Loading...
HomeMy WebLinkAboutLEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY - FDP - FDP160005 - REPORTS - DRAINAGE REPORTFINAL DRAINAGE REPORT FOR LEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY Prepared For: FORT COLLINS SELF-STORAGE, LLC 5013 Bluestem Court Fort Collins, CO 80525 March 16,2016 Project No. 39708.02 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................................... i Vicinity Map ......................................................................................................................................................... 1 General Description and Location .................................................................................................................. 2 Location And Existing Site Characteristics ................................................................................................. 2 Site Soils ........................................................................................................................................................... 2 Floodplain ........................................................................................................................................................ 2 Drainage Basins and Sub-Basins ....................................................................................................................... 3 Major Basin ...................................................................................................................................................... 3 Historic Sub-Basins ........................................................................................................................................ 3 Developed Sub-Basins.................................................................................................................................... 4 Drainage Design Criteria .................................................................................................................................. 6 Regulations ...................................................................................................................................................... 6 Low-Impact Development ............................................................................................................................ 6 Development Criteria Reference and Constraints ................................................................................... 7 Hydrologic Criteria ........................................................................................................................................ 7 Hydraulic Criteria........................................................................................................................................... 7 Floodplain Regulation Compliance .............................................................................................................. 8 Modifications of Criteria ............................................................................................................................... 8 Drainage Facility Design .................................................................................................................................... 9 General Concept ............................................................................................................................................ 9 Water Quality/ Detention Facilities ............................................................................................................ 9 Stormwater Pollution Prevention ..................................................................................................................10 Temporary Erosion Control ......................................................................................................................10 Permanent Erosion Control .......................................................................................................................10 Summary & Conclusions .................................................................................................................................11 References .........................................................................................................................................................12 Page ii APPENDIX Appendix A – Site & Soil Descriptions and Characteristics Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Existing & Proposed Drainage Plans Appendix E – LID Exhibit Page iii Engineer’s Certification Block I hereby certify that this Final Drainage Report for Lemay Avenue Craft Brewery & Self-Storage Facility was prepared by me (or under my direct supervision) for JR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Timothy J. Halopoff, PE Registered Professional Engineer State of Colorado No. 37953 Page 1 VICINITY MAP Page 2 GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS Lemay Avenue Craft Brewery & Self- Storage is located in the northeast quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian in the City of Fort Collins, Larimer County, Colorado. More specifically, the Lemay Avenue Craft Brewery & Self- Storage site is a 6.35 acre property that is currently undeveloped. The site is zoned I (Industrial) and will support the proposed craft brewery and self-storage facilities. The site is surrounded by Buckingham Street to the north, Lemay Avenue to the east, and developed land to the south and west. The proposed use of the site is split into three lots. The first lot contains the craft brewery building with 7,912 total square feet. The second lot contains the self-storage facilities with 8 buildings totaling 104,000 square feet. The third lot is for a future development and will be a lawn area until the lot is developed. The proposed detention pond was designed for the future development of lot 3 at 60% impervious. The existing site generally slopes from the north to south with slopes ranging between 0.60% and 2.5%. The property is generally covered with sparse native grasses. The site currently drains to the southeast corner of the site where runoff is collected in an existing 30” CMP culvert and piped south in the City’s Lemay Avenue Right-Of-Way. SITE SOILS The Lemay Avenue Craft Brewery & Self- Storage site soils consist of loamy soil, predominately Nunn clay loam. Nunn clay loam belongs to hydrologic soils Group C. Group C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Nunn clay loam with 0-3 percent slopes generally has a combined surface layer thickness of approx. 