HomeMy WebLinkAboutLAKE STREET APARTMENTS - PDP - PDP160007 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTGeotechnical Engineering Report
West Lake Street Student Housing
821 West Lake Street
Fort Collins, Colorado
November 24, 2015
Terracon Project No. 20155052
Prepared for:
Student Housing CSU, LLC
Middleton, Wisconsin
Prepared by:
Terracon Consultants, Inc.
Fort Collins, Colorado
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY ............................................................................................................ i
1.0 INTRODUCTION .............................................................................................................1
2.0 PROJECT INFORMATION .............................................................................................1
2.1 Project Description ...............................................................................................1
2.2 Site Location and Description...............................................................................2
3.0 SUBSURFACE CONDITIONS ........................................................................................2
3.1 Typical Subsurface Profile ...................................................................................2
3.2 Laboratory Testing ...............................................................................................3
3.3 Water-Soluble Sulfates ........................................................................................3
3.4 Groundwater ........................................................................................................3
4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ......................................4
4.1 Geotechnical Considerations ...............................................................................4
4.1.1 Expansive Soils ........................................................................................4
4.1.2 Foundation Recommendations .................................................................4
4.2 Earthwork.............................................................................................................5
4.2.1 Site Preparation ........................................................................................5
4.2.2 Demolition ................................................................................................5
4.2.3 Excavation ................................................................................................5
4.2.4 Subgrade Preparation ...............................................................................6
4.2.5 Fill Materials and Placement ......................................................................7
4.2.6 Compaction Requirements ........................................................................8
4.2.7 Utility Trench Backfill ................................................................................8
4.2.8 Grading and Drainage ...............................................................................9
4.2.9 Exterior Slab Design and Construction ...................................................10
4.3 Foundations .......................................................................................................10
4.3.1 Drilled Piers Bottomed in Bedrock - Design Recommendations ..............10
4.3.2 Drilled Piers Bottomed in Bedrock - Construction Considerations ...........11
4.4 Seismic Considerations......................................................................................12
4.5 Floor Systems ....................................................................................................12
4.5.1 Floor System - Design Recommendations ..............................................12
4.5.2 Floor Systems - Construction Considerations .........................................13
4.6 Lateral Earth Pressures .....................................................................................13
4.7 Pavements .........................................................................................................15
4.7.1 Pavements – Subgrade Preparation .......................................................15
4.7.2 Pavements – Design Recommendations ................................................15
4.7.3 Pavements – Construction Considerations .............................................18
4.7.4 Pavements – Maintenance .....................................................................18
5.0 GENERAL COMMENTS ...............................................................................................18
TABLE OF CONTENTS (continued)
Appendix A – FIELD EXPLORATION
Exhibit A-1 Site Location Map
Exhibit A-2 Exploration Plan
Exhibit A-3 Field Exploration Description
Exhibits A-4 to A-12 Boring Logs
Appendix B – LABORATORY TESTING
Exhibit B-1 Laboratory Testing Description
Exhibit B-2 Atterberg Limits Test Results
Exhibit B-3 Grain-size Distribution Test Results
Exhibits B-4 to B-7 Swell-consolidation Test Results
Exhibit B-8 Water-soluble Sulfates Test Results
Appendix C – SUPPORTING DOCUMENTS
Exhibit C-1 General Notes
Exhibit C-2 Unified Soil Classification System
Exhibit C-3 Description of Rock Properties
Exhibit C-4 Laboratory Test Significance and Purpose
Exhibits C-5 and C-6 Report Terminology
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable i
EXECUTIVE SUMMARY
A geotechnical investigation has been performed for the proposed West Lake Street Student
Housing to be constructed at 821 West Lake Street in Fort Collins, Colorado. Seven (7) borings,
presented as Exhibits A-4 through A-10 and designated as Boring No. 1 through Boring No. 7, were
performed to depths of approximately 5 to 55 feet below existing site grades. This report specifically
addresses the recommendations for the proposed student housing structure. Borings performed in
these areas are for informational purposes and will be utilized by others.
