Loading...
HomeMy WebLinkAboutHARMONY COMMONS - FDP - FDP160013 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSEast Bound Harmony Road - Speed Limit 55 MPH by MAVD Detached Sidewalk by MAVD Harmony Road Drainage Swale 80' - 0" Harmony Road Setback Between 5' - 20' Building Setbacks Vary by MAVD Landscaping Lot 4 Retail Building Harmony Road Median T.O. Parapet 4943.7 Finished Floor 4918.5 James C. Gamble, "How Landscape Architects Contribute to Context Sensitive Design of Thoroughfares," http://www.landdesigncollaborative.com/news/newsArticle1.htm Artical appeared in the April 2006 Transportation Design Issue of elevation:, newsletter of the Illinois chapter of the American Society of Landscape Architects. 55 MPH East Bound Harmony Road Lady Moon Drive 50.00° 2 1 OF 8 Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 W1 W2 W4 W5 W6 6 W8 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Sandstone Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold Hard Coat Stucco Manuf: Sto Product: PowerWall Color: Field - White Linen (fine texture) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16 smooth face, running bond with 4x16 banding Colors: - 75% - Body Color - Best Block #637 - 25% - Accent Bands - Best Block #315 Standoff 1/2" from face of masonry Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" W1 W2 W1 W4 W1 W2 W1 W4 W1 6 W4 beyond 7 7 7 12 11 7 21 12 12 12 12 Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" 6 11 55 8 12 beyond beyond beyond 12 12 12 12 12 2 6 1 W4 7 W1 W2 W4 color 2 W2 W2 W4 color 2 W5 beyond 21 Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" W4 color 2 W4 beyond 6 11 7 W2 W1 W1 W2 W4 W5 W6 6 W8 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Sandstone Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold Hard Coat Stucco Manuf: Sto Product: PowerWall Color: Field - White Linen (fine texture) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16 smooth face, running bond with 4x16 banding Colors: - 75% - Body Color - Best Block #637 - 25% - Accent Bands - Best Block #315 Standoff 1/2" from face of masonry T.O. Masonry 6' - 0" AFG W8 17 19 19 18 18 17 W8 T.O. Masonry 6' - 0" AFG T.O. Masonry 6' - 0" AFG W8 17 T.O. Masonry 6' - 0" AFG 17 W8 Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 First Floor Plan 100' - 0" High Roof Parapet 125' - 0" Low Roof Parapet 118' - 8" W4 W2 W2 W1 W1 W4 W4 11 6 7 7 W2 W1 1 111 1 1 12 beyond beyond beyond 11 7 W4 W5 Oblique Elevation 21 21 W4 W2 W4 W2 W2 21 21 21 12 12 12 12 7 12 12 12 12 12 12 12 12 First Floor Plan 100' - 0" High Roof Parapet 125' - 0" Low Roof Parapet 118' - 8" W2 W4 W4 W1 W1 W2 W4 Beyond 6 12 W4 W4 W1 1 6 7 7 1 1 1 12 12 2 12 12 12 12 12 12 Beyond Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons First Floor Plan 100' - 0" First Floor Plan 100' - 0" Second Floor Plan 114' - 0" 110 11 W4 W1 Field W1 Field 12 12 12 12 13 12 11 11 1 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 17 14 17 Max. Height = 35' - 8" First Floor Plan 100' - 0" Second Floor Plan W5 W5 114' - 0" W1 W1 Field W1 Accent W1 Accent W1 Accent W4 W3 W3 9 W1 Field W1 Field W1 12 13 12 12 12 12 12 12 13 12 12 12 12 12 12 12 12 12 12 12 W1 Accent W1 Accent W1 First Floor Plan 100' - 0" First Floor Plan 100' - 0" Second Floor Plan 114' - 0" 112b 5 5 5 W1 Field W1 Field W1 Field W1 Field W6 W3 W3 6 W5 W4 12 12 12 12 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 17 17 12 12 17 First Floor Plan 100' - 0" First Floor Plan 100' - 0" Second