30 inches. Runoff is moderately high, and the hazards of wind erosion are moderately low. Supporting figures can be found in the Appendix, page A-1. FLOODPLAIN The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. The “City of Fort Collins Floodplain Review Checklist for 50% Submittals” checklist is not applicable for this Drainage Report. Page 3 DRAINAGE BASINS AND SUB-BASINS MAJOR BASIN The proposed Lemay Avenue Craft Brewery & Self-Storage site is located in the Dry Creek major basin. The Dry Creek drainage basin is tributary to the Cache la Poudre River and extends from the Wyoming border to where it joins the river near Mulberry and Timberline. The Dry Creek basin is approximately 23 miles long and six miles wide and encompasses approximately 62 square miles. The land used in the upper and middle portion of the basin is primarily rangeland and irrigated hay meadows and pastures. The majority of the lower portion of the basin is developed and includes commercial, industrial and residential uses. The project site is a part of the lower Dry Creek basin. There are no major drainageways located within or immediately adjacent to the site. The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. An annotated FIRM exhibit is included in Appendix A. HISTORIC SUB-BASINS Lemay Avenue Craft Brewery & Self-Storage is an infill development piece of property. It is governed by the City’s Reasonable Use policy, in which the proposed drainage basins will need to follow the generally accepted principle of releasing the 100-year developed condition flow rate at the same location and at a magnitude of 0.2cfs/acre as the pre-development condition. There are no offsite areas that flow across the proposed development site. Referring to the “Existing Drainage Plan”, included in the Appendix, the following describes the existing condition drainage basins. Existing Onsite Sub-Basins: The site has two existing onsite drainage basins. Sub-basin EX1 consists of a 6.20 acre area of undeveloped open space with native grasses and weeds covering the majority of the ground and is assumed to be 2% impervious. Runoff generally flows to the southeast across basin EX-1, at slopes ranging from 0.50% to 2.0%, generally leaving the site at the southeast corner, where it is piped south off-site through an existing 30” CMP culvert. Sub-basin EX2 consists of a 1.51 acre area of undeveloped open space with the same ground cover and percentage imperviousness as sub-basin EX-1. Runoff in sub-basin EX-1 collects in a roadside swale and flows south to the southeast corner, of the site where it is piped south, off-site through an existing 30” CMP culvert. Page 4 DEVELOPED SUB-BASINS The proposed developed condition sub-basins have been designed to mimic the historic basins’ runoff patterns. The following describes the proposed conditions on-site drainage basins. Refer to the “Proposed Drainage Plan” in the appendix for review. Proposed Onsite Sub-Basins: Sub-basin A consists of 0.98 acres on the northern portion of the subject property. Runoff from the proposed building and parking lot travels west to an LID basin in the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin B consists of 0.85 acres on the northwest corner of the subject property. Runoff from sub-basin b is collected in an LID basin on the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin C consists of 0.41 acres near the northwest corner of the subject property. Runoff from the proposed building and driveways travels west to an LID basin on the western edge of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin D consists of 0.16 acres on the western edge of the subject property. Runoff is captured in a proposed soft swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin E consists of 0.39 acres in the western portion of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southwest corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub-basin F consists of 0.16 acres on the east side of the subject on the western edge of the subject property. Runoff is captured in a proposed soft swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin G consists of 0.77 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin and then flows south into the proposed detention pond on the southern edge of the property. Page 5 Sub-basin H consists of 0.68 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin I is comprised of 0.82 acres in the center of the subject property. Runoff from the proposed lawn area is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin J is comprised of 0.19 acres at the eastern edge of the subject property. Runoff from this basin is captured in a swale and flows south through an LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin K is comprised of 0.32 acres near the southeast corner of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southeast corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub-basin L is comprised of 0.76 acres and contains the proposed detention pond area. Runoff from this basin is collected in the proposed detention pond on the southern edge of the property. Sub-basin M is comprised of 0.53 acres on the northern edge of the subject property. Runoff from this basin is collected in a proposed sump inlet along Buckingham Street. Captured flows are piped east to the corner of Buckingham Street and Lemay Avenue where they are release into a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off-site through and existing 30” CMP culvert. Sub-basin N is comprised of 1.48 acres on the eastern edge of the subject property. Runoff from this basin is collected in a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off-site through and existing 30” CMP culvert. Sub-basin O is comprised of 0.10 acres on the southern edge of the subject property. Runoff from this basin sheet flow south off-site. Page 6 DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Storm Drainage Design Criteria and Construction Manual (with all current 2011 Revisions)(FCSDDCCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. LOW-IMPACT DEVELOPMENT Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management. Per City criteria, a minimum of 50 percent of new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP) ) as well as 25% of the new drive area must be treated by porous pavement. The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. The proposed site uses porous pavers, bio- swales and LID basins for the LID/BMP design elements. In total 100% of the new impervious area is treated by an LID before reaching the proposed detention pond and 25.1% of the new pavement area is porous pavement, see the tables below for more details on each. Since 100% of the new impervious area is being treated by an LID, water quality is not needed in the detention pond. An illustrative LID/Surface Maps as well as sizing of the LID/BMPs is provided in Appendix E. Table1: LID Requirements 50% On-Site Treatment by LID Requirement New Impervious Area 144,522 sq. ft. Required Minimum Impervious Area to be Treated 72,261 sq. ft. (=50% of new impervious area) Area of Paver Section #1 16,748 sq. ft. Impervious Run-on area for Paver Section #1 (1.5:1) 25,090 sq. ft. Impervious Area Directly Treated by LID Treatment Method #2 - LID Basin #2 17,770 sq. ft. Impervious Area Directly Treated by LID Treatment Method #3 - LID Swale #1 7,377 sq. ft. Impervious Area Directly Treated by LID Treatment Method #4 - LID Basin #3 64,572 sq. ft. Impervious Area Directly Treated by LID Treatment Method #5 - LID Basin #4 29,713 sq. ft. Total Impervious Area Treated 144,522 sq. ft. Actual % of Impervious Area Treated 100.0 % Table2: Porous Pavement Requirement 25% Porous Pavement Requirement New Driveable Area 68,778 sq. ft. Required Minimum Area of Porous Pavement (=25% of new pavement area) 17,195 sq. ft. Area of Paver Section #1 17,280 sq. ft. Total Porous Pavement Area 17,280 sq. ft. Actual % of Porous Pavement Provided 25.1 % Page 7 Table3: LID Sizing LID Sizing LID Measure Impervious Area Treated Sq. ft. Area of LID sq.ft. Ratio Paver Section #1 25090 16748 1.5 LID Swale #1 22222 5599 4.0 LID Swale #2 18261 2516 7.3 LID Basin #1 4097 4097 1.0 LID Basin #2 2925 585 5.0 LID Basin #3 64572 6520 9.9 LID Basin #4 11452 1636 7.0 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS There were no previous drainage reports or master plan used in the development of this final drainage report. The developed site runoff is constrained to release 0.2 cfs per acre from the proposed detention pond. There are 6.49 acres contributing to the pond and therefore the maximum pond release is set to 1.3 cfs. