HomeMy WebLinkAboutHOUSKA AUTOMOTIVE EXPANSION - BDR - BDR150010 - REPORTS - DRAINAGE REPORT (3)Final Drainage Report
For
Houska Automotive Repair
Fort Collins, Colorado
Prepared for:
D and N Houska Family, Family , LLLLLLLLCCCC
c/o Dennis Houska
899 Riverside Drive
Fort Collins, Colorado
Prepared by:
908 Laporte Avenue
Fort Collins, CO 80521
(970) 219-2834
March 30, 2016
ENGINEER’S CERTIFICATION
I hereby state that this Drainage Report for the Houska Automotive Repair project was
prepared by me or under my direct supervision for the owners’ thereof and meets or
exceeds the criteria in the City of Fort Collins Storm Drainage Design Criteria and
Construction Standards.
-------------------------------------------
Stacy J. Gowing
Registered Professional Engineer
State of Colorado No: 34290
FOR REVIEW ONLY
TABLE OF CONTENTS
I. INTRODUCTION ................................ ................................ ................................ ......... 1111
II. GENERAL LOCATION AND DESCRIPTION ................................ ........................... 1111
A. Property Location .................................................................................................... 1
B. Description of Property .......................................................................................... 2
C. Developed Conditions ............................................................................................ 2
III. DRAINAGE BASINS AND SUB-SUB -BASINS ................................ ................................ ... 3333
A. Major Basin Description .............................................................................................. 3
IV. DRAINAGE DESIGN CRITERIA ................................ ................................ ................. 3333
A. Four Step Process .......................................................................................................... 3
B. Development Criteria Reference and Constraints ............................................... 4
C. Hydrological and Hydraulic Criteria......................................................................... 5
V. DRAINAGE FACILITY DESIGN ................................ ................................ .................. 5555
A. General Concept ........................................................................................................... 5
B. Specific Details – Detention ........................................................................................ 5
C. Specific Details – Inlets and Storm Sewer ............................................................... 5
D. Specific Details – Stormwater Quality ..................................................................... 6
VI. SEDIMENT/EROSION CONTROL ................................ ................................ ............. 8888
VII. CONCLUSIONS ................................ ................................ ................................ ............ 8888
A. Compliance with standards ....................................................................................... 8
B. Drainage Concept ......................................................................................................... 8
VIII. REFEEEERRRREEEENNNNCCCCEEEESSSS REF ................................ ................................ ................................ ................ 9999
IX. APENDICES ................................ ................................ ................................ .................. 9999
1
I. INTRODUCTION
This report presents the pertinent data, methods, assumptions, and references
used in analyzing and preparing the final drainage and water quality design for
the Houska Automotive Repair project (the "project").
II.GENERAL LOCATION AND DESCRIPTION
A. Property Location
The project is located on the south side of Riverside Avenue, just southeast
of the existing Houska Automotive site at 899 Riverside Avenue, and is
intended to function as an extension of the existing Houska Automotive use.
The site is an infill site completely surrounded by existing development.
SITE
Vicinity Map, NTS
2
B. Description of Property
1. The project site is an undeveloped parcel located between the existing
Houska Automotive site and the private drive aisle into the Albertson’s
shopping center along the south side of Riverside Avenue.
2. The project site is currently undeveloped; and is 2.28 acres in size.
3. The site is currently covered with weeds, native and volunteer
vegetation; with an existing vegetative cover of approximately 60%.
4. There is no significant off-site runoff entering the site, and the site drains
overland to the south curb and gutter of Riverside Avenue.
5. Existing surface soils, according to the National Resources Conservation
Service, consist of Satanta Loam. The soil type is classified as hydrologic
soil group B.
6. Existing soils underlying the proposed work are classified as clayey sand
(SC), as identified by a soils investigation prepared by Terracon.
7. There are no irrigation ditches or stormwater conveyance systems on
the property.
