December 14, 2015
Jerod Huwa
BHA Design, Inc.
1603 Oakridge Dr.
Fort Collins, CO 80525
RE: Warren Federal Credit Union, PDP150011, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 9 Comment Originated: 12/09/2015
12/09/2015: Please see redline plans for detailed comments.
Response – Revised per redlines
Comment Number: 10 Comment Originated: 12/09/2015
12/09/2015: Tree grates along the Illinois Drvie must be 5' if feasible. Also
perimeter evergreen material must be incorporated into parking lot screening.
Response - The tree grates have been resized to 5’x5’ and evergreen plant material was added to the
parking lot screening.
Comment Number: 11 Comment Originated: 12/09/2015
12/09/2015: Need more landscape transition depth along Limon Drive.
Wall/hardscape transition does not meet the intent of the code. Please refine
the plaza area to provide more landscape planting depth, such as a 5' deep
bed at the top of the wall and/or with ornamental trees in tree grates.
Response - The planting beds along Limon were increased in depth and additional planting beds were
added to the top of the wall.
Comment Number: 12 Comment Originated: 12/09/2015
12/09/2015: Building elevations: For the second story cladding system and
other materials, the plans must show the material which will be used with the
final plans, and not an either/or material callout. Staff is very concerned that the
materials for the second story, in particular the stucco, are not an appropriate
choice for an institutional building, and do not work with the style of the building.
Prior to and in preparation for the hearing, please provide a color material
sample sheet. This can be photographic examples and material images and
incorporated into the elevation sheets. See Banner Health PDP elevation
sheets for an example. Also see redlines for signage and wall comments.
Response – Materials board has been provided and signage has been removed from the elevations.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/05/2015
12/09/2015: The sidewalk ramps at the corners of Limon & Iowa and Limon &
Illinois need to be built to City standards. They need to match the existing
access ramps. The Limon & Iowa ramps need to be built for detached
sidewalks on both legs, while the Limon & Illinois ramps need to be built for
detached on Limon and attached on Illinois.
08/05/2015: Please label the type of concrete treatment at the corners of Iowa
Drive and Limon Drive as well as Illinois Drive and Limon Drive
Response – Corners are now shown with a standard design
Comment Number: 11 Comment Originated: 12/09/2015
12/09/2015: The entrance angle for all driveway approaches shall be near 90
degrees to the centerline of the street for a minimum of 25' from the curb or
edge of pavement. What is the entrance angle? if it is +/- 10 degrees, it must be
consistent for 25'.
Response – Per email from Marc R, do not need variance for current design
Comment Number: 12 Comment Originated: 12/09/2015
12/09/2015: Add a signature block, scale, and north arrow to sheet 2 of the
Utility Plans.
Response – Added
Comment Number: 13 Comment Originated: 12/09/2015
12/09/2015: The 6' Pedestrian Easement on the southwest corner of the
property should be an Access Easement. Please change on the plat as well.
Response – Modified
Comment Number: 14 Comment Originated: 12/09/2015
12/09/2015: Label the dimensions of the drainage easement being shown on
Lot 3 on the Utility Plans. See redlines.
Response – Added
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Lighting Plan
Comment Number: 2 Comment Originated: 12/02/2015
12/02/2015: In regard to LED light fixtures, cooler color temperatures are
harsher at night and cause more disruption to circadian rhythms for both
humans and wildlife. Please consider a warmer color temperature (2700K or
3000K versions) for your LED light fixtures, rather than the 4000-4500K
versions.
Response – Lighting has been changed as requested to 3000K.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 08/04/2015
08/04/2015:
The final landscape plan will need to identify all trees and landscape plants by
direct labeling them on the plan. Street trees should be selected from the City of
Fort Collins street tree list.
Response – Shade and ornamental trees have now been labeled and street trees are labeled using
species from the City of Fort Collins street tree list.
Comment Number: 3 Comment Originated: 08/04/2015
08/04/2015:
Skymaster English oak is no longer in nursery production. Due to likely
availability problems use another canopy shade tree in its place.
Response – Acknowledged
Comment Number: 6 Comment Originated: 12/08/2015
12/08/2015:
Show the locations of any other street lights and the locations where stop signs
will be located. Street tree placement from any of these fixtures should be
adjusted to meet the following standard.