Floor Plan 114' - 0" W4 W3 W3 W3 W3 W1 Accent W1 Accent W1 Field W1 W1 Field 1 1 1 1 12 12 12 12 12 13 12 12 12 12 12 12 12 12 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 101 Max Height = 35' - 8" W4 W5 1 12 W1 Field 17 17 14 14 5 W4 W2 12 12 12 12 12 12 12 12 12 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Slate Grey Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold Hard Coat Stucco Manuf: Sto Product: PowerWall NExT Colors: Field - White Linen (fine texture) Accent - Bronze (fine texture) W1 Brick Veneer Manuf: TBD Product: Modular brick, running bond Color: Light Tan W3 W4 W5 W6 6 W2 W8 Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16 smooth face, running bond with 4x16 banding Colors: - 75% - Body Color - Best Block #637 - 25% - Accent Bands - Best Block #315 Standoff 1/2" from face of masonry Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 SA MR Office Building 'E' Elevations Lot 5 2015-13 Office Building 'E' 8 OF 8 1/8" = 1'-0" 1 South Building Elevation 1/8" = 1'-0" 2 West Building Elevation Exterior Material Legend 0 Keynote Legend Key Value Keynote Text 1 Steel column painted white on concrete base, refer to Struct. 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen by Metal Sales: T-13 panel installed horizontal per manuf. standard details, color: Sandstone, see detail 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 13 Curtainwall system, refer to A7.1 and A7.2 for elevations, details, and dimensions 14 Mechanical roof top unit (dashed) 17 Prefinished break metal cap flashing, refer to section details No. Description Date Accent 6 6 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 14 17 14 17 17 17 W1 Field 5 12 12 W2 12 W3 12 W2 12 W3 12 W2 12 W3 12 W2 12 19 19 19 18 W8 5' - 4" 13' - 4" 3' - 4" 17 18 T.O. Masonry 6' - 0" 12' - 8" 6' - 0" W8 18 17 T.O. Masonry 6' - 0" Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Slate Grey Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold Hard Coat Stucco Manuf: Sto Product: PowerWall NExT Colors: Field - White Linen (fine texture) Accent - Bronze (fine texture) W1 Brick Veneer Manuf: TBD Product: Modular brick, running bond Color: Light Tan W3 W4 W5 W6 6 W2 W8 Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16 smooth face, running bond with 4x16 banding Colors: - 75% - Body Color - Best Block #637 - 25% - Accent Bands - Best Block #315 Standoff 1/2" from face of masonry Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 SA MR Office Building 'E' Elevations Lot 5 2015-13 Office Building 'E' 7 OF 8 1/8" = 1'-0" 1 North Building Elevation 1/8" = 1'-0" 2 East Building Elevation 1/4" = 1'-0" 3 Trash Enclosure - Front Elevation 1/4" = 1'-0" 4 Trash Enclosure - Typical Side Elevation Exterior Material Legend 0 Keynote Legend Key Value Keynote Text 1 Steel column painted white on concrete base, refer to Struct. 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen by Metal Sales: T-13 panel installed horizontal per manuf. standard details, color: Sandstone, see detail 8 Fire Department Connection 9 Roof drain 11 Knox box per PFA requirements 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 13 Curtainwall system, refer to A7.1 and A7.2 for elevations, details, and dimensions 14 Mechanical roof top unit (dashed) 17 Prefinished break metal cap flashing, refer to section details 18 Steel pipe bollard, typ. see detail on sheet 19/AS.1 19 Steel trash enclosure gate with 1 1/2" metal decking, factory primed field painted to match "Weathered Copper" flashings. See details on sheet AS.1 & AS.2 No. Description Date ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 SA MR Office Building 'E' Rendering Lot 5 2015-13 Office Building 'E' 6 OF 8 No. Description Date 6 6 W1 W5 W1 W8 W4 1 1 1 1 1 1 1 W4 1 8 16 W5 W1 5 11 Oblique Elevation 12 21 21 12 First Floor Plan 100' - 0" High Roof Parapet 125' - 0" Low Roof Parapet 118' - 8" W4 W4 W4 W2 W2 W5 W1 12 2 12 12 12 12 12 12 16 12 12 11 W4 6 beyond beyond 11 1 W4 W1 W4 beyond beyond beyond 1 12 12 1 Oblique Elevation 1 12 First Floor Plan 100' - 0" High Roof Parapet 125' - 0" Low Roof Parapet 118' - 8" W1 W1 W4 7 7 1 11 12 7 12 6 W2 W2 1 8 16 12 W1 W4 12 W8 W4 16Plan Step in W1 7 12 12 12 21 21 W4 12 W1 W2 W4 W5 W6 6 W8 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Sandstone Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold Hard Coat Stucco Manuf: Sto Product: PowerWall Color: Field - White Linen (fine texture) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16 smooth face, running bond with 4x16 banding Colors: - 75% - Body Color - Best Block #637 - 25% - Accent Bands - Best Block #315 Standoff 1/2" from face of masonry First Floor Plan 100' - 0" Low Roof Parapet 118' - 8" 12 12 12 12 6 1 1 1 1 W5 W4 W2 W5 W1 W4 First Floor Plan 100' - 0" High Roof Parapet 125' - 0" Low Roof Parapet 118' - 8" W4 W2 W1 W1 1 12 2 12 1 12 12 12 12 12 12 11 W4 21 21 First Floor Plan 100' - 0" High Roof Parapet 125' - 0" Low Roof Parapet 118' - 8" 2' - 8" W4 W4 W2 W1 11 12 1 12 2 12 W4 12 5 OF 8 5 5 OF 8 3 5 OF 8 1 5 OF 8 2 5 OF 8 4 5 OF 8 6 5 OF 8 7 Harmony Road Lady Moon Drive 5 OF 8 2 Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 JDO SA Lot 4 Retail Building Elevations Lot 4 2015-13 Lot 4 Retail Building 5 OF 8 3/32" = 1'-0" 1 North Building Elevation 3/32" = 1'-0" 2 South Building Elevation 3/32" = 1'-0" 4 West Building Elevation 3/32" = 1'-0" 3 East Building Elevation Exterior Material Legend Keynote Legend Key Value Keynote Text 1 Steel column painted white on concrete base, refer to Struct. 2 Steel canopy, painted, refer to detail 14/A1.2 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen by Metal Sales: T-13 panel installed horizontal per manuf. standard details, color: Sandstone, see detail 15/A3.5 7 Collector head and 4"x6" open faced downspout, prefinished to match adjacent building material, provide splash blocks at all roof to roof downspouts 8 Fire Department Connection 11 Knox box per PFA requirements 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 14 Mechanical roof top unit (dashed) 16 Exterior insulated hollow metal door & frame w/ thermal threshold, painted to match adjacent building material. 21 Exterior light fixture, refer to electrical 3/32" = 1'-0" 6 East Retail_West Building Elevation 3/32" = 1'-0" 7 West Retail_West Building Elevation 3/32" = 1'-0" 5 West Retail_South Elevation Key Plan No. Description Date (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 SA MR Lot 4 Retail Building Elevations & 3D Views Lot 4 2015-13 Lot 4 Retail Building 4 OF 8 1 3D View of North East Corner Exterior Material Legend 2 3D View of South West Corner 3 3D View of South East Corner 1/4" = 1'-0" 4 North Trash Enclosure Elevation 1/4" = 1'-0" 5 East Trash Enclosure Elevation 1/4" = 1'-0" 6 South Trash Enclosure Elevation 1/4" = 1'-0" 7 West Trash Enclosure Elevation Keynote Legend Key Value Keynote Text 17 Prefinished break metal cap flashing, refer to section details 18 Steel pipe bollard, typ. see