Based on the information obtained from our subsurface exploration, the site can be developed for
the proposed project. However, the following geotechnical considerations were identified and will
need to be considered:
The proposed building may be supported on a drilled pier foundation system bottomed in
bedrock.
A slab-on-grade floor system is recommended for portions of the proposed below-grade
parking requiring a floor slab provided the subgrade soils are over excavated a minimum of
1 foot, moisture conditioned and recompacted as presented in the 4.2 Earthwork section of
this report. We recommend replacing the upper 6 inches with Colorado Department of
Transportation (CDOT) Class 1 structure backfill.
The amount of movement of slabs-on-grade, pavements, etc. will be related to the wetting of
underlying supporting soils. Therefore, it is imperative the recommendations discussed in the
4.2.8 Grading and Drainage section of this report be followed to reduce potential movement.
The 2012 International Building Code, Table 1613.5.2 IBC seismic site classification for this
site is D.
Close monitoring of the construction operations discussed herein will be critical in achieving
the design subgrade support. We therefore recommend that Terracon be retained to
monitor this portion of the work.
This summary should be used in conjunction with the entire report for design purposes. It should
be recognized that details were not included or fully developed in this section, and the report must
be read in its entirety for a comprehensive understanding of the items contained herein. The section
titled GENERAL COMMENTS should be read for an understanding of the report limitations.
Responsive ■ Resourceful ■ Reliable 1
GEOTECHNICAL ENGINEERING REPORT
West Lake Street Student Housing
821 West Lake Street
Fort Collins, Colorado
Terracon Project No. 20155052
November 24, 2015
1.0 INTRODUCTION
This report presents the results of our geotechnical engineering services performed for the
proposed West Lake Street Student Housing project to be located at 821 West Lake Street in Fort
Collins, Colorado. The purpose of these services is to provide information and geotechnical
engineering recommendations relative to:
subsurface soil and bedrock conditions foundation design and construction
groundwater conditions floor slab design and construction
grading and drainage pavement construction
lateral earth pressures earthwork
seismic considerations
Our geotechnical engineering scope of work for this project included the initial site visit, the
advancement of seven test borings to depths ranging from approximately 5 to 55 feet below
existing site grades, laboratory testing for soil engineering properties and engineering analyses
to provide foundation, floor system and pavement design and construction recommendations.
Logs of the borings along with an Exploration Plan (Exhibit A-2) are included in Appendix A. The
results of the laboratory testing performed on soil and bedrock samples obtained from the site
during the field exploration are included in Appendix B.
2.0 PROJECT INFORMATION
2.1 Project Description
Item Description
Site layout Refer to the Exploration Plan (Exhibit A-2 in Appendix A)
Proposed construction
We understand a 5-story building with a below-grade or at grade
parking level and student housing above the parking level is planned
for this site. A post-tensioned concrete deck is being considered for
the roof of the parking level with wood framing for the housing levels
above. A parking lot is also being considered near the southern
portion of the site.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 2
Item Description
Building loading (provided)
Interior columns: 440 kips
Exterior walls: 10 kips per lineal foot
Grading
We anticipate cuts on the order of 12 feet or less will be required if
the proposed construction includes a below grade parking area. We
anticipate shallower cuts and fills on the order of 5 feet will be
required for the proposed construction if the parking level will be at
or near grade.
Cut and fill slopes Assumed to be no steeper than 3H:1V (Horizontal to Vertical)
Traffic loading (assumed)
NAPA Traffic Class:
Automobile Parking Areas: Class I
Truck traffic and main drives Class II
2.2 Site Location and Description
Item Description
Location
The site is an approximate 82,500 square foot lot located at 815
West Lake Street in Fort Collins, Colorado.
Existing improvements
An existing school occupies the site with an associated asphaltic
concrete paved parking lot located at the northwest portion of this
site, a playground area on the west side of the building, and another
playground on the east side of the building.
Current ground cover
The ground is covered with asphalt and concrete pavements,
landscaped grass, and sand playground areas.
