February 12, 2016
Ken Bradtke
Atlas Tower Holdings, LLC
4450 Arapahoe Ave. Suite 100
Boulder, CO 80303
RE: Alta Vista (903 Buckingham St) Wireless Telecommunication Facility, PDP160004, Round Number
1
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: General
02/09/2016: Will the proposed paint color match the color shown in the rendering?
Please provide staff with a color sample for the silo color.
Comment Number: 1 Comment Originated: 02/09/2016
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
02/08/2016: Please include grading/drainage/erosion control/construction details
with this submittal (as a utility set with cover sheet, notes, signature block, etc.), or
amend the approved FDP to include the wireless telecommunications facility.
Comment Number: 1 Comment Originated: 02/08/2016
02/08/2016: If this submittal is approved in place of the Colorado Iron and Metal
FDP, rather than as an amendment to it, public improvements (curb and gutter) will
need to go in with this project.
Comment Number: 2 Comment Originated: 02/08/2016
02/08/2016: The access and utility easement will need to be dedicated by separate
document. More information on that process can be found here:
http://www.fcgov.com/engineering/pdf/Easrowdedications2010.pdf
Comment Number: 3 Comment Originated: 02/08/2016
Department: Environmental Planning
Contact: Kelly Kimple, 970-416-2401, kkimple@fcgov.com
Topic: General
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at
970-224-6045 or cfrickey@fcgov.com.
Page 1 of 5
02/10/2016: Would like to see the landscape plans, when available.
Comment Number: 1 Comment Originated: 02/10/2016
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
02/11/2016:
Tower must meet the adopted 100B mph nominal wind load.
Comment Number: 1 Comment Originated: 02/11/2016
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
02/10/2016: c.) Contact Light and Power Engineering to coordinate the
transformer and electric meter locations. Please show these locations on the utility
plans. Transformers need to have an 8’ frontal and 3’ side/rear clearance. It also
has to be 10’ within a drivable surface and cannot be located under the drip zone of
any trees. Please reference our Electric Construction, Policies Practices &
Procedures to ensure requirements and policies are met.
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 1 Comment Originated: 02/10/2016
02/10/2016: kVA and system modification charges will apply.
Comment Number: 2 Comment Originated: 02/10/2016
02/10/2016: Utility easement will need to be dedicated between Alta Vista and
landowner for electrical infrastructure to include primary lines and transformer
Comment Number: 3 Comment Originated: 02/10/2016
02/10/2016: A completed commercial service form (C-1) and one-line diagram will
need to be filled out by engineer/electrician and provided to Light & Power in order to
determine billing and proper transformer sizing. A link to our C-1 form is below.
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 4 Comment Originated: 02/10/2016
02/10/2016: Compound Detail Plans show pad-mount transformer by VZW. If FCU
will not be providing utility transformer and VZW will be supplying the 13.2kV step
down transformer, then the site will have to be primary metered.
Comment Number: 5 Comment Originated: 02/10/2016
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Page 2 of 5
02/09/2016: FIRE LANES
Fire access is required to within 150' of all portions of the facility. An Emergency
Access Easement will be required to connect with the existing EAE already serving
the business facility to the north. Code language and fire lane specifications will
apply.
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the jurisdiction.
The fire apparatus access road shall comply with the requirements of this section
and shall extend to within 150 feet of all portions of the facility and all portions of the
exterior walls of the first story of the building as measured by an approved route
around the exterior of the building or facility.
FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to the
design criteria already contained in relevant standards and policies, any new fire
lane must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20' minimum unobstructed width & 14 foot minimum
overhead clearance (EAE dedicated at 20' width however the actual road width may
be reduced to 16' for this particular application.)
> Be designed as a flat, all-weather driving surface capable of supporting 40 tons.
Compacted road base is acceptable in this application.
> Dead-end fire access roads in excess of 150 feet in length shall be provided with
an approved area for turning around fire apparatus.
> The required turning radii of a fire apparatus access road shall be a minimum of
25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans.
> Be visible by painting and/or signage, and maintained unobstructed at all times.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D;
FCLUC 3.6.2(B)2006 and Local Amendments.