detail on sheet 19/AS.1 19 Steel trash enclosure gate with 1 1/2" metal decking, factory primed field painted to match "Weathered Copper" flashings. See details on sheet AS.1 & AS.2 No. Description Date 7 W1 12 12 12 12 12 beyond 6 21 21 21 21 Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" beyond W4 W2 W4 color 2 W1 W5 1 12 5 5 16 11 8 12 11 2 7 21 21 17 W8 15' - 4" 18 18 T.O. Masonry 6'-0" AFG 17 17 18 W8 2' - 4" 10' - 8" 2' - 4" 15' - 4" 18 19 T.O. Masonry 6'-0" AFG 16' - 8" 17 18 18 W8 T.O. Masonry 6'-0" AFG W8 W8 18 17 16' - 8" 10' - 7 1/4" 4' - 1 1/2" 1' - 11 1/4" 19 T.O. Masonry 6'-0" AFG W1 W2 W4 W5 W6 6 W8 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Sandstone Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold Hard Coat Stucco Manuf: Sto Product: PowerWall Color: Field - White Linen (fine texture) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16 smooth face, running bond with 4x16 banding Colors: - 75% - Body Color - Best Block #637 - 25% - Accent Bands - Best Block #315 Standoff 1/2" from face of masonry Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 JDO MR Lot 3 Retail Building Elevations Fort Collins, CO 2015-13 Lot 3 Retail Building 3 OF 8 1/8" = 1'-0" 1 North Building Elevation 1/8" = 1'-0" 2 South Building Elevation 1/8" = 1'-0" 3 East Building Elevation 1/8" = 1'-0" 4 West Building Elevation 1/4" = 1'-0" 5 North - Trash Enclosure Elevation 1/4" = 1'-0" 6 South - Trash Enclosure Elevation 1/4" = 1'-0" 7 East - Trash Enclosure Elevation 1/4" = 1'-0" 8 West - Trash Enclosure Elevation Keynote Legend Number Description 1 Steel column painted white on concrete base, refer to Struct. 2 Steel canopy, painted, refer to detail 13/A1.2 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen by Metal Sales: T-13 panel installed horizontal per manuf. standard details, color: Sandstone, see detail 16/A1.2 7 Collector head and 4"x6" open faced downspout, prefinished to match adjacent building material 8 Fire Department Connection 11 Knox box per PFA requirements 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 16 Exterior insulated hollow metal door & frame w/ thermal threshold, painted to match adjacent building material. 17 Prefinished break metal cap flashing, refer to section details 18 Steel pipe bollard, typ. see detail on sheet 10/AS.1 19 Steel trash enclosure gate 1 1/2" metal decking, factory primed field painted to match "Weathered Copper" flashings. See details on sheet AS.1 21 Exterior light fixture, refer to electrical 0 Exterior Material Legend No. Description Date Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 SA MR Lot 3 Retail Building Elevations & 3D Views Fort Collins, CO 2015-13 Lot 3 Retail Building 2 OF 8 Exterior Material Legend 1 3D View of North West Corner 3 3D View of South East Corner 2 3D View of South West Corner No. Description Date Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners & Stahl Inc. 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com FP Submittal Harmony Commons ARCH 1 Submittal No.1 11/30/2015 2 Submittal No.2 01/20/2016 201 South College Ave. - Suite 203 Fort Collins, CO 80524 (970) 682-1555 Contact: Brian Stahl Email: Brian@stahldevelopment.com 3 Check Set 02/17/2016 4 FP Submittal 03/14/2016 SA MR Harmony Frontage Renderings & Details Fort Collins, CO 2015-13 Harmony Commons 1 OF 8 East Bound Traffic - Harmony Road Section Detail @ 80' Harmony Road Setback Typical Masonry Banding Detail Driver's Cone of Vision No. Description Date