HomeMy WebLinkAboutCAPSTONE COTTAGES - FDP - FDP150046 - CORRESPONDENCE - REVISIONS (5)Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 fax
fcgov.com/developmentreview
March 30,, 2016
From: Linda Ripley
Daman Holland
RIPLEY DESIGN INC
419 Canyon Ave., Suite 200
Fort Collins, CO 80521
RE: Response to Comments for Capstone Cottages, FDP150046, Round Number 2
Please see the following summary of responses to City staff comments. If you have questions about any
comments, you may contact the following Team members.
Consultant Responses:
Ripley Design, Inc. (RDI).....
Northern Engineering (NE).....
Traffic Engineer (TE)....
Capstone (CA)....
Cedar Creek Associatiates (CC)....
Lighting Consultant (LC)....
Architect (A)....
Comment Summary:
Department: Planning Services
Contact: Pete Wray, 9702216754, pwray@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 01/12/2016
01/12/2016: Site Plan (all plans typ.) add back in interim oneway lane connection to 10th. Street
with sidewalk per Council direction?
Ripley Design, Inc. (RDI)
The oneway connection has been added back in.
Comment Number: 7 Comment Originated: 01/12/2016
01/12/2016: C303. Add transit stop pad and shelter facility.
Ripley Design, Inc. (RDI)
The transit stop pad is shown along Lincoln Avenue west of the roundabout.
No shelter is being provided. Emma Belmont did not require the developer to provide a shelter. Transfort
would provide that at a later date.
Comment Number: 9 Comment Originated: 01/12/2016
01/12/2016: Grading Plan between Maintenance building area and Tract D, show how drainage is
not being directed to property line on east side. A swale may be needed.
Northern Engineering (NE)
A swale has been added.
Page 1 of 23
Comment Number: 10 Comment Originated: 03/09/2016
03/09/2016: Utility Plans: show interim street connection to 10th Street on all sheets (C200, 300, 301,
305, 400, 401 etc.).
Northern Engineering (NE)
Interim connection has been readded to the plans.
Comment Number: 11 Comment Originated: 03/09/2016 03/09/2016: Utility Plan: Show transit stop
pads on both sides of Lincoln.
Northern Engineering (NE)
Transit stop pads are shown and labeled.
Comment Number: 12 Comment Originated: 03/11/2016 03/11/2016: Redlines are available for pic
up at front counter from Jeff.
Ripley Design, Inc. (RDI).....
Acknowledged
Comment Number: 13 Comment Originated: 03/11/2016
03/11/2016: Based on extent of comments from round two review, another round is needed. Please
coordinate with the front DRC office to coordinate a submittal appointment. I will provide a new routing
sheet for round 3.
Ripley Design, Inc. (RDI).....
Acknowledged
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 03/09/2016
03/09/2016: L6: Include boulder symbol in legend that is shown in medians.
Ripley Design, Inc. (RDI)
Done.
Comment Number: 7 Comment Originated: 03/09/2016
03/09/2016: L7: I am not sure what the 4 blank rectangles are in the median?
Ripley Design, Inc. (RDI)
These were contour designations. It has been fixed.
Comment Number: 8 Comment Originated: 03/09/2016
03/09/2016: L8: We need to confirm if the rain garden should be included in the south parkway area
adjacent to Buffalo Run Apartments in regards to ultimate maintenance.
Ripley Design, Inc. (RDI)
No rain garden is proposed at this location.
Topic: Site Plan
Comment Number: 1 Comment Originated: 03/08/2016
03/08/2016: SP 1: In Planning signature block, add CDNS "Director" in both locations.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 2 Comment Originated: 03/08/2016 03/08/2016: SP 1: General Notes #5, change
duplex to "twofamily".
Ripley Design, Inc. (RDI).....
Page 2 of 23
Done
Comment Number: 3 Comment Originated: 03/08/2016
03/08/2016: SP2: Add interim oneway street connection to 10th Street with sidewalk.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 4 Comment Originated: 03/08/2016
03/08/2016: SP2/SP3: Project approved for 201 units and plan now shows 202.
Ripley Design, Inc. (RDI).....
There was an error in the unit count before. The present unit count including the two units added over the
maintenance facility is 202.
Comment Number: 5 Comment Originated: 03/08/2016
03/08/2016: SP4: What is the symbol on Tract B?
Ripley Design, Inc. (RDI).....
The symbol indicates underground detention.
Comment Number: 9 Comment Originated: 03/09/2016
03/09/2016: Need to show transit stop pads and shelter area on all plans on both sides on Lincoln.
Ripley Design, Inc. (RDI).....
Done
Department: Engineering Development Review
Contact: Marc Virata, 9702216567, mvirata@fcgov.com
Topic:Construction Drawings
Comment Number: 110 Comment Originated: 01/13/2016
03/09/2016: Please Check sheets C511C515 for some of the legend discrepancies. Ideally if the
Wilson sheets can add sheet numbers on the legend, it would be easier to follow as well.
01/13/2016: In general, there are some discrepancies on sheet numbers listed in the index and the as
numbered. Also discrepancies exist on the legend map.
Northern Engineering (NE)
Keymap issues have been corrected.
Comment Number: 115 Comment Originated: 01/13/2016
03/09/2016: This looks to meet the cover now for the crossing at "International"/Duff. The crossing at
Webster is still short, but would appear to be under concrete. Is there a way to define the concrete limit on
C312 to provide more definitive proof that the shallow crossing here will be under concrete?
01/13/2016: Sheet ST1 shows the 48" RCP having less than the minimum cover needed across
Webster Avenue, with a depth of less than 2'. If the concern is maintaining the 18" from the water line,
perhaps twin pipes and/or and elliptical pipe can be explored to get additional cover from Webster.
Northern Engineering (NE)
A line showing the limits of concrete vs. asphalt is now shown and labeled on the storm plan.
Comment Number: 125 Comment Originated: 01/13/2016
03/09/2016: This area being underneath concrete still has very minimal cover and needs further
refinement. Either a realignment of the water line, or a lowering needs to occur.
01/13/2016: Sheet ST4's Storm Drain Line 33 has less than 2 feet of cover over the top of the
roadway and is about 1.5 feet at its shallowest. While this area appears to be a concrete roadway, I'm
concerned that at 1.5 feet, we may have depth concerns.
Page 3 of 23
Northern Engineering (NE)
Waterline lowering is now specified at crossing.
Comment Number: 130 Comment Originated: 01/13/2016
03/09/2016: This area being underneath asphalt and a foot of cover is problematic. Either a
realignment of the water line, or a lowering needs to occur.
01/13/2016: Sheet ST4's Storm Drain Line 5 has at its shallowest about 1 foot of cover over the top of
the roadway. I'm wondering if a waterline lowering should be explored here (and in other locations as it
pertains to some of the other shallow crossing noted above).