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent imperviousness and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type C hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO-3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To more closely match the City of Fort Collins IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-year, 1-hour rainfall depth of 0.82 inches and a 100-year, 1- hour rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. The 2- hour 100-year rainfall total is 3.67 inches, based on the rainfall frequencies adopted by the City of Fort Collins. HYDRAULIC CRITERIA This report demonstrates that the proposed stormwater detention concept is able to reduce the 100-year developed condition flows to a flow rate of 0.2 cfs/ acre; thereby satisfying the City’s Reasonable Use requirements. The Rational Formula-based Federal Aviation Administration (FAA) method is used to preliminarily size the detention pond in accordance with City criteria, as the tributary area is less than 20 acres in size. The ultimate Lemay Avenue Craft Brewery & Self-Storage storm drainage system will be designed to convey the minor and major storm events through the property with the proposed inlets, storm Page 8 sewer pipes, soft swales, and LID measures for the flows being calculated by this report. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm flows. During the major developed condition 100-year storm, the accumulated water depth in the ponds will be held to a maximum level of one-foot below all building finished floor elevations. Additionally, this report summarizes if any, the expected changes to offsite conditions or flows. This project will eventually show that the flow rate released downstream is less than would historically be experienced, and that the sedimentation is lessened through increase infiltration. All swale and pipe outlets will be protected with turf mat or riprap; whichever is most appropriate. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection of downstream conveyance channels and culverts. Lid measures have been integrated into this design on higher levels than most City of Fort Collin’s projects to date. In all, 100% of this project’s impervious areas pass through and are treated in LID’s prior to reaching the detention pond. FLOODPLAIN REGULATION COMPLIANCE The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. The “City of Fort Collins Floodplain Review Checklist for 50% Submittals” checklist is not applicable for this Drainage Report. MODIFICATIONS OF CRITERIA There are no modifications to the Storm Drainage Criteria Manual and Construction Standards being requested. Page 9 DRAINAGE FACILITY DESIGN GENERAL CONCEPT The proposed improvements to the Lemay Avenue Craft Brewery & Self-Storage site will result in developed condition runoff being conveyed around the proposed buildings and to the south via concrete pans and swales. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, permeable pavement systems are proposed for portions of the parking lot, Lid infiltration forebay basins to treat roof and driveway drainage, and grass lined bio-swales (soft-swales) are proposed on the west and east sides of the site to improve water quality. Runoff from the site is captured in LID basins and swales located around the self-storage site and in open areas adjacent to the building. Runoff is conveyed via sheet flow, concrete pans and bio- swales in a southerly direction to the proposed detention pond at the southern end of the site. The existing drainage outfall from the site is in the southeast corner of the property. The proposed detention pond is sized to detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. Runoff collected from Buckingham Street and Lemay Avenue will combine with flows released from the proposed detention pond and will continue to flow south off-site through an existing 30” CMP culvert, similar to historic conditions. WATER QUALITY/ DETENTION FACILITIES Water quality will be provided for the site through the use of LID basins and swales. Detention will be provided for the site through the proposed detention pond on the southern edge of the site. The voids provided by the gravel in the permeable pavers will also be included in the provided detention volume. The proposed detention pond will detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. The 100 yr water surface elevation and the overflow weir elevation for the pond is at 4944.90. The proposed pond also has 1 foot of freeboard above this elevation. See Table 3, below, for detention pond sizing and release rates. Table4: Detention Pond Values Storage Volume Required (acre-ft) WQCV Volume Required (acre-ft) (*provided in LID basins and swales) Storage Volume Provided Including volume provided by void space in Pervious Pavers (acre-ft) 100-yr Max Inflow Rate (cfs) 100-yr Max Release Rate (cfs) 1.36 0.16 1.36 28.9 1.3 Page 10 STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, and others. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed detention/water quality ponds, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. JR will provide a detailed Storm Water Management and Erosion Control Plan at the time of the FDP submittal that will meet all requirements of the City of Fort Collins. Page 11 SUMMARY & CONCLUSIONS The existing conditions drainage has two onsite sub-basins with the same outfall point in the southeast corner of the subject property. The proposed drainage condition was designed to mimic the historic basins’ runoff patterns. The existing conditions drainage patterns are maintained in the design of the project. The proposed improvements will have positive impacts on the timing, flow rate, and quality of runoff leaving the site; and will reduce potential impacts for flooding downstream of this site. The hydrologic and detention calculations were performed using the required methods as outlined in the City of Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual. The proposed drainage improvements meet or exceed the City’s requirements. The proposed concept for the development of the Lemay Avenue Craft Brewery & Self-Storage site involves routing developed condition flows to a proposed onsite detention pond. LID site enhancements will treat the site runoff at the source before allowing the runoff to be conveyed to the proposed detention pond. The site’s stormwater facilities are sized to meet the City of Fort Collins “Storm Drainage Criteria Manual and Construction Standards” for both detention and water quality. Page 12 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997. 