HomeMy WebLinkAboutFORT COLLINS EMERGENCY CENTER, 4858 S. COLLEGE AVE. - PDP160001 - CORRESPONDENCE - REVISIONS6901 South Pierce Street, Suite 350 Littleton, Colorado 80128 Voice 303-232-8088 Fax 303-232-5255
March 8, 2016
Mr. Ryan Mounce
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
RE: Fort Collins Emergency Center - 4858 S College Ave, PDP160001, Round
Number 1 Comment Response
Dear Ryan,
Revised Project Development Plan, Drainage Report and Construction Documents for the above referenced project
are attached. Revisions to the referenced plans are based on comments and redlines received from your office dated
February 11, 2016. Please find below a summary of comments as well as a responses noted in red.
Comment Summary:
Department: Planning Services
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/26/2016
01/26/2016: For this type of land-use, a minimum of 4 bicycle parking spaces are required, at least one of
which needs to be protected or enclosed. If the same location is utilized for the additional spaces, the
building canopy will qualify these as protected spaces.
Please update the site plan data block to include the percentage or number of bike spaces that are
protected or enclosed. 4 spaces are provided, all are covered by the building canopy. The data table is
adjusted as noted.
Comment Number: 2 Comment Originated: 01/26/2016
01/26/2016: Please dimension the full extent of the drive-aisle and emergency vehicle parking width on the
south side of the building. Dimension added.
Comment Number: 3 Comment Originated: 01/26/2016
01/26/2016: The trash enclosure needs a separate walk-in access without needing to open the main gates.
A simple elevation exhibit for the enclosure should be included on the site plan or elevations. Materials for
the trash and generator enclosure should be similar to the materials used for the primary building. A door is
added to the trash enclosure. An elevation detail sheet is added to the set.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 2 of 13
Comment Number: 4 Comment Originated: 01/26/2016
01/26/2016: A couple minor fixes and typos should be corrected on the site plan:
- Typo on the easternmost easement (bridle instead of brindle).
- Update the planning signature block to 2016 from 2012.
- Please change the land-use in the site data block to hospital (emergency room).
- When the plat for the site is submitted, please be sure to update the legal descriptions on the drawings
accordingly. Noted typos have been corrected.
Comment Number: 5 Comment Originated: 01/26/2016
On the lighting plan, please add a catalog cut-sheet for the lighting fixtures proposed. In regard to LED light
fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian rhythms for
both humans and wildlife. Please consider a warmer color temperature (3000K or less) for your LED light
fixtures. Please also consider fixtures with dimming capabilities so that light levels can be adjusted as
needed. A cut sheet is added. The 3000K LED is proposed
Comment Number: 6 Comment Originated: 01/26/2016
On the building elevations, please remove the cross emblems; signage is not approved as part of the
development review process, rather through a separate sign-permit with zoning. The Cross is removed
from the elevations.
Comment Number: 7 Comment Originated: 01/26/2016
The east (rear) side of the building needs to include some additional design elements to meet the minimum
façade and wall articulation standards found in LUC 3.5.3(E)(2). Elements such as windows, trellis with
vines, or projecting/recessed building elements would help meet this standard where large blank walls
exist. This issue was discussed with staff and shading and shadowing is added to the plan to exemplify the
overall articulation and variety of exterior finishes and materials.
Also consider this side of the structure will see higher visibility in the future when the frontage road is
removed and access comes from the rear.
Comment Number: 8 Comment Originated: 01/26/2016
On the landscaping plan, please consider even spacing for the street trees. These trees should be canopy
shade trees spaced 30-to-40 feet apart. Street trees in parkway are not possible due to gas line.
Comment Number: 9 Comment Originated: 01/26/2016
The ground cover table will need to be updated with the approximate square footage on the site. Please
also see water conservation's comments regarding the need for a water budget table. Ground cover chart
updated.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 3 of 13
Comment Number: 10 Comment Originated: 01/26/2016
Additional perimeter landscaping is needed to the east of the parking/drive areas. Please see
environmental planning's comments about suggested groupings for a more natural look. Additional
landscaping provided east of driveway.
Comment Number: 11 Comment Originated: 01/26/2016
Please add standard Fort Collins landscaping and street tree notes to the landscaping plan (see handout or
digital copy). Standard landscape notes included.