Northern Engineering (NE)
Waterline lowering is now specified at crossing.
Comment Number: 135 Comment Originated: 01/13/2016
03/09/2016: This will be brought up with Capital Projects for their verification/consideration.
01/13/2016: Sheet ST5's Future Storm Drain Line 7 appears to be situated to have less than the
minimum cover required (showing less than 2 feet), again due in part to maintaining 18" of clearance
from an existing water line.
Northern Engineering (NE)
Acknowledged
Comment Number: 140 Comment Originated: 01/13/2016
03/09/2016: The revised drawings appear to better address the issue and will be brought up with
Capital Projects as an FYI.
01/13/2016: Sheet ST5's Storm Drain Line 8 shows less than the minimum cover required, and in
general is the existing storm pipe that this line ties into, problematic with its elevation in relation to
Lemay Avenue? Existing ground is higher than proposed as depicted on the profile view, with a cut
occurring, though C502 shows a fill instead of a cut in this area. Is there a profile for this existing line
shown in relation to finished grade along Lemay Avenue? C502 should be depicting this pipe under
the roadway and illustrate whether the pipe itself is problematic with the ultimate Lemay
improvements.
Northern Engineering (NE)
Acknowledged.
Comment Number: 145 Comment Originated: 01/13/2016
03/09/2016: I'm understanding that part of the confusion on this water line is the potential that it will be
turned over from the City to Elco. Perhaps at staff review we can reengage on this discussion with City
water and decide if Elco needs to be brought into the discussion.
01/13/2016: In general, it appears that much of the previous comments pertain to conflicts with existing
water lines (and potentially an existing storm line as well). Given the reworking of Lincoln that will occur
with the project, and the reworking of Lemay in the future, presumably by the City, I would be curious to
understand whether some of the existing utility infrastructure should be modified and/or relocated,
since the corresponding roadways will have similar realignment, which could better allow compliance
with street standard cover requirements.
Northern Engineering (NE)
While the applicant cannot speak to the need to engage with ELCO, all comments regarding storm cover
have been addressed via waterline lowerings as discussed in the staff review meeting.
Comment Number: 180 Comment Originated: 01/13/2016
03/09/2016: Noticing that the response was to not provide a crossing with ped refuge at the north leg
of Webster and "International", I would perhaps want to chat about this further with other City
Transportation staff. I really suspect that the landscaping here will become a goat path for pedestrians
who would rather not cross at the roundabout with additional traffic, or further north without the benefit
of the median.
01/13/2016: On Sheet C516 a couple of thoughts regarding access ramps:
Page 4 of 23
● There's a ramp facing east on the south side of Cottage Drive and the minor arterial. I don't
believe this is needed, as there's a crossing and a receiving ramp along the north leg of
this intersection.
● The access ramps on the south side of the Duff Drive/minor arterial intersection don't
appear to align with each other across the minor arterial.
● I'm wondering if there's an opportunity and support for an access ramp on the north leg of
Webster Avenue/minor arterial intersection with a pedestrian refuge island midway through
the splitter island? Perhaps this crossing negate the need for a crossing at the north side of
the Cottage Drive/minor arterial intersection.
Northern Engineering (NE)
Per our discussion at staff review, the refuge will not be provided.
Comment Number: 185 Comment Originated: 01/13/2016
03/09/2016: The receiving ramp (without necessarily the sidewalk) should be built at the northeast
corner of Buckingham/realigned Lemay at this time. The response on the second ramp (midblock on
Webster) indicates it was eliminated, but the plans appear to still show it. It is expected that when an
access ramp is provided (as required) along an abutting public street, it is required that a receiving ramp
across the street is provided. Please ensure these are provided (again ramps only, not sidewalk) on the
north side of Webster to "receive" crossings from the south side.
01/13/2016: On Sheets C517 and C518 also pertaining to access ramps:
● Please ensure that at the southeast corner of the BuckinghamDuff/realigned Lemay
intersection that an access ramp is built heading north, with a receiving access ramp at the
northeast corner of this intersection. It would seem that this could be built in the ultimate
condition today within the limits of the curb and gutter section for BuckinghamDuff.
Northern Engineering (NE)
Per discussions with staff, no access ramps will be built at the Duff/Lemay intersection. Applicant is
aware that the southeast ramp cost will need to be escrowed along with the other future Lemay
improvements.
● The midblock receiving access ramp on the north side of BuckinghamDuff doesn't appear
to align with the access ramp/sidewalk on the south side.
Northern Engineering (NE)
The midblock ramp has been removed.
● The plans should indicate that the aforementioned receiving ramps along the north side of
BuckinghamDuff being built now. The sidewalk on the north side isn't required with this
project, (but can be built with this project) in its current iteration it is confusing to discern
what is being built along the north side.
Northern Engineering (NE)
As discussed with staff, the only ramps to be built with this project at located at the intersection of
Duff/Minor Arterial.
● Sheet C518 should be showing at least the receiving access ramps along the north side of
the BuckinghamDuff/minor arterial intersection. Sidewalk again along the north side isn't
required, but would be nice; what is to be built north of the curb and gutter along the north
side should be clarified.
Northern Engineering (NE)
These ramps have been added back into the plans.
Comment Number: 190 Comment Originated: 01/13/2016
03/09/2016: This response indicates this was revised accordingly, but I see no change to the profile
view.
01/13/2016: On the plan and profile sheets, please ensure that the profile lines use a heavier
lineweight for the 0 and 5 foot elevations, it's difficult to verify elevations without the variation of
lineweight at the major intervals.
Northern Engineering (NE)
Page 5 of 23
An example of how the final plan will print was provided to staff and we confirmed that the issue identified is
a result of the reprints not having the ability to provide distinction between finer linetypes. As discussed, our
final mylar plans will be printed inhouse and will not have the same issue.
Comment Number: 195 Comment Originated: 01/13/2016
03/09/2016: The response indicates concern with providing this information. I believe this should be
provided at least for the areas that are not abutting the development, it is helpful for areas such as the
north side of Duff for the next few comments below. It would also be helpful for the south side of
Lincoln on Wilson's set, as well as the north and south sides of Lincoln east of the development.
01/13/2016: On the plan and profile sheets, please ensure that existing and proposed contours are
shown and labeled in plan view.
Northern Engineering (NE)
Plans with contours shown have been provided to facilitate review only, however it is still the applicant’s
intention to remove the contours at final mylar.
Comment Number: 200 Comment Originated: 01/13/2016
03/09/2016: The response indicates the plans have been revised accordingly, but the information
was not provided (except for ultimate Lemay, which isn't to be built with this project).
01/13/2016: On the cross section sheets, please provide flowline elevations to cross check against the
specified cross slope and the plan and profile sheets.
Northern Engineering (NE)
Flowline elevation info is now provided, and double checked!
