Loading...
HomeMy WebLinkAboutFOX GROVE PHASE ONE - FDP - FDP140030 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject Routing Sheet New: X Revision: Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Final Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): N/A Labels Received Y/N: Y n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a RETURN ALL REDLINES 1111 1 1 1 1111 1 1 1111 1 111 1 1111 1 1111 1 1111 1 XX X 1111 1111 1 1 1111 1 1 1111 1 1111 1 0 12 12 12 110040 110000100000Revised: 1-29-2016 PPPPPPPPPPPPPPPPPPPP T.I.A. Utility Plans Planning Objectives Comment Response Letter Site Plan Landscape Plan New projects: APO labels & list: Holland Wetland Delineation (plans) Ecological Study (ECS) Hazmat Review Soils Study- New/Update Digital copy of all materials L.U.C. Mod. Requests Drainage Report Building Materials Exhibit Easements (As Needed) SWMP (Erosion Report) Utility Plan Site Plan Landscape Plan Plat Building Elevations Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Economic Development Environmental Planner Forestry GIS Historic Preservation CFC Light & Power Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Sanitation Dist: BOXELDER Outside Agency Water District: ELCO Street Oversizing Technical Services Traffic Operations Transfort Transportation Planning Water Conservation Received: County Assessor CDOT Ditch Co: Railroad: ___________________ School District Other: Total: Format Required: (P)aper, Digital (CD) Xcel Energy Zoning City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) Lighting Plan Plat Building Elevations Lighting Plan Drainage Report Turnaround Time: 3 weeks Comments Due: Fox Grove Final Development Plan FDP140030