HomeMy WebLinkAboutRIVER DISTRICT BLOCK 8 MIXED-USE DEVELOPMENT (OLD ELK DISTILLERY) - PDP - PDP140016 - REPORTS - DRAINAGE REPORT (5)March 7, 2016 PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR Lot 1, River District Block 8 Mixed Use Fort Collins, Colorado Prepared for: Blue Ocean Enterprises 401 West Mountain Ave. Fort Collins, CO 80521 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 838-013  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. March 7, 2016 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for Lot 1, River District Block 8 Mixed Use Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Lot 1, River District Block 8 Mixed Use development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Aaron Cvar, PE Senior Project Engineer Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 1 C. Floodplain.......................................................................................................................................... 4 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 F. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Specific Details .................................................................................................................................. 7 V. CONCLUSIONS ........................................................................................................ 8 A. Compliance with Standards .............................................................................................................. 8 B. Drainage Concept .............................................................................................................................. 8 References ......................................................................................................................... 9 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Water Quality Design Computations APPENDIX C – LID Design Information APPENDIX D – Erosion Control Report APPENDIX E – Reference Material – Selected Portions of the Downtown River District Improvement Plans (February 2012) Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 MAP POCKET: Proposed Drainage Exhibit Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The project site is located in the west quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The proposed development site is situated along the south side of Willow Street, just southeast of the intersection of Linden Street and Willow Street. 4. The proposed development site is in the City of Fort Collins Old town Basin. Typical detention requirements for this basin are to detain the difference between the 100- year developed inflow rate and the historic 2-year release rate; however, due to recent storm infrastructure improvements discussed below, the site is not required to detain onsite flows. 5. The project site is located within existing downtown development, and is surrounded by existing businesses. The existing Ranchway Feeds site is located on the north side of Willow Street, directly across from the proposed development site. 6. Minimal offsite flows from the west and south are received by the project site. Existing drainage systems in Linden Street and Willow Street convey the majority of offsite drainage approaching the site. B. Description of Property 1. The development area is roughly 1.24 net acres, as identified on the Drainage Exhibit. Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 2 Figure 1 – Aerial Photograph 2. The subject property is currently undeveloped ground. The ground cover generally consists of gravel surfacing. Existing ground slopes are mild to moderate (i.e., 1 - 6±%) through the interior of the property. General topography slopes from southwest to northeast. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Paoli Fine Sandy Loam (Hydrologic Soil Group B). 4. The proposed project site plan is composed of the development of a distillery and restaurant. Associated roadways, water and sewer lines will be constructed with the development. Water Quality will be placed near the southeast corner of the site and will treat the majority of developed runoff prior to discharge into the Willow Street storm system. Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 5. The Cache La Poudre River is located just north of the proposed development site. 6. The proposed land use is Commerical. Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 4 C. Floodplain Figure 3 –Area Floodplain Mapping 1. No portion of the subject property is encroached by the adjacent FEMA 100-year floodplain (Cache La Poudre River located just north of the site). II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 2. The proposed development site is in the City of Fort Collins Old Town Basin. Typical Detention requirements for this basin are to detain the difference between the 100- year developed inflow rate and the historic 2-year release rate. However, the Downtown River District Improvement Project Plans (February 2012) have been constructed up to the manhole in Willow Street shown on the current project plans. An improved 42-inch storm system in Willow Street will be the discharge point for the current project. The improved storm line in Willow Street conveys flow southeast to Udall Pond #1. Water quality treatment will be provided onsite prior to discharge into the improved storm system in Willow Street. B. Sub-Basin Description 3. The subject property historically drains overland from southwest to northeast. An existing area inlet in Willow Street captures runoff within the curb and gutter of Willow. Stormwater is then conveyed via the existing storm pipe in Willow north to the Cache La Poudre River. A more detailed description of the project drainage patterns follows in Section IV.A.4., below. Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 5 III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated swales to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated using extended detention methods prior to exiting the site. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality where none previously existed, sediment with erosion potential is removed from the downstream drainageway systems. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: The proposed development will eliminate sources of potential pollution previously left exposed to weathering and runoff processes. C. Development Criteria Reference and Constraints The subject property is surrounded by currently developed properties. Thus, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: Existing elevations along the property lines will generally be maintained. Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 6 As previously mentioned, overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 80th percentile rain event, which has been employed to design the project’s water quality features. The second event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated above, no portion of the subject property is located in a FEMA regulatory floodplain or floodway. 4. The proposed project does not propose to modify any natural drainageways. F. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. 2. Onsite detention and water quality treatment will be provided within the proposed underground detention/water quality cells as noted on the Drainage Exhibit. The underground system will treat developed runoff prior to discharge into the existing storm system in Willow Street, which conveys drainage in the Cache La Poudre River. 3. The drainage patterns anticipated for proposed drainage basins are described below. Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 7 Basin 1 and 2 Basins 1 and 2 consists of rooftop area and parking/drive area. The entirety of these basin will be directed to underground water quality holding cells located under the parking area near the entry point along Willow Street. Inlets will be designed at Final within the parking area which will fully capture and direct 100-year flows into the underground system. Basin OS1 Basin OS1 consists of a portion of the rooftop of an adjacent building to the southwest and a small strip of ground between this building and the proposed development site. Flows will be routed via surface flow into the parking/drive area near the entry point along Willow Street. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. Water quality treatment in the form of extended detention will be provided for the proposed development within the proposed underground water quality as shown on the Drainage Exhibit. Stormtech chamber system design details are provided in the Appendix, and show roughly 240 L.F. of chambers to create the required extended detention volume. TABLE 1 – Preliminary Detention and Water Quality Summary 2. The underground system will be designed according the criteria outlined in the “City of Fort Collins Underground Detention Criteria”. Details of the current design may be modified at the time of Final design. 3. A paver system will be situated over the underground extended detention component. Surface runoff from the ground level courtyard and service yard will drain into the paver system. The system will be designed at Final with a underdrains and other necessary features to ensure proper performance of the pavers. 4. The service yard contains a 10’x20’ spill containment area draining to a 1,000 gal. self-contained cistern. This is to prevent any spilled spirits, etc. from draining into the public storm drain. “Refer to the operations and best management practices manual by Old Elk Distilleries for additional information.” 5. LID features will be further detailed at Final Design. Please see the Appendix for LID design calculations and an LID summary table. As shown in the LID summary table, the current design exceeds the 75% LID requirement. Pond Detention Vol. (Ac-Ft) Extended.Det. Vol. (Ac-Ft) Total Req'd. Vol. (Ac-Ft) 1 N/A 0.050 0.050 Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 8 6. Final design details, construction documentation, and Standard Operating Procedures (SOP) Manual shall be provided by the City of Fort Collins for within the Development Agreement (DA) for the project. 7. The drainage features associated with the proposed project are all private facilities, located on private property. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with the Old Town Master Plan. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing detention and extended detention. 2. The drainage concept for the proposed development is consistent with the Old Town Master Plan. Lot 1, River District Block 8 Mixed Use Preliminary Drainage Report 9 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 838-013 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….………………………………… 0.95 100% Date: Concrete …….......……………….….……….………………..….…………………………… 0.95 90% Gravel ……….…………………….….…………………………..…………………………… 0.50 40% Roofs …….…….………………..……………….……………………………………………. 0.95 90% Pavers…………………………...………………..……………………………………………. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 53806 1.24 0.000 0.000 0.000 1.235 0.000 0.50 0.50 0.63 40% HISTORIC COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 9/15/2014 Overland Flow, Time of Concentration: Project: 838-013 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: 838-013 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: H1 H1 1.24 17 17 14 0.50 0.50 0.63 1.78 3.04 6.71 1.1 1.9 5.2 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) HISTORIC RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) ATC 9/15/2014 Q  C f  C i  A CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 838-013 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….……………………………… 0.95 100% Date: Concrete …….......……………….….……….………………..….…………………………… 0.95 90% Gravel ……….…………………….….…………………………..…………………………… 0.50 40% Roofs …….…….………………..……………….……………………………………………. 0.95 90% Pavers…………………………...………………..……………………………………………. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. 