HomeMy WebLinkAboutNORTH COLLEGE DRIVE THRU - PDP - PDP160014 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY1603 & 1605 NORTH COLLEGE
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
APRIL 2016
Prepared for:
Peak to Peak Properties
P.O. Box 102291
Denver, CO 80250
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
___,,/1/.' __
Project #1605
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Roads .............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pedestrians Facilities ...................................................................................................... 5
Bicycle Facilities .............................................................................................................. 9
Transit Facilities .............................................................................................................. 9
III. PROPOSED DEVELOPMENT ............................................................................... 10
Trip Generation ............................................................................................................. 10
Trip Distribution ............................................................................................................. 10
Background Traffic Projections ..................................................................................... 10
Trip Assignment ............................................................................................................ 14
Signal Warrants ............................................................................................................. 14
Geometry ...................................................................................................................... 14
Operation Analysis ........................................................................................................ 14
Pedestrian Level of Service ........................................................................................... 19
Bicycle Level of Service ................................................................................................ 19
Transit Level of Service ................................................................................................. 19
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 21
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 8
2. Trip Generation ....................................................................................................... 10
3. Short Range (2021) Background Peak Hour Operation .......................................... 18
4. Short Range (2021) Total Peak Hour Operation ..................................................... 20
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Balanced/Adjusted Recent Peak Hour Traffic ........................................................... 7
5. Site Plan .................................................................................................................. 11
6. Trip Distribution ....................................................................................................... 12
7. Short Range (2021) Background Peak Hour Traffic ................................................ 13
8. Site Generated Peak Hour Traffic ........................................................................... 15
9. Short Range (2021) Total Peak Hour Traffic ........................................................... 16
10. Short Range (2021) Geometry ................................................................................ 17
APPENDICES
A. Base Assumptions Packet
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Short Range (2021) Background Peak Hour Operation
E. Short Range (2021) Total Peak Hour Operation
F. Pedestrian/Bicycle Level of Service
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 1
I. INTRODUCTION
This intermediate transportation impact study (TIS) addresses the capacity,
geometric, and control requirements at and near the proposed 1603 & 1605 North College
development. The proposed 1603 & 1605 North College development is located south of
Willox Lane and west of (adjacent to) North College Avenue in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the
owner/developer (Peak to Peak Properties), the project planner (Ripley Design, Inc.) and
the Fort Collins Traffic Engineering staff. This study generally conforms to the format set
forth in the Fort Collins transportation impact study guidelines contained in the “Larimer
County Urban Area Street Standards” (LCUASS). Appendix A contains the
Transportation Impact Study Base Assumptions form and related attachments for the
1603 & 1605 North College development. The study involved the following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the 1603 & 1605 North College development is shown in Figure 1.
It is important that a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial and residential. There are
residential uses to the west of the site. There are commercial uses to the north, south,
and east of the site. The center of Fort Collins lies to the south of the proposed 1603 &
1605 North College site. Land adjacent to the site is flat (<2% grade) from a traffic
operations perspective.
Roads
The primary streets near the 1603 & 1605 North College site are North College
Avenue and Willox Lane. The existing geometry at the key intersections is shown in
Figure 2.
North College Avenue is to the east of (adjacent to) of the proposed 1603 & 1605
North College site. It is a north-south street classified as a four-lane arterial according
to the Fort Collins Master Street Plan and an NRB category highway according to
CDOT. North College Avenue has recently been improved. Currently, North College
Avenue has a four-lane cross section with a raised center median. At the North
College/Willox intersection, North College Avenue has northbound and southbound left-
turn lanes, two through lanes in each direction, and northbound and southbound right-
turn lanes. The North College/Willox intersection has signal control. The posted speed
limit in this area of North College Avenue is 40 mph. South of Willox Lane, on the west
side of North College Avenue, there is a 12-foot wide lane (10 feet plus 2 foot gutter
pan) that is designated as a bike lane. Given this width, it also functions as a right-turn
lane for the access to the Conoco/McDonalds site in the southwest quadrant of the
North College/Willox intersection. South of the access, the curb/gutter tapers to
become a standard bike lane to the south (adjacent to the existing car wash/storage use
and beyond). There is an 8-foot sidewalk, parkway, and street light standards in this
area.
Willox Lane is to the north of the proposed 1603 & 1605 North College site. It is
an east-west street classified as a two-lane arterial according to the Fort Collins Master
Street Plan. Currently, Willox Lane has a two-lane cross section with a center median
lane. At the North College/Willox intersection, Willox Lane has eastbound and
westbound left-turn lanes, one through lane in each direction, and eastbound and
westbound right-turn lanes. The posted speed limit in this area of Willox Lane is 30
mph.
Willox
North College
Shields
Vine
Lemay
SCALE: 1"=2000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 4
Willox
Driveway
North College
- Denotes Lane
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 5
Existing Traffic
Figure 3 shows recent peak hour traffic counts at the North College/Willox and
North College/Driveway intersections. The traffic counts at the North College/Willox
intersection were obtained in July 2013 by the City of Fort Collins. Since there is a
closure on the west leg of Willox Lane (bridge out), these traffic counts were deemed to
be appropriate. The traffic counts at the North College/Driveway intersection were
obtained in March 2016. This driveway is located approximately 450 feet south of
Willox Lane. Raw traffic count data is provided in Appendix B. Since the counts were
done in different years, the counts at the North College/Willox intersection were factored
up to reflect a year 2016 condition. The volumes between the two intersections were
then balanced. The factored/balanced recent peak hour traffic is shown in Figure 4.
Existing Operation
The North College/Willox and North College/Driveway intersections were evaluated
using techniques provided in the 2010 Highway Capacity Manual. Calculation forms are
provided in Appendix C. Using the morning and afternoon peak hour traffic shown in
Figure 4, the peak hour operation is shown in Table 1. The current City signal timing
was used for the North College/Willox intersection. A description of level of service for
signalized and unsignalized intersections from the 2010 Highway Capacity Manual is
provided in Appendix C. Table 4-3 (revised per staff comments regarding type of
intersection) showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are
also provided in Appendix C. This site is in an area termed “Community Commercial
District” on the Fort Collins Structure Plan. The North College/Willox intersection is
assumed to be in an area termed “Commercial Corridor.” In areas termed “Commercial
Corridor,” acceptable overall operation at signalized intersections during the peak hours
is defined as level of service D or better. At signalized intersections, acceptable
operation of any leg and any movement is level of service E. At arterial/arterial and
arterial/collector or local stop sign controlled intersections, there is no acceptable level of
service indicated. The North College/Willox and North College/Driveway intersections will
meet the City of Fort Collins Motor Vehicle LOS Standard during in the morning and
afternoon peak hours.
Pedestrian Facilities
There are sidewalks along the east side of North College Avenue and along
Willox Lane, east of North College Avenue. There are sidewalks along the south side of
Willox Lane, west of North College Avenue, and along both sides of North College
Avenue. This area of North College Avenue has been under construction with the North
College Improvements.
