please make the text sizes of like notes consistent. See redlines.
Comment Number: 21 Comment Originated: 01/15/2014
01/15/2014: Please label all surrounding properties as either unplatted or subdivision name,
including the properties east of Timberline Road and south pf Harmony Road. See redlines.
Topic: Site Plan
Comment Number: 22 Comment Originated: 01/15/2014
01/15/2014: There are line over text issues on sheet LS 00. See redlines.
Comment Number: 23 Comment Originated: 01/15/2014
01/15/2014: Please rotate the marked text 180 degrees. See redlines.
Comment Number: 24 Comment Originated: 01/15/2014
01/15/2014: Please mask all text within hatched areas. See redlines.
Comment Number: 25 Comment Originated: 01/15/2014
01/15/2014: Please change the legal description to match the subdivision plat.
Comment Number: 26 Comment Originated: 01/15/2014
01/15/2014: There was no sheet LS 1 routed to us. Is this sheet part of the set? If not, please
remove it from the sheet index, and renumber sheet LS 2 to LS 1.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/10/2014
01/10/2014: The site has been changed and no longer has the issue that promoted the need for
two access points. Please remove the eastern access and revise the parking lot to function
with one access. Please keep the access as far west as possible on the site.
Topic: Traffic Impact Study
Comment Number: 2 Comment Originated: 01/10/2014
01/10/2014: The TIS requirement was waived for the previous use of 4000sf. The scale has
been increased to 7000sf and needs to be re-evaluated for the need of a TIS. Please contact
Ward Stanford at 970-221-6605 to discuss the new proposal.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/16/2014
01/16/2014: Get utility locates and show ALL underground utilities on the plans to identify
possible conflicts with the sewer service.
Comment Number: 2 Comment Originated: 01/16/2014
01/16/2014: Is there any possibility of extending an 8" public sewer west across Timberline
and connecting the sewer service to a MH at the end of that line?
Department: Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 12/30/2013
12/30/2013: List the species of the existing trees to remain and their aprox. sizes in height.
These should be pruned if needed with such a note listed on the landscaping plan. This is in
addition to trees overhanging outside the property line as noted in the landscaping plan.
Comment Number: 6 Comment Originated: 12/30/2013
12/30/2013: Landscaping note no. 29 should read that "All landscaping must be secured with
an irrevocable letter of credit, performance bond, or escrow account for 125% of the valuation
remaining of the materials and labor prior to the issuance of any Certificate of Occupancy or
Temporary Certificate of Occupancy".
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/30/2013
12/30/2013: A conflict may be created by placing the 3 compact vehicle spaces along the west
property line. In order for the drivers of any vehicles parked there and faced fwd. the driver
would have to back up and make a complete u-turn in order to exit. You could provide an
added compact parking space to the two facing the street and west of the right providing a
backup for the three spaces and eliminating the three compact spaces facing west. Therefore
you would only be reducing 2 compact parking spaces overall.
Comment Number: 2 Comment Originated: 12/30/2013
12/30/2013: Based on the building square footage a maximum of 21 vehicle spaces is allowed.
A modification of standards or alternative compliance is required for excess spaces.
Comment Number: 3 Comment Originated: 12/30/2013
12/30/2013: Trash Enclosure - In addition to the separate entry opening for an individual to gain
access interior bollards or other measures should be made to prevent the opening from being
blocked within the trash enclosure.
Comment Number: 4 Comment Originated: 12/30/2013
12/30/2013: Provide length and depth dimensions of the building.