3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [July 21, 2010] APPENDIX A SITE & SOIL DESCRIPTIONS AND CHARACTERISTICS LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 1- VICINITY MAP SITE LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 2 - SOILS MAP LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 3 - FIRM MAP APPENDIX B HYDROLOGIC CALCULATIONS Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 3/9/16 A 0.98 100 0.73 74.69 5 0.15 0.80 90 0.10 9.20 84.69 B 0.85 100 0.00 0.00 5 0.85 5.00 90 0.00 0.00 5.00 C 0.41 100 0.23 56.10 5 0.00 0.00 90 0.18 39.50 95.60 D 0.16 100 0.00 0.00 5 0.08 2.50 90 0.08 45.00 47.50 E 0.39 100 0.21 53.85 5 0.00 0.00 90 0.18 41.50 95.35 F 0.16 100 0.00 0.00 5 0.06 1.90 90 0.10 56.30 58.20 G 0.77 100 0.36 46.75 5 0.00 0.00 90 0.41 47.90 94.65 H 0.68 100 0.33 48.53 5 0.00 0.00 90 0.35 46.30 94.83 I 0.82 100 0.48 58.54 5 0.34 2.10 90 0.00 0.00 60.64 J 0.19 100 0.00 0.00 5 0.19 5.00 90 0.00 0.00 5.00 K 0.32 100 0.16 50.00 5 0.00 0.00 90 0.16 45.00 95.00 L 0.76 100 0.00 0.00 5 0.76 5.00 90 0.00 0.00 5.00 M 0.53 100 0.39 72.88 5 0.14 1.40 90 0.00 0.00 74.28 N 1.48 100 0.45 30.41 5 0.96 3.20 90 0.07 4.30 37.91 O 0.10 100 0.00 0.00 5 0.10 5.00 90 0.00 0.00 5.00 Basins Total Weighted % Basin ID Total Area (ac) % Imp. Area (ac) Imp. Weighted % Imp. % Imp. Area (ac) Weighted % Imp. % Imp. 39708.02 COMPOSITE % IMPERVIOUS CALCULATIONS Paved Roads/ Drives Lawns Roof Area (ac) Weighted % Imp. X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 3/9/16 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) A 0.98 C 84.7 0.78 0.65 70 1.4 6.2 200 1.0 20.0 2.0 1.7 7.8 270.0 11.5 7.8 B 0.85 C 5.0 0.52 0.08 20 5.0 4.9 95 0.5 15.0 1.1 1.5 6.4 115.0 10.6 6.4 C 0.41 C 95.6 0.90 0.81 15 3.0 1.4 150 0.8 20.0 1.8 1.4 2.8 165.0 10.9 5.0 D 0.16 C 47.5 0.60 0.32 35 20.0 3.1 150 0.8 15.0 1.3 1.9 5.0 185.0 11.0 5.0 E 0.39 C 95.4 0.90 0.81 15 3.0 1.4 150 0.8 20.0 1.8 1.4 2.8 165.0 10.9 5.0 F 0.16 C 58.2 0.63 0.39 35 20.0 2.8 150 0.8 15.0 1.3 1.9 4.7 185.0 11.0 5.0 G 0.77 C 94.7 0.89 0.80 35 2.0 2.6 150 0.6 20.0 1.5 1.6 4.2 185.0 11.0 5.0 H 0.68 C 94.8 0.89 0.80 50 2.8 2.8 250 0.5 20.0 1.4 2.9 5.7 300.0 11.7 5.7 I 0.82 C 60.6 0.64 0.41 120 1.6 11.8 140 1.5 15.0 1.8 1.3 13.1 260.0 11.4 11.4 J 0.19 C 5.0 0.52 0.08 10 20.0 2.2 150 1.3 15.0 1.7 1.5 3.6 160.0 10.9 5.0 K 0.32 C 95.0 0.89 0.80 50 2.8 2.8 120 1.6 20.0 2.5 0.8 3.5 170.0 10.9 5.0 L 0.76 C 5.0 0.52 0.08 50 6.0 7.3 200 1.0 15.0 1.5 2.2 9.5 250.0 11.4 9.5 M 0.53 C 74.3 0.70 0.53 40 2.0 5.2 230 0.4 20.0 1.3 3.0 8.3 270.0 11.5 8.3 N 1.48 C 37.9 0.58 0.27 30 13.0 3.5 430 1.4 15.0 1.8 4.0 7.6 460.0 12.6 7.6 O 0.10 C 5.0 0.52 0.08 10 20.0 2.2 130 1.5 20.0 2.4 0.9 3.1 140.0 10.8 5.0 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 Grassed waterway TRAVEL TIME (Tt) Paved areas and shallow paved swales Type of Land Surface Heavy Meadow Tillage/field Short pasture and lawns Nearly bare ground STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Tc CHECK 39708.02 DATA (URBANIZED BASINS) INITIAL/OVERLAND (Ti) X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 3/9/16 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS 1 A 0.98 0.65 7.8 0.64 2.43 1.6 1 B 0.85 0.08 6.4 0.07 2.60 0.18 7.8 0.71 2.43 1.73 0.8 1.73 150 1.8 1.4 Swale flow to DP2 2 C 0.41 0.81 5.0 0.33 2.78 0.92 2 D 0.16 0.32 5.0 0.05 2.78 0.14 5.00 0.38 2.78 1.06 Total flow at DP2 2 9.2 1.09 2.29 2.50 0.8 2.50 150 1.8 1.4 Swale flow to DP3 3 E 0.39 0.81 5.0 0.32 2.78 0.9 3 F 0.16 0.39 5.0 0.06 2.78 0.2 5.0 0.38 2.78 1.1 Total flow at DP3 3 10.6 1.47 2.17 3.2 1.0 3.2 100 2.0 0.8 Swale flow to DP8 4 G 0.77 0.80 5.0 0.62 2.78 1.7 1 1.7 100 2.0 0.8 Swale flow to DP8 5 H 0.68 0.80 5.7 0.54 2.68 1.4 5 I 0.82 0.41 11.4 0.34 2.10 0.7 11.4 0.88 2.10 1.8 1.3 1.8 150 2.3 1.1 Swale flow to DP6 6 J 0.19 0.08 5.0 0.02 2.78 0.1 Total flow at DP6 6 12.5 0.90 2.02 1.8 0.65 1.8 70 1.6 0.7 Swale flow to DP7 7 K 0.32 0.80 5.0 0.26 2.78 0.7 Total flow Flow at DP7 7 13.3 1.16 1.97 2.3 1.0 2.3 100 2.0 0.8 Swale flow to DP8 Detention Pond Area 8 L 0.76 0.08 9.5 0.06 2.26 0.1 Detention Pond Outlet Total flow at DP8 8 14.1 3.25 1.92 6.2 Piped to DP10 Sump Inlet 9 M 0.53 0.53 8.3 0.28 2.38 0.7 1.4 0.7 700 2.4 4.9 Piped/ Swale flow to DP10 10 N 1.48 0.27 7.6 0.40 2.46 1.0 Total flow at DP 10 10 13.2 0.68 1.97 1.3 0.3 Total Release from site 10 1.6 Flow Off-site south O 0.10 0.08 5.0 0.01 2.78 0.03 DIRECT RUNOFF TOTAL RUNOFF STREET/SWALE PIPE Add Pond Release Pond Release STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 3/9/16 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS 1 A 0.98 0.78 7.8 0.76 8.47 6.4 1 B 0.85 0.52 6.4 0.44 9.05 4.0 7.8 1.20 8.47 10.2 0.8 10.16 150 1.8 1.4 Swale flow to DP2 2 C 0.41 0.90 5.0 0.37 9.70 3.6 2 D 0.16 0.60 5.0 0.10 9.70 1.0 5.00 0.47 9.70 4.6 Total flow at DP2 2 9.2 1.67 7.98 13.3 0.8 13.33 150 1.8 1.4 Swale flow to DP3 3 E 0.39 0.90 5.0 0.35 9.70 3.4 3 F 0.16 0.63 5.0 0.10 9.70 1.0 5.0 0.45 9.70 4.4 Total flow at DP3 3 10.6 2.12 7.55 16.0 1.0 16.0 100 2.0 0.8 Swale flow to DP8 4 G 0.77 0.89 5.0 0.69 9.70 6.7 1 6.7 100 2.0 0.8 Swale flow to DP8 5 H 0.68 0.89 5.7 0.61 9.35 5.7 5 I 0.82 0.64 11.4 0.52 7.32 3.8 11.4 1.13 7.32 8.3 1.3 8.3 150 2.3 1.1 Swale flow to DP6 6 J 0.19 0.52 5.0 0.10 9.70 1.0 Total flow at DP6 6 12.5 1.23 7.04 8.7 0.65 8.7 70 1.6 0.7 Swale flow to DP7 7 K 0.32 0.89 5.0 0.28 9.70 2.7 Total flow Flow at DP7 7 13.3 1.51 6.87 10.4 1.0 10.4 100 2.0 0.8 Swale flow to DP8 Detention Pond Area 8 L 0.76 0.52 9.5 0.40 7.90 3.2 Detention Pond Outlet Total flow at DP8 8 14.1 4.32 6.68 28.9 Piped to DP10 Sump Inlet 9 M 0.53 0.70 8.3 0.37 8.31 3.1 1.4 3.1 700 2.4 4.9 Piped/ Swale flow to DP10 10 N 1.48 0.58 7.6 0.86 8.56 7.4 Total flow at DP 10 10 13.2 1.23 6.89 8.5 1.3 Total Release from site 10 9.8 Flow Off-site south O 0.10 0.52 5.0 0.05 9.70 0.5 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE Add Pond Release Pond Release STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 3/9/16 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) EX1 1.51 C 2.0 0.51 0.06 30 3.0 7.2 750 0.6 5.0 0.4 32.3 39.5 780.0 14.3 14.3 EX2 6.20 C 12.3 0.54 0.12 350 0.9 34.8 200 1.5 5.0 0.6 5.4 40.2 550.0 13.1 13.1 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 (Tt) Tillage/field Short pasture and lawns Nearly bare ground Grassed waterway Paved areas and shallow paved swales DATA Heavy Meadow (URBANIZED BASINS) Type of Land Surface STANDARD FORM SF-2 EXISTING TIME OF CONCENTRATION 39708.02 SUB-BASIN INITIAL/OVERLAND TRAVEL TIME Tc CHECK (Ti) X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 3/9/16 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS Existing 2-yr Flows EX1 EX1 1.51 0.06 14.3 0.09 1.90 0.2 EX2 6.20 0.12 13.1 0.74 1.98 1.5 14.3 0.83 1.90 1.6 Existing 100-yr Flows EX1 EX1 1.51 0.51 14.3 0.77 6.63 5.1 EX2 6.20 0.54 13.1 3.35 6.92 23.2 14.3 4.12 6.63 27.3 STANDARD FORM SF-3 EXISTING STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 39708.02 2-Year DIRECT RUNOFF TOTAL RUNOFF STREET PIPE X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 APPENDIX C HYDRAULIC CALCULATIONS Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.6 3.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 0.7 3.1 cfs INLET IN A SUMP OR SAG LOCATION Lemay Avenue craft Brewery & Self-Storage Facility DP 9 CDOT/Denver 13 Combination H-Vert H-Curb W Lo (C) Lo (G) Wo WP Override Depths UD-Inlet_v3.14-DP 9.xlsm, Inlet In Sump 12/8/2015, 8:55 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 11.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.002 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 24.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 24.0 24.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 13.0 13.0 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Lemay Avenue craft Brewery & Self-Storage Facility DP 9 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' UD-Inlet_v3.14-DP 9.xlsm, Q-Allow 12/8/2015, 8:53 AM Subdivision: 0 Project Name: Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: 0 Date: 3/9/16 This is to convert % imp. to a C value 100-year (must insert % imp. and C pervious). ft3 acre-ft. 