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 6
47/107
323/781
53/154
93/65
640/582
96/107
67/108
89/124
97/79
67/232
65/154
65/114
473/1005
4/13
926/814
6/15
Willox
Driveway
North College
AM/PM
FACTORED/BALANCED
RECENT PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 7
52/103
361/753
60/149
96/67
748/632
99/110
69/111
92/128
114/86
69/239
67/159
76/123
4/13
926/814
Willox
Driveway
473/1005 North College
6/15
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
North College/Willox
(signal)
EB LT C C
EB T D C
EB RT A A
EB APPROACH C C
WB LT C C
WB T C D
WB RT A C
WB APPROACH C C
NB LT A A
NB T A B
NB RT A B
NB APPROACH A B
SB LT A A
SB T A B
SB RT A A
SB APPROACH A B
OVERALL B B
North College/Driveway
(RT-in/RT-out) EB RT B B
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 9
Bicycle Facilities
Bicycle lanes exist along North College Avenue and Willox Lane within the study
area.
Transit Facilities
Currently, this area of Fort Collins is served by Transfort routes 8 and 81.
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The 1603 & 1605 North College development is a proposed fast-food restaurant
development. Figure 5 shows a site plan of the 1603 & 1605 North College
development. Access to the 1603 & 1605 North College site will be via an existing right-
in/right-out access to/from North College Avenue. The short range analysis (Year 2021)
includes development of the 1603 & 1605 North College site and an appropriate
increase in background traffic, due to normal growth, and other approved or expected
developments in the area.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 9
th
Edition, ITE was used to estimate trips that would be
generated by the 1603 & 1605 North College project. Land Use Code 934 – Fast-Food
Restaurant with Drive-through was used for the trip generation calculation. Table 2
shows the daily and peak hour trip generation for 1603 & 1605 North College project. Full
development of the 1603 & 1605 North College site resulted in 1240 daily weekday trip
ends, 113 morning peak hour trip ends, and 82 afternoon peak hour trip ends.
TABLE 2
Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
934 Fast-Food
Restaurant 2.5 KSF 496.12 1240 23.16 58 22.20 55 16.98 43 15.67 39
Trip Distribution
Trip distribution for the 1603 & 1605 North College development was based on
existing/future travel patterns, land uses in the area, consideration of trip attractions/
productions in the area, and engineering judgment. Figure 6 shows the trip distribution
for the short range (2021) analysis future. The trip distribution was agreed to by City of
Fort Collins staff in the scoping emails.
Background Traffic Projections
Figure 7 shows the short range (2021) background peak hour traffic projections.
Background traffic projections for the short range were obtained by reviewing the North
Front Range Regional Transportation Plan, and engineering judgment. Based upon
these sources, it was determined that the traffic volumes would increase by
approximately 1.0 percent per year.
SCALE: 1"=30'
SITE PLAN Figure 5
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 11
Willox
North College
10% 20%
50% 20%
SCALE: 1"=600'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 12
AM/PM
SHORT RANGE (2021) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 13
55/108
380/791
62/156
100/70
785/662
104/115
72/117
96/134
119/90
72/250
70/166
80/130
497/1055
4/13
972/855
6/15
Willox
Driveway
North College
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 14
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Using the trip distribution shown in Figure 6, Figure 8 shows the assignment
of the site generated peak hour vehicle traffic. Passby factors were applied according
to The Trip Generation Handbook, ITE and distributed based upon the existing
directional split on North College Avenue. The passby and assigned site traffic is
reflected in Figure 8. The site generated vehicle traffic was combined with the
background traffic to determine the total forecasted vehicle traffic at the key
intersections. Figure 9 shows the short range (2021) total peak hour vehicle traffic at
the key intersections.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. The North
College/Willox intersection is currently signalized. The North College/Site Access
intersection will not meet peak hour signal warrants, nor do the two intersections meet
signal spacing criteria.
Geometry
Figure 10 shows a schematic of the short range (2021) geometry. A southbound
right-turn deceleration lane is shown to be warranted at the North College/Site Access
intersection. The right-turn lane is required based upon the CDOT State Highway Access
Code and LCUASS criteria. The CDOT criterion requires a right-turn lane at more than 50
vehicles per hour (right-turns). This is exceeded by 26 and 5 vehicles in the respective
peak hours. Utilizing Figure 8-4 (LCUASS), the threshold requiring a right-turn lane is
exceeded by 35 and 12 vehicles in the respective peak hours. Based upon the recent
street improvements on North College Avenue, it is not known whether this right-turn lane
will be required. That decision rests with the City of Fort Collins and CDOT.
Operation Analysis
Operation analyses were performed at the North College/Willox and North
College/Site Access intersections. The operation analyses were conducted for the short
range analysis, reflecting a year 2021 condition. The current City signal timing was
used for the North College/Willox intersection. The following analyses reflect the
warranted right-turn deceleration lane at the North College/Driveway intersection.
Using the short range (2021) background peak hour traffic volumes, the North
College/Willox and North College/Driveway intersections operate as indicated in Table 3.
The key intersections operate acceptably with existing control, geometry, and signal
timing in the morning and afternoon peak hours. Calculation forms for these analyses
are provided in Appendix D.
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 15
3/2
5/4
6/4
6/5
3/2
6/5
54/32
73/43
-18/-9
55/39
Willox
Site Access
North College
40/22
AM/PM
SHORT RANGE (2021) TOTAL
PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 16
58/110
385/795
68/160
100/70
791/667
104/115
72/117
96/134
122/92
72/250
70/166
86/135
551/1087
77/56
954/846
61/54
Willox
Site Access
North College
40/22
SHORT RANGE (2021) GEOMETRY Figure 10
DELICH
ASSOCIATES
1603 & 1605 North College TIS, April 2016
Page 17
Willox
Site Access
North College
- Required Lane
- Existing Lane
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 18
TABLE 3
Short Range (2021) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
North College/Willox
(signal)
EB LT C C
EB T D C
EB RT A A
EB APPROACH C C
WB LT C C
WB T C D
WB RT A C
WB APPROACH C C
NB LT A A
NB T A B
NB RT A B
NB APPROACH A B
SB LT A A
SB T B B
SB RT A A
SB APPROACH A B
OVERALL B B
North College/Driveway
(RT-in/RT-out) EB RT B B
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 19
Using the traffic volumes shown in Figure 9, the North College/Willox and North
College/Site Access intersections operate in the short range (2021) total condition as
indicated in Table 4. Calculation forms for these analyses are provided in Appendix E.
The key intersections operate similar to the background operation with existing
geometry, control, and signal timing in the morning and afternoon peak hours. The
increase in delay at the North College/Site Access intersection without the warranted
auxiliary right-turn lane will not be significant.
Pedestrian Level of Service
Appendix F shows a map of the area that is within 1320 feet of the 1603 & 1605
North College development. There are four pedestrian destinations within 1320 feet of
the 1603 & 1605 North College development. These are: 1) the commercial area to the
north of the site; 2) the commercial area to the east and northeast of the site; 3) the
commercial uses to the south of the site; and 4) the residential neighborhood to the
west of the site. The 1603 & 1605 North College site is located within an area termed as
“activity center,” which sets the level of service threshold at LOS B for all measured
categories, except for street crossing which is LOS C. The Pedestrian LOS Worksheet
is provided in Appendix F. Pedestrian level of service is achieved for all areas except 4)
the residential neighborhood to the west of the site. This mobile home park was
constructed without sidewalks. If this parcel redevelops, it is assumed that a new
development would construct sidewalks.