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/25/2016
Please remove the site plan from the utility plan set. Please see appendix E-4 of the LCUASS for pre and
post-hearing requirements for the utility plans. The site plan is removed from the set.
Comment Number: 2 Comment Originated: 01/25/2016
The future “local access circulator” area will need to lie within an emergency access easement as well as
public access easement. The future drive is included in an easement.
Comment Number: 3 Comment Originated: 01/25/2016
The project will need to obtain 2 access permits from CDOT. One for the new driveway and one for the
existing driveway. We will work with CDOT to obtain the required permits.
Comment Number: 4 Comment Originated: 01/25/2016
Payment in lieu of construction will need to be provided for the local access circulator as well as for the
sidewalk. Payment amounts are to be determined. Comment noted.
Comment Number: 5 Comment Originated: 01/28/2016
The frontage road has been annexed by the City and was not accepted by the county for maintenance.
Comment noted.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/26/2016
Thank you for providing an Ecological Characterization Study for the site. Based on the findings and
recommendations of the ECS, a 50-foot buffer from the irrigation ditch will not be required. However, some
additional habitat improvement will be required. Along the top and/or side slopes of the detention area,
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 4 of 13
please provide additional shrub plantings to (1) provide additional habitat and (2) meet the parking lot
screening requirements. A mix of evergreen and deciduous shrubs (fruit-bearing and/or flowering species)
should be planted in groupings of 3-5 plants and distributed along the western edge of the detention area.
Additional landscaping provided east of driveway with groupings.
Comment Number: 2 Comment Originated: 01/26/2016
A detailed seed mix for the native seed area should be included on the plans. I will provide a seed mix that
was recently prepared by our Natural Areas Department for detention areas, which includes a mix of native
grasses and perennials. City Seed mix included on notes and detail sheet.
Comment Number: 3 Comment Originated: 01/26/2016
Please update the square footage calculations in the ground cover legend. Ground cover chart updated.
Comment Number: 4 Comment Originated: 01/26/2016
01/26/2016: Please vary the grading of the detention area to create a more naturalistic, undulating
landform. Side slopes should vary and range from 4:1 to 20:1, per the Stormwater Standards and
Guidelines. This may help to create planting areas for the shrub groupings described above. Grading
revised as requested.
Topic: Lighting Plan
Comment Number: 5 Comment Originated: 01/26/2016
01/26/2016: As noted in the Planning Services comments, please provide cutsheets for the light fixtures
that are proposed. I would recommend adding back shields to the light fixtures near property lines and the
detention area to reduce spillover impacts. A fixture cut sheet is added.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/29/2016
Use the Standard City of Fort Collins General Landscape notes and street tree notes on the landscape
plan. Standard landscape notes included.
Comment Number: 2 Comment Originated: 01/29/2016
Cologreen Juniper is a tree and should be listed under the heading Evergreen Trees in the Plant Schedule.
It should be listed as 6 feet height and B&B. Colorgreen Juniper is listed under trees in chart.
Comment Number: 3 Comment Originated: 01/29/2016
If there are any City street lights? If so please show there locations and provide the following light-tree
separations with street trees. Canopy Shade tree - 40 feet from the streetlight Ornamental tree -15 feet
from the streetlight. Lights are shown and tree adjusted to accommodate locations.
Comment Number: 4 Comment Originated: 01/29/2016
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 5 of 13
List the percentage of each tree species used in the Plant Schedule and check that the quantities used
meet the minimum species diversity standard 3.2.1 D 3. LUC. Tree species maximum allowable standard
met.
Comment Number: 5 Comment Originated: 01/29/2016
The standard for Street tree planting in parkways between sidewalk and curb is to use canopy shade trees
( LUC 3.2.1 D 2 a). Trees should be selected from the City of Fort Collins street tree list. Kentucky
Coffeetree could be a good selection for this area. The Fastigiate English Oak is not a canopy shade tree. It
appears three canopy shade trees could be placed in the area in front of the building and one south of the
south entry. Evaluate if this is feasible. Street trees in parkway are not possible due to gas line. Tim
approved (informally) four trees east of sidewalk for street tree requirement.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 01/27/2016
Building Permit Pre-Submittal Meeting: he pre-submittal meeting requirement is noted.