Comment Number: 205 Comment Originated: 01/13/2016
03/09/2016: The response indicates the grading has been revised to be within rightofway or within a
grading easement. Is a grading easement specifically being identified as the grading plans don't
appear to depict an easement. The grades within rightofway are not meeting at least a 4:1 slope
however and would need to be revised (which would likely then require the grading easement). The
cross section at 31+50 again shows the need for some sort of grading easement from the property
owner to the east.
01/13/2016: The cross sections for Duff Drive show grading past the platted rightofway for Duff
Drive along the north and would require an offsite grading easement. Note that the rightofway
from STA 27+50 on is not depicted for the north side as well as the south side east of the new
minor arterial. Offside grading easement might be needed for the south side of Duff Drive east of
this property.
Northern Engineering (NE)
The grading has been updated to be 4:1. The applicant is working to acquire an easement from the owner
to the north.
Comment Number: 210 Comment Originated: 01/13/2016
03/09/2016: Please see comment 700, looking to have the plat show the 15 foot utility easement also
as a grading easement.
01/13/2016: The ultimate Lemay Avenue design shows the need for offsite easement to construct
Lemay Avenue on the west side. This is just for reference to Engineering Capital for the future
construction.
Northern Engineering (NE)
The plat has been revised as requested.
Comment Number: 220 Comment Originated: 01/13/2016
03/09/2016: With the spot elevations not provided, some general concerns: On the west leg of
Duff and International (C516) along Duff, the flowline grades shown on the spot elevations do not
coincide with the plan and profile deisgn (grades of 5% and 20% when the plan and profile show
in the .5 to 2% range,) Flowline grades shown on International's spot elevations also do not match
the International flowline plan and profile (2.3% instead of .6%).
Along Lincoln in front of South Clubhouse Drive the grades within the flowine are at .3% below the .5%,
Page 6 of 23
similarly along International at Cottage Drive, flowline grades fall below .5%
There appear to be exceed of 2% cross slope for ADA at access ramps, such as crossing Webster
at International, also at Cottage Drive at International, and the midblock private drive at Duff Drive.
01/13/2016: Intersection spot elevations are needed for the public streets intersections in accordance
with Figure 727 and 728 of LCUASS.
Northern Engineering (NE)
Flowline grades and elevations are now fully coordinated with the intersection details.
Comment Number: 225 Comment Originated: 01/13/2016
03/09/2016: Please add a key map for the newly added sheets (C916 C922), and show a plan view as
well, I can't find where these are located as the station information doesn't coincide with the stationing
used overall in the plans (stationing generally has been from 32+00 to 43+00, but these sheets start at
around 111+50. In general these sheets by labelling as EOP Island Profiles may appear to be profiling
the "flowlines" from the center median, but I'm not seeing where left and right flowline profiles for the
roadways (in addition to the provided centerline profiles) are depicted.
01/13/2016: It appears that Sheets C911 through C914 is profiling the centerline. Please add flowline
plan and profiles as well. Ideally instead of profiling the centerline, there would be a flowline profile
against both "flowlines" of the center median.
Northern Engineering (NE)
The edge of pavement profiles have been updated to include plan views. After further discussion with the
city, the alignment location will remain at the edge of pavement and additional notes have been added to
clarify that they are at the edge of pavement and not flow line.
Comment Number: 230 Comment Originated: 01/13/2016
03/09/2016: Thanks for this information. Please also have proposed grading shown for the area east of
STA 42+93 to understand the extent of grading needed along the county portion of Lincoln.
01/13/2016: Similar to #195, please have sheets C911 through C914 show (and label) existing and
proposed contours. Sheets 915 and 916 should be showing this information as well with the indication
of elevations on the sheet.
Northern Engineering (NE)
Contours will be added for the eastern grading tie in.
Comment Number: 260 Comment Originated: 01/13/2016
03/09/2016: I'll look to get additional peer review of the joint pattern and may have followup
comments on this. From my limited perspective, it appears fine, I just perhaps wonder about the acute
angles being created north of the crosswalk along the Buffalo Run frontage.
01/13/2016: A concrete joint pattern and reinforcement detail is needed for the concrete used for the
roundabout and its approaches.
Northern Engineering (NE)
The joint on the north side of Buffalo runs western cross walk has been revised.
Comment Number: 265 Comment Originated: 01/13/2016
03/09/2016: Can the report "Lincoln & International Roundabout Design Criteria and Calculation
Package" please be signed and stamped as a document we can retain for the project?
01/13/2016: I'm presuming a report on the parameters used for the design of the roundabout will be
provided and further discussion will occur on the Thursday morning meeting. Turning templates for
emergency and WB50 vehicles should be provided in the report, and how does a WB67 track through
the intersection?
Northern Engineering (NE)
A stamped and signed calculation package has been sent to the city.
Comment Number: 280 Comment Originated: 01/13/2016
03/09/2016: Carried over to show to Capital for any comments or concerns. 01/13/2016: There are
some general concerns with the location of manholes in relation to the public streets, such as for
ultimate Lemay on C502 showing manoles in flowlines where the bikelane along Lemay would be, as
Page 7 of 23
well as against the median flowline. A manhole in the Lincoln flowline median is shown as well. We'll
want to ensure that manholes aren't located in bikelanes, and aren't in conflict with median flowlines,
either placed in the median, or in the middle of the adjacent travel lane.
Northern Engineering (NE).....
Comment Number: 201 Comment Originated: 03/09/2016
03/09/2016: Note that Sheet C518 is missing information on the cross sections.
Northern Engineering (NE)
The cross section info is now provided.
Comment Number: 206 Comment Originated: 03/09/2016
03/09/2016: On sheet C507, there's a concern with a grade break exceeding .4% from 4.79% to 2.75% and
4.22% to 2.75% in the flowlines of Duff east of "International". Additionally, the cross slopes at the access
ramps here would exceed 2% and not result in an ADA compliant crossing.
Northern Engineering (NE)
The plans have been updated to meet ADA cross slope requirements. Please note that the grade breaks in
question are the grade from the Minor Arterial edge of travel way to the PCR of the curb return, and do not
actually signify any actual design components.
Comment Number: 222 Comment Originated: 03/09/2016
03/09/2016: Please have the Wilson plans overlay the plat information on Sheet C908 through C911 in
order to provide verification that the rightofway dedications delineated on the plat coincide with the
road designs. I'd want to see the curve and line data along the rightofway, discerning existing and
proposed rightofway, as well as showing the intersecting lot lines.
Northern Engineering (NE)
The plans have been updated to remove duplicate line work at the ROW and the plans have been updated
to the show current Capstone development plan information.