Bicycle Level of Service
Appendix F shows a map of the area that is within 1320 feet of the 1603 & 1605
North College development. There are three bicycle destinations within 1320 feet of the
1603 & 1605 North College development. These are: 1) the commercial area to the
north of the site; 2) the commercial area to the east and northeast of the site; and 3) the
commercial uses to the south of the site. The Bicycle LOS Worksheet is provided in
Appendix F. The minimum level of service for this site is C. This site is connected to
bike lanes on North College Avenue and Willox Lane. Therefore, it is concluded that
level of service C can be achieved.
Transit Level of Service
This area of Fort Collins is served by Transfort Routes 8 and 81.
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 20
TABLE 4
Short Range (2021) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
North College/Willox
(signal)
EB LT C C
EB T D C
EB RT A A
EB APPROACH C C
WB LT C C
WB T C D
WB RT A C
WB APPROACH C C
NB LT A A
NB T A B
NB RT A B
NB APPROACH A B
SB LT A A
SB T B B
SB RT A A
SB APPROACH B B
OVERALL B B
North College/Site Access
(RT-in/RT-out) EB RT B B
DELICH 1603 & 1605 North College TIS, April 2016
ASSOCIATES Page 21
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the 1603 & 1605 North College development on
the short range (2021) street system in the vicinity of the proposed development. As a
result of this analysis, the following is concluded:
The development of the 1603 & 1605 North College site is feasible from a traffic
engineering standpoint. At full development, the 1603 & 1605 North College site
will generate approximately 1240 daily weekday trip ends, 113 morning peak
hour trip ends, and 82 afternoon peak hour trip ends.
Current operation at the North College/Willox and North College/Driveway
intersections is acceptable with existing control, geometry, and signal timing.
Figure 10 shows a schematic of the short range (2021) geometry. It is important to
note that a southbound right-turn deceleration lane at the North College/Site
Access intersection is warranted with the short range (2021) total traffic volumes.
Requirement of this auxiliary lane rests with the City of Fort Collins and CDOT.
In the short range (2021) future, given development of the 1603 & 1605 North
College site and an increase in background traffic, the North College/Willox and
North College/Site Access intersections will meet the City of Fort Collins Motor
Vehicle LOS Standard, the warranted auxiliary lane. The increase in delay at the
North College/Site Access intersection without the warranted auxiliary right-turn
lane will not be significant.
Acceptable level of service is achieved for bicycle, and transit modes based upon
the measures in the multi-modal transportation guidelines. Pedestrian level of
service is achieved for all areas except for the residential neighborhood to the
west of the site. This mobile home park was constructed without sidewalks.
APPENDIX A
-------------:---------------------- .--- -..-
Chapter 4 - Attachments
Attachment A
Transportation Impact Study
Base Assumptions
Project Information
Project Name I (pori/toO 5 N cO R'rt.t tOL.t-.Gc.t; /J-vG/JU&
Project Location We-S'f (!)P N. to{..(J~C;& '8r:Jvrtf o P- t-U{L L.O~
TIS Assumptions ~oY...
Type of Study Full: AJo InterD1ediat~k~~~d.
"
I~ "y '''<'
Study Area Boundaries North: '5'16 AcCGss{Wu.t.-a;<:'? South: '5 IT& keG s
East: IJ. t2.0cc Ga& West}J. CoL{.t;;c,G'
Study Years Short Range: e.DZ( Long Range: ~) A
Future Traffic Gro""th Rate J '?/fSAQ.. CC tp OT ~ItG -ro~ <:~. -o70;l'~g,tt~. ')
Study Intersections 1. All access drives(.{)o~~ 5.
2. /J.C(Ju.~~/t.J,(..i..O¥·~ 6.
....• J. 7.
4. 18.
Time Period for Study AM: 7:00-9:~: 4:UU-O:u~ I Sat Noon: u»
Trip Generation Rates ;4.TT foe 6f-&b
Trip Adjustment Factors Passby: t+,4.;(J b-1>(;~k '/2.. --=tr"G, ICaptive Market: IV/A
Overall Trip Distribution SEE AIT ACHED SKETCH
Mode Split Assumptions AI/A
Committed Roadway Improvements '-h", 'f/? (!",; <tiC;; Ave "'VB" ~),() (.<1 r-rAc~ ::
\ V\')w:,l;. \-'",(U. Q~ AL «-:/";:;
Other Traffic Studies JJ~T /J-WA f!.GT 0 P. IJ.-AJ P
Areas Requiring Special Study
\V(A \,-I-NL WH("'r'~<:"~
l)'~\ \AI~\v,lQ CD 0\ (Qv\.l\~ J -( ~Le..)S
\
Date: [tie euAR l' 2:1 Z-O I to
Traffic Engineer: 1)6;L(Co tJ- . }jgSOC 114 yGS
Local Entity Engineer: __ -+U=->,..:.J~· ..L".. """""'~J\----"-~.;>-E.-/'____7-"---<--=--~=='---'7.,-\z,_I1"_, -"16",, __
; "'---./
}fs>05 BAt:'
Page 4-34 Larimer County Urban Area S~t Standards - RepaalM and Reenacted April 1. 2007
Adopted by Larimer County, CIty of Loveland, City of Fort Collins
~).j \.C;;?! <JJ
\ ,0
~)
I
U
-I
-I
UJ
(!)
UJ
-I
-I
0- UN I I- ..S>
g§ Z ~
Ci
UJ
Z
oS
Al..L ACC6SS TwRU A~JAC&Vf ?f<o~ser?
1603-1605 SITE PLAN 12-17-15
_I ~_~ , ~l'" ~r "- , ~W''''';i~'; ",' i'i'.'I1,"/L'li. ,''''~'C'''i "",,.'", "''1' c' '" "",",~";'" ,. "",!t,i.'" ;', - '~ ~ '" I I" ,---,-,,-40'ROW ,-,-"'''''---------,,---,v
SIte RAAJ
Depending on the ultimate user, these 5
parking spaces may go away for increased
stacking distance.
r----140'ROW ----I
~
...:.::..t - ·w .-.
0::>
Zz
>-w
;- ~~ IW <.9 <.9
~ ~ - I....W .I
w.....I
f-O
«0 f-"-'"
(j)
~~ u<!J
wZ
~12 U-OlU «
WCll
zU-
:JO
I-fQ
III «« WCll III
,~,-,
/i2tP
~~r ):::'oot::;,e59IAOeA~T
~O~& C)"64-
DAfLCf (4 Q6. (~) - 1240 Tg
A IV1, 110 (Z? 1&) ~ ~f3 I) 113 Tti
tJur (Z2.26) - 55
\)0 IN {(".9~- 4~ 7 (321&
OUT{I~.01)~ 31 j .
P~<3S ~ 6f - 14M - 497
PM- buy
13~~D UPOAJ bl~C'(O~AL S'PLlT
IRIP "'bt"OTj2. l f5Ull Oil)
tv. ~(.,Gr;.g-
101/ <r '> ~0't
W 1£...\1-~-----+------
t
NORTH COLLEGE AVENUE,
CONIFER TO WILLOX PLAN
Ji;l I~
~" "'~'):i'AL!"''''',.,*,.' __ '''''''-'''- ~---'
.. 31VV1 XOT71M •• N
-,
, ~ .. ..,.- -.~ :.- .I ....~ .'..,.._J,i;-...:._.:_,' .:+. •..~
, L ,,"-~i e .~Vl~ "'", ..
1 j ·1' ~g Il)~ Ii a~~ ~~<"~ii iI
I <!
