Loading...
HomeMy WebLinkAboutWINDSONG AT ROCK CREEK - FDP - FDP160010 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Windsong at Rock Creek TIS, October 2015 ASSOCIATES Figure 3 shows recent peak hour counts at the Ziegler/Rock Creek intersection. The traffic volumes at the Ziegler/Rock Creek intersection were collected in May 2015. Raw traffic data is provided in Appendix B. Table 1 shows the current morning and afternoon peak hour operation of the Ziegler/Rock Creek intersection. The Ziegler/Rock Creek intersection currently meets the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with existing control and geometry. Calculation forms are provided in Appendix C. A description of level of service for signalized and unsignalized intersection from the 2010 Highway Capacity Manual is provided in Appendix C. Table 4-3 (revised per staff comments regarding type of intersection) showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. The Windsong at Rock Creek site is in an area termed “other.” In areas termed “other,” acceptable overall operation at signalized intersections during the peak hours is defined as level of service D or better. At signalized intersections, acceptable operation of any leg and any movement is level of service E. At unsignalized intersections, acceptable operation is considered to be at level of service E for any approach leg for an arterial/arterial, arterial/collector and arterial/local intersections. In such areas, it is expected that there would be substantial delays to the minor street movements at unsignalized intersections during the peak hours. This is considered to be normal in urban areas. At unsignalized collector/local intersections, acceptable operation is considered to be at level of service C for any approach leg. Figure 4 shows the site plan for the development at Windsong at Rock Creek. The development at Windsong at Rock Creek is a 64 bed memory care facility. Currently the site is vacant. Access to the site will be via a right-in/right-out access and a full movement access to/from Rock Creek Drive. Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. Nursing Home (Code 620) in Trip Generation, 9th Edition, ITE was used to estimate the trips that would be generated by the proposed/expected uses at a site. This land use category best fits a memory care facility. A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows the expected trip generation on a daily and peak hour basis. The trip generation of the Windsong at Rock Creek development resulted in 134 daily trip ends; 11 morning peak hour trip ends; and 14 afternoon peak hour trip ends. Directional distribution of the generated trips was determined for Windsong at Rock Creek site and is shown in Figure 5. Figure 6 shows the site generated peak hour traffic assignment of Windsong at Rock Creek. Figure 7 shows the short range (2020) background morning and afternoon peak hour traffic at the Ziegler/Rock Creek intersection. Background traffic volume forecasts for the short range (2020) future were obtained by reviewing traffic studies for other developments in this area and reviewing historic counts in the area. Traffic volumes at the Ziegler/Rock Creek intersection were increased at a rate of 2.0 percent per year. Table 3 shows the short range (2020) background morning and afternoon peak hour operation at the Ziegler/Rock Creek intersection. Calculation forms are provided in Appendix D. The Ziegler/Rock Creek intersection will meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with the existing control and geometry in the short range (2020) future. DELICH Windsong at Rock Creek TIS, October 2015 ASSOCIATES Figure 8 shows the short range (2020) total morning and afternoon peak hour traffic at the Ziegler/Rock Creek, Rock Creek/Right-in/Right-out Access, and Rock Creek/Full Movement Access intersections. Table 4 shows the short range (2020) total morning and afternoon peak hour operation at the key intersections. Calculation forms are provided in Appendix E. The Ziegler/Rock Creek, Rock Creek/Right-in/Right-out Access, and Rock Creek/Full Movement Access intersections will meet the City of Fort Collins Motor Vehicle LOS Standards during the morning and afternoon peak hours with the existing control and geometry. The recommended short range (2020) geometry is shown in Figure 9. The existing geometry at the Ziegler/Rock Creek intersection is appropriate. The right- in/right-out access should be designed to discourage other traffic movements. Although the trip