Comment Number: 223 Comment Originated: 03/09/2016
03/09/2016: Related to the previous comment, this additional information will help provide further clarity
on the rightofway vacation that has been proposed. In looking at past submittals of the legal description
for this rightofway vacation, it's apparent that the area to be vacated has shrunk over time as the
roundabout design has been further refined. The 5/7/2014 legal had 3,578 square feet proposed for
vacation, the 12/9/2014 legal had 918 square feet, and now the 2/19/2016 legal has 601 square feet.
Seeing that area defined on Wilson's plans with the corresponding plat/rightofway/lot line information
provided in the previous comment will help finalize the approach on potential rightofway vacation, but
it's perhaps worth noting that the overall area has been reduced by a factor of almost 6 over time. I
would perhaps then question whether the 601 square feet at this point is worth pursuing a rightofway
vacation, since the area isn't buildable and would encompass a utility easement any way would the
time for two readings before Council prior to plat and plan recordings make the effort worth it?
Northern Engineering (NE)
The right of way vacation will no longer be requested.
Comment Number: 224 Comment Originated: 03/09/2016
03/09/2016: The removal plan sheets and road plan and profiles in Wilson's set provides existing
features to show how removals occur in proximity to existing conditions. Please have the existing
conditions also evident on the paving detail and signing and striping plan sheets.
Northern Engineering (NE)
The existing conditions have been added to the paving and signing striping sheets.
Comment Number: 226 Comment Originated: 03/09/2016
03/09/2016: Additional pavement removal is needed for the westbound Lincoln approach at the eastern
end of the tiein point into existing. The patching limits should expand further south to depict the patch
extending to at least half the lane line in the westbound movement.
Northern Engineering (NE)
Page 8 of 23
The patching limits have been revised to take the sawcut to the edge of the lane to allow for the demo of the
existing ELCO water line.
Comment Number: 227 Comment Originated: 03/09/2016
03/09/2016: The south side of eastbound Lincoln along the eastern limits of the work show that there
would be additional unused pavement width on the south side. I wonder if there's value in now having a
defined right turn lane created onto 12th Street, and would want to ensure that there's no confusing the
excess width as a second lane, parking lane, etc.
Northern Engineering (NE)
The EB striping has been revise to eliminate the reversing east of the median. The striping now has a flat
curve which reduces the EB right turn/bike lane.
Comment Number: 236 Comment Originated: 03/09/2016
03/09/2016: On C928 the sign on 1.14 I think we should discuss further, as I believe this would typically
be used to show a street name for the south leg of this roundabout, but in this case is the entrance to
Buffalo Run apartments. Minimizing unintended entering onto Buffalo Run should be considered.
Northern Engineering (NE)
The Buffaflo Run sign has been eliminated.
Comment Number: 241 Comment Originated: 03/09/2016
03/09/2016: The cross section sheets should show tying into existing on the south side at STA 40 and
40+50.
Northern Engineering (NE)
These details will be incorporated.
Comment Number: 242 Comment Originated: 03/09/2016
03/09/2016: STA 42+50, STA 43+00 and STA 43+50 should be showing the additional pavement
widening that's being proposed along the north side of Lincoln Avenue. There should be a 4 foot
recycled asphalt shoulder past the edge of pavement to help contain the new asphalt and provide
some shy distance for the bikelane edge. Behind the shoulder should be 4:1 grading to tie back into
existing.
Northern Engineering (NE)
These details will have been incorporated into the typical sections and cross sections
Comment Number: 228 Comment Originated: 03/09/2016
03/09/2016: In reference to #225, on needing left and right flowline profiles, please consider how
information on Sheet C915 coordinates with C508 for coordination of "International" road design
information. C508 shows centerline, left and right profiles, C915 provides a centerline profile. The
termination of the centerline on C508 is at STA 12+39.45, there's a matchline on C915 at 12+38.91,
where the plans don't seem to coincide. There isn't corresponding information on the Wilson set that I'm
able to find that shows how the left and right flowline profiles of Northern's on C508 are tied into. Can
the two sets show some overlap of each other's information to partially address this, in addition to
getting left/right profiles on Wilson's design? On C915 is the vertical curve grade using a 1% centerline
approach grade taken from C508?
Northern Engineering (NE)
The plans have coordinated the labels and design for the tie in.
Comment Number: 229 Comment Originated: 03/09/2016
03/09/2016: For the newly added sheets C916C922 referenced in Comment 225, there are vertical curve
lengths and corresponding K values that don't meet the requirements for the arterial roadway classification.
Perhaps that's okay though, upon getting further understanding where these areas are in relationship to a
plan view, correlating these locations with the centerline and left/right profile designs, etc. Need additional
information/clarification on these sheets.
Northern Engineering (NE)
Page 9 of 23
The K values approaching the roundabout are designed to a lower speed than the requirements for a the
standard arterial roadway classification due to the design speed differential. The sag curves are short sag
curves at the roundabout are short and do not limit headlight stopping sight distance through the lit
roundabout
Comment Number: 237 Comment Originated: 03/09/2016
03/09/2016: The additional phasing plan sheets are appreciated and I will coordinate additional review
with Engineering construction inspection folks for additional input.
I'm having a little difficulty in understanding how the phasing of the asphalt work will ultimately result in
asphalt seams that are in accordance with our patching standards of being on a lane line, or half way
into a lane, parallel and perpendicular to the lane of travel. Might there be a need to ultimately perform
a mill and new top lift to address this for the asphalt?
Northern Engineering (NE)
The plans will be clarified. I have assumed that the final lift of asphalt would be placed at night for a smooth
final lift for EB and WB. The plans will be clarified.
Comment Number: 241 Comment Originated: 03/09/2016
03/09/2016: The cross section sheets should show tying into existing on the south side at STA 40 and
40+50. Also, please look to specify the elevations at the left and right flowline of the cross sections
instead of the gutter edge, which will be reviewed in coordination with the left and right profiles
reference in #225.
Northern Engineering (NE)
After further discussion with the City, the roundabout plans will continue to label the gutter lil. Cross sections
at 40+00 and 40+50 have been revised.
Topic: General
Comment Number: 500 Comment Originated: 01/13/2016
03/09/2016: The placement of two trees at the southwest corner of the roundabout and perhaps 4
trees at the northwest corner of the roundabout appear to conflict with the low growth exhibit areas
specified on the Wilson roundabout design report. Please have the low growth areas from the report
specifically shown on the Landscape plan for coordination and verification on tree placement.
01/13/2016: A landscape plan for the medians pertaining to the roundabout (including approach
medians) is needed.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 510 Comment Originated: 01/13/2016
03/09/2016: The plans appear to have added with this round, a rain garden in rightofway at the
southwest leg of the roundabout. I'm understanding that this can go away is intended to do so.
01/13/2016: The placement of rain gardens within utility easements behind the rightofway does not
constitute Engineering approval for its placement, though the slope and material type immediately
behind the public street sidewalks need to be verified for being gradual, and not a "hole" or with rough
media behind the walk. I would question the implications on the integrity of the rain gardens being
maintained over time with any utility installation work occurring in the future within the general utility
easement.