! !~ . I
; I
l
'\ L __
.j 1
II
1
i
-_._--- ..I•' ~
.t
Figure 3C
71rASSOCIATES .:»J '--DELICH
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 7/16/2013 Observer: City of Fort Collins
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: College/Willox
S = straight
L = left turn
Time Northbound: College Southbound: College Total Eastbound: Willox Westbound: Willox Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 10 66 15 91 19 212 26 257 348 19 26 11 56 10 20 18 48 104 452
7:45 14 79 14 107 24 176 32 232 339 19 22 44 85 16 18 17 51 136 475
8:00 14 84 14 112 30 135 18 183 295 19 23 28 70 18 16 16 50 120 415
8:15 9 94 10 113 23 117 17 157 270 10 18 14 42 21 11 16 48 90 360
7:30-8:30 47 323 53 423 96 640 93 829 1252 67 89 97 253 65 65 67 197 450 1702
PHF 0.84 0.86 0.88 0.94 0.8 0.75 0.73 0.81 0.88 0.86 0.55 0.74 0.77 0.81 0.93 0.97 0.9
4:30 19 167 20 206 19 131 18 168 374 21 28 24 73 24 46 49 119 192 566
4:45 27 198 42 267 31 175 12 218 485 18 26 21 65 32 35 50 117 182 667
5:00 33 224 54 311 26 131 17 174 485 36 37 21 94 28 34 63 125 219 704
5:15 28 192 38 258 31 145 18 194 452 33 33 13 79 30 39 70 139 218 670
4:30-5:30 107 781 154 1042 107 582 65 754 1796 108 124 79 311 114 154 232 500 811 2607
PHF 0.81 0.87 0.71 0.84 0.86 0.83 0.9 0.86 0.75 0.84 0.82 0.83 0.89 0.84 0.83 0.9 0.93
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/2/2016 Observer: Sue
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: College/Westside Driveway (S. of Willox)
S = straight
L = left turn
Time Northbound: College Southbound: College Total Eastbound: Driveway Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 123 123 228 0 228 351 0 2 2 0 2 353
7:45 0 121 121 276 1 277 398 0 0 0 0 0 398
8:00 0 92 92 220 2 222 314 0 1 1 0 1 315
8:15 0 137 137 202 1 203 340 0 3 3 0 3 343
7:30-8:30 0 473 0 473 0 926 4 930 1403 0 0 6 6 0 0 0 0 6 1409
PHF n/a 0.86 n/a 0.86 n/a 0.84 0.5 0.84 n/a n/a 0.5 0.5 n/a n/a n/a n/a 0.89
4:30 0 223 223 196 3 199 422 0 5 5 0 5 427
4:45 0 262 262 227 3 230 492 0 2 2 0 2 494
5:00 0 260 260 197 6 203 463 0 5 5 0 5 468
5:15 0 260 260 194 1 195 455 0 3 3 0 3 458
4:30-5:30 0 1005 0 1005 0 814 13 827 1832 0 0 15 15 0 0 0 0 15 1847
PHF n/a 0.96 n/a 0.96 n/a 0.9 0.54 0.9 n/a n/a 0.75 0.75 n/a n/a n/a n/a 0.93
APPENDIX C
HCM 2010 Signalized Intersection Summary Recent AM
3: College Avenue & Willox Lane
3/31/2016 HCM 2010 Signalized Intersection Summary
recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 69 92 114 76 67 69 52 361 60 99 748 96
Future Volume (veh/h) 69 92 114 76 67 69 52 361 60 99 748 96
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1937
Adj Flow Rate, veh/h 78 103 0 85 75 0 58 406 0 111 840 30
Adj No. of Lanes 111111121121
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 293 186 158 274 194 165 463 2025 906 698 2060 959
Arrive On Green 0.06 0.10 0.00 0.07 0.10 0.00 0.05 0.57 0.00 0.06 0.58 0.58
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3539 1583 1774 3539 1647
Grp Volume(v), veh/h 78 103 0 85 75 0 58 406 0 111 840 30
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1770 1583 1774 1770 1647
Q Serve(g_s), s 3.1 4.2 0.0 3.3 3.0 0.0 1.0 4.4 0.0 2.0 10.4 0.6
Cycle Q Clear(g_c), s 3.1 4.2 0.0 3.3 3.0 0.0 1.0 4.4 0.0 2.0 10.4 0.6
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 293 186 158 274 194 165 463 2025 906 698 2060 959
V/C Ratio(X) 0.27 0.55 0.00 0.31 0.39 0.00 0.13 0.20 0.00 0.16 0.41 0.03
Avail Cap(c_a), veh/h 355 466 396 328 466 396 554 2025 906 771 2060 959
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.2 34.3 0.0 29.1 33.4 0.0 6.6 8.3 0.0 6.0 9.2 7.1
Incr Delay (d2), s/veh 0.5 2.6 0.0 0.6 1.3 0.0 0.1 0.2 0.0 0.1 0.6 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 2.3 0.0 1.7 1.6 0.0 0.5 2.2 0.0 1.0 5.2 0.3
LnGrp Delay(d),s/veh 29.7 36.9 0.0 29.8 34.7 0.0 6.7 8.5 0.0 6.1 9.8 7.2
LnGrp LOS C D C C A A A A A
Approach Vol, veh/h 181 160 464 981
Approach Delay, s/veh 33.8 32.1 8.3 9.3
Approach LOS C C A A
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 6.9 51.6 8.6 13.0 7.7 50.8 8.2 13.3
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 27.0 7.0 19.0 7.0 27.0 7.0 19.0
Max Q Clear Time (g_c+I1), s 3.0 12.4 5.3 6.2 4.0 6.4 5.1 5.0
Green Ext Time (p_c), s 0.0 4.6 0.0 0.4 0.1 5.1 0.0 0.4
Intersection Summary
HCM 2010 Ctrl Delay 13.5
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Recent AM
3: College Avenue & Willox Lane
3/31/2016 Timing Report, Sorted By Phase
recent am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 33 11 25 11 33 11 25
Maximum Split (%) 13.8% 41.3% 13.8% 31.3% 13.8% 41.3% 13.8% 31.3%
Minimum Split (s) 9.5 25 9.5 25 9.5 25 9.5 25
Yellow Time (s) 3 4.5 3 3.5 3 4.5 3 3.5
All-Red Time (s) 1 1.5 1 2.5 1 1.5 1 2.5
Minimum Initial (s) 4 10 4 7 4 10 4 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 58.5 69.5 22.5 33.5 58.5 69.5 22.5 33.5
End Time (s) 69.5 22.5 33.5 58.5 69.5 22.5 33.5 58.5
Yield/Force Off (s) 65.5 16.5 29.5 52.5 65.5 16.5 29.5 52.5
Yield/Force Off 170(s) 65.5 4.5 29.5 52.5 65.5 4.5 29.5 52.5
Local Start Time (s) 42 53 6 17 42 53 6 17
Local Yield (s) 49 0 13 36 49 0 13 36
Local Yield 170(s) 49 68 13 36 49 68 13 36
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 16.5 (21%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: College Avenue & Willox Lane
HCM 2010 Signalized Intersection Summary Recent PM
3: College Avenue & Willox Lane
3/31/2016 HCM 2010 Signalized Intersection Summary
recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 111 128 86 123 159 239 103 753 149 110 632 67
Future Volume (veh/h) 111 128 86 123 159 239 103 753 149 110 632 67
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1937
Adj Flow Rate, veh/h 119 138 0 132 171 28 111 810 71 118 680 0
Adj No. of Lanes 111111121121
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 301 251 213 327 251 213 503 1816 812 436 1826 850
Arrive On Green 0.09 0.13 0.00 0.09 0.13 0.13 0.06 0.51 0.51 0.06 0.52 0.00
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3539 1583 1774 3539 1647
Grp Volume(v), veh/h 119 138 0 132 171 28 111 810 71 118 680 0
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1770 1583 1774 1770 1647