8. Portions of the project site are located within the City regulatory Old
Town 100-year floodplain. The property is located outside the City
regulatory Old Town 100-year floodway, however floodway is located
inside the Riverside right-of-way adjacent to the property, as shown on
the City’s online floodplain mapping.
C. Developed Conditions
1. The proposed project consists of 3 buildings to support additional
automotive repair uses, such as tire maintenance and general
automotive repair. None of these buildings are located within the FEMA
or City of Fort Collins Old Town Masterplan 100-year floodplain or
floodway.
2. The project includes the relocation of the existing Houska access to
provide a single access for both the existing and proposed uses, which
necessitates the relocation of two existing inlets on Riverside. The
project also includes private drive aisles, parking, and associated
hardscape and landscaping.
3. None of the proposed buildings are located within the City regulatory
Old Town 100-year floodplain or floodway.
3
4. The improvements proposed within the floodplain include a driveway,
sidewalks, drainage improvements and miscellaneous site improvements.
5. The project is currently envisioned to be built in two phases. Phase one
includes building one, all the public infrastructure and a temporary
parking area. Phase two includes buildings two and three. The
drainage design for phase one encompasses all phases of the project.
6. The developed site will drain from south to north via overland flow and
swales to a proposed regional water quality pond located at the
northwest corner of the site.
III.DRAINAGE BASINS AND SUB-SUB -BASINS
A. Major Basin Description
1. The project site lies within the Old Town drainage basin.
2. The project site currently drains overland from south to north, exiting the
site along the western and northern lot lines. Runoff is received by the
existing storm drainage system in Riverside Avenue and the Locust Street
Outfall.
IV. DRAINAGE DESIGN CRITERIA
A. Four Step Process
The stormwater management strategy for the project is the “Four Step
Process”, with the goal of minimizing adverse impacts of urbanization on
receiving waters. The following is a description of the steps employed to
achieve this goal.
1. Employ Runoff Reduction Practices
a. Two bioretention ponds are proposed for the project site. These
will collect much of the runoff from the developed areas.
Infiltration will be encouraged and directly connected impervious
areas will be minimized. This design, in combination with the
highly permeable underlying soils (clayey sands) results in
infiltration opportunities that do not currently exist on site.
b. The percentage of proposed impervious cover is 74%. This
impervious cover rate is less than allowed, and less than typical for
intensive commercial development.
4
c. The vegetated areas will be heavily landscaped, in contrast to the
sparse existing vegetation currently existing, allowing for
decreased effective runoff coefficients.
2. Implement BMP’s That Provide a Water Capture Volume (WQCV) with
Slow Release.
a. The steps described above will provide attenuation for peak rates
of runoff.
b. Additionally, runoff attenuation and water quality treatment is
provided by a regional extended detention basin to be located on
the development site. This basin receives a large majority of runoff
from the site prior to exiting the site.
3. Stabilize Drainageways.
a. There are no drainageways or conveyances within the project site,
and the site drains directly to existing storm sewer systems.
However, off-site benefit is achieved through the use of
stormwater extended detention for a site that currently has none.
By providing these improvements, discharges are attenuated and
treated for water quality.
b. Stormwater impact fees and month stormwater utility fees will be
paid by this development. This additional revenue will contribute
to the overall City programs to stabilize drainageways throughout
the city.
4. Implement Site Specific and Other Source Control BMP’s.
a. The combination of intensive vegetative establishment and water
quality treatment through Low Impact Development (LID)
techniques will allow for a reduction in particulates and adhered
pollutants as compared the existing condition.
B. Development Criteria Reference and Constraints
1. As previously discussed, historic drainage patterns are maintained with
the proposed project.
2. As an infill project, existing topography along the boundary is
maintained.
5
C. Hydrological and Hydraulic CCCCrrrriiiitttteeeerrrriiiiaaaa
1. Hydrologic and hydraulic criteria is as per the City of Fort Collins Storm
Drainage and Design Criteria and Construction Standards.