Existing topography The site is relatively flat.
3.0 SUBSURFACE CONDITIONS
3.1 Typical Subsurface Profile
Specific conditions encountered at each boring location are indicated on the individual boring logs
included in Appendix A. Stratification boundaries on the boring logs represent the approximate
location of changes in soil types; in-situ, the transition between materials may be gradual. Based
on the results of the borings, subsurface conditions on the project site can be generalized as
follows:
Material Description
Approximate Depth to
Bottom of Stratum (feet)
Consistency/Density/Hardness
Sand with varying amounts of silt,
clay, and gravel
About 7 to 41 feet below
existing site grades.
Loose to dense
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 3
Material Description
Approximate Depth to
Bottom of Stratum (feet)
Consistency/Density/Hardness
Lean clay with varying amounts of
sand
About 26 to 47 feet below
existing site grades.
Medium stiff to very stiff
Claystone/sandstone bedrock
To the maximum depth of
exploration of about 55 feet.
Medium hard
3.2 Laboratory Testing
Representative soil samples were selected for swell-consolidation testing and exhibited 1.3
percent compression to 0.8 percent swell when wetted. Samples of site soils and bedrock
selected for plasticity testing exhibited non-plastic to medium plasticity with liquid limits ranging
from non-plastic to 38 and plasticity indices ranging from 6 to 20. Laboratory test results are
presented in Appendix B.
3.3 Water-Soluble Sulfates
Results of water-soluble sulfate testing indicate that ASTM Type I or II portland cement should be
specified for all project concrete on and below grade. Foundation concrete should be designed
for low sulfate exposure in accordance with the provisions of the ACI Design Manual, Section
318, Chapter 4.
3.4 Groundwater
The boreholes were observed while drilling and after completion for the presence and level of
groundwater. In addition, delayed water levels were also obtained in some borings. The water levels
observed in the boreholes are noted on the attached boring logs, and are summarized below:
Boring Number
Depth to groundwater
while drilling, ft.
Depth to groundwater
several days after
drilling, ft.
Elevation of
groundwater several
days after drilling, ft.
1 18 19.5 180.7
2 15½ 17.1 182.4
3 18 N/A --
4 25 17.2 183.6
5 22 18 181.9
6 Not encountered Backfilled after drilling --
7 Not encountered Backfilled after drilling --
These observations represent groundwater conditions at the time of the field exploration, and may
not be indicative of other times or at other locations. Groundwater levels can be expected to
fluctuate with varying seasonal and weather conditions, and other factors.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 4
Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff
and other factors not evident at the time the borings were performed. Therefore, groundwater
levels during construction or at other times in the life of the structure may be higher or lower than
the levels indicated on the boring logs. The possibility of groundwater level fluctuations should
be considered when developing the design and construction plans for the project.
In Boring Nos. 1, 2, 4, and 5, temporary piezometers were constructed in the borehole upon
completion. Periodic groundwater measurements may be obtained for a period of up to 1 year
before the temporary piezometers will need to be either abandoned or permitted as groundwater
monitoring wells through the state of Colorado.
4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION
4.1 Geotechnical Considerations
Based on subsurface conditions encountered in the borings, the site appears suitable for the
proposed construction from a geotechnical point of view provided certain precautions and design
and construction recommendations described in this report are followed. We have identified
geotechnical conditions that could impact design and construction of the proposed structure,
pavements, and other site improvements.
4.1.1 Expansive Soils
Laboratory testing indicates the native clay soils exhibited 1.3 percent compression to 0.8 percent
swell when wetted at the samples in-situ moisture content. However, it is our opinion these
materials will exhibit a higher expansive potential if the clays undergo a significant loss of
moisture.