'C' value 0.64 59423.6 1.364 'C' * 1.25 0.8 Area 6.49 acres Modified Modified Release Rate 1.3 cfs M. FATER D. JUDISH C. LI 5/95 Nov-97 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 100 Runoff Release Required Required cum 100 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 9.950 51.66 15498.12 390.0 15108.1 0.3468 10 600 7.720 40.08 24049.34 780.0 23269.3 0.5342 15 900 6.520 33.85 30466.66 1170.0 29296.7 0.6726 20 1200 5.600 29.08 34890.24 1560.0 33330.2 0.7652 25 1500 4.980 25.86 38784.24 1950.0 36834.2 0.8456 30 1800 4.520 23.47 42242.11 2340.0 39902.1 0.9160 35 2100 4.080 21.18 44485.06 2730.0 41755.1 0.9586 40 2400 3.740 19.42 46603.39 3120.0 43483.4 0.9982 45 2700 3.460 17.96 48503.66 3510.0 44993.7 1.0329 50 3000 3.230 16.77 50310.48 3900.0 46410.5 1.0654 55 3300 3.030 15.73 51914.81 4290.0 47624.8 1.0933 60 3600 2.860 14.85 53456.83 4680.0 48776.8 1.1198 65 3900 2.720 14.12 55076.74 5070.0 50006.7 1.1480 70 4200 2.590 13.45 56478.58 5460.0 51018.6 1.1712 75 4500 2.480 12.88 57942.72 5850.0 52092.7 1.1959 80 4800 2.380 12.36 59313.41 6240.0 53073.4 1.2184 85 5100 2.290 11.89 60637.37 6630.0 54007.4 1.2398 90 5400 2.210 11.47 61961.33 7020.0 54941.3 1.2613 95 5700 2.130 11.06 63036.07 7410.0 55626.1 1.2770 100 6000 2.060 10.70 64173.12 7800.0 56373.1 1.2941 105 6300 2.000 10.38 65419.2 8190.0 57229.2 1.3138 110 6600 1.940 10.07 66478.37 8580.0 57898.4 1.3292 115 6900 1.890 9.81 67708.87 8970.0 58738.9 1.3485 120 7200 1.840 9.55 68783.62 9360.0 59423.6 1.3642 125 7500 1.790 9.29 69702.6 9750.0 59952.6 1.3763 130 7800 1.750 9.09 70870.8 10140.0 60730.8 1.3942 135 8100 1.710 8.88 71914.39 10530.0 61384.4 1.4092 140 8400 1.670 8.67 72833.38 10920.0 61913.4 1.4213 145 8700 1.630 8.46 73627.75 11310.0 62317.8 1.4306 150 9000 1.600 8.31 74764.8 11700.0 63064.8 1.4478 155 9300 1.570 8.15 75808.39 12090.0 63718.4 1.4628 160 9600 1.540 8.00 76758.53 12480.0 64278.5 1.4756 165 9900 1.510 7.84 77615.21 12870.0 64745.2 1.4863 170 10200 1.480 7.68 78378.43 13260.0 65118.4 1.4949 175 10500 1.450 7.53 79048.2 13650.0 65398.2 1.5013 180 10800 1.420 7.37 79624.51 14040.0 65584.5 1.5056 185 11100 1.400 7.27 80683.68 14430.0 66253.7 1.5210 190 11400 1.380 7.16 81680.54 14820.0 66860.5 1.5349 195 11700 1.360 7.06 82615.1 15210.0 67405.1 1.5474 200 12000 1.340 6.96 83487.36 15600.0 67887.4 1.5585 205 12300 1.320 6.85 84297.31 15990.0 68307.3 1.5681 210 12600 1.300 6.75 85044.96 16380.0 68665.0 1.5763 10-year Composite 'C' 0.52 Area 6.49 acres Modified Modified Release Rate 1.3 M. FATER D. JUDISH C. LI 5/95 Apr-98 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 10 Runoff Release Required Required cum 10 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 4.870 16.44 4931 390.0 4540.6 0.1042 10 600 3.780 12.76 7654 780.0 6874.0 0.1578 15 900 3.190 10.77 9689 1170.0 8519.1 0.1956 20 1200 2.740 9.25 11096 1560.0 9536.3 0.2189 25 1500 2.440 8.23 12352 1950.0 10401.8 0.2388 30 1800 2.210 7.46 13425 2340.0 11085.0 0.2545 35 2100 2.000 6.75 14174 2730.0 11444.2 0.2627 40 2400 1.830 6.18 14822 3120.0 11702.1 0.2686 45 2700 1.690 5.70 15399 3510.0 11889.2 0.2729 50 3000 1.580 5.33 15997 3900.0 12096.6 0.2777 55 3300 1.480 4.99 16483 4290.0 12192.5 0.2799 60 3600 1.400 4.72 17009 4680.0 12329.0 0.2830 65 3900 1.320 4.45 17373 5070.0 12303.5 0.2824 70 4200 1.250 4.22 17718 5460.0 12257.7 0.2814 75 4500 1.190 4.02 18072 5850.0 12222.1 0.2806 80 4800 1.140 3.85 18467 6240.0 12226.9 0.2807 85 5100 1.090 3.68 18761 6630.0 12130.5 0.2785 90 5400 1.050 3.54 19135 7020.0 12115.1 0.2781 95 5700 1.010 3.41 19429 7410.0 12018.7 0.2759 100 6000 0.970 3.27 19641 7800.0 11841.3 0.2718 105 6300 0.940 3.17 19986 8190.0 11795.6 0.2708 110 6600 0.910 3.07 20269 8580.0 11689.0 0.2683 115 6900 0.880 2.97 20492 8970.0 11521.8 0.2645 120 7200 0.860 2.90 20897 9360.0 11536.8 0.2648 Page 1 2-year Composite 'C' 0.42 Area 6.49 Modified Modified Release Rate 1.3 M. FATER D. JUDISH C. Li 5/95 Apr-98 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 2 Runoff Release Required Required cum 2 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 2.850 7.77 2330.559 390.0 1940.6 0.0445 10 600 2.210 6.02 3614.411 780.0 2834.4 0.0651 15 900 1.870 5.10 4587.521 1170.0 3417.5 0.0785 20 1200 1.610 4.39 5266.246 1560.0 3706.2 0.0851 25 1500 1.430 3.90 5846.841 1950.0 3896.8 0.0895 30 1800 1.300 3.54 6378.372 2340.0 4038.4 0.0927 35 2100 1.170 3.19 6697.291 2730.0 3967.3 0.0911 40 2400 1.070 2.92 6999.854 3120.0 3879.9 0.0891 45 2700 0.990 2.70 7286.063 3510.0 3776.1 0.0867 50 3000 0.920 2.51 7523.208 3900.0 3623.2 0.0832 55 3300 0.870 2.37 7825.772 4290.0 3535.8 0.0812 60 3600 0.820 2.24 8046.562 4680.0 3366.6 0.0773 65 3900 0.770 2.10 8185.577 5070.0 3115.6 0.0715 70 4200 0.730 1.99 8357.303 5460.0 2897.3 0.0665 75 4500 0.690 1.88 8463.609 5850.0 2613.6 0.0600 80 4800 0.660 1.80 8635.334 6240.0 2395.3 0.0550 85 5100 0.630 1.72 8757.995 6630.0 2128.0 0.0489 90 5400 0.610 1.66 8978.785 7020.0 1958.8 0.0450 95 5700 0.580 1.58 9011.495 7410.0 1601.5 0.0368 100 6000 0.560 1.53 9158.688 7800.0 1358.7 0.0312 105 6300 0.540 1.47 9273.172 8190.0 1083.2 0.0249 110 6600 0.520 1.42 9354.946 8580.0 774.9 0.0178 115 6900 0.510 1.39 9592.09 8970.0 622.1 0.0143 120 7200 0.490 1.34 9616.622 9360.0 256.6 0.0059 Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: 0 Date: 3/9/16 Site Basin Area % Impervious A 0.98 84.7 B 0.85 5.0 C 0.41 95.6 D 0.16 47.5 E 0.39 95.4 F 0.16 58.2 G 0.77 94.7 H 0.68 94.8 I 0.82 60.6 J 0.19 5.0 K 0.32 95.0 L 0.76 5.0 TOTAL 6.49 62.1 WQCV = 6,877 cf WQCV = 0.16 acre-ft Pond WCQV Sizing WQCV = (0.91I 3 - 1.19I 2 + 0.78I) * A/12 WQCV provided in LID Basins and Swales X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 Subdivision 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location Fort Collins Project No. 39708.02 By: BAB Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: 0 A - Upper Surface Date: 3/9/16 B - Lower Surface Pond Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet) (cubic feet) (cubic feet) (acre feet) 0.00 4941.35 4,095 0 0 0.00 1.00 4942.00 5,866 3,220 3,220 0.07 2.00 4943.00 14,371 9,806 13,026 0.30 3.00 4944.00 21,341 17,742 30,768 0.71 3.90 4944.90 30,928 23,386 54,154 1.24 Pavers 1.36 Volume (acre feet) Volume Water Surface Elevation 100-Year Detention 1.36 4944.90 Paver Volume Calculations Paver Surface area= 16,748 sq. ft. Depth of #2 rock = 1 ft Volume of #2 rock = 16748 cubic ft. 30% of Volume = 5,024 cubic ft or 0.12 acre ft POND VOLUME CALCULATIONS 30% of Volume of #2 rock in pavers = 0.12 acre feet (see below) X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 2 3/7/2016 Subdivision 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location Fort Collins Project No. 39708.02 By: BAB Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: 0 A - Upper Surface Date: 3/9/16 B - Lower Surface WQ Volume in LIDs Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet) (cubic feet) (cubic feet) (acre feet) 0.00 4943.00 500 0 0 0.00 1.00 4944.00 2,500 1,373 1,373 0.03 2.00 4945.00 2,000 2,245 3,618 0.08 3.00 4946.00 1,500 1,744 5,362 0.12 4.00 4947.00 1,300 1,399 6,761 0.16 Volume (acre feet) Volume needed Cumulative Volume Provided Water Quality 0.16 0.16 POND VOLUME CALCULATIONS X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 Project: Basin ID: 1 #1 Vertical #2 Vertical Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Orifice Orifice Water Surface Elevation at Design Depth Elev: WS = 4,944.90 feet Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 4,941.34 feet Required Peak Flow through Orifice at Design Depth Q = 1.30 cfs Pipe/Vertical Orifice Diameter (inches) Dia = 12.0 inches Orifice Coefficient Co = 0.62 Full-flow Capacity (Calculated) Full-flow area Af = 0.79 sq ft