HomeMy WebLinkAboutRIGDEN FARM FILING NINETEEN - PDP/FDP - FDP150035 - REPORTS - DRAINAGE REPORTFebruary 26, 2016
Mr. Wes Lamarque
City of Fort Collins
Storm Water Utility
700 Wood Street
Fort Collins, CO 80522
Re: Rigden Farm Filing Nineteen
(Formerly known as Filing Six Lots M8 & M9 Minor Amendment)
ICG Project No. 1233-136-00
Dear Wes,
Please accept the following letter report on behalf of Schuman Companies, Inc. to demonstrate
the site’s compliance with the previously approved Final Drainage Report for Rigden Farm
Filing Six, as prepared by JR Engineering, dated February 8, 2002.
INTRODUCTION
This proposed development is legally known as Lots M8 & M9 of Rigden Farm Filing Nineteen
and contains 10,995 square feet or 0.25 acres and 12,569 square feet or 0.29 acres, respectively.
Lot M8 is bounded on the north by William Neal Parkway, the west by Tract BD, the south by
Lot 319 and the east by Bryce Drive. Lot M9 is bounded on the north by William Neal Parkway,
on the west by Bryce Drive, on the south by Lot 232 and on the east by Tract AS. Lot M8
generally drains to the east where flows are intercepted by existing curb and gutter and conveyed
to a storm sewer system that discharges into existing detention pond 269. Lot M9 generally
drains to the east and sheet flows directly into existing detention pond 269. The design for this
pond was included as part of the Filing Six Drainage Report and was constructed with that
Filing. The original runoff coefficient calculations and stage-storage table are attached for
reference and all detention and water quality requirements for this site have been met by the
overall Ridgen Farm development.
EXISTING CONDITIONS
The site is currently vacant and contains a stand of grasses. The Overall Drainage Basin Map
that was included in the previously approved Final Drainage and Erosion Control Report shows
Lot M8 draining into sub-basin 146, the western 30 feet of Lot M9 draining into sub-basin 142,
and the remainder of Lot M9 draining into sub-basin 171, as shown on the enclosed map.
Mr. Wes Lamarque
February 26, 2016
Page 2 of 3
PROPOSED DEVELOPMENT
The proposed development continues to direct runoff to the perimeter streets and ultimately to
Pond 269 as anticipated in the Filing Six Final Drainage Report. Pond 269 releases into the
Fossil Creek Reservoir Inlet Ditch (FCRID).
The southern half of Lot M8 will drain south to the proposed flowline of the access drive and
then flow east into the flowline of Bryce Drive. The majority of the runoff will be pulled off a
series of curb cuts that will direct the runoff to a shallow grass lined swale and then into the
flowline of Bryce Drive via a new 2 foot sidewalk chase. This location has been identified as
design point #1 on the proposed drainage basin map. The northern half of Lot M8 will drain
north toward William Neal Parkway and sheet flow into the flowline of the street. Flows will
then be conveyed east to design point 42 of the Rigden Farm Filing Six report where it will be
collected by an existing sump inlet and conveyed via storm pipe to Pond 269. The majority of
Lot M9 will follow current conditions and drain east toward Tract AS. The western most 25 feet
of the development will drain west toward Bryce Drive and sheet flow into the flowline of the
street (as designated in the Filing Six drainage basin map). The northern half of Lot M9 will
drain north toward William Neal Parkway and sheet flow into the flowline of the street.
Similarly to the flows from Lot M8, these flows will be conveyed east to design point 42. The
southern half of Lot M9 will flow south to the proposed flowline of the access drive and then
flow east into a curb cut in the southeast corner of the site. This location has been identified as
design point #2 on the proposed drainage basin map. The concentrated flow at this point will be
dissipated and spread out through the use of a cobble dissipater and a section of ScourStop Mat
that will prevent erosion immediately downstream of the curb cut. The water will then flow over
approximately 50 feet of established turf and finally sheet flow over the existing concrete trail
and into Pond 269. Please refer to the attached Drainage and Erosion Control Plan for flow
direction.