This report provides recommendations to help mitigate the effects of soil shrinkage and
expansion. However, even if these procedures are followed, some movement and cracking in
the structure, pavements, and flatwork should be anticipated. The severity of cracking and other
damage such as uneven floor slabs will probably increase if any modification of the site results in
excessive wetting or drying of the expansive clays. Eliminating the risk of movement and distress
is generally not feasible, but it may be possible to further reduce the risk of movement if
significantly more expensive measures are used during construction. It is imperative the
recommendations described in section 4.2.8 Grading and Drainage of this report be followed to
reduce movement.
4.1.2 Foundation Recommendations
The proposed building may be supported on a drilled pier foundation system bottomed in bedrock.
We recommend a slab-on-grade floor system for portions of the proposed below-grade parking level
requiring a floor slab provided the subgrade soils are over excavated a minimum of 1 foot, moisture
conditioned and recompacted as presented in the 4.2 Earthwork section of this report. We
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 5
recommend replacing the upper 6 inches with Colorado Department of Transportation (CDOT) Class
1 structure backfill. Even when bearing on properly prepared soils, movement of the slab-on-
grade floor system is possible should the subgrade soils undergo an increase in moisture content.
We estimate movement of about 1 inch is possible. If the owner cannot accept the risk of slab
movement, a structural floor should be used.
4.2 Earthwork
The following presents recommendations for site preparation, excavation, subgrade preparation
and placement of engineered fills on the project. All earthwork on the project should be observed
and evaluated by Terracon on a full-time basis. The evaluation of earthwork should include
observation of over-excavation operations, testing of engineered fills, subgrade preparation,
subgrade stabilization, and other geotechnical conditions exposed during the construction of the
project.
4.2.1 Site Preparation
Prior to placing any fill, strip and remove existing vegetation, the recommended over-excavation for
the below-grade parking slab, and any other deleterious materials from the proposed construction
area.
Stripped organic materials should be wasted from the site or used to re-vegetate landscaped areas
after completion of grading operations. Prior to the placement of fills, the site should be graded to
create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill
beneath proposed structures.
4.2.2 Demolition
Demolition of the existing building, pavements, and other site features should include complete
removal of all foundation systems, below-grade structural elements, pavements, and exterior flat
work within the proposed construction area. This should include removal of any utilities to be
abandoned along with any loose utility trench backfill or loose backfill found adjacent to existing
foundations. All materials derived from the demolition of the existing structure and pavements
should be removed from the site. The types of foundation systems supporting the existing building
are not known. If some or all of the existing buildings are supported by drilled piers, the existing
piers should be truncated a minimum depth of 3 feet below areas of planned new construction.
Consideration could be given to re-using the asphalt and concrete provided the materials are
processed and uniformly blended with the on-site soils. Asphalt and/or concrete materials should
be processed to a maximum size of 2-inches and blended at a ratio of 30 percent asphalt/concrete
to 70 percent of on-site soils.
4.2.3 Excavation
It is anticipated that excavations for the proposed construction can be accomplished with
conventional earthmoving equipment.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 6
The soils to be excavated can vary significantly across the site as their classifications are based
solely on the materials encountered in widely-spaced exploratory test borings. The contractor
should verify that similar conditions exist throughout the proposed area of excavation. If different
subsurface conditions are encountered at the time of construction, the actual conditions should be
evaluated to determine any excavation modifications necessary to maintain safe conditions.
Although evidence of fills or underground facilities such as septic tanks, vaults, basements, and
utilities was not observed during the site reconnaissance, such features could be encountered
during construction. If unexpected fills or underground facilities are encountered, such features
should be removed and the excavation thoroughly cleaned prior to backfill placement and/or
construction.
Depending upon depth of excavation and seasonal conditions, surface water infiltration and/or
groundwater may be encountered in excavations on the site. It is anticipated that pumping from
sumps may be utilized to control water within excavations.
The subgrade soil conditions should be evaluated during the excavation process and the stability
of the soils determined at that time by the contractors’ Competent Person. Slope inclinations flatter
than the OSHA maximum values may have to be used. The individual contractor(s) should be
made responsible for designing and constructing stable, temporary excavations as required to
maintain stability of both the excavation sides and bottom. All excavations should be sloped or
shored in the interest of safety following local, and federal regulations, including current OSHA
excavation and trench safety standards. If any excavation, including a utility trench, is extended to
a depth of more than 20 feet, it will be necessary to have the side slopes and/or shoring system
designed by a professional engineer.