Q Serve(g_s), s 4.5 5.5 0.0 5.0 7.0 1.2 2.3 11.6 1.8 2.4 9.2 0.0
Cycle Q Clear(g_c), s 4.5 5.5 0.0 5.0 7.0 1.2 2.3 11.6 1.8 2.4 9.2 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 301 251 213 327 251 213 503 1816 812 436 1826 850
V/C Ratio(X) 0.40 0.55 0.00 0.40 0.68 0.13 0.22 0.45 0.09 0.27 0.37 0.00
Avail Cap(c_a), veh/h 301 466 396 327 466 396 571 1816 812 543 1826 850
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 26.3 32.4 0.0 26.4 33.0 30.5 8.3 12.3 9.9 8.7 11.6 0.0
Incr Delay (d2), s/veh 0.8 1.9 0.0 0.8 3.3 0.3 0.2 0.8 0.2 0.3 0.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.3 3.0 0.0 2.5 3.8 0.6 1.1 5.8 0.8 1.2 4.6 0.0
LnGrp Delay(d),s/veh 27.1 34.2 0.0 27.2 36.2 30.8 8.5 13.1 10.1 9.0 12.2 0.0
LnGrp LOS C C C D C ABBAB
Approach Vol, veh/h 257 331 992 798
Approach Delay, s/veh 30.9 32.2 12.4 11.7
Approach LOS C C B B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.0 46.3 10.0 15.8 8.2 46.1 10.0 15.8
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 28.0 6.0 19.0 9.0 26.0 6.0 19.0
Max Q Clear Time (g_c+I1), s 4.3 11.2 7.0 7.5 4.4 13.6 6.5 9.0
Green Ext Time (p_c), s 0.1 6.0 0.0 0.8 0.1 5.2 0.0 0.8
Intersection Summary
HCM 2010 Ctrl Delay 16.9
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Recent PM
3: College Avenue & Willox Lane
3/31/2016 Timing Report, Sorted By Phase
recent pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 34 10 25 13 32 10 25
Maximum Split (%) 13.8% 42.5% 12.5% 31.3% 16.3% 40.0% 12.5% 31.3%
Minimum Split (s) 9.5 30 9.5 25 9.5 30 9.5 25
Yellow Time (s) 3 4.5 3 3.5 3 4.5 3 3.5
All-Red Time (s) 1 1.5 1 2.5 1 1.5 1 2.5
Minimum Initial (s) 4 10 4 7 4 10 4 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 57.5 68.5 22.5 32.5 57.5 70.5 22.5 32.5
End Time (s) 68.5 22.5 32.5 57.5 70.5 22.5 32.5 57.5
Yield/Force Off (s) 64.5 16.5 28.5 51.5 66.5 16.5 28.5 51.5
Yield/Force Off 170(s) 64.5 4.5 28.5 51.5 66.5 4.5 28.5 51.5
Local Start Time (s) 41 52 6 16 41 54 6 16
Local Yield (s) 48 0 12 35 50 0 12 35
Local Yield 170(s) 48 68 12 35 50 68 12 35
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 16.5 (21%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: College Avenue & Willox Lane
HCM 2010 TWSC Recent AM
6: College Avenue & Driveway
4/8/2016 HCM 2010 TWSC
recent am.syn
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Traffic Vol, veh/h 0 6 0 473 926 4
Future Vol, veh/h 0 6 0 473 926 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 7 0 526 1029 4
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1294 517 1033 0 - 0
Stage 1 1031 - - - - -
Stage 2 263 - - - - -
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 154 503 668 - - -
Stage 1 305 - - - - -
Stage 2 757 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 154 503 668 - - -
Mov Cap-2 Maneuver 154 - - - - -
Stage 1 305 - - - - -
Stage 2 757 - - - - -
Approach EB NB SB
HCM Control Delay, s 12.3 0 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 668 - 503 - -
HCM Lane V/C Ratio - - 0.013 - -
HCM Control Delay (s) 0 - 12.3 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0 - -
Lanes and Geometrics Recent AM
6: College Avenue & Driveway
4/8/2016 Lanes and Geometrics
recent am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 100 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95
Ped Bike Factor
Frt 0.865 0.999
Flt Protected
Satd. Flow (prot) 0 1611 0 3539 3536 0
Flt Permitted
Satd. Flow (perm) 0 1611 0 3539 3536 0
Link Speed (mph) 30 30 30
Link Distance (ft) 243 458 451
Travel Time (s) 5.5 10.4 10.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
6: College Avenue & Driveway
4/8/2016 HCM 2010 TWSC
recent pm.syn
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Traffic Vol, veh/h 0 15 0 1055 855 13
Future Vol, veh/h 0 15 0 1055 855 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 16 0 1134 919 14
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1493 467 933 0 - 0
Stage 1 926 - - - - -
Stage 2 567 - - - - -
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 114 542 729 - - -
Stage 1 346 - - - - -
Stage 2 531 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 114 542 729 - - -
Mov Cap-2 Maneuver 114 - - - - -
Stage 1 346 - - - - -
Stage 2 531 - - - - -
Approach EB NB SB
HCM Control Delay, s 11.8 0 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 729 - 542 - -
HCM Lane V/C Ratio - - 0.03 - -
HCM Control Delay (s) 0 - 11.8 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
Lanes and Geometrics Short Bkgrd PM
6: College Avenue & Driveway
4/8/2016 Lanes and Geometrics
recent pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 100 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95
Ped Bike Factor
Frt 0.865 0.998
Flt Protected
Satd. Flow (prot) 0 1611 0 3539 3532 0
Flt Permitted
Satd. Flow (perm) 0 1611 0 3539 3532 0
Link Speed (mph) 30 30 30
Link Distance (ft) 243 458 451
Travel Time (s) 5.5 10.4 10.3
Intersection Summary
Area Type: Other
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Intersection type
Land Use (from structure plan)
Commercial
corridors
Other corridors within:
Mixed use
districts
Low density
mixed use
residential
All other
areas
Signalized intersections
(overall)
D E* D D
Any Leg E E D E
Any Movement E E D E
Stop sign control
(arterial/arterial,
arterial/collector or local-
any approach leg)
N/A F** F** E
Stop sign control
(collector/local--any
approach leg)
N/A C C C
* mitigating measures required
** considered normal in an urban environment
APPENDIX D
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
3: College Avenue & Willox Lane
3/31/2016 HCM 2010 Signalized Intersection Summary
sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 72 96 119 80 70 72 55 380 62 104 785 100
Future Volume (veh/h) 72 96 119 80 70 72 55 380 62 104 785 100
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1937
Adj Flow Rate, veh/h 81 108 0 90 79 0 62 427 0 117 882 31
Adj No. of Lanes 111111121121
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 295 186 158 276 196 167 445 2006 897 683 2045 951
Arrive On Green 0.07 0.10 0.00 0.07 0.11 0.00 0.05 0.57 0.00 0.06 0.58 0.58
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3539 1583 1774 3539 1647