The Filing Six design utilized an “Ultimate Development” condition for the basin that makes up
the site. Per the original report, the area within M8 (sub-basin 146) was assumed to be Multi-
Family with an imperviousness of 65% and a Runoff Coefficient of 0.65. It is noted that Table
3-3 from the City of Fort Collins Design Criteria Manual currently shows a runoff coefficient of
0.65 and percent impervious of 70% for multi-family area. Per the weighted average runoff
calculations, the actual imperviousness of Lot M8 is 62%, with a minor storm Runoff Coefficient
of 0.67 as shown on the attached spreadsheet. The small increase in the runoff coefficient of M8
will not have a substantial impact to the overall flow being conveyed to the existing pond.
Per the original report, the area within M9 (sub-basin 171) was assumed to be single family
development. The single family imperviousness is 55% with a minor storm Runoff Coefficient
of 0.65. However, M9 is zoned multi-family and it is our belief that the assumption that all lots
in sub-basin 171 were single family was a small oversight in the original drainage report. The
actual imperviousness of Lot M9 is 56%, with a minor storm Runoff Coefficient of 0.61 as
shown on the attached spreadsheet. Even though the percent impervious is 1% greater than the
original assumption, the runoff coefficient is less than 0.65 and this additional impervious area
will not have an adverse impact to the function of the existing pond.
Mr. Wes Lamarque
February 26, 2016
Page 3 of 3
It is requested that the site be deemed in substantial conformance with the previously approved
Final Drainage Reports. Please see the attached excerpts from the Filing Six Final Drainage
Report detailing the assumptions and original flow calculations for these two sub-basins.
LOW IMPACT DEVELOPMENT REQUIREMENTS
City Staff has stated that the use of porous pavers is not applicable on the residential driveways
providing access to the units on M8 and M9; however, Low Impact Development (LID) criteria
should be achieved where readily available. The sites are constrained in both size and relative to
storm drain outfall options as there are no storm pipes adjacent to the property that could be used
to serve a variety of LID options such as rain gardens. Therefore, he project is meeting the intent
of runoff reduction practices through the use of two LID techniques: grass buffers and a grass
swale.
The southern half of the roof area of M8 in addition to the driveway runoff will be conveyed to a
grass swale that runs along the south property line. Runoff from the northern half of the roof
area and the access walks for both M8 and M9 will flow over a grass buffer prior to sheet
flowing over the sidewalk adjacent to William Neal Parkway. As previously mentioned, runoff
from the southern half of the roof area of M9 in addition to the driveway runoff will be conveyed
to a curb cut. This concentrated runoff will be spread out through the use of a cobble dissipater
and segment of ScourStop Mat and then flow through a previously established grass buffer
located in the open space directly east of the site before ultimately entering the regional pond.
Please refer to the attached LID Exhibit for a breakdown of the proposed impervious area and
LID treatment areas.
If you have any questions or comments please contact me at (970) 460-1091.
Sincerely,
Skylar Brower, P.E.
Colorado Professional Engineer 44248
Attachments
FF=99.93
GFF=98.60
BFF=90.09
FF=98.93
GFF=97.60
BFF=89.09
FF=97.93
GFF=96.60
BFF=88.09
FF=96.23
GFF=94.90
BFF=85.39
FF=95.73
GFF=94.40
BFF=86.89
FF=96.23
GFF=94.90
BFF=85.39
LOT M8
LOT M9
TRACT AS
TRACT BD
LOT 319 LOT 232
POND
269
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
RIGDEN FARM FILING NINETEEN
LOTS M8 & M9
DRAINAGE & EROSION CONTROL PLAN
2/26/16
1"=20'
N/A
SB
RA
1233-133-00
6 of 8
SCHUMAN COMPANIES, INC.