generation/assignment shows little traffic, the City may desire an enhanced channelization island at this access. Right-turn lanes are not required at the site access intersections based on Figure 8-4 in LCUASS. According to Figure 8-1 in LCUASS, an eastbound left-turn lane is not required at Rock Creek/Full Movement Access intersection. However, with other potential developments using the site access in the future, Windsong at Rock Creek will restripe this section of Rock Creek Drive to provide an eastbound left-turn lane. According to LCUASS, Chapter 7, Table 7-3, on major collector streets, the distance between high volume driveways and intersections is 200 feet (minimum). The corner clearance between driveways/alleys (not high volume) and street intersections is 175 feet (minimum). The distance between driveway edges is 75 feet (minimum). The Right-in/Right-out Access will not be a high volume driveway. The Full Movement Access will likely have volumes commensurate with that of a high volume driveway in the future, since it will serve other parcels north of Rock Creek Drive. There are two driveways that will provide access to the Windsong at Rock Creek site on the north side of Rock Creek Drive. According to the site plan, the Right-in/Right-out Access is 198 feet east of Ziegler Road (centerline to centerline). Therefore, the Right-in/Right-out Access meets the corner clearance spacing criterion. The distance between the Right- in/Right-out Access and the Full Movement Access is 253 feet (centerline to centerline). Therefore, the spacing between the Right-in/Right-out Access and the Full Movement Access meets the driveway spacing criterion. The distance between the Full Movement Access and the driveway to the south (serves Fossil Ridge High School) is 177 feet. This separation meets the driveway spacing criterion. The Windsong at Rock Creek site is in an area within which the City requires pedestrian and bicycle level of service evaluations. Appendix F shows a map of the area that is within 1320 feet of the Windsong at Rock Creek site. The Windsong at Rock Creek site is located within an area termed as “transit corridor,” which sets the pedestrian level of service threshold at LOS C for all measured categories, except for Directness and Security at LOS B. There are two destination areas within 1320 feet of the proposed development at Windsong at Rock Creek: 1) the residential area to the west and 2) Fossil Ridge High School to the southeast. This development will build sidewalk along the site frontage. Appendix F contains a Pedestrian LOS Worksheet. The pedestrian level of service will be met. DELICH Windsong at Rock Creek TIS, October 2015 ASSOCIATES Based upon Fort Collins Bicycle LOS criteria, there is one destination area within 1320 feet of the Windsong at Rock Creek site: Fossil Ridge High School to the southeast. Appendix F contains a Bicycle LOS Worksheet. Bicyclists will have access to Ziegler Road and Rock Creek Drive. The bicycle level of service will be met. Currently, this area is served by Transfort route 16. The nearest bus stop is at the Ziegler/Rock Creek intersection. It is concluded that, with development of the Windsong at Rock Creek, the future level of service at the key intersections will be acceptable. The Rock Creek/Right- in/Right-out Access intersection should be designed to discourage left turns. An eastbound left-turn lane will be restriped at the Rock Creek/Full Movement Access intersection. The driveway spacing along Rock Creek Drive meets the spacing criteria in Table 7-3 in LCUASS. The pedestrian and bicycle level of service will be met. SCALE: 1"=500' SITE LOCATION Figure 1 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Windsong at Rock Creek Timberwood Drive Rock Creek Drive Ziegler Road Technology Parkway FRHS Access EXISTING GEOMETRY Figure 2 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Ziegler Road Rock Creek Drive - Denotes Lane RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Ziegler Road Rock Creek Drive AM/PM 81/41 534/343 13/5 21/78 258/612 69/140 64/33 30/25 72/51 100/125 9/25 6/15 DELICH Windsong at Rock Creek TIS, October 2015 ASSOCIATES TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM Ziegler/Rock Creek (signal) EB LT/T/RT D D WB LT D C WB T D C WB RT D C WB APPROACH D C NB LT A A NB T A A NB RT A A NB APPROACH A A SB LT A A SB T A A SB RT A A SB APPROACH A A OVERALL B A TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 620 Nursing Home 64 Beds EQ. 134 0.12 8 0.05 3 0.07 4 0.15 10 SITE PLAN Figure 4 