Half Central Angle in Radians Theta = 3.14 rad Full-flow capacity Qf = 6.8 cfs Percent of Design Flow = 526% Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416) Theta = 1.01 rad Flow area Ao = 0.14 sq ft Top width of Orifice (inches) To = 10.18 inches Height from Invert of Orifice to Bottom of Plate (feet) Yo = 0.24 feet Elevation of Bottom of Plate Elev Plate Bottom Edge = 4,941.58 feet Resultant Peak Flow Through Orifice at Design Depth Qo = 1.3 cfs Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 0.58 feet Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. = 4,941.46 feet Lemay Ave. Craft Brewery & Self Storage RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES 3970802 UD-Detention_v2.35.xls, Restrictor Plate 12/11/2015, 11:13 AM Project: Basin ID: Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert. Circular Opening: Diameter in Inches Dia. = inches OR Rectangular Opening: Width in Feet W = 3.00 0.58 ft. Length (Height for Vertical) L or H = 3.00 0.24 ft. Percentage of Open Area After Trash Rack Reduction % open = 50 100 % Orifice Coefficient Co = 0.62 0.62 Weir Coefficient Cw = 3.00 Orifice Elevation (Bottom for Vertical) Eo = 4944.00 4,941.34 ft. Calculation of Collection Capacity: Net Opening Area (after Trash Rack Reduction) Ao = 4.50 0.14 sq. ft. OPTIONAL: User-Overide Net Opening Area Ao = sq. ft. Perimeter as Weir Length Lw = 9.00 ft. OPTIONAL: User-Overide Weir Length Lw = ft. Top Elevation of Vertical Orifice Opening, Top = 4941.58 ft. Center Elevation of Vertical Orifice Opening, Cen = 4941.46 ft. Horizontal Orifices Vertical Orifices Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor, & Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes (input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek) 4941.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4942.00 0.51 0.00 0.00 0.00 0.00 0.51 0.00 0.51 4943.00 0.86 0.00 0.00 0.00 0.00 0.86 0.00 0.86 4944.00 1.11 0.00 0.00 0.00 0.00 1.11 0.00 1.11 4944.90 23.05 23.05 21.24 0.00 0.00 1.29 0.00 1.29 #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A Project: Basin ID: Lemay Ave. Craft Brewery & Self Storage STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) 4941 4941.5 4942 4942.5 4943 4943.5 4944 4944.5 4945 4945.5 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Stage (feet, elev.) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE OUTLET STRUCTURE 3970802 UD-Detention_v2.35.xls, Outlet 3/7/2016, 4:43 PM Project Description Solve For Headwater Elevation Input Data Discharge 28.90 ft³/s Headwater Elevation 4945.41 ft Crest Elevation 4944.90 ft Weir Coefficient 2.61 US Crest Length 30.00 ft Cross Section Image Cross Section for Pond Emergency Overflow 3/8/2016 11:56:52 AM Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Plan View North CO-7 CO-6 CO-5 CO-4 CO-3 CO-1 O-4 O-1 DP9 Single Type 13 Combo Inlet Pond Outlet 18" FES Plug MH-3 MH-2 MH-2 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 12/10/2015 Bentley StormCAD V8i (SELECTseries 3) 3970802-Lemay.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] 2yr Results J-loss Coeff N-value Pipe Velocity Down (ft/s) Velocity Up (ft/s) Velocity Avg (ft/s) EGL Down (ft) EGL Up (ft) HGL Down (ft) HGL Up (ft) Invert Down (ft) Invert Up (ft) Line Slope (ft/ft) Line Length (ft) Line Size (in) Capacity (Design) (cfs) Flow (cfs) Label CO-1 0.70 5.89 18.0 19.1 0.003 4,943.21 4,943.15 4,943.56 4,943.46 4,943.64 4,943.57 2.24 2.26 2.65 0.013 1.500 CO-2 1.40 12.38 24.0 123.5 0.003 4,942.65 4,942.28 4,943.12 4,943.02 4,943.21 4,943.05 2.61 2.52 1.32 0.013 1.000 CO-3 2.40 12.27 24.0 68.0 0.003 4,942.28 4,942.08 4,942.88 4,942.62 4,943.02 4,942.81 3.03 3.03 3.52 0.013 1.000 CO-4 0.70 5.76 18.0 29.9 0.003 4,943.24 4,943.15 4,943.59 4,943.46 4,943.67 4,943.57 2.21 2.21 2.65 0.013 1.500 CO-5 1.00 6.65 18.0 338.9 0.004 4,944.49 4,943.13 4,944.88 4,943.53 4,945.00 4,943.64 2.71 2.71 2.65 0.013 1.500 CO-6 1.00 6.67 18.0 84.2 0.004 4,943.12 4,942.78 4,943.51 4,943.15 4,943.63 4,943.29 2.72 2.72 2.92 0.013 0.150 CO-7 0.30 2.27 12.0 91.3 0.004 4,941.34 4,940.97 4,941.59 4,941.20 4,941.65 4,941.27 2.00 2.00 2.26 0.013 1.500 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203 Page 1 of 1 -755-1666 12/14/2015 Bentley StormCAD V8i (SELECTseries 3) 3970802-Lemay.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] 100yr Results J-loss Coeff N-value Pipe Velocity Down (ft/s) Velocity Up (ft/s) Velocity Avg (ft/s) EGL Down (ft) EGL Up (ft) HGL Down (ft) HGL Up (ft) Invert Down (ft) Invert Up (ft) Line Slope (ft/ft) Line Length (ft) Line Size (in) Capacity (Design) (cfs) Flow (cfs) Label CO-1 3.10 5.89 18.0 19.1 0.003 4,943.21 4,943.15 4,944.25 4,944.24 4,944.34 4,944.31 3.38 2.37 2.26 0.013 1.500 CO-2 6.20 12.38 24.0 123.5 0.003 4,942.65 4,942.28 4,944.14 4,944.07 4,944.24 4,944.14 3.94 2.47 2.09 0.013 1.000 CO-3 11.50 12.27 24.0 68.0 0.003 4,942.28 4,942.08 4,943.72 4,943.30 4,944.07 4,943.81 4.44 4.73 5.74 0.013 1.000 CO-4 3.10 5.76 18.0 29.9 0.003 4,943.24 4,943.15 4,944.26 4,944.24 4,944.35 4,944.31 3.32 2.42 2.26 0.013 1.500 CO-5 5.30 6.65 18.0 338.9 0.004 4,944.49 4,943.13 4,945.50 4,944.28 4,945.77 4,944.49 4.18 4.18 3.64 0.013 1.500 CO-6 5.30 6.67 18.0 84.2 0.004 4,943.12 4,942.78 4,944.25 4,944.07 4,944.46 4,944.24 4.19 3.72 3.27 0.013 0.150 CO-7 1.30 2.27 12.0 91.3 0.004 4,941.34 4,940.97 4,941.88 4,941.45 4,942.02 4,941.64 2.99 2.99 3.47 0.013 1.500 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203 Page 1 of 1 -755-1666 12/14/2015 Bentley StormCAD V8i (SELECTseries 3) 3970802-Lemay.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] HY-8 Culvert Analysis Report Table 1 - Culvert Summary Table: Culvert 1 Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) 2yr 1.73 1.73 4947.33 0.806 0.590 1-S2n 0.544 0.557 0.544 0.547 3.435 100yr 10.20 6.13 4949.27 2.630 2.750 4-FFf 1.000 0.931 1.000 1.064 7.806 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4946.52 ft, Outlet Elevation (invert): 4946.41 ft Culvert Length: 22.45 ft, Culvert Slope: 0.0049 ******************************************************************************** Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 1.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE Water Surface Profile Plot for Culvert: Culvert 1 Table 2 - Culvert Summary Table: Culvert 1 Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) 2yr 1.80 1.80 4944.25 0.687 0.415 1-S2n 0.458 0.501 0.458 0.555 3.335 100yr 8.70 8.70 4945.42 1.802 1.855 7-M2c 1.500 1.138 1.138 1.002 6.051 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4943.56 ft, Outlet Elevation (invert): 4943.42 ft Culvert Length: 31.94 ft, Culvert Slope: 0.0044 ******************************************************************************** Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 1.50 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE Water Surface Profile Plot for Culvert: Culvert 1 Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: 0 Date: 3/9/16 24" RCP FES Pond Outfall Q100 (cfs) 11.5 1.3 Flows are the greater of proposed vs. future D or H (in) 24 24 W (ft) Slope (%) 1.30 1.30 Yn (in) Yt (ft) Unknown Unknown If "unknown" Yt/D=0.4 Yt/D, Yt/H 0.40 0.40 Per section MD 7.2 Supercritical No No Q/D^2.5, Q/WH^1.5 2.03 0.23 Q/D^1.5, Q/WH^0.5 4.07 0.46 Da, Ha (in) * Da=0.5(D+Yn), Ha=0.5(H+Yn) Q/Da^1.5, Q/WHa^0.5 * d50 (in), Required 3.37 0.38 Required Riprap Size L L Fig. MD-21 OR MD-22 Use Riprap Size L L d50 (in) 9 9 Table MD-7 1/(2 tanT) 4.00 4.00 Fig. MD-23 OR MD-24 Erosive Soils Yes Yes At 2.09 0.24 At=Q/5.5 L 2.5 -6.8 L=(1/(2 