Northern Engineering (NE)
The rain garden has been removed.
Comment Number: 525 Comment Originated: 01/13/2016
03/09/2016: I did find the detail for this on C706 of the civil, on sheet C200 please have the references
Page 10 of 23
refer to the detail.. I'm not sure I'm finding it being referenced on the site and landscape plans, but should
be added as well.
01/13/2016: Carrying forward a PDP comment as unresolved, looking to have "Being Private
Maintenance" informational signs at the entrances to the site off of the public streets. A detail should be
added to the civil detail sheets, and their locations referencing the detail should be shown on the
site/landscape and civil plans.
Northern Engineering (NE)
The reference to the detail on Sheet C706 has been added.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 530 Comment Originated: 03/09/2016
03/09/2016: We've received comments from the business property owners to the east (who have also
contacted Larimer County, being not in City limits) regarding construction buildout of the project. They
are looking to have the following occur with the construction of the project:
"A barrier installed at the ends of Webster and Duff (and Link if necessary) prohibiting vehicle and
pedestrian access through the FCBA subdivision. Perhaps a 4’ orange fence across that entire area
would work."
“No Construction Access”sign installed at Lincoln and Link."
The City is OK with their requests and would want to verify if the Developer is amenable to these items,
and their placing in the development agreement. Larimer County Engineering has indicated support of
the items listed above as well, and with the second item occurring outside City limits, they are OK with
the following input: "County is fine with a “No Construction Access”sign being installed at Lincoln and
Link, We would expect the Developer to install it. The sign should conform to MUTCD requirements and
mounting posts need to meet break away requirements. They should also be required to obtain utility
locates before installing the posts.
We would not require it to be on plans. But if City requires it to be on the plans, it is not necessary for
me to sign the sheet.
Any questions at the time of installation can be directed to Bill Gleiforst, Larimer County Traffic
Operations Manager at (970) 4985707.
There are no County permits required for the installation. "
Northern Engineering (NE)
Acknowledged.
Comment Number: 535 Comment Originated: 03/09/2016
03/09/2016: Seeing that work is occurring within the County's jurisdiction of Lincoln Avenue east of the
site, we should have Larimer County Engineering's signature on the cover page of the utility plan set,
and we can then look to have the sign noted in the previous comment added to the set.
Northern Engineering (NE)
The County signature block has been added to the cover sheet.
Comment Number: 540 Comment Originated: 03/09/2016
03/09/2016: At the last streetscape team meeting, it was brought up that perhaps the amount of
sidewalk added on the south side of Lincoln Avenue could be reduced and intend to operate more with
the existing sidewalk, to reduce the parallel sidewalk scenario. We'd like to brainstorm this further with
the design team as there could be some overall cost savings, while still trying to balance providing the
bike bypass needs around the roundabout.
Northern Engineering (NE)
Page 11 of 23
The sidewalk has been revised to keep all of the existing walk on the south side. The sidewalk now ties to
the existing west of the bike access ramp.
Comment Number: 545 Comment Originated: 03/09/2016
03/09/2016: At the last streetscape team meeting, it was brought up that Parks would want a pull out
into the median along Lincoln west of the roundabout in order to better maintain the median. This does
not appear to have been accounted for in the plans.
Northern Engineering (NE)
The striping at the east median has been updated to allow for maintenance access
Topic: Plat
Comment Number: 700 Comment Originated: 03/09/2016
03/09/2016: It was previously discussed of having the utility easement behind realigned Lemay on
Tract G also as a grading easement. This is reflect on the civil drawings but is not depicted on the plat.
Northern Engineering (NE)
The plat has been updated.
Department: Environmental Planning
Contact: Kelly Kimple, 9704162401, kkimple@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/11/2016
03/08/2016: On sheet L7.0 there is some text overlap in labeling the NHBZ. Please correct and also
remove the redundant "the buffer zone", which comes after "the Natural Habitat Buffer Zone". The
Natural Habitat Buffer Zone (NHBZ) will be referred to in the Development Agreement and will be used
for purposes of the DA, future inspections, and for evaluating the overall establishment of the wetland
and buffer; therefore, it should be labeled consistently and clearly on all plans.
01/11/2016: On all plans showing the mitigation wetland and associated buffer, please label more clearly
to indicate the entire upland area around the wetland is the NHBZ. A logical boundary would be the
graydashed existing stormdrain line. Please also provide a table of the area of the mitigation wetland, as
well as the buffer.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 2 Comment Originated: 01/11/2016
01/11/2016: Please see redlines on landscape plans for replacing the nonnative species with natives,
specifically GSD, QSR, ASG, ARM, and some PSP. Also, the 17 SXE in the northwest corner appear
to be mislabeled.
Ripley Design, Inc. (RDI).....
Corrected.
Comment Number: 3 Comment Originated: 01/11/2016
01/11/2016: As discussed, a mitigation and monitoring plan will need to be finalized to indicate how the
wetlands will be installed and monitored to ensure success. This document will be attached to the
development agreement. A letter of credit to ensure the wetlands and buffer can be replaced, should
the success criteria not be met, will be required.
Cedar Creek Association (CC)..
The mitigation and monitoring plan has been finalized and submitted.
Page 12 of 23
Comment Number: 4 Comment Originated: 01/11/2016
03/08/2016: A note should be added to the landscape plan regarding the seed mixes proposed on the
wetland enlargement may change based on what species respond best. All seed mix changes shall be
approved by the City's Environmental Planner.
01/11/2016: What is the proposed seed mix for the wetland area? I will email a suggested mix, as well
as a mix to replace the dryland seed mix that includes more forbes.
Ripley Design, Inc. (RDI).....
Note has been added.
Comment Number: 5 Comment Originated: 01/13/2016
01/13/2016: Thank you for providing a photometric plan with this PDP submittal and that no light
spillage is shown within the buffer area. Please also consider the 3000K option for the light fixtures, in
order to limit the amount of blue light in the night environment. Both LED and metal halide fixtures
contain large amounts of blue light in their spectrum, and exposure to blue light at night has been
shown to harm human health and endanger wildlife. Please also consider fixtures with dimming
capabilities so that light levels can be adjusted as needed.
Ripley Design, Inc. (RDI).....
Our lighting consultant has responded to this comment see attached email from Chuck Polson.
Comment Number: 6 Comment Originated: 03/08/2016
03/08/2016: Please add an Environmental Planner signature to all utility plans that show the NHBZ.
Ripley Design, Inc. (RDI).....
Done
Department: Forestry
Contact: Tim Buchanan, 9702216361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 27 Comment Originated: 03/08/2016 03/08/2016:
The tree inventory and mitigation plan did not appear to the in the landscape plan set. Email this plan
to the City Forester and also include the tree inventory and mitigation plan in the landscape plan.