1 13633 0.31 Note: For preliminary calculations, Composite Runoff Coefficients are 0.95 0.95 1.00 90% 2 40849 0.94 based on an assumed imperviousness of 90% and COFC Storm Drainage 0.95 0.95 1.00 90% OS1 5564 0.13 Design Criteria Table 3-3 0.95 0.95 1.00 90% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 03/02/16 Overland Flow, Time of Concentration: Project: 838-013 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: 838-013 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: 1 1 0.31 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.8 1.4 3.1 2 2 0.94 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 2.5 4.3 9.3 OS1 OS1 0.13 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.3 0.6 1.3 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) ATC 03/02/16 Q  C f  C i  A 40 Table RO-10 Rational Method Minor Storm Runoff Coefficients for Zoning Classifications Description of Area or Zoning Coefficient R-F 0.3 U-E 0.3 L-M-In 0.55 R-L, N-C-L 0.6 M-M-N, N-C-M 0.65 N-C-B 0.7 Business: C-C-N, C-C-R, C-N, N-C, C-S 0.95 R-D-R, C-C, C-L 0.95 D, C 0.95 H-C 0.95 C-S 0.95 Industrial: E 0.85 I 0.95 Undeveloped: R-C, T 0.2 P-O-L 0.25 For guidance regarding zoning districts and classifications of such districts please refer to Article Four of the City Land Use Code, as amended. 41 Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt 0.95 Concrete 0.95 Gravel 0.5 Roofs 0.95 Recycled Asphalt 0.8 Lawns, Sandy Soil: Flat <2% 0.1 Average 2 to 7% 0.15 Steep >7% 0.2 Lawns, Heavy Soil: Flat <2% 0.2 Average 2 to 7% 0.25 Steep >7% 0.35 (4) A new Section 2.9 is added, to read as follows: 2.9 Composite Runoff Coefficient Drainage sub-basins are frequently composed of land that has multiple surfaces or zoning classifications. In such cases a composite runoff coefficient must be calculated for any given drainage sub-basin. The composite runoff coefficient is obtained using the following formula: ( ) t n i i i A C A C ∑ = = 1 * (RO-8) Where: C = Composite Runoff Coefficient Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci, acres or feet2 n = Number of different surfaces to be considered At = Total Area over which C is applicable, acres or feet2 (5) A new Section 2.10 is added, to read as follows: 42 2.10 Runoff Coefficient Adjustment for Infrequent Storms The runoff coefficients provided in tables RO-10 and RO-11 are appropriate for use with the 2-year storm event. For storms with higher intensities, an adjustment of the runoff coefficient is required due to the lessening amount of infiltration, depression retention, evapo-transpiration and other losses that have a proportionally smaller effect on storm runoff. This adjustment is applied to the composite runoff coefficient. These frequency adjustment factors are found in Table RO-12. Table RO-12 Rational Method Runoff Coefficients for Composite Analysis Storm Return Period (years) Frequency Factor Cf 2 to 10 11 to 25 26 to 50 51 to 100 1.00 1.10 1.20 1.25 Note: The product of C times Cf cannot exceed the value of 1, in the cases where it does a value of 1 must be used (6) Section 3.1 is deleted in its entirety. (7) Section 3.2 is deleted in its entirety. (8) Section 3.3 is deleted in its entirety. (9) A new Section 4.3 is added, to read as follows: 4.3 Computer Modeling Practices (a) For circumstances requiring computer modeling, the design storm hydrographs must be determined using the Stormwater Management Model (SWMM). Basin and conveyance element parameters must be computed based on the physical characteristics of the site. (b) Refer to the SWMM Users’ Manual for appropriate modeling methodology, practices and development. The Users’ Manual can be found on the Environmental Protection Agency (EPA) website (http://www.epa.gov/ednnrmrl/models/swmm/index.htm). (c) It is the responsibility of the design engineer to verify that all of the models used in the design meet all current City criteria and regulations. 4.3.1 Surface Storage, Resistance Factors, and Infiltration Table RO-13 provides values for surface storage for pervious and impervious surfaces and the infiltration rates to be used with SWMM. Table RO-13 also lists the appropriate infiltration decay rate, zero detention depth and resistance factors, or Manning’s “n” values, for pervious and impervious surfaces to be used for SWMM modeling in the city of Fort Collins. 