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 TRIP DISTRIBUTION Figure 5 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Ziegler Road Rock Creek Drive AM/PM SITE 5% 5% 10% 80% SITE GENERATED PEAK HOUR TRAFFIC Figure 6 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Ziegler Road Rock Creek Drive AM/PM 1/1 6/3 1/0 2/8 0/1 1/1 1/3 0/0 2/7 8/4 2/7 0/0 0/0 0/0 8/4 Right-in/Right-out Site Access SHORT RANGE (2020) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Ziegler Road Rock Creek Drive AM/PM 89/45 590/379 14/6 23/86 285/676 76/155 71/36 33/28 79/56 110/138 10/28 7/17 DELICH Windsong at Rock Creek TIS, October 2015 ASSOCIATES TABLE 3 Short Range (2020) Background Peak Hour Operation Intersection Movement Level of Service AM PM Ziegler/Rock Creek (signal) EB LT/T/RT D C WB LT D C WB T D C WB RT D C WB APPROACH D C NB LT A A NB T B A NB RT A A NB APPROACH A A SB LT A A SB T A B SB RT A A SB APPROACH A A OVERALL B B SHORT RANGE (2020) TOTAL PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Ziegler Road Rock Creek Drive AM/PM 1/3 0/0 129/190 131/193 2/7 0/0 0/0 127/183 8/4 123/189 Right-in/Right-out Site Access 89/45 590/379 15/7 23/86 285/676 82/158 71/36 34/28 79/56 112/146 10/29 8/18 DELICH Windsong at Rock Creek TIS, October 2015 ASSOCIATES TABLE 4 Short Range (2020) Total Peak Hour Operation Intersection Movement Level of Service AM PM Ziegler/Rock Creek (signal) EB LT/T/RT D C WB LT D C WB T D C WB RT D C WB APPROACH D C NB LT A A NB T B A NB RT A A NB APPROACH A A SB LT A A SB T A B SB RT A A SB APPROACH A A OVERALL B B Rock Creek/Right-in/Right-out (stop sign) SB RT A A Rock Creek/Site Access (stop sign) EB LT A A SB LT/RT A A SHORT RANGE (2020) GEOMETRY Figure 9 DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Ziegler Road Rock Creek Drive - Denotes Lane Right-in/Right-out Site Access APPENDIX A 1 2 3 4 5 APPENDIX B 6 7 APPENDIX C 8 HCM 2010 Signalized Intersection Summary 168: Ziegler & Rock Creek Recent am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 64 30 72 6 9 100 81 534 13 69 258 21 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.96 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 75 35 52 7 11 2 95 628 0 81 304 0 Adj No. of Lanes 010111111111 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 222222222222 Cap, veh/h 139 57 70 222 255 215 825 1300 1105 573 1298 1103 Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.04 0.70 0.00 0.04 0.70 0.00 Sat Flow, veh/h 664 416 510 1349 1863 1566 1774 1863 1583 1774 1863 1583 Grp Volume(v), veh/h 162 0 0 7 11 2 95 628 0 81 304 0 Grp Sat Flow(s),veh/h/ln 1590 0 0 1349 1863 1566 1774 1863 1583 1774 1863 1583 Q Serve(g_s), s 9.4 0.0 0.0 0.0 0.6 0.1 1.6 16.9 0.0 1.4 6.5 0.0 Cycle Q Clear(g_c), s 10.7 0.0 0.0 0.6 0.6 0.1 1.6 16.9 0.0 1.4 6.5 0.0 Prop In Lane 0.46 0.32 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 266 0 0 222 255 215 825 1300 1105 573 1298 1103 V/C Ratio(X) 0.61 0.00 0.00 0.03 0.04 0.01 0.12 0.48 0.00 0.14 0.23 0.00 Avail Cap(c_a), veh/h 422 0 0 356 440 370 925 1300 1105 627 1298 1103 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 45.5 0.0 0.0 41.2 41.2 41.0 4.1 7.6 0.0 5.3 6.0 0.0 Incr Delay (d2), s/veh 2.3 0.0 0.0 0.1 0.1 0.0 0.1 1.3 0.0 0.1 0.4 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 0.0 0.0 0.2 0.3 0.1 0.8 9.0 0.0 0.7 3.4 0.0 LnGrp Delay(d),s/veh 47.8 0.0 0.0 41.3 41.3 41.0 4.2 8.9 0.0 5.5 6.5 0.0 LnGrp LOS D D D D A A A A Approach Vol, veh/h 162 20 723 385 Approach Delay, s/veh 47.8 41.3 8.2 6.3 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.8 82.1 20.1 7.7 82.3 20.1 Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0 Max Green Setting (Gmax), s 10.0 58.5 25.0 7.0 61.5 25.0 Max Q Clear Time (g_c+I1), s 3.6 8.5 12.7 3.4 18.9 2.6 Green Ext Time (p_c), s 0.1 3.4 0.4 0.0 3.4 0.6 Intersection Summary HCM 2010 Ctrl Delay 13.1 HCM 2010 LOS B 9 Timing Report, Sorted By Phase 168: Ziegler & Rock Creek Recent am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 2 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 14 65 31 11 68 31 Maximum Split (%) 12.7% 59.1% 28.2% 10.0% 61.8% 28.2% Minimum Split (s) 11 32.5 30 11 31.5 31 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 123123 Minimum Initial (s) 474474 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 19 17 18 18 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 41 55 10 41 52 10 End Time (s) 55 10 41 52 10 41 Yield/Force Off (s) 51 3.5 35 48 3.5 35 Yield/Force Off 170(s) 51 94.5 18 48 95.5 17 Local Start Time (s) 31 45 0 31 42 0 Local Yield (s) 41 103.5 