Ripley Design, Inc. (RDI)....
Done.
Comment Number: 28 Comment Originated: 03/08/2016
03/08/2016:
Not all of the medians along Lincoln or new landscape area on the south side of Lincoln show up on
the Landscape plan.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 29 Comment Originated: 03/08/2016
03/08/2016:
The locations of the Autumn Brilliance Serviceberry’s closest to the roundabout appear like they will
cause a line of site problem for pedestrians crossing the street. Review and remove these from the
plan if necessary.
Ripley Design, Inc. (RDI).....
Page 13 of 23
Done
Comment Number: 30 Comment Originated: 03/08/2016
03/08/2016:
To provide more tree diversity in the medians (not the roundabout) explore the use of some Red
Baron Crabapple or Chanticleer Pear.
Ripley Design, Inc. (RDI).....
Done
Department: Light And Power
Contact: Todd Vedder, 9702246152, tvedder@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/12/2016
01/12/2016: New development and system modification charges may apply. A link to our online electric
fee estimator is below.
http://www.fcgov.com/utilities/business/buildersanddevelopers/plantinvestmentde
velopmentfees/electricdevelopmentfeeestimator?id=3
Capstone (CA)....
Acknowledged
Comment Number: 2 Comment Originated: 01/12/2016
01/12/2016: Transformer and meter location needs to be coordinated with Light & Power. It is preferred
to have the meters gained on one side of the building opposite from gas meters. Coordination is
important since this is a congested site and power lines need to be separated by 10 feet from water lines
and 3 feet from gas lines.
Capstone (CA)....
Coordination is underway. We are waiting for transformer locations to be designated by Light and Power.
Minor adjustments to the landscape plan may occur after locations have been established , probably early
next week.
Comment Number: 3 Comment Originated: 01/12/2016
01/12/2016: A C1 form needs to be filled and a oneline diagram needs to be provided for the clubhouse
in order to size the transformer properly. It is preferred to serve the clubhouse with single phase if
possible. A link to a copy of our C1 form is below.
http://zeus.fcgov.com/utilsprocedures/files/EngWiki/WikiPdfs/C/C1Form.pdf
The oneline diagram has been submitted and the C1 form will be submitted soon.
Comment Number: 4 Comment Originated: 01/12/2016
01/12/2016: Please provide breaker panel sizing for each unit.
Lighting Engineer (LC)....
Done
Comment Number: 5 Comment Originated: 01/12/2016
01/12/2016: For any multifamily units, it will be the responsibility of the developer/electrician to provide
the service from the transformer to the meter.
Capstone (CA)....
Acknowledged
Comment Number: 6 Comment Originated: 01/12/2016
01/12/2016: Drawings show an electrical line along the north side of Lincoln, just south of the
Page 14 of 23
development. This needs to be double checked since our maps do not show any electrical on the north
side of Lincoln, but rather on the south side. This could be telephone line since the drawings show
telephone being feed in the area.
Northern Engineering (NE)
This line is actually a telecommunications line. The plans have been updated accordingly.
Comment Number: 7 Comment Originated: 01/12/2016
01/12/2016: If any existing electrical lines need to be relocated to accommodate the roundabout,
modification charges will apply.
Northern Engineering (NE)
Acknowledged.
Comment Number: 8 Comment Originated: 01/12/2016
01/12/2016: Street lighting and electrical design will be done for the existing Lemay Ave. Once the new
Lemay Ave is installed, modification charges will apply for the relocation of street lighting and electrical
infrastructure.
Capstone (CA)....
Acknowledged
Comment Number: 9 Comment Originated: 01/12/2016
01/12/2016: Distinguish between City street lighting and private lighting on the landscape drawings.
Some proposed City street lights are missing from the drawings. Contact Todd Vedder if a copy is
needed for proposed street lighting. Local residential streets shall have one light at each intersection. If
the intersection lights would exceed 320 feet apart on a straight street, midblock lights shall be added
so lights do not exceed 320 feet spacing. If the street has a curve, judgment shall be used to reduce
the spacing to less than 320 feet.
Shade trees are required to maintain 40 feet of clearance with street lights and ornamental trees are
required to maintain 15 feet of clearance with street lights. (clearances is from the trunk of tree to light)
Ripley Design, Inc. (RDI).....
Done
Comment Number: 10 Comment Originated: 03/08/2016
03/08/2016: In regards to comment #5, it will be the responsibility of the developer/electrician to
provide the secondary service from the transformer to the meter. This pertains to any single family
attached units and where there is ore than one meter on a lot. Please contact Todd Vedder with any
questions.
Northern Engineering (NE)
Acknowledged.
Comment Number: 11 Comment Originated: 03/08/2016
03/08/2016: On sheet L2.0 there is a proposed street light on the northwest corner too close to an
existing trees. Street lights need to maintain 40' separation from shaded trees and 15' separation from
ornamental.
Ripley Design, Inc. (RDI).....
Todd Vedder is reviewing the situation and may propose to put the light on the west side of the existing
Lemay.
Department: PFA
Contact: Jim Lynxwiler, 9704162869, jlynxwiler@poudrefire.org Topic:
General
Comment Number: 1 Comment Originated: 03/08/2016
03/08/2016: KEY BOXES REQUIRED
Page 15 of 23
Per the fire marshal, a Knox Box will be required on every building.
Architect (A)....
Acknowledged
Comment Number: 2 Comment Originated: 03/08/2016
03/08/2016: FIRE LANE SIGNAGE & MARKING
Fire lanes shall be signed as appropriate. This can be handled at time of final inspection if so desired,
however it is recommended that a plan for signage be included in the plans at this time. Code language
provided below.
> IFC503.3: Where required by the fire code official, approved signs or other approved notices that
include the words NO PARKING FIRE LANE shall be provided for fire apparatus access roads to
identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated
shall be maintained in a clean and legible condition at all times ad be replaced or repaired when
necessary to provide adequate visibility.
> IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked
with permanent NO PARKING FIRE LANE signs complying with Figure D103.6. Signs shall have a
minimum dimension of 12 inches wide by 18 inches high and have red letters on a white reflective
background. Signs shall be posted on one or both sides of the fire apparatus road as required by
Section D103.6.1 or D103.6.2.
Northern Engineering (NE)
Acknowledged. An initial attempt at locating “No parking” signs is included with this submittal on Sheet
C200. Applicant will be happy to work with PFA to refine what is presented prior to mylar plans.
Comment Number: 3 Comment Originated: 03/08/2016
03/08/2016: FIRE HYDRANTS
Private fire hydrants shall have an approved maintenance plan as per IFC 507.5.3. A plan needs to be
submitted to the fire marshal for review prior to final approval. This information should be noted on
future plan sets.
Northern Engineering (NE)
A maintenance plan is currently under development with input from PFA staff and ELCO.