605 S. COLLEGE AVE, SUITE 100
FORT COLLINS, COLORADO 80524
PHONE: 970.219.1493
0
SCALE: 1" = 20'
20 10 20 40
LEGEND
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN
BOUNDARY
SILT FENCE
INLET PROTECTION
Interwest Consulting Group
1218 West Ash, Suite A
Windsor, Colorado
LOCATION: Rigden Farm M8 & M9
PROJECT NO: 1233-136-00
COMPUTATIONS BY: SB
DATE: 2/26/2016
Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria
Recommended % Impervious from Urban Storm Drainage Criteria Manual
Runoff %
coefficient Impervious
C
Streets, parking lots (asphalt): 0.95 100
Concrete: 0.95 96
Roofs: 0.95 90
Permeable Pavers: 0.50 40
General multi-family area: 0.65 70
General single family area: 0.65 55
Lawns (flat <2%, sandy soil): 0.10 0
SUBBASIN TOTAL TOTAL PAVED CONCRETE ROOF PAVER LANDSCAPE RUNOFF %
DESIGNATION AREA AREA AREA AREA AREA AREA AREA COEFF. Impervious REMARKS
(ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (C)
M8 0.25 10,995 2,036 322 4,991 0 3,646 0.67 62
M9 0.29 12,569 2,147 390 4,991 0 5,041 0.61 56
Equations
- Calculated C coefficients & % Impervious are area weighted
C = Σ (Ci Ai) / At
Ci = runoff coefficient for specific area, Ai
Ai = areas of surface with runoff coefficient of Ci
n = number of different surfaces to consider
At = total area over which C is applicable; the sum of all Ai's
RUNOFF COEFFICIENTS & % IMPERVIOUS
Flow-FINAL - No Pavers.xls Cval
Interwest Consulting Group
1218 West Ash, Suite C
Windsor, Colorado
LOCATION: Rigden Farm M8 & M9
PROJECT NO: 1233-136-00
COMPUTATIONS BY: SB
DATE: 2/26/2016
10-yr storm Cf = 1.00
SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS
DATA TIME (ti) (tt) (URBANIZED BASIN) tc
DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10
POINT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min)
(1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14)
M8 0.25 0.67 30 2.0 3.4 115 1.00 0.013 2.5 0.8 4.2 145 10.8 5.0
M9 0.29 0.61 30 2.0 3.8 98 1.00 0.013 2.5 0.7 4.5 128 10.7 5.0
EQUATIONS:
tc = ti + tt
ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3
tt = L/Vel.
Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual)
final tc = minimum of ti + tt and urbanized basin check
min. tc = 5 min. due to limits of IDF curves
STANDARD FORM SF-2
TIME OF CONCENTRATION - 10 YEAR
Flow-FINAL - No Pavers.xls TOC-10
Interwest Consulting Group
1218 West Ash, Suite C
Windsor, Colorado
LOCATION: Rigden Farm M8 & M9
PROJECT NO: 1233-136-00
COMPUTATIONS BY: SB
DATE: 2/26/2016
100-yr storm Cf = 1.25
SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS
DATA TIME (ti) (tt) (URBANIZED BASIN) tc
DESIGN SUBBASIN(s) Area C C*Cf Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10
POINT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min)
(1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14)
1 M8 0.25 0.67 0.84 30 2.0 2.1 115 1.00 0.013 2.5 0.8 2.8 145 10.8 5.0
2 M9 0.29 0.61 0.76 30 2.0 2.7 98 1.00 0.013 2.5 0.7 3.3 128 10.7 5.0
EQUATIONS:
tc = ti + tt
ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3
tt = L/Vel.
Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual)
final tc = minimum of ti + tt and urbanized basin check
min. tc = 5 min. due to limits of IDF curves
TIME OF CONCENTRATION - 100 YR
STANDARD FORM SF-2
Flow-FINAL - No Pavers.xls TOC-100
Interwest Consulting Group
1218 West Ash, Suite C
Windsor, Colorado
RATIONAL METHOD PEAK RUNOFF
(2-YEAR)
LOCATION: Rigden Farm M8 & M9
PROJECT NO: 1233-136-00
COMPUTATIONS BY: SB
DATE: 2/26/2016
2-yr storm, Cf = 1.00
DIRECT RUNOFF CARRY OVER TOTAL REMARKS
Design Tributary A C Cf tc i Q (2) from Q (2) Q(2)tot
Sub-basin (new) Design
Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs)
1 M8 0.25 0.67 5.0 2.85 0.5
2 M9 0.29 0.61 5.0 2.85 0.5
Q = Cf C iA
Q = peak discharge (cfs)
C = runoff coefficient
Cf = frequency adjustment factor
I = rainfall intensity (in/hr) from IDF curve
A = drainage area (acres)
NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis)
Flow-FINAL - No Pavers.xls Q2
Interwest Consulting Group
1218 West Ash, Suite C
Windsor, Colorado
RATIONAL METHOD PEAK RUNOFF
(10-YEAR)
LOCATION: Rigden Farm M8 & M9
PROJECT NO: 1233-136-00
COMPUTATIONS BY: SB
DATE: 2/26/2016
10-yr storm, Cf = 1.00
DIRECT RUNOFF CARRY OVER TOTAL REMARKS
Design Tributary A C Cf tc i Q (10) from Q (10) Q(10)tot
Sub-basin (new) Design
Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs)
1 M8 0.25 0.67 5.0 4.87 0.8 0.8
2 M9 0.29 0.61 5.0 4.87 0.9 0.9
Q = Cf C iA
Q = peak discharge (cfs)
C = runoff coefficient
Cf = frequency adjustment factor
I = rainfall intensity (in/hr) from IDF curve
A = drainage area (acres)
NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis)
Flow-FINAL - No Pavers.xls Q10
Interwest Consulting Group
1218 West Ash, Suite C
Windsor, Colorado
RATIONAL METHOD PEAK RUNOFF
(100-YEAR)
LOCATION: Rigden Farm M8 & M9
PROJECT NO: 1233-136-00
COMPUTATIONS BY: SB
DATE: 2/26/2016
100-yr storm, Cf = 1.25
DIRECT RUNOFF CARRY OVER TOTAL REMARKS
Des. Area A C Cf tc i Q (100) from Q (100) Q(100)tot
(new) Design
Point Design. (ac) (min) (in/hr) (cfs) Point (cfs) (cfs)
1 M8 0.25 0.84 5.0 9.95 2.1 2.1
2 M9 0.29 0.76 5.0 9.95 2.2 2.2
Q = C iA
Q = peak discharge (cfs)
C = runoff coefficient
I = rainfall intensity (in/hr) from IDF curve
A = drainage area (acres)
NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis)
Flow-FINAL - No Pavers.xls Q100
SUMMARY
DRAINAGE SUMMARY TABLE
Design Tributary Area C (2) C (10) C (100) tc (2) tc (10) tc (100) Q(2)tot Q(10)tot Q(100)tot DRAINAGE
Sub-basin STRUCTURE
Point (ac) (min) (min) (min) (cfs) (cfs) (cfs) /REMARKS
M8 0.25 0.67 0.67 0.84 5.0 5.0 5.0 0.5 0.8 2.1
M9 0.29 0.61 0.61 0.76 5.0 5.0 5.0 0.5 0.9 2.2
Page 7
RIGDEN FARM M8 & M9
LID AREA EXHIBIT
DATE: 02/26/16
CONSTRUCTION ENTRANCE
W/ VEHICLE TRACKING CONTROL
GRAVEL BAG
CONCRETE WASHOUT AREA
NOTES:
1. CONCRETE WASHOUT LOCATION TO BE DETERMINED IN
THE FIELD.
2. CONTRACTOR TO ESTABLISH PERIMETER PROTECTION
ALONG THE LIMITS OF DISTURBANCE TO LIMIT ACCESS TO
THE ACTIVE CONSTRUCTION AREA. CONTRACTOR TO LIMIT
SEDIMENT FROM ENTERING THE PUBLIC RIGHT OF WAY
THROUGH THE USE OF A VEHICLE TRACKING PAD OR OTHER
APPROVED METHOD.
3. THE DOWNSTREAM INLET ON THE SOUTH SIDE OF
WILLIAM NEAL PARKWAY JUST WEST OF THE ZIEGLER
INTERSECTION MAY BE REQUIRED TO RECEIVE INLET
PROTECTION IF GRAVEL BAG AT PROPERTY LINE IS NOT
ADEQUATELY MAINTAINED.
4. THE SITE CURRENTLY HAS EXISTING PERIMETER SILT
FENCE INSTALLED. CONTRACTOR TO INSTALL NEW SILT
FENCE AS NEEDED AND/OR MAINTAIN THE EXISTING SILT
FENCE IN PLACE.