25 38 103.5 25 Local Yield 170(s) 41 84.5 8 38 85.5 7 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 75 Offset: 10 (9%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 168: Ziegler & Rock Creek 10 HCM 2010 Signalized Intersection Summary 168: Ziegler & Rock Creek Recent pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 33 25 51 15 25 125 41 343 5 140 612 78 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.98 0.94 0.98 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 38 29 4 17 29 8 47 394 0 161 703 47 Adj No. of Lanes 010111111111 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222 Cap, veh/h 146 96 10 261 208 172 508 1219 1036 759 1257 1067 Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.04 0.65 0.00 0.07 0.67 0.67 Sat Flow, veh/h 688 861 92 1395 1863 1541 1774 1863 1583 1774 1863 1581 Grp Volume(v), veh/h 71 0 0 17 29 8 47 394 0 161 703 47 Grp Sat Flow(s),veh/h/ln 1641 0 0 1395 1863 1541 1774 1863 1583 1774 1863 1581 Q Serve(g_s), s 1.3 0.0 0.0 0.0 1.1 0.4 0.7 7.4 0.0 2.2 15.8 0.8 Cycle Q Clear(g_c), s 3.0 0.0 0.0 0.7 1.1 0.4 0.7 7.4 0.0 2.2 15.8 0.8 Prop In Lane 0.54 0.06 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 252 0 0 261 208 172 508 1219 1036 759 1257 1067 V/C Ratio(X) 0.28 0.00 0.00 0.07 0.14 0.05 0.09 0.32 0.00 0.21 0.56 0.04 Avail Cap(c_a), veh/h 589 0 0 559 605 501 628 1219 1036 843 1257 1067 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.8 0.0 0.0 31.9 32.1 31.7 5.1 6.1 0.0 3.8 6.8 4.4 Incr Delay (d2), s/veh 2.2 0.0 0.0 0.4 1.1 0.4 0.1 0.7 0.0 0.1 1.8 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 0.0 0.0 0.4 0.6 0.2 0.3 4.0 0.0 1.0 8.6 0.4 LnGrp Delay(d),s/veh 35.0 0.0 0.0 32.2 33.2 32.1 5.1 6.8 0.0 3.9 8.6 4.4 LnGrp LOS D C C C A A A A A Approach Vol, veh/h 71 54 441 911 Approach Delay, s/veh 35.0 32.7 6.6 7.6 Approach LOS D C A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 6.6 59.5 13.9 8.2 57.9 13.9 Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0 Max Green Setting (Gmax), s 8.0 30.5 25.0 8.0 30.5 25.0 Max Q Clear Time (g_c+I1), s 2.7 17.8 5.0 4.2 9.4 3.1 Green Ext Time (p_c), s 0.0 8.6 1.0 0.1 12.4 1.0 Intersection Summary HCM 2010 Ctrl Delay 9.5 HCM 2010 LOS A 11 Timing Report, Sorted By Phase 168: Ziegler & Rock Creek Recent pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 2 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Min None None C-Min None Maximum Split (s) 12 37 31 12 37 31 Maximum Split (%) 15.0% 46.3% 38.8% 15.0% 46.3% 38.8% Minimum Split (s) 11 32.5 30 11 31.5 31 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 123123 Minimum Initial (s) 474474 Vehicle Extension (s) 366366 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 19 17 18 18 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 7 19 56 7 19 56 End Time (s) 19 56 7 19 56 7 Yield/Force Off (s) 15 49.5 1 15 49.5 1 Yield/Force Off 170(s) 15 30.5 64 15 31.5 63 Local Start Time (s) 31 43 0 31 43 0 Local Yield (s) 39 73.5 25 39 73.5 25 Local Yield 170(s) 39 54.5 8 39 55.5 7 Intersection Summary Cycle Length 80 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 56 (70%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 168: Ziegler & Rock Creek 12 Table 4-3 Fort Collins (GMA and City Limits) Motor Vehicle LOS Standards (Intersections) Intersection type Land Use (from structure plan) Commercial corridors Other corridors within: Mixed use districts Low density mixed use residential All other areas Signalized intersections (overall) D E* D D Any Leg E E D E Any Movement E E D E Stop sign control (arterial/arterial, arterial/collector or local- any approach leg) N/A F** F** E Stop sign control (collector/local--any approach leg) N/A C C C * mitigating measures required ** considered normal in an urban environment 13 UNSIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 15 C > 15 and < 25 D > 25 and < 35 E > 35 and < 50 F > 50 SIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 20 C > 20 and < 35 D > 35 and < 55 E > 55 and < 80 F > 80 14 APPENDIX D 15 HCM 2010 Signalized Intersection Summary 168: Ziegler & Rock Creek Short Background am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 71 33 79 7 10 110 89 590 14 76 285 23 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.96 0.99 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 84 39 60 8 12 13 105 694 1 89 335 2 Adj No. of Lanes 010111111111 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 222222222222 Cap, veh/h 147 60 78 230 280 235 780 1274 1080 512 1273 1056 Arrive On Green 0.15 0.15 0.15 0.15 0.15 0.15 0.04 0.68 0.68 