As a safety measure, it is recommended that all vehicles and soil piles be kept a minimum lateral
distance from the crest of the slope equal to the slope height. The exposed slope face should be
protected against the elements
4.2.4 Subgrade Preparation
After the recommended over-excavation for the below-grade parking slab and any deleterious
materials have been removed from the construction area, the top 8 inches of the exposed ground
surface should be scarified, moisture conditioned, and recompacted to at least 95 percent of the
maximum dry unit weight as determined by ASTM D698 before any new fill, foundation, or
pavement is placed.
If pockets of soft, loose, or otherwise unsuitable materials are encountered at the bottom of the
below-grade parking excavations, the proposed elevations may be reestablished by over-
excavating the unsuitable soils and backfilling with compacted engineered fill or lean concrete.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 7
After the bottom of the excavation has been compacted, engineered fill can be placed to bring the
building pad and pavement subgrade to the desired grade. Engineered fill should be placed in
accordance with the recommendations presented in subsequent sections of this report.
The stability of the subgrade may be affected by precipitation, repetitive construction traffic or
other factors. If unstable conditions develop, workability may be improved by scarifying and
drying. Alternatively, over-excavation of wet zones and replacement with granular materials may
be used, or crushed gravel and/or rock can be tracked or “crowded” into the unstable surface soil
until a stable working surface is attained. Use of fly ash, cement, or geotextiles could also be
considered as a stabilization technique. Laboratory evaluation is recommended to determine the
effect of chemical stabilization on subgrade soils prior to construction. Lightweight excavation
equipment may also be used to reduce subgrade pumping.
4.2.5 Fill Materials and Placement
The on-site soils or approved granular and low plasticity cohesive imported materials may be used
as fill material. The soil removed from this site that is free of organic or objectionable materials,
as defined by a field technician who is qualified in soil material identification and compaction
procedures, can be re-used as fill for the building pad and pavement subgrade. It should be noted
that on-site soils may require reworking to adjust the moisture content to meet the compaction
criteria.
Imported soils (if required) should meet the following material property requirements:
Gradation Percent finer by weight (ASTM C136)
4” 100
3” 70-100
No. 4 Sieve 50-100
No. 200 Sieve 15-50
Soil Properties Value
Liquid Limit 30 (max.)
Plastic Limit 15 (max.)
Maximum Expansive Potential (%) Non-expansive1
1. Measured on a sample compacted to approximately 95 percent of the maximum dry unit weight as
determined by ASTM D698 at optimum moisture content. The sample is confined under a 100 psf
surcharge and submerged.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 8
4.2.6 Compaction Requirements
Engineered fill should be placed and compacted in horizontal lifts, using equipment and
procedures that will produce recommended moisture contents and densities throughout the lift.
Item Description
Fill lift thickness
9 inches or less in loose thickness when heavy, self-
propelled compaction equipment is used
4 to 6 inches in loose thickness when hand-guided
equipment (i.e. jumping jack or plate compactor) is used
Minimum compaction requirements
Fills less than 8 feet thick: 95 percent of the maximum
dry unit weight as determined by ASTM D698
Moisture content cohesive soil (clay) -1 to +3 % of the optimum moisture content
Moisture content cohesionless soil
(sand)
-3 to +2 % of the optimum moisture content
1. We recommend engineered fill be tested for moisture content and compaction during placement.
Should the results of the in-place density tests indicate the specified moisture or compaction limits
have not been met, the area represented by the test should be reworked and retested as required
until the specified moisture and compaction requirements are achieved.
2. Specifically, moisture levels should be maintained low enough to allow for satisfactory compaction
to be achieved without the fill material pumping when proofrolled.