tan T))(At/Yt - D) Min L 6.0 6.0 Min L=3D or 3H Max L 20.0 20.0 Max L=10D or 10H Length (ft) 6.0 6.0 Bottom Width (ft) 6.0 6.0 Width=3D (Minimum) Riprap Depth (in) 18 18 Depth=2(d50) Type II Base Depth (in) 6 6 Table MD-12 (fine grained soils) Cutoff Wall Cutoff Wall Depth (ft) Depth of Riprap and Base Cutoff Wall Width (ft) Note: No Type II Base to be used if Soil Riprap is specified within the plans * For use when the flow in the culvert is supercritical (and less than full). PIPE OUTFALL RIPRAP SIZING CALCULATIONS STORM DRAIN SYSTEM X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 APPENDIX D EXISTING & PROPOSED DRAINAGE PLANS A Westrian Company LEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY EXISTING CONDITIONS DRAINAGE MAP Know what's tc Q5 Q100 C100 C5 (min) (cfs) (cfs) EX1 1.51 0.51 0.06 14.3 0.2 4.8 EX2 6.20 0.54 0.12 13.1 1.7 21.6 Existing Runoff Summary Table Basin ID Area (acres) LEMAY AVENUE BUCKINGHAM STREET A Westrian Company LEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY PROPOSED CONDITIONS DRAINAGE MAP Know what's tc Q5 Q100 C100 C5 (min) (cfs) (cfs) A 0.98 0.78 0.65 7.8 1.6 6.4 B 0.85 0.52 0.08 6.4 0.2 4.0 C 0.41 0.90 0.81 5.0 0.9 3.6 D 0.16 0.60 0.32 5.0 0.1 1.0 E 0.39 0.90 0.81 5.0 0.9 3.4 F 0.16 0.63 0.39 5.0 0.2 1.0 G 0.77 0.89 0.80 5.0 1.7 6.7 H 0.68 0.89 0.80 5.7 1.4 5.7 I 0.82 0.64 0.41 11.4 0.7 3.8 J 0.19 0.52 0.08 5.0 0.1 1.0 K 0.32 0.89 0.80 5.0 0.7 2.7 L 0.76 0.52 0.08 9.5 0.1 3.2 M 0.53 0.70 0.53 8.3 0.7 3.1 N 1.48 0.58 0.27 7.6 1.0 7.4 O 0.10 0.52 0.08 5.0 0.03 0.5 Runoff Summary Table Basin ID Area (acres) Top of Pond Volume WS Release WS Release Elevation (acres) (ft) (cfs) (ft) (cfs) (ft) 1.36 0.16* 1.36** 4944.90 1.3 4944.90 28.9 4946.00 * WQCV provided in LID basin and swale, not in detention pond ** 100 yr detention volume provided in detention pond as well as the void space in the pervious pavers Storage Volume Required (acre-ft) WQCV Required (acre-ft) Detention Pond Summary Table 100-yr Emergency Overflow LEMAY AVENUE BUCKINGHAM STREET APPENDIX E LID EXHIBITS Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course? 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia Ia = 84.7 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.847 C) Tributary Watershed Area ATotal = 25,090 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS = 16,748 sq ft (Minimum recommended permeable pavement area = 7464 sq ft) E) Impervious Tributary Ratio RT = 0.4 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 602 cu ft (WQCV = (0.8 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? H) Total Volume Needed VTotal = cu ft 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin = 6.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.20 D) Slope of the Base Course/Subgrade Interface S = 0.005 ft / ft E) Length Between Lateral Flow Barriers (max = 71.89 ft.) L = 50.0 ft F) Volume Provided Based on Depth of Base Course V = 977 cu ft Flat or Stepped: V = P * ((Dmin-1)/12) * Area Sloped: V = P * [(Dmin - (Dmin - 6*SL-1)) / 12] * Area Volume assumes uniform slope & lateral flow barrier spacing. Calculate the volume of each cell individually when this varies. 4. Lateral Flow Barriers A) Type of Lateral Flow Barriers B) Number of Permeable Pavement Cells Cells = 5. Perimeter Barrier A) Is a perimeter barrier provided on all sides of the pavement system? (Recommeded for PICP, concrete grid pavement, or for any Lemay Avenue Craft Brewery & Self-Storage Paver Section #1 Design Procedure Form: Permeable Pavement Systems (PPS) BAB JR Engineering March 7, 2016 Choose One No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One YES- Flat or Stepped Installation NO- Sloped Installation Choose One Concrete Walls no-infiltration section.) 3970802 UD-BMP_v3.03- Pavers #1.xlsm, PPS 3/7/2016, 10:40 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 6. Filter Material and Underdrain System A) Is the underdrain placed below a 6-inch thick layer of CDOT Class C filter material? B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) C) Distance from the Lowest Elevation of the Storage Volume y = ft (i.e. the bottom of the base course to the center of the orifice) 7. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is there a minimum 30 mil thick impermeable PVC geomembrane liner on the bottom and sides of the basin, extending up to the top of the base course? B) CDOT Class B Separator Fabric 8. Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat). Calculate cells individually where this varies.) A) Depth of WQCV in the Reservoir DWQCV = inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time DOrifice = inches (Use a minimum orifice diameter of 3/8-inches) Notes: Lemay Avenue Craft Brewery & Self-Storage Design Procedure Form: Permeable Pavement Systems (PPS) BAB JR Engineering March 7, 2016 Paver Section #1 Choose One YES NO Choose One 4-inch 6-inch Choose One Choose One YES NO Placed above the liner Placed above and below the liner N/A 3970802 UD-BMP_v3.03- Pavers #1.xlsm, PPS 3/7/2016, 10:40 AM Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge for 2-Year Return Period Q2 = 0.34 cfs 2. Hydraulic Residence Time A) : Length of Grass Swale LS = 210.0 ft B) Calculated Residence Time (based on design velocity below) THR= 6.3 minutes 3. Longitudinal Slope (vertical distance per unit horizontal) A) Available Slope (based on site constraints) Savail = 0.010 ft / ft B) Design Slope SD = 0.008 ft / ft 4. Swale Geometry A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft / ft B) Bottom Width of Swale (enter 0 for triangular section) WB = 0.00 ft 5. Vegetation A) Type of Planting (seed vs. sod, affects vegetal retardance factor) 6. Design Velocity (0.7 ft / s maximum for desirable 5-minute residence time) V2 = 0.56 ft / s 7. Design Flow Depth (1 foot maximum) D2 = 0.39 ft A) Flow Area A2 = 0.6 sq ft B) Top Width of Swale WT = 3.1 ft C) Froude Number (0.50 maximum) F = 0.22 D) Hydraulic Radius RH = 0.19 E) Velocity-Hydraulic Radius Product for Vegetal Retardance VR = 0.11 F) Manning's n (based on SCS vegetal retardance curve E for seeded grass) n = 0.078 G) Cumulative Height of Grade Control Structures Required HD = 0.40 ft AN UNDERDRAIN IS 8. Underdrain REQUIRED IF THE (Is an underdrain necessary?) DESIGN SLOPE < 2.0% 9. Soil Preparation (Describe soil amendment) 10. Irrigation Notes: Design Procedure Form: Grass Swale (GS) BAB JR Engineering March 7, 2016 Lemay Avenue Craft Brewery & Self-Storage Bio-Swale #1 Choose One Temporary Permanent Choose One Grass From Seed Grass From Sod Choose One YES NO 3970802 UD-BMP_v3.03- Bio-Swale #1.xlsm, GS 3/7/2016, 12:23 PM Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge for 2-Year Return Period Q2 = 1.70 cfs 2. Hydraulic Residence Time A) : Length of Grass Swale LS = 105.0 ft B) Calculated Residence Time (based on design velocity below) THR= 2.4 minutes 3. Longitudinal Slope (vertical distance per unit horizontal) A) Available Slope (based on site constraints) Savail = 0.004 ft / ft B) Design Slope SD = 0.003 ft / ft 4. Swale Geometry A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft / ft B) Bottom Width of Swale (enter 0 for triangular section) WB = 0.00 ft 5. Vegetation A) Type of Planting (seed vs. sod, affects vegetal retardance factor) 6. Design Velocity (0.35 ft / s maximum for desirable 5-minute residence time) V2 = 0.74 ft / s 7. Design Flow Depth (1 foot maximum) D2 = 0.76 ft A) Flow Area A2 = 2.3 sq ft B) Top Width of Swale WT = 6.1 ft C) Froude Number (0.50 maximum) F = 0.21 D) Hydraulic Radius RH = 0.37 E) Velocity-Hydraulic Radius Product for Vegetal Retardance VR = 0.27 F) Manning's n (based on SCS vegetal retardance curve E for seeded grass) n = 0.057 G) Cumulative Height of Grade Control Structures Required HD = 0.10 ft AN UNDERDRAIN IS 8. Underdrain REQUIRED IF THE (Is an underdrain necessary?) DESIGN SLOPE < 2.0% 9. Soil Preparation (Describe soil amendment) 10. Irrigation Notes: Design Procedure Form: Grass Swale (GS) BAB JR Engineering March 7, 2016 Lemay Avenue Craft Brewery & Self-Storage Bio-Swale #2 Choose One Temporary Permanent Choose One Grass From Seed Grass From Sod Choose One YES NO 3970802 UD-BMP_v3.03- Bio-Swale #2.xlsm, GS 3/7/2016, 12:24 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 5.