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/18/2016
3-Phase Primary electric facilities exists along the East side of this property. Comment noted.
Comment Number: 2 Comment Originated: 01/18/2016
A utility easement may need to be dedicated for the existing electric facilities on the East side, as well as
the future new electric infrastructure. A new electric easement is shown on the plan.
Comment Number: 3 Comment Originated: 01/18/2016
Please provide a one line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be
found at: Requested info will be provided as the building design progresses.
Comment Number: 4 Comment Originated: 01/18/2016
Development charges, electric Capacity Fee, Building Site charges and any system modification charges
necessary will apply to this development. (We urge you to use our fee estimator to help better understand
these charges.) Comment noted.
Comment Number: 5 Comment Originated: 01/18/2016
Contact Light and Power Engineering to coordinate the transformer and electric meter locations, please
show the locations on the utility plans. Transformer locations shall be within 10' of a paved surface and
must have a minimum of an 8' clearance from the front side and a 3' clearance around the sides and rear.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 6 of 13
(1000 kVA up to 2500 kVA requires 4' around the sides and rear.) The transformer is shown on the plan.
Comment Number: 6 Comment Originated: 01/18/2016
Please contact Light & Power Engineering if you have any questions at 221-6700. Please reference our
policies, development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers. Comment noted.
Department: Outside Agencies
Topic: General
Comment Number: 1 Comment Originated: 01/25/2016
The following comments are from Terry Farrill, Fort Collins - Loveland Water District and South Fort Collins
Sanitation District. Terry may be reached at 970-226-3104, ext. 104.
- The District's signature block is required on sheet C0.00. Signature block is added.
- The District requires a minimum and maximum depth of cover over the water line of 5 feet and 6 feet
respectively, unless otherwise noted. A note is added to sheet 6.10 stating cover requirements.
- All water line construction shall conform to the Fort Collins - Loveland Water District standards and
specifications current to the date of construction. A note is added to sheet 6.10 stating cover requirements.
- The District requires a Reduced Pressure Principle Back-Flow-Prevention-Device (RP Device) on the fire
line and the domestic water service. A note is added to sheet 6.10 stating cover requirements.
- The District will require a grease trap/interceptor on the sanitary sewer service. A grease trap is added to
sheet 6.10.
- The District's Industrial Pretreatment Business Questionnaire needs to be completed and submitted to the
District for review and approval. The Questionnaire can be obtained on the District's website, fclwd.com.
The questionnaire will be provided under separate cover.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 01/26/2016
EMERGENCY ACCESS EASEMENT
An Emergency Access Easement will be required by separate document and labeled as such on future
plans. Fire lane signage will also be required and should be indicated on future plans. Code language
provided below. The required easement is added to the plat. Fire line sigs are added to the site plan.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 7 of 13
MARKING
> IFC503.3: Where required by the fire code official, approved signs or other approved notices that include
the words NO PARKING - FIRE LANE shall be provided for fire apparatus access roads to identify such
roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained
in a clean and legible condition at all times ad be replaced or repaired when necessary to provide adequate
visibility. Fire lane signs are added to the site plan.
SIGNS
> IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked with
permanent NO PARKING - FIRE LANE signs complying with Figure D103.6. Signs shall have a minimum
dimension of 12 inches wide by 18 inches high and have red letters on a white reflective background. Signs
shall be posted on one or both sides of the fire apparatus road as required by Section D103.6.1 or
D103.6.2. Fire lane signs are added to the site plan.
Comment Number: 2 Comment Originated: 01/26/2016
AUTOMATIC FIRE SPRINKLER SYSTEM
This building will require an automatic fire sprinkler system under a separate permit. Please contact
Assistant Fire Marshal, Joe Jaramillo with any fire sprinkler related questions at 970-416-2868. The building
will be protected by a fire sprinkler system.
Comment Number: 3 Comment Originated: 01/26/2016
FDC
> IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA standards. Fire
department connections shall be located on the street side of buildings, fully visible and recognizable from
the street or nearest point of fire department vehicle access. The location of the FDC shall be approved by
the fire department. Comment noted.
