February 12, 2016
Ian Schuff
Russell + Mills Studios
141 S. College Ave Ste 104
Fort Collins, CO 80524
RE: College Eight Thirty, FDP160002, Round Number 1
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: Building Elevations
02/02/2016: There is a band of brick shown on the south elevation that doesn't
occur on either of the perspective renderings. Update the elevations so that all of
them match.
Comment Number: 1 Comment Originated: 02/02/2016
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
02/10/2016: Carrying over the main comment from PDP, with the concern that the
alley needs to be repaved with the project. The information provided now at time of
final showing existing alley cross slopes less than standard; the understanding that
as proposed, a 3.5' asphalt patch would essentially be added to the existing alley
abutting the property, not in accordance with LCUASS patching standards; and as
per the condition of the variance request approval letter from Sheri Langenberger
from November, the alley will need to be reconstructed. The repaving of the alley
with a mill and overlay would need to look at providing more cross slope in the flatter
areas around the street patch and look to keep a more consistent cross slope along
the alley. Please label existing edge of asphalt and how the alley repaving would tie
into the existing alley limits to the north.
Comment Number: 1 Comment Originated: 02/10/2016
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at
970-224-6045 or cfrickey@fcgov.com.
Page 1 of 5
02/10/2016: What is the intention on the type of paving for the parking lot off of the
alley, under the overhang. Is this intended to be asphalt or concrete? In general,
there should be the use of a concrete pan that helps delineate the right-of-way edge
from the alley and would also make future maintenance of the alley easier (the pan
could then also From that perspective perhaps all onsite paving should be in
concrete, with the only asphalt would be for the street patch and alley repaving.
Comment Number: 2 Comment Originated: 02/10/2016
02/10/2016: The sidewalk chases on Locust Street would need to widen the
sidewalk 6 inches on either side of the chase and add construction details pertaining
to this.
Comment Number: 3 Comment Originated: 02/10/2016
02/10/2016: Please update General Note No. 48 to reflect the reduced utility
easement approved for College Avenue, and no utility easements along Locus and
the alley.
Comment Number: 4 Comment Originated: 02/10/2016
02/10/2016: Where is the 308/C502 detail being used on the plans?
Comment Number: 5 Comment Originated: 02/10/2016
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
02/12/2016: The portion of the north side of the building that is less than 3 feet from
the property line must be a 1 hour wall with no openings. Walls within 3 feet to less
than 5 feet of the property line must be 1 hour with no more than 15% openings. The
portion of open garage access that is less than 3 feet from the property line on the
the north side still poses a concern.
Comment Number: 1 Comment Originated: 02/12/2016
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
02/11/2016: It is anticipated that Light and Power will intercept an existing 4" conduit
in the alley to the east of the project to feed the new transformer. The excavation in
the alley will be flowfilled and permanent asphalt patch to be completed by the
Developer/Contractor.
Comment Number: 1 Comment Originated: 02/11/2016
02/11/2016: Individual, separate meters will be required for each commercial/retail
space and each residential unit.
Comment Number: 2 Comment Originated: 02/11/2016
02/11/2016: Development fees, electric capacity fees, building site charges and any
system modification charges necessary will apply to this project. Please reference
our policies, development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 3 Comment Originated: 02/11/2016
02/11/2016: Light & Power will need the following documentation to be submitted
before design will begin and construction will start on the electric facilities to feed the
development: AutoCAD files of the approved Site Plan, Plat, Utility Plan and
Landscape Plan drawings, and one line diagram. Please email the CAD files once
approved
Comment Number: 4 Comment Originated: 02/11/2016
Page 2 of 5
02/11/2016: Please contact Tyler Siegmund in Light & Power Engineering if you
have any questions at 970.416.2772 or 970.221.6700
Comment Number: 5 Comment Originated: 02/11/2016
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
02/09/2016: Prior PFA comments resolved. Nothing further.
Comment Number: 1 Comment Originated: 02/09/2016
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
02/09/2016: Please see redlined plans and drainage report.
Comment Number: 2 Comment Originated: 02/09/2016
02/09/2016: Please provide evidence that the rain garden planters are in
compliance with drain times per Colorado Revised Statute 37-92-602(8). More
information on this statute is available at http://tinyurl.com/RevisedStatuteMemo, and
a spreadsheet to show compliance is available for download at
http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at
(970)224-6192 or dmogen@fcgov.com with any questions about this requirement or
for assistance with the spreadsheet.
Comment Number: 3 Comment Originated: 02/09/2016
02/09/2016: Water Quality Planter Detail is seen on Sheet LS501. Please copy to
or move to Utility Plans.
Also, please revise this detail as 12" min. ponding depth is called out and the actual
measurement called out is 6".
Comment Number: 4 Comment Originated: 02/09/2016
02/09/2016: Please submit a variance application for review as the 100% water
quality treatment requirement is not currently being met.
Comment Number: 5 Comment Originated: 02/09/2016
02/09/2016: Please note that all City construction detail drawings are to be used in
their original, unaltered state. ANY modification(s) must be clearly distinguished and
all City logos/identifiers must be removed from the modified detail. Detail drawings
can be found in both .pdf and .dwg formats through the links to “Construction
Drawings” on www.fcgov.com/utility-development.
Comment Number: 6 Comment Originated: 02/09/2016
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
01/19/2016: Erosion control Escrow and Report are acceptable, Erosion Plan has
three minor redlines that can be sent over in pdf via email to show the final mark up
for Mylar. Other than that this projects is ready for erosion control criteria. If you
need clarification concerning this section, or if there are any questions please
contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Comment Number: 1 Comment Originated: 01/19/2016
Department: Technical Services
Page 3 of 5
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
02/08/2016: No comments.
Comment Number: 4 Comment Originated: 02/08/2016
Topic: Construction Drawings
02/08/2016: The titles in the sheet index do not match the titles on the noted sheets.
See redlines.
Comment Number: 6 Comment Originated: 02/08/2016
02/08/2016: All benchmark statements must match on all sheets.
Comment Number: 7 Comment Originated: 02/08/2016
Topic: Landscape Plans
02/08/2016: No comments.
Comment Number: 3 Comment Originated: 02/08/2016
Topic: Lighting Plan
02/08/2016: No comments.
Comment Number: 5 Comment Originated: 02/08/2016
Topic: Plat
02/08/2016: Please add new title commitment information as available.
Comment Number: 1 Comment Originated: 02/08/2016
Topic: Site Plan
02/08/2016: No comments.
Comment Number: 2 Comment Originated: 02/08/2016
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
02/09/2016: There was a request to sign the new on-street parking with time limts
such as 30 min parking. Work with the parking department on whether and how this
will be done. Also - we do not stripe diagonal parking any more, we just put up a
sign that says 'diagonal parking' and red curb those areas that don't allow parking.
(This is much easier to maintain.)
Comment Number: 1 Comment Originated: 02/09/2016
02/09/2016: In the last PDP submittal we asked about adequate sight distance for
cars coming out of the alley (for pedestrians on sidewalk as well as cars). The
response was that this would be provided directly to staff. I can't remeber if that
was done, or still needs to be completed.
Comment Number: 2 Comment Originated: 02/09/2016
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Page 4 of 5
02/09/2016: Please see redlines.
Comment Number: 1 Comment Originated: 02/09/2016
Page 5 of 5