2. Analyses are performed using City of Fort Collins spreadsheets and the
methodologies presented in Urban Storm Drainage Criteria Manual
Volumes 1, 2 and 3; Urban Drainage and Flood Control District, Denver,
Colorado.
V. DRAINAGE FACILITY DESIGN
A. General Concept
1. The general direction of proposed storm water flow is from south to north.
Storm water runoff from the site is directed towards a proposed regional
water quality pond located on the northwest corner of the site. This pond
connects to the Locust Street Outfall, which runs south-to-north
immediately west of the site.
2. Existing drainage patterns are maintained by the project. Runoff from the
site in both conditions is collected by adjacent storm sewer systems.
3. Water quality treatment is provided with extended detention (through a
regional water quality pond located on site) and Low Impact Development
techniques as discussed below.
B. Specific Details –––– DDDDeeeetttteeeennnnttttiiiioooonnnn
1. The project is located near at the bottom of the Old Town basin, adjacent
to the Locust Street Outfall. This regional outfall consists of a 108-inch
pipe directly connected to the Poudre River. Because of the location of the
site, detention on site would be counter-productive since it would only
serve to delay the site developed peak runoff to more closely coincide with
the peak runoff from the overall drainage basin. Stormwater is proposed
to runoff un-detained, allowing the runoff peak to flow into and through
the outfall pipe before the larger peak from the overall basin arrives.
2. City stormwater staff, as part of the overall cooperative effort on the
regional water quality pond, has modified the hydrologic modeling in the
Old Town Masterplan and verified that detention is not required, nor
advised, for the development. Detention is not included in the project.
CCCC. . Specific Details –––– Inlets and Storm Sewer
1. Two existing storm drain inlets are located under the proposed driveway
and must be relocated. It is expected that these inlets are adequately
6
sized, so identical inlets are being proposed for areas just outside of the
proposed driveway. Both inlets are relocated in such a way as to ensure
they continue to drain to the same receiving drainage system.
a. The 5’ Type R curb inlet on the eastern side of the proposed
driveway is moved approximately 17’ towards the east along
Riverside. To accomplish this, the existing pipe to the existing inlet
is extended to a new manhole behind the curb/gutter. The new
single curb inlet is connected to the new manhole.
b. The 15’ Type R curb inlet on the western side of the driveway is
moved approximately 25’ towards the west along Riverside
Avenue. This inlet drains to a new manhole placed on the existing
receiving storm pipe from the existing inlet. The existing and
proposed inlets drain to the storm vault along the Locust Street
Outfall.
2. Four storm drain pipes are proposed as part of the regional water quality
pond.
a. Two 24-inch storm drain pipes (storm pipes 6 and 7) are proposed
along the north boundary as part of the regional water quality
pond. Storm pipe 7 terminates at an area drain at a point near the
eastern boundary, and will serve to convey off-site discharges to the
proposed regional pond. The size and general locations of these
pipes are as per direction from City stormwater staff.
b. A 24-inch storm drain pipe (storm pipe 5), storm manhole and a 30-
inch storm drain pipe (storm drain 4) are proposed to connect the
outfall structure for the regional water quality pond to the existing
vault located on the Locust Street Outfall.
DDDD. . Specific Details –––– Stormwater Quality
1. The City of Fort Collins, in cooperation with the developer, intends to
construct a regional water quality pond within the development site.
This pond will provide extended detention for a large regional drainage
area, and will also provide treatment for the project site. The regional
water quality pond has a storage volume of approximately 0.66 acre-feet
at elevation 4961.0’.
a. The City will acquire easements for the regional water quality pond
and conveyance elements as needed for the regional project.
b. Unfortunately, an area for Low Impact Development (LID)
treatment needed for the development project will be lost to
accommodate the regional project. In particular, the regional
conveyance is located within areas needed for LID treatment for
7
buildings 1 and 2. Because of this, the site’s LID requirement of
75% treatment is reduced by 0.64 acres, which is the amount of LID
treatment originally proposed by the developer within the lost area.