Comment Number: 1 Comment Originated: 02/09/2016
02/09/2016: PREMISE IDENTIFICATION
The telecommunications facility is required to be addressed separately. The
address is to be posted on the structure and/or access fence as well as at
Buckingham St. Code language provided below.
> IFC 505.1: New and existing buildings shall have approved address numbers,
building numbers or approved building identification placed in a position that is plainly
legible, visible from the street or road fronting the property, and posted with a
minimum of six-inch numerals on a contrasting background. Where access is by
means of a private road and the building cannot be viewed from the public way, a
monument, pole or other sign or means shall be used to identify the structure.
Comment Number: 2 Comment Originated: 02/09/2016
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Page 3 of 5
02/08/2016: There was discussion in the Conceptual Review Meeting for this
project that was related to the approved plans for this parcel for Colorado Iron and
Metal. I believe there were two options to move forward with site design that came
out of that discussion.
a. If the Wireless Telecommunication Facility is planned to be a part of that larger
development plan for Colorado Iron and Metal, then we will need to see those plans
with the appropriate revisions that show this telecommunications facility
incorporated. Grading and drainage information would need to be updated
accordingly.
b. If the Wireless Telecommunication Facility is planned to be built on its own and
the Colorado Iron and Metal plans are not going to move forward, then an entire new
set of construction plans for this project will be required. This would include grading,
drainage, erosion control plans as well as requirements set forth by the Engineering
Department.
Comment Number: 1 Comment Originated: 02/08/2016
02/08/2016: It looks like the plans show an increase in impervious ground cover of
at least 1000 square feet and as such a drainage report and construction plans
(grading, drainage, and erosion control plans) are required and must be prepared by
a Professional Engineer registered in the State of Colorado and in accordance with
the Fort Collins Stormwater Criteria Manual. New plans or updates to the Colorado
Iron and Metal plans will be required.
Comment Number: 2 Comment Originated: 02/08/2016
02/08/2016: Onsite detention is required for the runoff volume difference between
the 100-year developed flow rate and the 2-year historic release rate. In the Dry
Creek basin the 2-year historic release rate is 0.2 cfs/acre. A new drainage analysis
and report or updates to the existing drainage report for Colorado Iron and Metal will
be required.
Comment Number: 3 Comment Originated: 02/08/2016
02/08/2016: Fifty percent of the site runoff is required to be treated using the
standard water quality treatment as described in the Fort Collins Stormwater
Manual, Volume 3-Best Management Practices (BMPs).
(http://www.fcgov.com/utilities/business/builders-and-developers/development-form
s-guidelines-regulations/stormwater-criteria) Extended detention is the usual
method selected for water quality treatment; however the use of any of the BMPs is
encouraged.
Comment Number: 4 Comment Originated: 02/08/2016
02/08/2016: Low Impact Development (LID) requirements are required on all new or
redeveloping property which includes sites required to be brought into compliance
with the Land Use Code. These require a higher degree of water quality treatment
with one of the two following options:
a. 50% of the newly added or modified impervious area must be treated by LID
techniques and 25% of new paved areas must be pervious.
b. 75% of all newly added or modified impervious area must be treated by LID
techniques.
Comment Number: 5 Comment Originated: 02/08/2016
02/08/2016: Per Colorado Revised Statute §37-92-602 (8) effective August 5, 2015,
criteria regarding detention drain time will apply to this project. As part of the
drainage design, the engineer will be required to show compliance with this statute
using a standard spreadsheet (available on request) that will need to be included in
the drainage report. Upon completion of the project, the engineer will also be
required to upload the approved spreadsheet onto the Statewide Compliance Portal.
This will apply to any volume based stormwater storage, including extended
detention basins and bio-retention cells.
Comment Number: 6 Comment Originated: 02/08/2016
Page 4 of 5
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
02/09/2016: Please make changes to the legal description on sheets T-1 & C-1 as
marked. See redlines.
Comment Number: 1 Comment Originated: 02/09/2016
02/09/2016: Add dashes to the sheet numbers in the index, or remove the dashes
from the numbers on each sheet.
Comment Number: 2 Comment Originated: 02/09/2016
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
02/10/2016: The Silo needs to more clarification of the visual appearance. Needs to
look more like a silo.
Comment Number: 1 Comment Originated: 02/10/2016
Page 5 of 5