April 01, 2016
Deb Cook
5983 STAR VIEW DR
Broomfield, CO 80020
RE: 1026 Summer Street Extra Occupancy Rental House Conversion, BDR160009, Round
Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Meaghan Overton, at 970-416-2283 or moverton@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Meaghan Overton, 970-416-2283, moverton@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 03/31/2016
03/31/2016: Redlines are available at the Development Review Center.
Response: Redlines received
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 03/31/2016
03/31/2016: While not required, I encourage you to consider adding more
landscaping in the side yard along the west edge of the driveway. This will
help screen the parking from the pedestrian realm and minimize the impact of
the additional paved parking area.
Response: The west yard along the new driveway will be landscaped with
upright Chinese Junipers to screen the parking area.
Topic: Site Plan
Comment Number: 1 Comment Originated: 03/31/2016
03/31/2016: Please check the scale and measurements on the site plan.
Many of the measurements appear to be 1 foot or more off. See redlines on
site plan and comments from Technical Services for more information.
Response: The measurements have been rechecked on the Site Plan, and
field measurements were taken to verify that they are correct. Please make
sure your print is at full size to ensure a proper 1/8"=1'-0" scale.
Comment Number: 2 Comment Originated: 03/31/2016
03/31/2016: How many bike parking spaces will be provided? Please show
the detail of the number of bike parking spaces and what the bike rack will
look like.
Response: There will be five bike parking spaces, one space for each
bedroom. The bike rack has been labeled on the Site Plan and details for it
have been added to Sheet 2.
Comment Number: 3 Comment Originated: 03/31/2016
03/31/2016: The parking space for vehicle 4 appears to block the walkway to
the front door of the house. Please ensure that there is an unobstructed
walkway from Summer St. to the front door.
Response: The existing walkway from Summer St. to the front door will
remain as is, and be unobstructed by the new parking area.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/01/2016
04/01/2016: The property has Hollywood curb and gutter which does not
meet current ADA standards. The sidewalk will need to be widened (min
additional width allowed to be added is 4 feet) or will need to be replaced with
new curb, gutter, and sidewalk that has a 5.5 foot sidewalk width. Either
choice will need to meet current ADA criteria. The plans will need to label
and show which choice is planned. Appropriate details will need to be added
to the plans. All concrete work within the right-of-way is required to be
completed by a contractor licensed to do work within the right-of-way.
Response: An additional 4 feet of new sidewalk will be added to the
existing sidewalk, as shown on the Site Plan.
Comment Number: 2 Comment Originated: 04/01/2016
04/01/2016: The project is not showing installation of a driveway cut, but if
you desired to do so the maximum driveway curt for a residential property is
24 feet wide.
Response: No new driveway cut will be installed. The existing mountable
curb will continue to be used.
Comment Number: 3 Comment Originated: 04/01/2016
04/01/2016: A 9 foot utility easement will need to be dedicated along the
frontage of the property. Information on the EASEMENT DEDICATION
process for doing this can be found at:
http://www.fcgov.com/engineering/devrev.php
Response: A new 9 foot utility easement will be dedicated (4/6/16) as
shown on the Site Plan.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 03/31/2016
03/31/2016: Will there be any trees impacted other than the 2.0 inch caliper
Hackberry tree in the front yard? If other trees that are significant will be
impacted contact the City Forester for an on-site meeting to evaluate,
inventory and if need determine mitigation.
Response: No trees on the site will be impacted.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 03/23/2016
03/23/2016: I've noted the additional proposed parking area along with the
proposed grading - both are acceptable. Please notify me if any additional
site changes are proposed/required to discuss what, if any, requirements will
apply.
Response: Please see new parking design proposal on the Site Plan.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/21/2016
03/21/2016: No Comment from Erosion Control. This site; disturbs less than
10,000 sq. ft., is not in a sensitive area, and is not in a larger development
under construction. Therefore, no submittal of erosion control material is
needed at this time. However, the site still must be swept and maintained to
prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials
and other pollutants from entering the storm sewer at all times or BMPs will
be required of the site. If you need; clarification concerning the erosion control
section, the site does in fact disturb greater than 10,000 sq. ft., or if there are
any questions, please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Response: The site still will be swept and maintained to prevent dirt, saw
cuttings, concrete wash, trash & debris, landscape materials and other
pollutants from entering the storm sewer at all times
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 4 Comment Originated: 03/31/2016
03/31/2016: There are line over text issues. See redlines.
Response: The line over text redlines have been corrected.
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 03/31/2016
03/31/2016: No comments.
Topic: Site Plan
Comment Number: 1 Comment Originated: 03/31/2016
03/31/2016: Please correct the bearings & distances for the lot dimensions.
See redlines.
Response: Bearings and distances of the lot lines have been corrected.
Comment Number: 2 Comment Originated: 03/31/2016
03/31/2016: There are line over text issues. See redlines.
Response: The line over text redlines have been corrected.
Comment Number: 3 Comment Originated: 03/31/2016
03/31/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Response: Text has been masked in the hatched areas.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/31/2016
03/31/2016: The new vehicle spaces take up the sidewalk connection to the
entrance of the home. Need to maintain a sidewalk connection.
Response: The existing walkway from Summer St. to the front door will
remain as is, and be unobstructed by the new parking area.
Comment Number: 2 Comment Originated: 03/31/2016
03/31/2016: Where are the bike spaces?
Response: The bike rack is located in front of the house on the existing
driveway, as noted on the Site Plan.
Comment Number: 3 Comment Originated: 03/31/2016
03/31/2016: Is that sod on the south side of parking stall 3 and 4?
Response: There is sod to the south of parking stall 4, but it is reachable
by the new angled entry portion of the driveway, and the sod will not be
driven upon.