3. Moisture conditioned clay materials should not be allowed to dry out. A loss of moisture within these
materials could result in an increase in the material’s expansive potential. Subsequent wetting of
these materials could result in undesirable movement.
The recommendations for placement and compaction criteria presented assume that fill depths
will be less than 8 feet. Fills on the order of 8 feet in depth, when placed and compacted as
recommended in this report, will experience some settlement, generally 1 inch or less. The
amount and rate of settlement will be increased if water is introduced into the fill. It is noted that
settlement of the fill material due to self-weight is in addition to settlements due to structural
induced loads. In areas where fill will be placed in thicknesses of 8 feet or more, we recommend
increasing the minimum compaction requirements to 98 percent of the maximum dry unit weight
as determined by ASTM D698.
4.2.7 Utility Trench Backfill
All trench excavations should be made with sufficient working space to permit construction including
backfill placement and compaction.
All underground piping within or near the proposed structure should be designed with flexible
couplings, so minor deviations in alignment do not result in breakage or distress. Utility knockouts
in foundation walls should be oversized to accommodate differential movements. It is imperative
that utility trenches be properly backfilled with relatively clean materials. If utility trenches are
backfilled with relatively clean granular material, they should be capped with at least 18 inches of
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 9
cohesive fill in non-pavement areas to reduce the infiltration and conveyance of surface water
through the trench backfill.
Utility trenches are a common source of water infiltration and migration. All utility trenches that
penetrate beneath the structure should be effectively sealed to restrict water intrusion and flow
through the trenches that could migrate below the structure. We recommend constructing an
effective clay “trench plug” that extends at least 5 feet out from the face of the building exterior. The
plug material should consist of clay compacted at a water content at or above the soil’s optimum
water content. The clay fill should be placed to completely surround the utility line and be compacted
in accordance with recommendations in this report.
It is strongly recommended that a representative of Terracon provide full-time observation and
compaction testing of trench backfill within building and pavement areas.
4.2.8 Grading and Drainage
All grades must be adjusted to provide effective drainage away from the proposed structure during
construction and maintained throughout the life of the proposed project. Infiltration of water into
foundation excavations must be prevented during construction. Landscape irrigation adjacent to
foundations should be minimized or eliminated. Water permitted to pond near or adjacent to the
perimeter of the structure (either during or post-construction) can result in significantly higher soil
movements than those discussed in this report. As a result, any estimations of potential
movement described in this report cannot be relied upon if positive drainage is not obtained and
maintained, and water is allowed to infiltrate the fill and/or subgrade.
Exposed ground (if any) should be sloped at a minimum of 10 percent grade for at least 10 feet
beyond the perimeter of the proposed structure, where possible. The use of swales, chases
and/or area drains may be required to facilitate drainage in unpaved areas around the perimeter
of the structure. Backfill against foundations and exterior walls should be properly compacted and
free of all construction debris to reduce the possibility of moisture infiltration. After construction
of the proposed structure and prior to project completion, we recommend verification of final
grading be performed to document positive drainage, as described above, has been achieved.
Flatwork and pavements will be subject to post-construction movement. Maximum grades
practical should be used for paving and flatwork to prevent areas where water can pond. In
addition, allowances in final grades should take into consideration post-construction movement
of flatwork, particularly if such movement would be critical. Where paving or flatwork abuts the
structure, care should be taken that joints are properly sealed and maintained to prevent the
infiltration of surface water.
Planters located adjacent to the structure should preferably be self-contained. Sprinkler mains
and spray heads should be located a minimum of 5 feet away from the building line(s). Low-
volume, drip style landscaped irrigation should not be used near the building. Roof drains should
discharge on to pavements or be extended away from the structure a minimum of 10 feet through
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 10
the use of splash blocks or downspout extensions. A preferred alternative is to have the roof
drains discharge by solid pipe to storm sewers or to a detention pond or other appropriate outfall.
4.2.9 Exterior Slab Design and Construction
Exterior slabs on-grade, exterior architectural features, and utilities founded on, or in backfill or
the site soils will likely experience some movement due to the volume change of the material.