Comment Number: 4 Comment Originated: 03/08/2016
03/08/2016: HYDRANT SPACING
A hydrant is required within 300' of any commercial or multifamily building. As has been previously
noted, hydrant spacing does not meet minimum standards in all areas. The NE and SE corners of the
site will require another hydrant.
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide 1,500 gpm at 20
psi residual pressure, spaced not further than 300 feet to the building, on 600foot centers thereafter.
Northern Engineering (NE)
Additional fire hydrants are now provided to meet the requirement.
Comment Number: 5 Comment Originated: 03/08/2016
03/08/2016: PLAN FOR WAYFINDING
While addressing may not yet be assigned, a plan for wayfinding within the site shall be submitted to
the fire department for review and approval. Unless all internal streets are named, this may include
monument signage at intersections along with a plan for posting building addresses. Code language
provided below.
> IFC 505.1: New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly legible, visible from the street or road
fronting the property, and posted with a minimum of sixinch numerals on a contrasting background.
Where access is by means of a private road and the building cannot be viewed from the public way, a
Page 16 of 23
monument, pole or other sign or means shall be used to identify the structure.
Capstone (CA)....
Acknowledged
Comment Number: 6 Comment Originated: 03/09/2016
03/09/2016: FIRE PITS & GRILLS
Fire pits and grills fueled by natural gas are allowed. Wood burning or smoke producing fire pits are
prohibited. Fire pits and grills require a 10' clearance to combustible construction and/or vegetation.
The 10' clearance shall be measured as both a horizontal and vertical distance.
Capstone (CA)....
Acknowledged
Comment Number: 7 Comment Originated: 03/09/2016
03/09/2016: HAZARDOUS MATERIALS
Pool chemistry and chemical quantities shall be provided at time of building permit.
Capstone (CA)....
Acknowledged
Department: Stormwater Engineering
Contact: Jesse Schlam, 9702182932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/28/2015
02/23/2016: Erosion Control Report (Ok'd on 12/28/2016) Erosion Control Plans have two minor
Comments one of which is needing to associate construction fence with W2 Wattles as they will get
run over and rendered useless. The other is needing an outlet protection structure on the detention
pond) Erosion Control Escrow will need to be recalculated with the changes based on the outlet
structure protection chosen.
12/28/2015: Erosion Control Report was acceptable. Erosion Control Plan will need some significant
redline changes primarily based upon needing interior perimeter protection as proposed plans have
shown through various other projects that not having interior perimeter protection on the site results in
muddy messes almost impossible to control from being discharged to inlets. Please revise erosion
control plan and calculate a escrow based upon the new changes to the erosion control plan. If you
need clarification concerning this section, or if there are any questions please contact Jesse Schlam
9702182932 or email @ jschlam@fcgov.com
Northern Engineering (NE)
The requested changes have been made and updated info supplied with this submittal. Please feel free to
contact us directly if any info is missing or not routed.
Contact: Wes Lamarque, 9704162418, wlamarque@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 01/13/2016
03/09/2016: Please add in the basin description text that basins 2,3,6 & 12 receive LID treatment.
01/13/2016: Please revise some of the text on page 8 of the drainage report. Basin descriptions are
inconsistent in describing where they will be detained. They reference between pond and paver system
for detention is inconsistent
Northern Engineering (NE)
The requested text has been added.
Comment Number: 14 Comment Originated: 03/09/2016
03/09/2016: The runon area for the porous paver system is over the manufacturer recommended
maximum by double. The concern is the maintenance and sustainability of these pavement systems
Page 17 of 23
may be compromised the the additional loading.
Also, the subbasins that drain onto the porous pavement may need some altering which may help
reduce the runon area. It appears that some of the roof tops that are planned to drain over the
pavement system may not drain that way per the grading plan.
Northern Engineering (NE)
The stormwater management strategy employs a comprehensive treatment train approach and lowimpact
development tactics recognized by the Urban Drainage and Flood Control District. Once such component is
minimizing directly connected impervious areas (MDCIA). This affords a greater overall runon area to the
pavers since the area is MDCIA rooftops with a dramatically reduced sediment load. A meeting has been
requested with Stormwater Staff to further discuss this topic in person.
Comment Number: 15 Comment Originated: 03/09/2016
03/09/2016: Please add a site specific construction detail for the underground detention. The
manufacturer's details/schematics are included, but a layout with dimensions is needed.
Northern Engineering (NE)
A site specific design is now provided.
Comment Number: 16 Comment Originated: 03/09/2016
03/09/2016: In Basin 14c, the private drive is designed to drain to the detention pond. The grading plan
does not show a way for these flows to drain to the pond. Please revise.
Northern Engineering (NE)
The drainage basin has been updated to reflect the current grading.
Comment Number: 17 Comment Originated: 03/09/2016
03/09/2016: Please provide and label all high point spot elevations for the grading around the
structures.
Northern Engineering (NE)
High points are labeled around all buildings.
Comment Number: 18 Comment Originated: 03/09/2016
03/09/2016: Please label all sidewalk culverts that take flows off of the street as concrete and
reference the detail.
Northern Engineering (NE)
Sidewalk culverts have all been labeled.
Comment Number: 19 Comment Originated: 03/09/2016
03/09/2016: Please label all storm sewer on the plan & profile sheets as public or private.
Northern Engineering (NE)
The requested labels have been added.
Comment Number: 20 Comment Originated: 03/09/2016
03/09/2016: Please provide a 3inch drop for the 6foot crosspan.
Northern Engineering (NE)
The applicant will revise this as needed, and is clarifying this comment with staff.
Department: Technical Services
Contact: Jeff County, 9702216588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 16 Comment Originated: 01/12/2016
03/10/2016: There are line over text issues. See redlines.
01/12/2016: There are line over text issues. See redlines.
Page 18 of 23
Architect (A)....
Comment Number: 17 Comment Originated: 01/12/2016
03/10/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines.
01/12/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines.
Architect (A)....
Comment Number: 37 Comment Originated: 03/10/2016
03/10/2016: The sheet numbering is inconsistent.
Architect (A)....
Topic: Construction Drawings
Comment Number: 20 Comment Originated: 01/12/2016
03/10/2016: There are still some issues. See redlines.
01/12/2016: There are titles in the sheet index do not match the titles on the noted sheets. See
redlines.
Northern Engineering (NE)
Redlines have been addressed.
Comment Number: 22 Comment Originated: 01/12/2016
03/11/2016: There are line over text issues. See redlines.
01/12/2016: There are line over text issues. See redlines.
Northern Engineering (NE)
Line over text issues have been addressed.
Comment Number: 23 Comment Originated: 01/12/2016
03/11/2016: Some sheet have this note shown incorrectly. The note needs to be exactly as shown in
previous comment.