Street Lights:
Canopy shade trees 40 feet
Ornamental trees 15 feet
Response – Required spacing provided
Stop Signs:
All trees 20 feet away from signs
Response – Required spacing provided
Comment Number: 7 Comment Originated: 12/08/2015
12/08/2015:
Evaluate street tree placement for line of site at the following corners:
Illinois and East Drake: The first tree along Illinois and the first tree along Drake.
Illinois and Limon: the first tree on Illinois should be shifted to the north. The first
tree along Limon may be in conflict with where a stop sign will be located and is
also close to the corner.
Response – Plans have been updated.
East Drake and Iowa: Evaluate the first tree for better clearance of east bound
traffic on Drake.
Response – Plans have been updated.
Comment Number: 8 Comment Originated: 12/08/2015
12/08/2015:
Select landscape Plants that will be in the beds at the corner of Illinois and
Limon and at Limon and Iowa that are low and less than 18 inches height.
Review plant selection with Clark Mapes in the Planning Department.
Response – Acknowledged.
Comment Number: 9 Comment Originated: 12/08/2015
12/08/2015:
Provide minimum tree species diversity that meets the LUC standard 3.2.1 D 3.
List the percent used of each tree that is used and check for minimum species
diversity.
Response – Species diversity has been added to the plant list.
Comment Number: 10 Comment Originated: 12/08/2015
12/08/2015:
Trees with tree grates along Illinois:
Provide a tree planting detail for the trees located in the sidewalk along Illinois
that will have tree grates. Grates should be 5 feet by feet or larger. Specify in the
detail the tree grate that will be used.
Response – A tree grate detail has been added to the plans.
Add a landscape note that says all
maintenance, repair and replacement of tree grates shall be the responsibility of
the adjacent property owner.
Response – Note has been added.
Department: Internal Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 12/14/2015
Per building services, Russ Hovland, The Warren credit union project shows the
building approx. 9ft from north PL and this will require 1-hour walls with 25%
windows/doors max.
Response – Site plan has been revised to provide 10.5’ clearance
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/13/2015
GIS COMMENTS 08/13/2015: Addresses will be assigned by the GIS
Department after the plans have met final approval through Development
Review and are recorded with the City.
Response – Acknowledged.
Comment Number: 3 Comment Originated: 08/13/2015
GIS COMMENTS 08/13/2015: Projects with three or more tenant units require
the Unit Level Addressing form to be completed and submitted to the GIS
Department once plans have met final approval through Development Review
and are recorded with the City. This can occur anytime during construction, but
before any utilities or address signs are installed. All addressing will be
determined by the GIS Department and submitted to Poudre Fire Authority,
USPS, Building Services, and Fort Collins Utilities. Failure to contact GIS and
determining addresses through other means may result in address changes.
The Unit Level Addressing form can be obtained by contacting the GIS office at
gis@fcgov.com or (970) 416-2483.
Response – Acknowledged.
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 07/24/2015
07/24/2015:
Building Permit Pre-Submittal Meeting:
Pre-Submittal meetings are offered to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi-family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid-design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi-family projects are advised to
call 416-2341 to schedule
a pre-submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial
chapter.
City of Fort Collins
Building Services
Plan Review
416-2341
Response – Acknowledged.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 12/08/2015
Street trees will need to be adjusted based on the location of the streetlights.
Forty feet of clearance to the streetlight will need to be maintained by shade
trees and fifteen feet by ornamental trees.
Response – Required spacing provided
Department: Outside Agencies
Contact: Bob Rulli, Century Link, ,
Topic: General
Comment Number: 1 Comment Originated: 07/24/2015
CENTURY LINK 07/24/2015: No issues here. Developer/Building to work with
Century Link as needs dictate. I can work with them on specifics (MP at
property edge, entrance conduits, backboard space etc. Century Link has no
facilities in the ROW around this block so we will have a build out to reach
property edge. Also, there are facilities along E Drake (south side) so any
relocates necessary to support this build will be at developers expense.
Short of that looking forward to the project. Developer can reach out to me for
questions as I cover this area. Direct: (970) 490.7503 Cell: (970) 988.2120.
robert.rulli@centurylink.com.
Response – Acknowledged.