Grp Volume(v), veh/h 81 108 0 90 79 0 62 427 0 117 882 31
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1770 1583 1774 1770 1647
Q Serve(g_s), s 3.2 4.4 0.0 3.5 3.2 0.0 1.1 4.8 0.0 2.1 11.2 0.6
Cycle Q Clear(g_c), s 3.2 4.4 0.0 3.5 3.2 0.0 1.1 4.8 0.0 2.1 11.2 0.6
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 295 186 158 276 196 167 445 2006 897 683 2045 951
V/C Ratio(X) 0.27 0.58 0.00 0.33 0.40 0.00 0.14 0.21 0.00 0.17 0.43 0.03
Avail Cap(c_a), veh/h 354 466 396 324 466 396 534 2006 897 753 2045 951
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.2 34.4 0.0 29.0 33.4 0.0 6.8 8.5 0.0 6.1 9.5 7.3
Incr Delay (d2), s/veh 0.5 2.9 0.0 0.7 1.3 0.0 0.1 0.2 0.0 0.1 0.7 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.6 2.4 0.0 1.8 1.7 0.0 0.6 2.4 0.0 1.0 5.6 0.3
LnGrp Delay(d),s/veh 29.7 37.3 0.0 29.7 34.7 0.0 7.0 8.8 0.0 6.2 10.2 7.3
LnGrp LOS C D C C A A A B A
Approach Vol, veh/h 189 169 489 1030
Approach Delay, s/veh 34.0 32.0 8.6 9.6
Approach LOS C C A A
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 7.0 51.2 8.8 13.0 7.9 50.3 8.4 13.4
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 27.0 7.0 19.0 7.0 27.0 7.0 19.0
Max Q Clear Time (g_c+I1), s 3.1 13.2 5.5 6.4 4.1 6.8 5.2 5.2
Green Ext Time (p_c), s 0.0 4.7 0.0 0.4 0.1 5.4 0.0 0.4
Intersection Summary
HCM 2010 Ctrl Delay 13.8
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Bkgrd AM
3: College Avenue & Willox Lane
3/31/2016 Timing Report, Sorted By Phase
sb am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 33 11 25 11 33 11 25
Maximum Split (%) 13.8% 41.3% 13.8% 31.3% 13.8% 41.3% 13.8% 31.3%
Minimum Split (s) 9.5 30 9.5 25 9.5 30 9.5 25
Yellow Time (s) 3 4.5 3 3.5 3 4.5 3 3.5
All-Red Time (s) 1 1.5 1 2.5 1 1.5 1 2.5
Minimum Initial (s) 4 10 4 7 4 10 4 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 58.5 69.5 22.5 33.5 58.5 69.5 22.5 33.5
End Time (s) 69.5 22.5 33.5 58.5 69.5 22.5 33.5 58.5
Yield/Force Off (s) 65.5 16.5 29.5 52.5 65.5 16.5 29.5 52.5
Yield/Force Off 170(s) 65.5 4.5 29.5 52.5 65.5 4.5 29.5 52.5
Local Start Time (s) 42 53 6 17 42 53 6 17
Local Yield (s) 49 0 13 36 49 0 13 36
Local Yield 170(s) 49 68 13 36 49 68 13 36
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 16.5 (21%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: College Avenue & Willox Lane
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
3: College Avenue & Willox Lane
3/31/2016 HCM 2010 Signalized Intersection Summary
sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 117 134 90 130 166 250 108 791 156 115 662 70
Future Volume (veh/h) 117 134 90 130 166 250 108 791 156 115 662 70
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1937
Adj Flow Rate, veh/h 126 144 0 140 178 38 116 851 69 124 712 0
Adj No. of Lanes 111111121121
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 301 258 220 328 258 220 487 1793 802 421 1804 839
Arrive On Green 0.09 0.14 0.00 0.09 0.14 0.14 0.06 0.51 0.51 0.07 0.51 0.00
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3539 1583 1774 3539 1647
Grp Volume(v), veh/h 126 144 0 140 178 38 116 851 69 124 712 0
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1770 1583 1774 1770 1647
Q Serve(g_s), s 4.7 5.8 0.0 5.3 7.3 1.7 2.4 12.5 1.8 2.6 9.9 0.0
Cycle Q Clear(g_c), s 4.7 5.8 0.0 5.3 7.3 1.7 2.4 12.5 1.8 2.6 9.9 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 301 258 220 328 258 220 487 1793 802 421 1804 839
V/C Ratio(X) 0.42 0.56 0.00 0.43 0.69 0.17 0.24 0.47 0.09 0.29 0.39 0.00
Avail Cap(c_a), veh/h 301 466 396 328 466 396 551 1793 802 524 1804 839
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 26.1 32.2 0.0 26.2 32.8 30.4 8.6 12.8 10.2 9.0 12.0 0.0
Incr Delay (d2), s/veh 0.9 1.9 0.0 0.9 3.3 0.4 0.2 0.9 0.2 0.4 0.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.4 3.1 0.0 2.6 4.0 0.8 1.2 6.3 0.8 1.3 4.9 0.0
LnGrp Delay(d),s/veh 27.1 34.0 0.0 27.1 36.1 30.8 8.8 13.7 10.4 9.4 12.7 0.0
LnGrp LOS C C C D C ABBAB
Approach Vol, veh/h 270 356 1036 836
Approach Delay, s/veh 30.8 32.0 13.0 12.2
Approach LOS C C B B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.1 45.8 10.0 16.1 8.4 45.5 10.0 16.1
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 28.0 6.0 19.0 9.0 26.0 6.0 19.0
Max Q Clear Time (g_c+I1), s 4.4 11.9 7.3 7.8 4.6 14.5 6.7 9.3
Green Ext Time (p_c), s 0.1 6.2 0.0 0.9 0.1 5.3 0.0 0.8
Intersection Summary
HCM 2010 Ctrl Delay 17.3
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Bkgrd PM
3: College Avenue & Willox Lane
3/31/2016 Timing Report, Sorted By Phase
sb pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 34 10 25 13 32 10 25
Maximum Split (%) 13.8% 42.5% 12.5% 31.3% 16.3% 40.0% 12.5% 31.3%
Minimum Split (s) 9.5 30 9.5 25 9.5 30 9.5 25
Yellow Time (s) 3 4.5 3 3.5 3 4.5 3 3.5
All-Red Time (s) 1 1.5 1 2.5 1 1.5 1 2.5
Minimum Initial (s) 4 10 4 7 4 10 4 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 57.5 68.5 22.5 32.5 57.5 70.5 22.5 32.5
End Time (s) 68.5 22.5 32.5 57.5 70.5 22.5 32.5 57.5
Yield/Force Off (s) 64.5 16.5 28.5 51.5 66.5 16.5 28.5 51.5
Yield/Force Off 170(s) 64.5 4.5 28.5 51.5 66.5 4.5 28.5 51.5
Local Start Time (s) 41 52 6 16 41 54 6 16
Local Yield (s) 48 0 12 35 50 0 12 35
Local Yield 170(s) 48 68 12 35 50 68 12 35
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 16.5 (21%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: College Avenue & Willox Lane
HCM 2010 TWSC Short Bkgrd AM
6: College Avenue & Driveway
3/31/2016 HCM 2010 TWSC
sb am.syn
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Traffic Vol, veh/h 0 6 0 497 972 4
Future Vol, veh/h 0 6 0 497 972 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 7 0 552 1080 4
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1358 542 1084 0 - 0
Stage 1 1082 - - - - -
Stage 2 276 - - - - -
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 140 485 639 - - -
Stage 1 287 - - - - -
Stage 2 746 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 140 485 639 - - -
Mov Cap-2 Maneuver 140 - - - - -
Stage 1 287 - - - - -
Stage 2 746 - - - - -
Approach EB NB SB
HCM Control Delay, s 12.5 0 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 639 - 485 - -