01/12/2016: Please change the name & note for the "Minor Arterial" to the following on all sheets
showing the street. International Boulevard (Final Name To Be Determined By City Council By
Resolution). Please use this exact wording. See redlines.
Northern Engineering (NE)
The note has been updated throughout the plan set.
Comment Number: 26 Comment Originated: 01/14/2016
03/11/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines.
01/14/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines.
Northern Engineering (NE)
Requested text has been masked.
Comment Number: 30 Comment Originated: 01/14/2016
03/11/2016: There is text that needs to be rotated 180 degrees. See redlines. 01/14/2016: There is text
that needs to be rotated 180 degrees. See redlines.
Northern Engineering (NE)
Text has been updated.
Comment Number: 32 Comment Originated: 01/14/2016
03/11/2016: There is text that needs the size increased. See redlines. 01/14/2016: There is text that
needs the size increased. See redlines.
Northern Engineering (NE)
The text size has been increased.
Page 19 of 23
Topic: Landscape Plans
Comment Number: 12 Comment Originated: 01/12/2016
03/10/2016: The note needs to be exactly as shown in previous comment.
01/12/2016: Please change the name & note for the "Minor Arterial" to the following. International
Boulevard (Final Name To Be Determined By City Council By Resolution). Please use this exact
wording. See redlines.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 13Comment Originated: 01/12/2016
03/10/2016: There are line over text issues. See redlines.
01/12/2016: There are line over text issues. See redlines.
Ripley Design, Inc. (RDI).....
Done
Comment Number: 14 Comment Originated: 01/12/2016
03/10/2016: There are text over text issues. See redlines.
01/12/2016: There are text over text issues. See redlines.
Ripley Design, Inc. (RDI).....
Done
Topic: Lighting Plan
Comment Number: 36 Comment Originated: 03/10/2016
03/10/2016: Please change the name & note on all sheets showing International Boulevard to:
International Boulevard (Final Name To Be Determined By City Council By Resolution). Please use
this exact wording. See redlines.
Lighting Engineer (LC)....
Done
Topic: Plat
Comment Number: 1 Comment Originated: 01/12/2016
03/10/2016: Is there a way to tie the lines for the 10' Utility & Drainage Easement (Rec. #97070197) &
20' Utility Easement (Book 1691 Page 57) to the Lots that they cross through?
01/12/2016: Please add bearings, distances, and/or curve data as marked. See redlines.
Northern Engineering (NE)
A tie has now been provided.
Comment Number: 6 Comment Originated: 01/12/2016
03/10/2016: All reception numbers for documents recorded by separate document, must be added
prior to producing mylars.
01/12/2016: All reception numbers for documents recorded by separate document, must be added
prior to producing mylars.
Page 20 of 23
Northern Engineering (NE)
Acknowledged. Some reception numbers may need to be handwritten due to timing with the various
documents being recorded.
Comment Number: 33 Comment Originated: 03/10/2016 03/10/2016: Please add a name for the Private
Drive on sheet 3. See redlines.
Northern Engineering (NE)
Street name has been added.
Comment Number: 34 Comment Originated: 03/10/2016 03/10/2016: Please change the bearing
direction along Lincoln Avenue on sheet 4. See redlines.
Northern Engineering (NE)
Bearing direction has been changed.
Topic: Site Plan
Comment Number: 9 Comment Originated: 01/12/2016
03/10/2016: The note needs to be exactly as shown in previous comment.
01/12/2016: Please change the name & note for the "Minor Arterial" to the following. International
Boulevard (Final Name To Be Determined By City Council By Resolution). Please use this exact
wording. See redlines.
Ripley Design, Inc. (RDI).....
Corrected.
Comment Number: 10 Comment Originated: 01/12/2016
03/10/2016: There are line over text issues. See redlines. 01/12/2016:
There are line over text issues. See redlines.
Ripley Design, Inc. (RDI).....
Corrected
Comment Number: 35 Comment Originated: 03/10/2016
03/10/2016: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets.
See redlines.
Ripley Design, Inc. (RDI).....
Corrected
Page 21 of 23
Department: Traffic Operation
Contact: Martina Wilkinson, 9702216887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/13/2016
01/13/2016: Is there any signing and striping for the areas not including the roundabout? I may have
missed it, but we'll need signing at the right in only off Lemay, etc.
Northern Engineering (NE)
Striping plans are found on sheets C511C515.
Comment Number: 2 Comment Originated: 01/13/2016
01/13/2016: Can you provide a brief design report related to the roundabout? It would be helpful to
have a summary document that bullets the key components, ICD, R values, truck turning
templates, etc. We'll have striping comments at the design meeting on Thursday.
Northern Engineering (NE)
A design report has been provided.
Comment Number: 3 Comment Originated: 01/13/2016
01/13/2016: The sheet index doesn't match the sheets.
Northern Engineering (NE)
This was corrected with the last submittal.
Comment Number: 4 Comment Originated: 01/13/2016
01/13/2016: What's the landscaping for the central island and splitters? Is it just mulch?
Ripley Design, Inc. (RDI).....
See Sheets L6, L7, L9 and L11 for proposed plant material.
Department: Transportation Planning
Contact: Emma Belmont, 9702246197, ebelmont@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/11/2016
03/11/2016: Based on the discussion on Wednesday, it sounds like the south side stop may be relocated
if the sidewalk configuration is changed. If so please ensure that the stop area is connected to the
sidewalk. I will need to review the stop again if changes are made.
Northern Engineering (NE)
The bus pad is connected to the sidewalk and located within the ROW.
Department: Water Conservation
Contact: Eric Olson, 9702216704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/12/2016
01/12/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans
must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions
concerning irrigation requirements to Eric Olson, at 2216704 or eolson@fcgov.com
Capstone (CA)....
Acknowledged
Page 22 of 23
Department: Zoning
Contact: Noah Beals, 9704162313, nbeals@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/13/2016
01/13/2016: The plans indicate that the porches are to be used for enclosed bikes space. Is this suppose
to be all the porches? It does not seem that the porches are large enough.
Ripley Design, Inc. (RDI).....
Some porches have been enlarged to accommodate bike parking. In other cases bike racks have
been added adjacent to the porch with the roof still providing cover.
Comment Number: 3 Comment Originated: 01/13/2016
03/09/2016: Please place the streets in the parkway not behind the sidewalk.
01/13/2016: On sheet L5.0 Please include street trees along Duff Drive.
Ripley Design, Inc. (RDI).....
Street trees along Duff Drive have been placed in the parkway except for two at the south end where
they would conflict with a stormwater pipe.
Comment Number: 9 Comment Originated: 01/13/2016
01/13/2016: The plat labeled a private street as need a name drive. Is there a name yet?
Northern Engineering (NE)
Yes it does. It will be called Greenway Lane.
End of comments.
Page 23 of 23