0.04 0.68 0.68 Sat Flow, veh/h 662 401 518 1335 1863 1568 1774 1863 1579 1774 1863 1546 Grp Volume(v), veh/h 183 0 0 8 12 13 105 694 1 89 335 2 Grp Sat Flow(s),veh/h/ln 1581 0 0 1335 1863 1568 1774 1863 1579 1774 1863 1546 Q Serve(g_s), s 10.9 0.0 0.0 0.0 0.6 0.8 1.9 20.6 0.0 1.6 7.6 0.0 Cycle Q Clear(g_c), s 12.2 0.0 0.0 0.7 0.6 0.8 1.9 20.6 0.0 1.6 7.6 0.0 Prop In Lane 0.46 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 285 0 0 230 280 235 780 1274 1080 512 1273 1056 V/C Ratio(X) 0.64 0.00 0.00 0.03 0.04 0.06 0.13 0.54 0.00 0.17 0.26 0.00 Avail Cap(c_a), veh/h 420 0 0 345 440 371 880 1274 1080 565 1273 1056 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.8 0.0 0.0 40.0 40.0 40.1 4.6 8.7 5.5 6.5 6.7 5.5 Incr Delay (d2), s/veh 2.4 0.0 0.0 0.1 0.1 0.1 0.1 1.7 0.0 0.2 0.5 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.5 0.0 0.0 0.2 0.3 0.3 0.9 11.0 0.0 0.8 4.1 0.0 LnGrp Delay(d),s/veh 47.2 0.0 0.0 40.1 40.0 40.2 4.7 10.4 5.5 6.7 7.2 5.5 LnGrp LOS D D D D ABAAAA Approach Vol, veh/h 183 33 800 426 Approach Delay, s/veh 47.2 40.1 9.7 7.1 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.8 80.7 21.5 7.7 80.8 21.5 Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0 Max Green Setting (Gmax), s 10.0 58.5 25.0 7.0 61.5 25.0 Max Q Clear Time (g_c+I1), s 3.9 9.6 14.2 3.6 22.6 2.8 Green Ext Time (p_c), s 0.1 3.9 0.5 0.1 3.9 0.7 Intersection Summary HCM 2010 Ctrl Delay 14.4 HCM 2010 LOS B 16 Timing Report, Sorted By Phase 168: Ziegler & Rock Creek Short Background am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 2 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 14 65 31 11 68 31 Maximum Split (%) 12.7% 59.1% 28.2% 10.0% 61.8% 28.2% Minimum Split (s) 11 32.5 30 11 31.5 31 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 123123 Minimum Initial (s) 474474 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 19 17 18 18 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 41 55 10 41 52 10 End Time (s) 55 10 41 52 10 41 Yield/Force Off (s) 51 3.5 35 48 3.5 35 Yield/Force Off 170(s) 51 94.5 18 48 95.5 17 Local Start Time (s) 31 45 0 31 42 0 Local Yield (s) 41 103.5 25 38 103.5 25 Local Yield 170(s) 41 84.5 8 38 85.5 7 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 10 (9%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 168: Ziegler & Rock Creek 17 HCM 2010 Signalized Intersection Summary 168: Ziegler & Rock Creek Short Background pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 36 28 56 17 28 138 45 379 6 155 676 86 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.98 0.95 0.98 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 41 32 9 20 32 23 52 436 1 178 777 56 Adj No. of Lanes 010111111111 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222 Cap, veh/h 145 100 22 278 228 189 449 1191 1011 715 1233 1047 Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.05 0.64 0.64 0.07 0.66 0.66 Sat Flow, veh/h 632 820 179 1388 1863 1545 1774 1863 1581 1774 1863 1581 Grp Volume(v), veh/h 82 0 0 20 32 23 52 436 1 178 777 56 Grp Sat Flow(s),veh/h/ln 1631 0 0 1388 1863 1545 1774 1863 1581 1774 1863 1581 Q Serve(g_s), s 1.6 0.0 0.0 0.0 1.2 1.1 0.8 8.8 0.0 2.5 19.3 1.0 Cycle Q Clear(g_c), s 3.5 0.0 0.0 0.8 1.2 1.1 0.8 8.8 0.0 2.5 19.3 1.0 Prop In Lane 0.50 0.11 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 267 0 0 278 228 189 449 1191 1011 715 1233 1047 V/C Ratio(X) 0.31 0.00 0.00 0.07 0.14 0.12 0.12 0.37 0.00 0.25 0.63 0.05 Avail Cap(c_a), veh/h 585 0 0 559 605 502 565 1191 1011 791 1233 1047 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.3 0.0 0.0 31.2 31.4 31.3 6.1 6.8 5.2 4.2 7.8 4.7 Incr Delay (d2), s/veh 2.3 0.0 0.0 0.4 1.0 1.0 0.1 0.9 0.0 0.2 2.4 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.8 0.0 0.0 0.4 0.7 0.5 0.4 4.8 0.0 1.2 10.6 0.5 LnGrp Delay(d),s/veh 34.6 0.0 0.0 31.6 32.4 32.3 6.3 7.7 5.2 4.4 10.3 4.8 LnGrp LOS C C C C AAAABA Approach Vol, veh/h 82 75 489 1011 Approach Delay, s/veh 34.6 32.1 7.5 8.9 Approach LOS C C A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 6.7 58.5 14.8 8.6 56.6 14.8 Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0 Max Green Setting (Gmax), s 8.0 30.5 25.0 8.0 30.5 25.0 Max Q Clear Time (g_c+I1), s 2.8 21.3 5.5 4.5 10.8 3.2 Green Ext Time (p_c), s 0.0 7.0 1.3 0.2 13.1 1.4 Intersection Summary HCM 2010 Ctrl Delay 10.8 HCM 2010 LOS B 18 Timing Report, Sorted By Phase 168: Ziegler & Rock Creek Short Background pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 2 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Min None None C-Min None Maximum Split (s) 12 37 31 12 37 31 Maximum Split (%) 15.0% 46.3% 38.8% 15.0% 46.3% 38.8% Minimum Split (s) 11 32.5 30 11 31.5 31 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 123123 Minimum Initial (s) 474474 Vehicle Extension (s) 366366 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 19 17 18 18 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 7 19 56 7 19 56 End Time (s) 19 56 7 19 56 7 Yield/Force Off (s) 15 49.5 1 15 49.5 1 Yield/Force Off 170(s) 15 30.5 64 15 31.5 63 Local Start Time (s) 31 43 0 31 43 0 Local Yield (s) 39 73.5 25 39 73.5 25 Local Yield 170(s) 39 54.5 8 39 55.5 7 Intersection Summary Cycle Length 80 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 56 (70%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 168: Ziegler & Rock Creek 19 APPENDIX E 20 HCM 2010 Signalized Intersection Summary 168: Ziegler & Rock Creek Short Total am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 71 34 79 8 10 112 89 590 15 82 285 23 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.96 0.99 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 84 40 60 9 12 16 105 694 3 96 335 2 Adj No. of Lanes 010111111111 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 222222222222 Cap, veh/h 147 61 78 230 281 236 780 1272 1078 511 1271 1055 Arrive On Green 0.15 0.15 0.15 0.15 0.15 0.15 0.04 0.68 0.68 0.04 0.68 0.68 Sat Flow, veh/h 658 408 515 1334 1863 1568 1774 1863 1579 1774 1863 1546 Grp Volume(v), veh/h 184 0 0 9 12 16 105 694 3 96 335 2 Grp Sat Flow(s),veh/h/ln 1581 0 0 1334 1863 1568 1774 1863 1579 1774 1863 1546 Q Serve(g_s), s 11.0 0.0 0.0 0.0 0.6 1.0 1.9 20.7 0.1 1.7 7.7 0.0 Cycle Q Clear(g_c), s 12.2 0.0 0.0 0.8 0.6 1.0 1.9 20.7 0.1 1.7 7.7 0.0 Prop In Lane 0.46 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 286 0 0 230 281 236 780 1272 1078 511 1271 1055 V/C Ratio(X) 0.64 0.00 0.00 0.04 0.04 0.07 0.13 0.55 0.00 0.19 0.26 0.00 Avail Cap(c_a), veh/h 420 0 0 344 440 371 879 1272 1078 563 1271 1055 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.8 0.0 0.0 40.0 39.9 40.1 4.7 8.8 5.5 6.6 6.8 5.6 Incr Delay (d2), s/veh 2.4 0.0 0.0 0.1 0.1 0.1 0.1 1.7 0.0 0.2 0.5 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.6 0.0 0.0 0.2 0.3 0.4 0.9 11.2 0.0 0.8 4.1 0.0 LnGrp Delay(d),s/veh 47.2 0.0 0.0 40.1 40.0 40.2 4.7 10.5 5.5 6.8 7.3 5.6 LnGrp LOS D D D D ABAAAA Approach Vol, veh/h 184 37 802 433 Approach Delay, s/veh 47.2 40.1 9.7 7.1 Approach LOS D D A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 7.8 80.6 21.6 7.8 80.6 21.6 Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0 Max Green Setting (Gmax), s 10.0 58.5 25.0 7.0 61.5 25.0 Max Q Clear Time (g_c+I1), s 3.9 9.7 14.2 3.7 22.7 3.0 Green Ext Time (p_c), s 0.1 3.9 0.5 0.1 3.9 0.7 Intersection Summary HCM 2010 Ctrl Delay 14.5 HCM 2010 LOS B 21 Timing Report, Sorted By Phase 168: Ziegler & Rock Creek Short Total am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 8 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None C-Max None Maximum Split (s) 14 65 31 11 68 31 Maximum Split (%) 12.7% 59.1% 28.2% 10.0% 61.8% 28.2% Minimum Split (s) 11 32.5 30 11 31.5 31 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 123123 Minimum Initial (s) 474474 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 19 17 18 18 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 41 55 10 41 52 10 End Time (s) 55 10 41 52 10 41 Yield/Force Off (s) 51 3.5 35 48 3.5 35 Yield/Force Off 170(s) 51 94.5 18 48 95.5 17 Local Start Time (s) 31 45 0 31 42 0 Local Yield (s) 41 103.5 25 38 103.5 25 Local Yield 170(s) 41 84.5 8 38 85.5 7 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 10 (9%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 168: Ziegler & Rock Creek 22 HCM 2010 Signalized Intersection Summary 168: Ziegler & Rock Creek Short Total pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 36 28 56 18 29 146 45 379 7 158 676 86 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.98 0.95 0.98 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 41 32 9 21 33 32 52 436 2 182 777 56 Adj No. of Lanes 010111111111 Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222 Cap, veh/h 145 101 22 280 231 192 447 1186 1006 713 1230 1044 Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.05 0.64 0.64 0.07 0.66 0.66 Sat Flow, veh/h 628 818 178 1388 1863 1545 1774 1863 1581 1774 1863 1581 Grp Volume(v), veh/h 82 0 0 21 33 32 52 436 2 182 777 56 Grp Sat Flow(s),veh/h/ln 1625 0 0 1388 1863 1545 1774 1863 1581 1774 1863 1581 Q Serve(g_s), s 1.5 0.0 0.0 0.0 1.3 1.5 0.8 8.9 0.0 2.6 19.4 1.0 Cycle Q Clear(g_c), s 3.5 0.0 0.0 0.8 1.3 1.5 0.8 8.9 0.0 2.6 19.4 1.0 Prop In Lane 0.50 0.11 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 269 0 0 280 231 192 447 1186 1006 713 1230 1044 V/C Ratio(X) 0.30 0.00 0.00 0.07 0.14 0.17 0.12 0.37 0.00 0.26 0.63 0.05 Avail Cap(c_a), veh/h 583 0 0 559 605 502 564 1186 1006 787 1230 1044 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.1 0.0 0.0 31.1 31.2 31.3 6.2 6.9 5.3 4.3 7.9 4.8 Incr Delay (d2), s/veh 2.3 0.0 0.0 0.4 1.0 1.5 0.1 0.9 0.0 0.2 2.