33 (11) Section 4.0 is amended to read as follows: 4.0 Intensity-Duration-Frequency Curves for Rational Method: The one-hour rainfall Intensity-Duration-Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) 2-Year 10-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 34 Table RA-8 -- City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with the Rational Method (31 minutes to 60 minutes) 2-Year 10-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.0 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.8 40 1.07 1.83 3.74 41 1.05 1.8 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.6 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.9 1.54 3.14 53 0.89 1.52 3.1 54 0.88 1.5 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.4 2.86 35 (12) A new Section 4.1 is added, to read as follows: 4.1 Intensity-Duration-Frequency Curves for SWMM: The hyetograph input option must be selected when creating SWMM input files. Hyetographs for the 2-, 5-, 10-, 25-, 50-, and 100-year City of Fort Collins rainfall events are provided in Table RA-9. Table RA-9 – City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with SWMM 2-Year 5-Year 10-Year 25-Year 50-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 5 0.29 0.40 0.49 0.63 0.79 1.00 10 0.33 0.45 0.56 0.72 0.90 1.14 15 0.38 0.53 0.65 0.84 1.05 1.33 20 0.64 0.89 1.09 1.41 1.77 2.23 25 0.81 1.13 1.39 1.80 2.25 2.84 30 1.57 2.19 2.69 3.48 4.36 5.49 35 2.85 3.97 4.87 6.30 7.90 9.95 40 1.18 1.64 2.02 2.61 3.27 4.12 45 0.71 0.99 1.21 1.57 1.97 2.48 50 0.42 0.58 0.71 0.92 1.16 1.46 55 0.35 0.49 0.60 0.77 0.97 1.22 60 0.30 0.42 0.52 0.67 0.84 1.06 65 0.20 0.28 0.39 0.62 0.79 1.00 70 0.19 0.27 0.37 0.59 0.75 0.95 75 0.18 0.25 0.35 0.56 0.72 0.91 80 0.17 0.24 0.34 0.54 0.69 0.87 85 0.17 0.23 0.32 0.52 0.66 0.84 90 0.16 0.22 0.31 0.50 0.64 0.81 95 0.15 0.21 0.30 0.48 0.62 0.78 100 0.15 0.20 0.29 0.47 0.60 0.75 105 0.14 0.19 0.28 0.45 0.58 0.73 110 0.14 0.19 0.27 0.44 0.56 0.71 115 0.13 0.18 0.26 0.42 0.54 0.69 120 0.13 0.18 0.25 0.41 0.53 0.67 36 RAINFALL INTENSITY-DURATION-FREQUENCY CURVE 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 STORM DURATION (minutes) RAINFALL INTENSITY (inches/hour) 2-Year Storm 10-Year Storm 100-Year Storm Figure RA-16 City of Fort Collins Rainfall Intensity-Duration-Frequency Curves (13) Section 5.0 is deleted in its entirety. (14) Section 6.0 is deleted in its entirety. (15) Section 7.0 is deleted in its entirety. (16) Section 7.1 is deleted in its entirety. (17) Section 7.2 is deleted in its entirety. (18) Section 7.3 is deleted in its entirety. (19) Section 8.0 is deleted in its entirety. (20) Table RA-1 is deleted in its entirety. DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-3—Recommended Percentage Imperviousness Values Land Use or Surface Characteristics Percentage Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family * Multi-unit (detached) 60 Multi-unit (attached) 75 Half-acre lot or larger * Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 * See Figures RO-3 through RO-5 for percentage imperviousness. C A = K A + ( 1 . 31 i 3 − 1 . 44 i 2 + 1 . 135 i − 0 . 12 ) for CA ≥ 0, otherwise CA = 0 (RO-6) C CD = K CD + ( 0 . 858 i 3 − 0 . 786 i 2 + 0 . 774 i + 0 . 04 ) (RO-7) C B = (CA + C CD ) 2 2007-01 RO-9 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-5— Runoff Coefficients, C Percentage Imperviousness Type C and D NRCS Hydrologic Soil Groups 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.04 0.15 0.25 0.37 0.44 0.50 5% 0.08 0.18 0.28 0.39 0.46 0.52 10% 0.11 0.21 0.30 0.41 0.47 0.53 15% 0.14 0.24 0.32 0.43 0.49 0.54 20% 0.17 0.26 0.34 0.44 0.50 0.55 25% 0.20 0.28 0.36 0.46 0.51 0.56 30% 0.22 0.30 0.38 0.47 0.52 0.57 35% 0.25 0.33 0.40 0.48 0.53 0.57 40% 0.28 0.35 0.42 0.50 0.54 0.58 45% 0.31 0.37 0.44 0.51 0.55 0.59 50% 0.34 0.40 0.46 0.53 0.57 0.60 55% 0.37 0.43 0.48 0.55 0.58 0.62 60% 0.41 0.46 0.51 0.57 0.60 0.63 65% 0.45 0.49 0.54 0.59 0.62 0.65 70% 0.49 0.53 0.57 0.62 0.65 0.68 75% 0.54 0.58 0.62 0.66 0.68 0.71 80% 0.60 0.63 0.66 0.70 0.72 0.74 85% 0.66 0.68 0.71 0.75 0.77 0.79 90% 0.73 0.75 0.77 0.80 0.82 0.83 95% 0.80 0.82 0.84 0.87 0.88 0.89 100% 0.89 0.90 0.92 0.94 0.95 0.96 TYPE B NRCS HYDROLOGIC SOILS GROUP 0% 0.02 0.08 0.15 0.25 0.30 0.35 5% 0.04 0.10 0.19 0.28 0.33 0.38 10% 0.06 0.14 0.22 0.31 0.36 0.40 15% 0.08 0.17 0.25 0.33 0.38 0.42 20% 0.12 0.20 0.27 0.35 0.40 0.44 25% 0.15 0.22 0.30 0.37 0.41 0.46 30% 0.18 0.25 0.32 0.39 0.43 0.47 35% 0.20 0.27 0.34 0.41 0.44 0.48 40% 0.23 0.30 