Loading...
HomeMy WebLinkAboutUNIVERSITY SQUARE REPLAT - FDP - FDP150031 - REPORTS - CITY STAFFColorado State University Colorado State University Open Arms Christian Preschool Spring Creek «¬287 Whedbee St East Dr Parker St E Lake St Garfield St Edwards St W Pitkin St S Mason St Bay Rd University Ave A St Mathews St Peterson St Bay Dr Peterson Pl Buckeye St South Dr Edison Dr Person Ct Braiden Dr Amy Van Dyken Way Tamasag Dr Mathews St Mathews St Peterson St Buckeye St W Lake St E Pitkin St E Elizabeth St Center Ave Centre Ave Remington St S College Ave W Prospect Rd E Prospect Rd University Square Second Filing Plat - Vicinity Map 1 inch = 600 feet 600 300 0 600 Feet Site LEGEND RIGHT OF WAY DEDICATED BY THIS PLAT 2,413 SQ.FT. 0.055 ACRES LOT 1 309,155 SQ.FT. 7.097 ACRES KING SURVEYORS 650 E. Garden Drive | Windsor, Colorado 80550 phone: (970) 686-5011 | email: info@KingSurveyors.com 2 NORTH O:\2015083-B\DWG\2015083B-SUB.dwg, 1/12/2016 11:36:25 AM South College Avenue Parking Structure Overall Site Plan April 29, 2015 0’ 10’ 20’ 40’ NORTH W. LAKE ST. MASON TRAIL W. PITKIN ST. S. COLLEGE AVE. 6’ Sidewalk New switchback in trail Existing Parking Lot Entrance Existing Parking Lot Exit Existing Underpass Trail Garage Entry Garage Entry Entry to Alumni Center Parking Lot Bikeway Connects Mason Trail Striped Sharrows in Parking Lot Drive Lane MASON BRT MASON TRAIL MASON BRT New Detached Sidewalk SPAR Submittal Medical Center Contextual Circulation Plan NORTH College Avenue Parking Structure Complete Summer 2016 Medical Center Complete Spring 2017 W. Pitkin St. W. Lake St. 920 parking spaces w/ new structure 106 parking spaces MAX Prospect Station Proposed Bus Stop S. College Ave. P P W. Prospect Rd. September 2, 2015 04.16.2015 SPAR SUBMITTAL SOUTH COLLEGE PARKING STRUCTURE ARCHITECTURAL VIEWS 04.16.2015 SPAR SUBMITTAL SOUTH COLLEGE PARKING STRUCTURE ARCHITECTURAL VIEWS