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.8 0.0 0.0 0.4 0.7 0.7 0.4 4.8 0.0 1.3 10.6 0.5 LnGrp Delay(d),s/veh 34.4 0.0 0.0 31.5 32.3 32.8 6.3 7.8 5.3 4.5 10.4 4.9 LnGrp LOS C C C C AAAABA Approach Vol, veh/h 82 86 490 1015 Approach Delay, s/veh 34.4 32.3 7.6 9.0 Approach LOS C C A A Timer 12345678 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 6.7 58.3 14.9 8.6 56.4 14.9 Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0 Max Green Setting (Gmax), s 8.0 30.5 25.0 8.0 30.5 25.0 Max Q Clear Time (g_c+I1), s 2.8 21.4 5.5 4.6 10.9 3.5 Green Ext Time (p_c), s 0.0 7.0 1.4 0.2 13.1 1.5 Intersection Summary HCM 2010 Ctrl Delay 11.0 HCM 2010 LOS B 23 Timing Report, Sorted By Phase 168: Ziegler & Rock Creek Short Total pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 8 Phase Number 124568 Movement NBL SBTL EBTL SBL NBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Min None None C-Min None Maximum Split (s) 12 37 31 12 37 31 Maximum Split (%) 15.0% 46.3% 38.8% 15.0% 46.3% 38.8% Minimum Split (s) 11 32.5 30 11 31.5 31 Yellow Time (s) 3 4.5 3 3 4.5 3 All-Red Time (s) 123123 Minimum Initial (s) 474474 Vehicle Extension (s) 366366 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 7 7 7 7 Flash Dont Walk (s) 19 17 18 18 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 7 19 56 7 19 56 End Time (s) 19 56 7 19 56 7 Yield/Force Off (s) 15 49.5 1 15 49.5 1 Yield/Force Off 170(s) 15 30.5 64 15 31.5 63 Local Start Time (s) 31 43 0 31 43 0 Local Yield (s) 39 73.5 25 39 73.5 25 Local Yield 170(s) 39 54.5 8 39 55.5 7 Intersection Summary Cycle Length 80 Control Type Actuated-Coordinated Natural Cycle 90 Offset: 56 (70%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 168: Ziegler & Rock Creek 24 HCM 2010 TWSC 3: Rock Creek & Right-in/Right-out Access Short Total am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 0 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 0 131 129 0 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - - 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 154 152 0 0 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 152 0 - 0 306 152 Stage 1 - - - - 152 - Stage 2 - - - - 154 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1429 - - - 686 894 Stage 1 - - - - 876 - Stage 2 - - - - 874 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1429 - - - 686 894 Mov Cap-2 Maneuver - - - - 686 - Stage 1 - - - - 876 - Stage 2 - - - - 874 - Approach EB WB SB HCM Control Delay, s 0 0 9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1429 - - - 894 HCM Lane V/C Ratio ---- 0.001 HCM Control Delay (s) 0 - - - 9 HCM Lane LOS A - - - A HCM 95th %tile Q(veh) 0 - - - 0 25 Lanes and Geometrics 3: Rock Creek & Right-in/Right-out Access Short Total am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 1 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 0 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected Satd. Flow (prot) 0 1863 1863 0 0 1611 Flt Permitted Satd. Flow (perm) 0 1863 1863 0 0 1611 Link Speed (mph) 25 25 30 Link Distance (ft) 295 340 225 Travel Time (s) 8.0 9.3 5.1 Intersection Summary Area Type: Other 26 HCM 2010 TWSC 3: Rock Creek & Right-in/Right-out Access Short Total pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 2 Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 0 193 190 0 0 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - - 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 214 211 0 0 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 211 0 - 0 425 211 Stage 1 - - - - 211 - Stage 2 - - - - 214 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1360 - - - 586 829 Stage 1 - - - - 824 - Stage 2 - - - - 822 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1360 - - - 586 829 Mov Cap-2 Maneuver - - - - 586 - Stage 1 - - - - 824 - Stage 2 - - - - 822 - Approach EB WB SB HCM Control Delay, s 0 0 9.4 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1360 - - - 829 HCM Lane V/C Ratio ---- 0.004 HCM Control Delay (s) 0 - - - 9.4 HCM Lane LOS A - - - A HCM 95th %tile Q(veh) 0 - - - 