Comment Number: 4 Comment Originated: 01/26/2016
KEY BOXES REQUIRED
> IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at least one key
box ("Knox Box") to be mounted in an approved, exterior location (or locations) on every new or existing
building equipped with a required fire sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet
above finished floor and within 10 feet of the front door, or closest door to the fire alarm panel. Exception
can be made by the PFA if it is more logical to have the box located somewhere else on the structure.
Comment noted.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/26/2016
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 8 of 13
Please review City of Fort Collins Criteria and design detention basin accordingly. The pond is now
designed with the FAA procedure.
Comment Number: 3 Comment Originated: 01/26/2016
Please provide evidence that the detention basin is in compliance with drain times per Colorado Revised
Statute 37-92-602(8). More information on this statute is available at
http://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to show compliance is available for download at
http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at (970)224-6192 or
dmogen@fcgov.com with any questions about this requirement or for assistance with the spreadsheet. The
compliance spreadsheet is attached in the appendix of the drainage report.
Comment Number: 4 Comment Originated: 01/26/2016
Please show where the proposed outlet is located and verify capacity and that any required easements are
in place. Please clarify existing and any proposed easements. Outlet location is shown. The existing
drainage easement is also shown.
Comment Number: 5 Comment Originated: 01/26/2016
Please show areas being treated with LID techniques and verify that LID requirements are being met. A
table verifying this would be helpful and a sample table can be downloaded at
http://tinyurl.com/SampleLIDTable. The LID spreadsheet is included on the plan. LID areas are labeled.
Comment Number: 6 Comment Originated: 01/26/2016
Please include all site areas in basins including those that are not currently shown to be detained on the
west and south sides. Additional basins are added to cover the entire site.
Comment Number: 7 Comment Originated: 01/26/2016
If future site access is from the east, how will this affect the proposed drainage plan? Will any modifications
be needed even though the detention basin is outside the access easement? When the road is
constructed, a drainage pan will be required to convey the surface water from the southeast curb cut into
the pond.
Comment Number: 8 Comment Originated: 01/26/2016
Please see redlined drainage report and civil plans. Redlined comments addressed.
Comment Number: 9 Comment Originated: 01/26/2016
Please note that additional comments may be forthcoming upon future submittals as additional details are
discovered. Comment noted.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 01/11/2016
The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be
submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 9 of 13
Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do not
meet requirements. Please submit; Erosion Control Plan (based upon redline comments), Erosion Control
Report (a few minor redlines), and an Escrow / Security Calculation (Not found with submitted materials
template can be found at www.fcgov.com/erosion . Also, based upon the area of disturbance State permits
for stormwater will be required since the site is over an acre. If you need clarification concerning the erosion
control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com The red-lined erosion control comments have been addressed.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 9 Comment Originated: 01/25/2016
Please revise the sub-title as marked. See redlines. Title revised per redlines.
Comment Number: 10 Comment Originated: 01/25/2016
There are line over text issues. See redlines. Line over text issues are resolved.
Topic: Construction Drawings
Comment Number: 14 Comment Originated: 01/25/2016
Please revise the sub-title as marked. See redlines. Title revised per redlines.
Comment Number: 15 Comment Originated: 01/25/2016
Please remove the legal description. It is not necessary. It is a duplication of the sub-title. Legal description
removed.
Comment Number: 16 Comment Originated: 01/25/2016
The City has moved to the NAVD88 vertical datum, and as of January 1, 2015 all projects are required to
be on NAVD88 datum. Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 10 of 13
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX’.
Benchmark note revised.
Comment Number: 17 Comment Originated: 01/25/2016
The titles in the sheet index do not match the titles on the noted sheets. See redlines. Sheet index
corrected.
Comment Number: 18 Comment Originated: 01/25/2016
All benchmark statements must match on all sheets. Benchmark note revised.
Comment Number: 19 Comment Originated: 01/25/2016
Sheet C0.02 is numbered wrong. Sheet number revised.
Comment Number: 20 Comment Originated: 01/25/2016
There are line over text issues. See redlines. Line over text issues are addressed.
Comment Number: 21 Comment Originated: 01/25/2016
There is text that needs to be masked. Mask all text in hatched areas. See redlines. Text masked added.
Comment Number: 22 Comment Originated: 01/25/2016
There are text over text issues. See redlines. Line over text issues are addressed.
Comment Number: 23 Comment Originated: 01/26/2016
All reception numbers for documents recorded by separate document must be added prior to mylars.