0.36 0.42 0.46 0.50 45% 0.26 0.32 0.38 0.44 0.48 0.51 50% 0.29 0.35 0.40 0.46 0.49 0.52 55% 0.33 0.38 0.43 0.48 0.51 0.54 60% 0.37 0.41 0.46 0.51 0.54 0.56 65% 0.41 0.45 0.49 0.54 0.57 0.59 70% 0.45 0.49 0.53 0.58 0.60 0.62 75% 0.51 0.54 0.58 0.62 0.64 0.66 80% 0.57 0.59 0.63 0.66 0.68 0.70 85% 0.63 0.66 0.69 0.72 0.73 0.75 90% 0.71 0.73 0.75 0.78 0.80 0.81 95% 0.79 0.81 0.83 0.85 0.87 0.88 100% 0.89 0.90 0.92 0.94 0.95 0.96 2007-01 RO-11 Urban Drainage and Flood Control District RUNOFF DRAINAGE CRITERIA MANUAL (V. 1) TABLE RO-5 (Continued)—Runoff Coefficients, C Percentage Imperviousness Type A NRCS Hydrologic Soils Group 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.00 0.00 0.05 0.12 0.16 0.20 5% 0.00 0.02 0.10 0.16 0.20 0.24 10% 0.00 0.06 0.14 0.20 0.24 0.28 15% 0.02 0.10 0.17 0.23 0.27 0.30 20% 0.06 0.13 0.20 0.26 0.30 0.33 25% 0.09 0.16 0.23 0.29 0.32 0.35 30% 0.13 0.19 0.25 0.31 0.34 0.37 35% 0.16 0.22 0.28 0.33 0.36 0.39 40% 0.19 0.25 0.30 0.35 0.38 0.41 45% 0.22 0.27 0.33 0.37 0.40 0.43 50% 0.25 0.30 0.35 0.40 0.42 0.45 55% 0.29 0.33 0.38 0.42 0.45 0.47 60% 0.33 0.37 0.41 0.45 0.47 0.50 65% 0.37 0.41 0.45 0.49 0.51 0.53 70% 0.42 0.45 0.49 0.53 0.54 0.56 75% 0.47 0.50 0.54 0.57 0.59 0.61 80% 0.54 0.56 0.60 0.63 0.64 0.66 85% 0.61 0.63 0.66 0.69 0.70 0.72 90% 0.69 0.71 0.73 0.76 0.77 0.79 95% 0.78 0.80 0.82 0.84 0.85 0.86 100% 0.89 0.90 0.92 0.94 0.95 0.96 RO-12 2007-01 Urban Drainage and Flood Control District APPENDIX B WATER QUALITY DESIGN COMPUTATIONS EXTENDED DETENTION WATER QUALITY POND DESIGN CALCULATIONS Pond 1 Project: 838-013 By: ATC Date: 9-12-14 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 1.240 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <-- CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.050 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = ** <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = ** <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = ** <-- INPUT from Figure 5 n = ** <-- INPUT from Figure 5 t (in) = ** <-- INPUT from Figure 5 number of rows = ** <-- CALCULATED from WQ Depth and row spacing **To be completed at final design APPENDIX C LID DESIGN INFORMATION Project Area Total Site Area 54,510 sf Impervious Area 49,224 sf Paver Area 3,231 sf Landscape Area 2,055 sf Required Minimum Area to be Treated by LID measures 40,883 sf Paver Area Treatment Paver Area 3,231 sf Paver Run‐on Area 9,484 sf Area Treated by Pavers 12,715 sf Infiltration Gallery Treatment Infiltration Gallery Area 854 sf Treatment area for Infiltration gallery 31,760 sf Area Treated by Infiltration Gallery 31,760 sf Total Area Treated 44,475 sf Percent of Impervious Area Treated by LID measures 81.59 % On‐Site Treatment by LID Project: By: Units: Imperial Point of Contact Date: Required Storage Volume 750 CF Select Stormtech Chamber System SC-310 Stone Porosity (Industry Standard = 40%) 30% Stone Foundation Depth 12 Inches Storage Volume Per Chamber 30.50 CF Avg Cover over Chambers (18 in min. & 96 in max.) 18 Inches 16 in (406 mm) Number of Chambers Required - 25 12 in (305 mm) Approximate Bed Size Required 721 SF Tons of Stone Required 87 Tons Volume of Excavation 102 CY Area of Filter Fabric 234 SY # of End Caps Required 8 Each Length of ISOLATOR ROW 49.84 FT ISOLATOR FABRIC 22 SY Is the limiting dimension for the bed the width or length? width Width 15 FT Length 55 FT # of Chambers Long 7 EA # of Chambers long - EA # of Rows 4 EA # of Rows - EA Actual Length 53.44 FT Actual Length - FT Actual Width 14.82 FT Actual Width - FT 3 of the chambers rows will contain only 6 chambers Please call StormTech @ 888-892-2694 for conceptual cost estimates. To use this sheet: Please enter data into the blue and green cells. If switching between Imperial and Metric units please check the correct units and data is input in the green cells. System Requirements River District Block Eight Mixed Use | Old Elk N. Haws 03.01.2016 Material Estimate Controlled by Width (Rows) Controlled by Length www.stormtech.com│20 Beaver Road│Suite 104│Wethersfield│Connecticut│06109│888.892.2694│fax 866.328.8401 APPENDIX D WATER EROSION CONTROL REPORT Lot 1, River District Block 8 Mixed