Loading...
HomeMy WebLinkAboutANGIE LEE PERIODONTICS - PDP - PDP160012 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (3)EXTERIOR FINISH SCHEDULE WOOD SIDING BRICK STONE VENEER STUCCO PRECAST CAPS STOREFRONT GLAZING STEEL & FLASHINGS PREFINISHED METAL COPING CMU GENERAL NOTE: ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF. BROWN BROWN COURSED ASHLAR- MIX GREY & TAN TAN MED. GREY SILVER GREY TINTED LIGHT GREY GREY GREY FIN. FLOOR 100' - 0" STEEL COLUMN, PAINTED STEEL CHANNEL, PAINTED PREFINISHED METAL FASCIA BRICK, STACKED BOND PREFINISHED METAL COPING PRECAST CAP STONE VENEER, COURSED ASHLAR PREFINISHED METAL COPING STEEL CHANNEL, PAINTED PREFINISHED METAL FASCIA BIKE RACK BRICK, STACKED BOND HORIZONTAL STUCCO REVEAL SMOOTH STUCCO HORIZONTAL WOOD SIDING ALUMINUM STOREFRONT FRAME AND DOOR FULL CUTOFF LIGHT FIXTURE 120' - 4" 116' - 0" 10' - 8" 3' - 3" STUCCO ACCENT JOINT ALUMINUM STOREFRONT WINDOW FIN. FLOOR 100' - 0" 10' - 8" 3' - 3" PREFINISHED METAL COPING FULL CUTOFF LIGHT FIXTURE BRICK, STACKED BOND ALUMINUM STOREFRONT FRAME AND DOOR BRICK, STACKED BOND SMOOTH STUCCO PREFINISHED METAL COPING 114' - 0" STUCCO ACCENT JOINT, TYP 419 Canyon Avenue, Suite 200 Fort Collins, CO 80521 ph: 970.224.1191 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARCHITECTS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. CHECKED BY: DRAWN BY: COPYRIGHT: Issued No. Description Date 1 03-03-15 Revisions 2 3 4 5 6 No. Description Date VAUGHT FRYE LARSON architects BID/PERMIT SET GD GD, CA 4803 BOARDWALK DR. FORT COLLINS, CO 80525 3/29/2016 10:38:52 AM 3/29/2016 10:38:52 AM G:\2015\15-71 Lee Periodontics\4 Revit\2016-02-10 Lee Periodontics Shell.rvt A2 ARCHITECTURAL ELEVATIONS LEE PERIODONTICS SCHEMATIC DESIGN 2015-71 1 1/4" = 1'-0" WEST ELEVATION 2 1/4" = 1'-0" SOUTH ELEVATION 3 PLANNING - NORTHEAST CORNER