0 27 Lanes and Geometrics 3: Rock Creek & Right-in/Right-out Access Short Total pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 1 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 0 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected Satd. Flow (prot) 0 1863 1863 0 0 1611 Flt Permitted Satd. Flow (perm) 0 1863 1863 0 0 1611 Link Speed (mph) 25 25 30 Link Distance (ft) 247 340 278 Travel Time (s) 6.7 9.3 6.3 Intersection Summary Area Type: Other 28 HCM 2010 TWSC 5: Rock Creek & Full Movement Access Short Total am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 8 123 127 0 0 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 50 - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 9 145 149 0 0 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 149 0 - 0 313 149 Stage 1 - - - - 149 - Stage 2 - - - - 164 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1432 - - - 680 898 Stage 1 - - - - 879 - Stage 2 - - - - 865 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1432 - - - 676 898 Mov Cap-2 Maneuver - - - - 676 - Stage 1 - - - - 879 - Stage 2 - - - - 860 - Approach EB WB SB HCM Control Delay, s 0.5 0 9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1432 - - - 898 HCM Lane V/C Ratio 0.007 - - - 0.003 HCM Control Delay (s) 7.5 - - - 9 HCM Lane LOS A - - - A HCM 95th %tile Q(veh) 0 - - - 0 29 Lanes and Geometrics 5: Rock Creek & Full Movement Access Short Total am City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 50 0 0 0 Storage Lanes 1 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected 0.950 Satd. Flow (prot) 1770 1863 1863 0 1611 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 1863 1863 0 1611 0 Link Speed (mph) 25 25 30 Link Distance (ft) 340 470 244 Travel Time (s) 9.3 12.8 5.5 Intersection Summary Area Type: Other 30 HCM 2010 TWSC 5: Rock Creek & Full Movement Access Short Total pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 4 Intersection Int Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Vol, veh/h 4 189 183 0 0 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 50 - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 210 203 0 0 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 203 0 - 0 422 203 Stage 1 - - - - 203 - Stage 2 - - - - 219 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1369 - - - 588 838 Stage 1 - - - - 831 - Stage 2 - - - - 817 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1369 - - - 586 838 Mov Cap-2 Maneuver - - - - 586 - Stage 1 - - - - 831 - Stage 2 - - - - 815 - Approach EB WB SB HCM Control Delay, s 0.2 0 9.3 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1369 - - - 838 HCM Lane V/C Ratio 0.003 - - - 0.009 HCM Control Delay (s) 7.6 - - - 9.3 HCM Lane LOS A - - - A HCM 95th %tile Q(veh) 0 - - - 0 31 Lanes and Geometrics 5: Rock Creek & Full Movement Access Short Total pm City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report Page 3 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 50 0 0 0 Storage Lanes 1 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.865 Flt Protected 0.950 Satd. Flow (prot) 1770 1863 1863 0 1611 0 Flt Permitted 0.950 Satd. Flow (perm) 1770 1863 1863 0 1611 0 Link Speed (mph) 25 25 30 Link Distance (ft) 340 518 277 Travel Time (s) 9.3 14.1 6.3 Intersection Summary Area Type: Other 32 APPENDIX F 33 SCALE: 1"=500' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Windsong at Rock Creek Timberwood Drive Rock Creek Drive Ziegler Road Technology Parkway FRHS Access 34 Pedestrian LOS Worksheet Project Location Classification: School Walking Area Description of Applicable Destination Area Within 1320’ Destination Area Classification Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Security Neighborhood to the west Residential Minimum B C C C B 1 Actual A B B B B Proposed A B B B B Fossil Ridge High School to the southeast Institutional Minimum B C C C B 2 Actual A B A B B Proposed A B A B B Minimum 3 Actual Proposed Minimum 4 Actual Proposed Minimum 5 Actual Proposed Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed 35 SCALE: 1"=500' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Windsong at Rock Creek TIS, October 2015 Windsong at Rock Creek Timberwood Drive Rock Creek Drive Ziegler Road Technology Parkway FRHS Access 36 Bicycle LOS Worksheet Level of Service – Connectivity Minimum Actual Proposed Base Connectivity: C A A Specific connections to priority sites: Description of Applicable Destination Area Within 1320’ Destination Area Classification Fossil Ridge High 1 School Institutional B A A 2 3 4 37