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 12/14/2015
12/14/2015: Comcast requests a 2 conduit from data room to transformer
area. Contact Don Kapperman for details.
Response – Acknowledged.
Contact: Xcel, ,
Topic: General
Comment Number: 2 Comment Originated: 08/25/2015
XCEL ENERGY 08/25/2015: This will require gas main extension to serve
customer.
Response – Acknowledged.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 7 Comment Originated: 12/01/2015
PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM TEST
New buildings require a fire department, emergency communication system
evaluation after the core/shell but prior to final build out. For the purposes of this
section, fire walls shall not be used to define separate buildings. Where
adequate radio coverage cannot be established within a building, public-safety
radio amplification systems shall be designed and installed in accordance with
criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau
Admin Policy #07-01
Response – Acknowledged.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 07/21/2015
11/30/2015: Waiting for Material Submittle FDP
08/03/2015: Waiting for Material Submittle FDP
07/21/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Response – Acknowledged.
.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 12/09/2015
12/09/2015: Stormwater is ready for a hearing.
Response – Acknowledged.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 08/04/2015
12/08/2015: There are line over text issues. See redlines.
08/04/2015: No comments.
Response – Revised
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 08/04/2015
12/08/2015: Please change the legal description to "Lot 1, 3 & Tract A, Warren
Federal Credit Union - East Drake".
Response – Revised
08/04/2015: Please change the title to "Lot 2, Warren Federal Credit Union -
East Drake".
Comment Number: 3 Comment Originated: 08/04/2015
12/08/2015: Please show the elevation of benchmark 17-92 to hundredths.
08/04/2015: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX¿.
Response – Revised
Comment Number: 5 Comment Originated: 08/04/2015
12/08/2015: There are line over text issues. See redlines.
08/04/2015: There are line over text issues. See redlines.
Response – Revised
Topic: Landscape Plans
Comment Number: 13 Comment Originated: 12/08/2015
12/08/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Response – Revised
Comment Number: 14 Comment Originated: 12/08/2015
12/08/2015: Please add "- East Drake" to the titles. See redlines.
Response – Revised
Topic: Lighting Plan
Comment Number: 8 Comment Originated: 08/04/2015
12/08/2015: There are line over text issues. See redlines.
08/04/2015: No comments.
Response – Revised
Comment Number: 15 Comment Originated: 12/08/2015
12/08/2015: There are text over text issues. See redlines.
Response – Revised
Comment Number: 16 Comment Originated: 12/08/2015
12/08/2015: Please add "- East Drake" to the titles. See redlines.
Response – Revised
Comment Number: 17 Comment Originated: 12/08/2015
12/08/2015: Please add "Electrical" to the title of sheet E1.0. See redlines.
Response – Revised
Topic: Plat
Comment Number: 18 Comment Originated: 12/08/2015
12/08/2015: Please change “Engineering Department” in the Notice Of Other
Documents statement to “Clerk”. See redlines.
Response – Revised
Topic: Site Plan
Comment Number: 10 Comment Originated: 08/04/2015
12/08/2015: Please change the legal description to "Lot 1, 3 & Tract A, Warren
Federal Credit Union - East Drake".
Response – Revised
08/04/2015: Please change the legal description to "Lot 2, Warren Federal
Credit Union - East Drake".
Comment Number: 19 Comment Originated: 12/08/2015
12/08/2015: There are line over text issues. See redlines.
Response – Revised
Comment Number: 20 Comment Originated: 12/08/2015
12/08/2015: Please add "- East Drake" to the title. See redlines.
Response – Revised
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 12/01/2015
12/01/2015: no new comments
Response – Acknowledged
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Response – Acknowledged
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: Please add all water and sewer details during final compliance.
Response – Acknowledged
Department: Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
Topic: Building Elevations
Comment Number: 2 Comment Originated: 11/20/2015
11/20/2015: Signage will be approved by separate review requiring sign
permit. However, please note the world globe appearing on the building may
be considered a sign. If that is the case then the height of the sign cannot be
over 7' in height. Currently the sign scales out at 11' in height.
Response – Acknowledged. Sign has been removed
Topic: Site Plan
Comment Number: 1 Comment Originated: 11/20/2015
11/20/2015: Please indicate building dimensions on site plan.
Response – Building dimensions have been added.