Comment noted.
Comment Number: 24 Comment Originated: 01/26/2016
Please correct the 10' Bridle Path & Utility Easement note as marked. See redlines. Text corrected.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 01/25/2016
Please revise the sub-title as marked. See redlines. Title revised.
Comment Number: 8 Comment Originated: 01/25/2016
There are line over text issues. See redlines. Line over text issues are addressed.
Topic: Lighting Plan
Comment Number: 11 Comment Originated: 01/25/2016
Please revise the sub-title as marked. See redlines. Title text is revised
Comment Number: 12 Comment Originated: 01/25/2016
Please correct the 10' Bridle Path & Utility Easement note as marked. See redlines. The easement is
removed from the plan to facilitate clarity
Comment Number: 13 Comment Originated: 01/25/2016
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 11 of 13
The plan is very busy. We suggest removing the contours, if not needed. Many items are removed from the
plan to make it more readable.
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/25/2016
Please revise the sub-title as marked. See redlines. Title text revised.
Comment Number: 2 Comment Originated: 01/25/2016
Please remove the legal description. It is not necessary. It is a duplication of the sub-title. Legal description
removed.
Comment Number: 3 Comment Originated: 01/25/2016
There are line over text issues. See redlines. Line over text issues are fixed.
Comment Number: 4 Comment Originated: 01/25/2016
There is text that needs to be masked. Mask all text in hatched areas. See redlines. Text masking is added.
Comment Number: 5 Comment Originated: 01/25/2016
All reception numbers for documents recorded by separate document must be added prior to mylars.
Comment noted.
Comment Number: 6 Comment Originated: 01/25/2016
Please correct the 10' Bridle Path & Utility Easement note as marked. See redlines. Easement text
corrected.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/28/2016
The traffic impact memo has been received and the conclusions accepted.
Comment Number: 2 Comment Originated: 01/28/2016
The internal circulation may be something to consider. The drop off is such that inbound vehicles will likely
cross over to the left side of the street to drop off patients. It feels a little odd. Site grading and future
access closures dictate the circulation remain as shown.
Comment Number: 3 Comment Originated: 01/28/2016
The front door is shown towards the Frontage Road. Once the connector roadway is built to the east, this
may be an awkward layout. Maybe the front door on a 45 degree angle might be more useful in the future?
The building prototype requires the door as shown.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 12 of 13
Topic: General
Comment Number: 1 Comment Originated: 01/19/2016
A landscape plan shall contain accurate and identifiable hydrozones, including a water budget chart that
shows the total annual water use, which shall not exceed fifteen (15) gallons per square foot over the site. If
you have questions contact Eric Olson at eolson@fcgov.com or 970-221-6704. Hydrozone plan and water
use chart included.
Comment Number: 2 Comment Originated: 01/19/2016
Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply
with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Comment noted.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/27/2016
Signage is not approved with the PDP and Final Plan. Signage is reviewed through separate sign permits.
The Symbol on the west and south side of the building is considered a sign. The cross is removed from the
plan.
Comment Number: 2 Comment Originated: 01/27/2016
What is the purpose of the turn around? The turnaround has two purposes. One is a turnaround for larger
vehicles. The other is a surface detention pond.
Comment Number: 3 Comment Originated: 01/27/2016
If there is no curb and gutter along the landscaped area, how are vehicles restricted from driving over the
landscaping? Curb is added around the turn around.
Comment Number: 4 Comment Originated: 01/27/2016
The trash enclosure needs to have a walk-in access separate from the main service gate. A man gate is
added to the enclosure.
Comment Number: 5 Comment Originated: 01/27/2016
Where is the mechanical equipment locations? How are they screened? Mechanical equipment is roof
mounted and screened.
Comment Number: 6 Comment Originated: 01/27/2016
The signature block for the Planning needs to be updated to the Director of Community Development and
Neighborhood Services Signature block revised.
Comment Number: 7 Comment Originated: 01/27/2016
The Site plan is part of the planning set. The Planning set will need sheet index. A cover sheet and sheet
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 13 of 13
index is added.
Thank you for your review and comments. Please let me know if you require anything further.
Professionally,
Jerry W. Davidson, P.E.
Perception Design Group, Inc.