HCM Lane V/C Ratio - - 0.014 - -
HCM Control Delay (s) 0 - 12.5 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0 - -
Lanes and Geometrics Short Bkgrd AM
6: College Avenue & Driveway
3/31/2016 Lanes and Geometrics
sb am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 100 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95
Ped Bike Factor
Frt 0.865 0.999
Flt Protected
Satd. Flow (prot) 0 1611 0 3539 3536 0
Flt Permitted
Satd. Flow (perm) 0 1611 0 3539 3536 0
Link Speed (mph) 30 30 30
Link Distance (ft) 243 458 451
Travel Time (s) 5.5 10.4 10.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
6: College Avenue & Driveway
3/31/2016 HCM 2010 TWSC
sb pm.syn
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Traffic Vol, veh/h 0 15 0 1055 855 13
Future Vol, veh/h 0 15 0 1055 855 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 16 0 1134 919 14
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1493 467 933 0 - 0
Stage 1 926 - - - - -
Stage 2 567 - - - - -
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 114 542 729 - - -
Stage 1 346 - - - - -
Stage 2 531 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 114 542 729 - - -
Mov Cap-2 Maneuver 114 - - - - -
Stage 1 346 - - - - -
Stage 2 531 - - - - -
Approach EB NB SB
HCM Control Delay, s 11.8 0 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 729 - 542 - -
HCM Lane V/C Ratio - - 0.03 - -
HCM Control Delay (s) 0 - 11.8 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
Lanes and Geometrics Short Bkgrd PM
6: College Avenue & Driveway
3/31/2016 Lanes and Geometrics
sb pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 100 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95
Ped Bike Factor
Frt 0.865 0.998
Flt Protected
Satd. Flow (prot) 0 1611 0 3539 3532 0
Flt Permitted
Satd. Flow (perm) 0 1611 0 3539 3532 0
Link Speed (mph) 30 30 30
Link Distance (ft) 243 458 451
Travel Time (s) 5.5 10.4 10.3
Intersection Summary
Area Type: Other
APPENDIX E
HCM 2010 Signalized Intersection Summary Short Total AM
3: College Avenue & Willox Lane
3/31/2016 HCM 2010 Signalized Intersection Summary
st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 72 96 122 86 70 72 98 385 68 104 791 100
Future Volume (veh/h) 72 96 122 86 70 72 98 385 68 104 791 100
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1937
Adj Flow Rate, veh/h 81 108 0 97 79 0 110 433 0 117 889 28
Adj No. of Lanes 111111121121
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Percent Heavy Veh, % 222222222222
Cap, veh/h 301 186 158 283 205 174 448 1990 890 675 1997 929
Arrive On Green 0.07 0.10 0.00 0.08 0.11 0.00 0.06 0.56 0.00 0.06 0.56 0.56
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3539 1583 1774 3539 1647
Grp Volume(v), veh/h 81 108 0 97 79 0 110 433 0 117 889 28
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1770 1583 1774 1770 1647
Q Serve(g_s), s 3.2 4.4 0.0 3.8 3.2 0.0 2.0 4.9 0.0 2.1 11.7 0.6
Cycle Q Clear(g_c), s 3.2 4.4 0.0 3.8 3.2 0.0 2.0 4.9 0.0 2.1 11.7 0.6
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 301 186 158 283 205 174 448 1990 890 675 1997 929
V/C Ratio(X) 0.27 0.58 0.00 0.34 0.39 0.00 0.25 0.22 0.00 0.17 0.45 0.03
Avail Cap(c_a), veh/h 360 466 396 324 466 396 521 1990 890 744 1997 929
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.1 34.4 0.0 28.8 33.1 0.0 7.1 8.7 0.0 6.2 10.1 7.7
Incr Delay (d2), s/veh 0.5 2.9 0.0 0.7 1.2 0.0 0.3 0.3 0.0 0.1 0.7 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.6 2.4 0.0 1.9 1.7 0.0 1.0 2.4 0.0 1.0 5.9 0.3
LnGrp Delay(d),s/veh 29.6 37.3 0.0 29.5 34.3 0.0 7.4 9.0 0.0 6.4 10.9 7.8
LnGrp LOS C D C C A A A B A
Approach Vol, veh/h 189 176 543 1034
Approach Delay, s/veh 34.0 31.7 8.7 10.3
Approach LOS C C A B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 7.7 50.1 9.2 13.0 7.9 50.0 8.4 13.8
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 27.0 7.0 19.0 7.0 27.0 7.0 19.0
Max Q Clear Time (g_c+I1), s 4.0 13.7 5.8 6.4 4.1 6.9 5.2 5.2
Green Ext Time (p_c), s 0.1 4.7 0.0 0.4 0.1 5.5 0.0 0.4
Intersection Summary
HCM 2010 Ctrl Delay 14.1
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Total AM
3: College Avenue & Willox Lane
3/31/2016 Timing Report, Sorted By Phase
st am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 33 11 25 11 33 11 25
Maximum Split (%) 13.8% 41.3% 13.8% 31.3% 13.8% 41.3% 13.8% 31.3%
Minimum Split (s) 9.5 30 9.5 25 9.5 30 9.5 25
Yellow Time (s) 3 4.5 3 3.5 3 4.5 3 3.5
All-Red Time (s) 1 1.5 1 2.5 1 1.5 1 2.5
Minimum Initial (s) 4 10 4 7 4 10 4 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 58.5 69.5 22.5 33.5 58.5 69.5 22.5 33.5
End Time (s) 69.5 22.5 33.5 58.5 69.5 22.5 33.5 58.5
Yield/Force Off (s) 65.5 16.5 29.5 52.5 65.5 16.5 29.5 52.5
Yield/Force Off 170(s) 65.5 4.5 29.5 52.5 65.5 4.5 29.5 52.5
Local Start Time (s) 42 53 6 17 42 53 6 17
Local Yield (s) 49 0 13 36 49 0 13 36
Local Yield 170(s) 49 68 13 36 49 68 13 36
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 16.5 (21%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: College Avenue & Willox Lane
HCM 2010 Signalized Intersection Summary Short Total PM
3: College Avenue & Willox Lane
3/31/2016 HCM 2010 Signalized Intersection Summary
st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 117 134 92 135 166 250 132 795 160 115 667 70
Future Volume (veh/h) 117 134 92 135 166 250 132 795 160 115 667 70
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1937
Adj Flow Rate, veh/h 126 144 0 145 178 38 142 855 70 124 717 0
Adj No. of Lanes 111111121121
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222222222
Cap, veh/h 301 258 220 328 258 220 493 1791 801 420 1773 825
Arrive On Green 0.09 0.14 0.00 0.09 0.14 0.14 0.07 0.51 0.51 0.07 0.50 0.00
Sat Flow, veh/h 1774 1863 1583 1774 1863 1583 1774 3539 1583 1774 3539 1647
Grp Volume(v), veh/h 126 144 0 145 178 38 142 855 70 124 717 0
Grp Sat Flow(s),veh/h/ln 1774 1863 1583 1774 1863 1583 1774 1770 1583 1774 1770 1647
Q Serve(g_s), s 4.7 5.8 0.0 5.5 7.3 1.7 3.0 12.6 1.8 2.6 10.1 0.0
Cycle Q Clear(g_c), s 4.7 5.8 0.0 5.5 7.3 1.7 3.0 12.6 1.8 2.6 10.1 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 301 258 220 328 258 220 493 1791 801 420 1773 825