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.050 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.03 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 4,097 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 32.1 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 21 sq ft D) Actual Flat Surface Area AActual = 728 sq ft E) Area at Design Depth (Top Surface Area) ATop = 1512 sq ft F) Rain Garden Total Volume VT= 1,120 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.2 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 32 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.13 in MINIMUM DIAMETER = 3/8" Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 3970802 UD-BMP_v3.03- Basin #1.xlsm, RG 3/7/2016, 12:00 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 3970802 UD-BMP_v3.03- Basin #1.xlsm, RG 3/7/2016, 12:00 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 95.6 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.956 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.36 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 2,925 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 287.7 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 192 sq ft D) Actual Flat Surface Area AActual = 200 sq ft E) Area at Design Depth (Top Surface Area) ATop = 322 sq ft F) Rain Garden Total Volume VT= 261 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.2 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 288 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.39 in Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #2 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 3970802 UD-BMP_v3Basin #2.xlsm, RG 3/7/2016, 12:09 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #2 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 3970802 UD-BMP_v3Basin #2.xlsm, RG 3/7/2016, 12:09 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 94.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.947 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.36 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 64,572 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 6,227.1 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 4151 sq ft D) Actual Flat Surface Area AActual = 4160 sq ft E) Area at Design Depth (Top Surface Area) ATop = 6520 sq ft F) Rain Garden Total Volume VT= 5,340 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.2 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 6,227 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 1.79 in Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #3 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 3970802 UD-BMP_v3#3.xlsm, RG 3/7/2016, 12:12 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #3 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 3970802 UD-BMP_v3#3.xlsm, RG 3/7/2016, 12:12 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 77.4 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.774 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.25 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 11,452 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 777.5 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 518 sq ft D) Actual Flat Surface Area AActual = 526 sq ft E) Area at Design Depth (Top Surface Area) ATop = 1636 sq ft F) Rain Garden Total Volume VT= 1,081 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.2 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 777 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.63 in Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #4 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 3970802 UD-BMP_v3.03- Basin #4.xlsm, RG 3/7/2016, 12:14 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) BAB JR Engineering March 7, 2016 Affinity Fort Collins LID Basin #4 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 3970802 UD-BMP_v3.03- Basin #4.xlsm, RG 3/7/2016, 12:14 PM Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date New Impervious Area Tributary to Detention Pond 144,522 sq. ft. Required Minimum Impervious Area to be Treated 72,261 sq. ft. (=50% of new impervious area) Area of Paver Section #1 16,748 sq. ft. Impervious Run-on area for Paver Section #1 (1.5:1) 25,090 sq. ft. Impervious Area Directly Treated by LID Treatment Method #2 - LID Basin #2 & Swale #1 17,770 sq. ft. Impervious Area Directly Treated by LID Treatment Method #3 - LID Swale #1 7,377 sq. ft. Impervious Area Directly Treated by LID Treatment Method #4 - LID Basin #3 64,572 sq. ft. Impervious Area Directly Treated by LID Treatment Method #5 - LID Basin #4 & Swale # 2 29,713 sq. ft. Total Impervious Area Treated 144,522 sq. ft. Actual % of Impervious Area Treated 100.0 % New Driveable Area 68,778 sq. ft. Required Minimum Area of Porous Pavement (=25% of new pavement area) 17,195 sq. ft. Area of Paver Section #1 17,280 sq. ft. Total Porous Pavement Area 17,280 sq. ft. Actual % of Porous Pavement Provided 25.1% 50% On-Site Treatment by LID Requirement 25% Porous Pavement Requirement LID Measure Impervious Area Treated Sq. ft. Area of LID sq.ft. Ratio Paver Section #1 25090 16748 1.5 LID Swale #1 22222 5599 4.0 LID Swale #2 18261 2516 7.3 LID Basin #1 4097 4097 1.0 LID Basin #2 2925 585 5.0 LID Basin #3 64572 6520 9.9 LID Basin #4 11452 1636 7.0 LID Sizing PAVER SECTION #1 RUN-ON AREA #1 LEMAY AVENUE BUCKINGHAM STREET PVC geomembrane installed normal to flow N/A- Flat installation Other (Describe): Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel 3970802 UD-BMP_v3.03- Pavers #1.xlsm, PPS 3/7/2016, 10:40 AM #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be applied to culvert sheet (#2 vertical & horizontal openings is not used). STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) Lemay Ave. Craft Brewery & Self Storage Current Routing Order is #3 W.S. EL. WQ W.S. EL. Minor W.S. EL. Major WQ H1 H2 V1 V2 Routing Order #1 (Standard) V1 W.S. EL. WQ W.S. EL. Design Storm WQ H1 Routing Order #3 (Single Stage) Routing Order #4 V2 V1 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ W.S. EL. Emergency Spillway Emergency Overflow into Pipe- H2 V2 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ V1 Routing Order #2 3970802 UD-Detention_v2.35.xls, Outlet 3/7/2016, 4:43 PM 215 12900 1.280 6.65 85730.3 16770.0 68960.3 1.5831 220 13200 1.260 6.54 86353.34 17160.0 69193.3 1.5885 225 13500 1.240 6.44 86914.08 17550.0 69364.1 1.5924 230 13800 1.220 6.33 87412.51 17940.0 69472.5 1.5949 235 14100 1.210 6.28 88580.71 18330.0 70250.7 1.6127 240 14400 1.200 6.23 89717.76 18720.0 70997.8 1.6299 Required detention Detention Pond Sizing Lemay Ave. Craft Brewery & Self-Storage Page 1 39708.02 100-Year X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016 2-Year 39708.02 X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 3/7/2016