HomeMy WebLinkAboutWARREN FEDERAL CREDIT UNION - FDP - FDP160011 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTSUBMITTAL CHECKLIST:
FINAL PLAN REVIEW
Community Development & Neighborhood Services – 281 N College Ave – Fort Collins, CO 80522-0580
Development Review Guide – STEP 6 of 8
Warren Federal Credit Union FDP – Initial Submittal
Submittal Check-in notes from Jason Holland, 2-24-2016:
1. In order to expedite your review, please review the applicable detailed submittal check-sheets and
Development Review Guide at: http://www.fcgov.com/developmentreview/applications.php
and: http://www.fcgov.com/drg/introduction.php
2. In addition to paper copies, a digital copy of materials is required with the initial application and
resubmittals at the time of check in. This can be submitted via CD or flash drive.
3. Item quantities listed as CD on the routing sheet can be submitted/routed on individual CD’s or as
paper copies.
4. Please bring a copy of this check sheet, all submittal materials and the attached project routing sheet at
the time of check-in. The City’s Development Review Center is experiencing high volumes of
development review project submittals at this time. In order to maintain efficient project reviews and
provide accurate, timely responses to inquiries, please keep the following factors in in mind when you
plan your submittal:
Appointments are required for all submittals or resubmittals - call 970-416-2740 to
schedule. Only complete submittals are accepted.
Submittals received Monday morning through Wednesday noon will be routed the same
week. Submittals received after Wednesday noon will be routed the following week.
Due to the high volume of projects that may be received on a per week basis, please
schedule your appointment for Monday or Tuesday if possible.
5. Refer to Routing Sheet for specific document quantities.
X= Items waived; D= Deferred; REQ= items required; N/A= not applicable; or (R)eceived; SN=
copy still needed from Initial Submittal.
Application form and filing fee. Application Form.pdf REQ
Transportation Development Review Fee – please contact Engineering at 221-6605 for information.
TDR Fees and Application.pdf REQ
Name and address of each owner of property within the boundaries of the development plan area. N/A
List of names of all general and/or limited partners, managers and directors and/or officers and directors of
the corporation involved as either applicants or owners. N/A
The following information is required to be submitted with all applications, unless waived by staff. Any item
waived must be dated and initialed by a planner with the City of Fort Collins Community Development and
Neighborhood Services Department.
June 29, 2015 2 FDP Submittal Requirements
Final Site Plan* (24” x 36” - folded) REQ
Final Subdivision Plat* (24” x 36” - folded) REQ
Final Architectural Elevations* (24” x 36” - folded) REQ
Final Landscape Plan* (24” x 36” - folded) REQ
Final Drainage and Erosion Control Report* REQ
Final Utility and Drainage Plans* (24” x 36” – unfolded) REQ
Requirements for utility plans checklist (1 copy). Utility Plans Checklist.pdf X (unless you want to)
Transportation Impact Analysis* (TIA), updated* N/A
Soils Report* REQ
Deeds* (contingent on final approval) N/A
Mylars* (Mylars not needed until Final plans are approved) D
Certification of Notice to Mineral Owner(s)* (1 copy) Mineral Rights Certificate.pdf N/A
Other information the Director may require:
- Subsurface Hydrologic Study* X
- Easements/Agreements* X
- Environmental Reports* X
- Building Materials Exhibit REQ (included on the elevations)
- Revised Lighting Plan: REQ
An electronic copy of all submitted materials (above) on a disk or other digital storage device (1 copy).
*This document is meant to be used as a checklist only. For a more detailed list and explanation of each of
these items, please see the handout: “Submittal Requirements: Final Plan Review”