V/C Ratio(X) 0.42 0.56 0.00 0.44 0.69 0.17 0.29 0.48 0.09 0.30 0.40 0.00
Avail Cap(c_a), veh/h 301 466 396 328 466 396 541 1791 801 522 1773 825
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 26.1 32.2 0.0 26.3 32.8 30.4 8.7 12.9 10.2 9.2 12.5 0.0
Incr Delay (d2), s/veh 0.9 1.9 0.0 0.9 3.3 0.4 0.3 0.9 0.2 0.4 0.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.4 3.1 0.0 2.7 4.0 0.8 1.5 6.3 0.8 1.3 5.0 0.0
LnGrp Delay(d),s/veh 27.1 34.0 0.0 27.3 36.1 30.8 9.0 13.8 10.4 9.6 13.2 0.0
LnGrp LOS C C C D C ABBAB
Approach Vol, veh/h 270 361 1067 841
Approach Delay, s/veh 30.8 32.0 12.9 12.6
Approach LOS C C B B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.8 45.1 10.0 16.1 8.4 45.5 10.0 16.1
Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0
Max Green Setting (Gmax), s 7.0 28.0 6.0 19.0 9.0 26.0 6.0 19.0
Max Q Clear Time (g_c+I1), s 5.0 12.1 7.5 7.8 4.6 14.6 6.7 9.3
Green Ext Time (p_c), s 0.1 6.2 0.0 0.9 0.1 5.3 0.0 0.8
Intersection Summary
HCM 2010 Ctrl Delay 17.4
HCM 2010 LOS B
Notes
Timing Report, Sorted By Phase Short Total PM
3: College Avenue & Willox Lane
3/31/2016 Timing Report, Sorted By Phase
st pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 11 34 10 25 13 32 10 25
Maximum Split (%) 13.8% 42.5% 12.5% 31.3% 16.3% 40.0% 12.5% 31.3%
Minimum Split (s) 9.5 30 9.5 25 9.5 30 9.5 25
Yellow Time (s) 3 4.5 3 3.5 3 4.5 3 3.5
All-Red Time (s) 1 1.5 1 2.5 1 1.5 1 2.5
Minimum Initial (s) 4 10 4 7 4 10 4 7
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 57.5 68.5 22.5 32.5 57.5 70.5 22.5 32.5
End Time (s) 68.5 22.5 32.5 57.5 70.5 22.5 32.5 57.5
Yield/Force Off (s) 64.5 16.5 28.5 51.5 66.5 16.5 28.5 51.5
Yield/Force Off 170(s) 64.5 4.5 28.5 51.5 66.5 4.5 28.5 51.5
Local Start Time (s) 41 52 6 16 41 54 6 16
Local Yield (s) 48 0 12 35 50 0 12 35
Local Yield 170(s) 48 68 12 35 50 68 12 35
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 16.5 (21%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 3: College Avenue & Willox Lane
HCM 2010 TWSC Short Total AM
6: College Avenue & Site Access
4/8/2016 HCM 2010 TWSC
st am.syn
Intersection
Int Delay, s/veh 0.5
Movement EBL EBR NBL NBT SBT SBR
Traffic Vol, veh/h 0 61 0 551 954 77
Future Vol, veh/h 0 61 0 551 954 77
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 100
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 68 0 612 1060 86
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1366 530 1060 0 - 0
Stage 1 1060 - - - - -
Stage 2 306 - - - - -
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 138 493 653 - - -
Stage 1 294 - - - - -
Stage 2 720 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 138 493 653 - - -
Mov Cap-2 Maneuver 138 - - - - -
Stage 1 294 - - - - -
Stage 2 720 - - - - -
Approach EB NB SB
HCM Control Delay, s 13.5 0 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 653 - 493 - -
HCM Lane V/C Ratio - - 0.137 - -
HCM Control Delay (s) 0 - 13.5 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.5 - -
Lanes and Geometrics Short Total AM
6: College Avenue & Site Access
4/8/2016 Lanes and Geometrics
st am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 100 100
Storage Lanes 0 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00
Ped Bike Factor
Frt 0.865 0.850
Flt Protected
Satd. Flow (prot) 0 1611 0 3539 3539 1583
Flt Permitted
Satd. Flow (perm) 0 1611 0 3539 3539 1583
Link Speed (mph) 30 30 30
Link Distance (ft) 243 458 451
Travel Time (s) 5.5 10.4 10.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
6: College Avenue & Driveway
4/8/2016 HCM 2010 TWSC
st pm.syn
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Traffic Vol, veh/h 0 54 0 1087 846 56
Future Vol, veh/h 0 54 0 1087 846 56
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 93 93 93 93 93 93
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 58 0 1169 910 60
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1494 455 910 0 - 0
Stage 1 910 - - - - -
Stage 2 584 - - - - -
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 114 552 744 - - -
Stage 1 353 - - - - -
Stage 2 521 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 114 552 744 - - -
Mov Cap-2 Maneuver 114 - - - - -
Stage 1 353 - - - - -
Stage 2 521 - - - - -
Approach EB NB SB
HCM Control Delay, s 12.3 0 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 744 - 552 - -
HCM Lane V/C Ratio - - 0.105 - -
HCM Control Delay (s) 0 - 12.3 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.4 - -
Lanes and Geometrics Short Total PM
6: College Avenue & Driveway
4/8/2016 Lanes and Geometrics
st pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 100 0
Storage Lanes 0 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00
Ped Bike Factor
Frt 0.865 0.850
Flt Protected
Satd. Flow (prot) 0 1611 0 3539 3539 1583
Flt Permitted
Satd. Flow (perm) 0 1611 0 3539 3539 1583
Link Speed (mph) 30 30 30
Link Distance (ft) 243 458 451
Travel Time (s) 5.5 10.4 10.3
Intersection Summary
Area Type: Other
APPENDIX F
Willox
College
SCALE: 1"=600'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
1603 & 1605 N. College TIS, April 2016
Pedestrian LOS Worksheet
Project Location Classification: Activity Center
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Commercial area to the
north of the site Commercial
Minimum B B C B B
1 Actual A B B B A
Proposed A B B B A
Commercial area to the
east and northeast of
the site
Commercial
Minimum B B C B B
2 Actual A B C B A
Proposed A B C B A
Commercial areas to
the south of the site Commercial
Minimum B B C B B
3 Actual A B A B A
Proposed A B A B A
Residential
neighborhood to the
west of the site
Residential
Minimum B B C B B
4 Actual A E A D B
Proposed A E A D B
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Willox
College
SCALE: 1"=600'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
1603 & 1605 N. College TIS, April 2016
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Commercial area to the
1 north of the site Commercial C B A
Commercial area to the
east and northeast of
the site
2 Commercial C B B
Commercial areas to
3 the south of the site Commercial C B A
4