Use Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX E REFERENCE MATERIAL – SELECTED PORTIONS OF THE DOWNTOWN RIVER DISTRICT IMPROVEMENT PLANS (FEBRUARY 2012) MAP POCKET DRAINAGE EXHIBITS LOT 1 LOT 2 DN X X X X X X X X X X X X X X X X X X X X X X D / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W S O S D H Y D CO H Y D SD SD SD SD LINDEN STREET (100' PUBLIC ROW) WILLOW STREET (PUBLIC ROW VARIES) EXISTING 1 STORY CONCRETE BUILDING EXISTING 1 STORY METAL BUILDING 1 0.31 70 69 71 70 68 69 71 72 72 70 69 71 72 72 70 71 73 72 EXISTING 24" RCP STORM DRAIN EXISTING STORM DRAIN INLETS PROPOSED STORM DRAIN 18" PVC STORM DRAIN PROPOSED STORM DRAIN INLET EXISTING 24" RCB STORM DRAIN OS1 0.13 OWNER MAWSON LUMBER AND HARDWARE CO 350 LINDEN ST FORT COLLINS, CO 80524 OWNER MAWSON LUMBER AND HARDWARE CO 115 LINCOLN AVE FORT COLLINS CO, 80524 OWNER GODINEZ JESSE/DOROTHY 400 LINDEN ST FORT COLLINS, CO 80524 OWNER FEEDERS SUPPLY LLC 359 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 416 LINDEN ST FORT COLLINS, CO 80524 OWNER RANCH-WAY INC 546 WILLOW ST FORT COLLINS, CO 80524 DOWNSPOUTS PIPED TO TREE GRATES (TYP.) EXISTING 42" RCP STORM DRAIN CONNECT TO EXISTING MANHOLE 30" RCP STORM DRAIN ROOF DRAIN SYSTEM (TYP.) ROOF DRAIN SYSTEM (TYP.) 2 0.94 2 OS1 3 0.013 BUILDING 2 BUILDING 1 1 PROPOSED OUTLET CONTROL STRUCTURE PROPOSED STORMTECH VAULTS PROPOSED PERMEABLE PAVERS PROPOSED PROPOSED SPILL SUBDRAIN CONTAINMENT AREA PROPOSED DRAIN BASIN PROPOSED TRENCH DRAIN PROPOSED DRAIN BASIN PROPOSED DRAIN BASIN PROPOSED DRAIN BASIN CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C800 DRAINAGE EXHIBIT A. Reese B. Ruch 1"=30' BENCHMARK PROJECT DATUM: NAVD88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 03-00 ON A PARAPET WALL AT THE NORTHWEST END OF THE LINCOLN AVE. BRIDGE NEAR THE NORTHEAST CORNER OF LINCOLN AVE. AND WILLOW ST. ELEVATION=4967.33 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 05-00 ON THE TOP OF CURB AT THE SIGNAL POLE BASE AT THE NORTHWEST CORNER OF LINDEN ST. AND JEFFERSON ST. ELEVATION=4978.05 PLEASE NOTE: THIS PLAN SET IS USING NAVD 88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD 29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD 29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD 29 UNADJUSTED = NAVD 88 - 3.18' BASIS OF BEARING THE BASIS OF BEARINGS IS THE SOUTHEASTERLY LINE OF BLOCK 9, TOWN OF FORT COLLINS AS BEARING S41°40'49"W (ASSUMED BEARING). NOTES: 1. REFER TO THE PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR RIVER DISTRICT BLOCK EIGHT MIXED-USE DATED MARCH 7, 2016 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 120 No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Mar. 7, 2016 PROJECT: 838-013 Sheet Of 21 Sheets LOT 1, RIVER DISTRICT BLOCK EIGHT MIXED USE DRAWING FILENAME: D:rojects\838-013\Dwg\Drng\838-013_DRNG.dwg LAYOUT NAME: C801 DATE: Mar 07, 2016 - 10:02am CAD OPERATOR: ben LIST OF XREFS: [NES-xborder] [838-013_xEXST] [838-013_xSITE] [838-013_xTOPO] [838-013_xUTIL] [838-013_xGRAD] [838-013_xADJ] [838-013_xEUTIL-FTC] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. 301 North Howes Street, Suite 010 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN www.northernengineering.com Phone: 970.221.4158 3/7/16 NOT FOR CONSTRUCTION REVIEW SET C 0.60 ac LEGEND: 4953 PROPOSED CONTOUR PROPOSED STORM SEWER EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 BASIN DESIGNATION BASIN AREA (AC) PROPOSED PERMEABLE PAVERS PROPOSED SUBDRAIN SD (min) 10-yr Tc (min) 100-yr Tc (min) 11No0.95 0.95 1.00 45 1.00% 1.9 1.9 1.3 110 0.60% 1.55 1.2 0 0.00% N/A N/A 5 5 5 22No0.95 0.95 1.00 60 1.00% 2.2 2.2 1.4 230 0.75% 1.73 2.2 0 0.00% N/A N/A 5 5 5 OS1 OS1 No 0.95 0.95 1.00 30 1.00% 1.5 1.5 1.0 138 0.75% 1.73 1.3 0 0.00% N/A N/A 5 5 5 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC 03/02/16 Time of Concentration (Equation RO-4)  3 1 1 . 87 1 . 1 * S Ti C Cf L   (min) 10-yr Tc (min) 100-yr Tc (min) H1 H1 No 0.50 0.50 0.63 146 1.60% 11.6 11.6 9.2 383 0.40% 1.26 5.0 0 0.00% N/A N/A 17 17 14 HISTORIC TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC 9/15/2014 Time of Concentration (Equation RO-4)  3 1 1 . 87 1 . 1 * S Ti C Cf L  