The LID requirement for the development is reduced to 0.62 acres
of treated drainage area (which is 1.68 acres x 75% - 0.64 acres).
c. The City’s regional water quality pond will also provide standard
water quality treatment for the development site through extended
detention.
d. The City will pay for the design, construction and other costs
associated with the regional water quality pond. These costs will be
offset by benefits to the development project as subsequently
negotiated.
e. An emergency spillway path is provided for the un-detained 100-
year flow through the water quality pond. This path is towards
Riverside Avenue, where the proposed elevations at the back of the
sidewalk are 4961.42. This area acts as a spillway with a level crest
length of 80 feet and a depth of 0.20 feet. The shallow depth
combined with the concrete sidewalk, curb/gutter and paving
results in a stable overflow path for emergency flows.
2. Low Impact Development (LID) water quality treatment is required for
75% of the proposed impervious area, minus 0.64 acres as previously
discussed. The modified LID water quality treatment area is 0.62 acres.
Two LID techniques are used to accomplish this, as follows:
a. Rain Garden Bioretention Pond 1 is located in the southwestern
portion of the site. This pond is located in an area that was
previously constructed as a bioswale for the existing development
in the Houska South development. This existing bioswale will be
redesigned and reconstructed as a rain garden and bioretention
pond. The new pond will handle 1.00 acres of Houska South
(identified as drainage basin 5 in the drainage report for that
project and drainage basin Q1B in this report) and 0.41 acres
(identified as basin Q1A in this report) of new development. The
total area treated is 1.41 acres.
b. Rain Garden Bioretention Pond 2 is located in the northwestern
portion of the site. This pond receives runoff from the central drive
aisle and treats 0.29 acres.
c. The total LID treated drainage area is 0.70 acres, which is higher
than the required 0.62 acres as discussed above. The net LID
treatment percentage for the site is 79.7%, once the credit for the
lost LID treatment opportunity is accounted for.
8
3. The sizing calculations and an LID summary are included in the
appendix.
VI. SEDIMENT/EROSION CONTROL
Temporary erosion control measures will be implemented with this project, as
detailed under a separate report entitled “Erosion and Sediment Control
Report”, dated 3/30/2016, prepared by Apex Engineering. Please see that
document for more information on the temporary best management practices
proposed to control sediment and erosion during construction.
VII. CCCCOOOONNNNCCCCLLLLUUUUSSSSIIIIOOOONNNNSSSS
A. Compliance with standards
1. All drainage design conforms to the criteria and requirements of City of
Fort Collins Storm Drainage Design Criteria and Construction Standards.
2. Proposed drainage improvements conform to the concepts and
recommendations of the Old Town Basin master plan.
B. Drainage Concept
1. The proposed drainage plan concept for the project will be effective for
the control of stormwater runoff and water quality for the proposed site
and conforms to City of Fort Collins standards.
9
VIII. RRRREEEEFFFFEEEERRRREEEENNNNCCCCEEEESSSS
1. City of Fort Collins Storm Drainage and Design Criteria and Construction
Standards.
2. Old Town Drainage Master Plan; Anderson Consulting, July 15, 2003.
3. Urban Storm Drainage Criteria Manual Volume 1-3; Urban Drainage and
Flood Control District, Denver, Colorado, April 2008.
4. Geotechnical Engineering Report, Houska Large Truck Facility; Terracon
(project number 20155048), dated 11/11/2015.
5. Final Drainage and Erosion Control Report, Houska Automotive Auto Parts
Warehouse; North Star Design, April 9, 2012.
IX. APENDICES
Appendix I - Hydrologic Calculations
Peak Discharge Calculations
Appendix II - Hydraulic and Water Quality Calculations
LID Stormwater Management Summary Worksheet
Bioretention Sizing Worksheets
Outfall Pipe Sizing Worksheet
Emergency Spillway Sizing Report
Appendix III - Mapping and Plans
Annotated Flood Insurance Rate Map
Drainage Exhibit (24”x36”)
10
Appendix I – Hydrology