Potential movement could be reduced by:
Minimizing moisture increases in the backfill;
Controlling moisture-density during placement of the backfill;
Using designs which allow vertical movement between the exterior features and
adjoining structural elements; and
Placing control joints on relatively close centers.
4.3 Foundations
The proposed building can be supported on a drilled pier foundation system bottomed in bedrock.
Design recommendations for foundations for the proposed structure and related structural
elements are presented in the following sections.
4.3.1 Drilled Piers Bottomed in Bedrock - Design Recommendations
Description Value
Minimum pier diameter 18 inches
Minimum bedrock embedment 1 10 feet
Maximum allowable end-bearing pressure 25,000 psf
Allowable skin friction (for portion of pier embedded into bedrock) 2,000 psf
Uplift force (tension due to soil uplift, kips) 2 15 x Pier diameter (ft.)
Void thickness (beneath grade beams) 4 inches
1. Drilled piers should be embedded into medium hard or very hard bedrock materials. Actual
structural loads and pier diameters may dictate embedment deeper than the recommended
minimum penetration.
2. Required pier penetration should be balanced against uplift forces for the portion of the pier in
firm or harder bedrock below a depth of 18 feet to resist axial loads and uplift forces.
We understand the top of the proposed piers will be approximately 7 feet below the ground
surface. Longer drilled pier lengths may be required if the drilled pier foundation elevations are
higher. Piers should be considered to work in group action if the horizontal spacing is less than
three pier diameters. A minimum practical horizontal clear spacing between piers of at least three
diameters should be maintained, and adjacent piers should bear at the same elevation. The
capacity of individual piers must be reduced when considering the effects of group action.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 11
Capacity reduction is a function of pier spacing and the number of piers within a group. If group
action analyses are necessary, capacity reduction factors can be provided for the analyses.
To satisfy forces in the horizontal direction using LPILE, piers may be designed for the following
lateral load criteria:
Parameters Clay
Sand and
Gravel
Sand and
Gravel
Claystone
Bedrock
LPILE soil type1
Stiff clay
without free
water
Sand
(above
water table)
Sand
(submerged)
Stiff clay
without free
water
Unit weight (pcf) 120 125 125 130
Average undrained shear strength (psf) 1,000 N/A N/A 9,000
Average angle of internal friction,
(degrees)
N/A 35 35 N/A
Coefficient of subgrade reaction, k (pci)*
500 - static
200 - cyclic
90 60
2,000- static
800 – cyclic
Strain, 50 (%) 0.007 N/A N/A 0.004
1. For purposes of LPILE analysis, assume a groundwater depth of about 17 feet below existing ground
surface (approximately Elev. 183 feet).
4.3.2 Drilled Piers Bottomed in Bedrock - Construction Considerations
Drilling to design depth should be possible with conventional single-flight power augers on the
majority of the site; however, specialized drilling equipment may be required for very hard bedrock
layers. In addition, caving soils and groundwater indicate that temporary steel casing will be
required to properly drill the piers prior to concrete placement.
Groundwater should be removed from each pier hole prior to concrete placement. Pier concrete
should be placed immediately after completion of drilling and cleaning. If pier concrete cannot be
placed in dry conditions, a tremie should be used for concrete placement. Free-fall concrete
placement in piers will only be acceptable if provisions are taken to avoid striking the concrete on
the sides of the hole or reinforcing steel. The use of a bottom-dump hopper, or an elephant's
trunk discharging near the bottom of the hole where concrete segregation will be minimized, is
recommended. Due to potential sloughing and raveling, foundation concrete quantities may
exceed calculated geometric volumes.
Casing should be withdrawn in a slow continuous manner maintaining a sufficient head of
concrete to prevent infiltration of water or caving soils or the creation of voids in pier concrete.
Pier concrete should have a relatively high fluidity when placed in cased pier holes or through a
tremie. Pier concrete with slump in the range of 5 to 7 inches is recommended.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 12
We recommend the sides of each pier should be mechanically roughened in the claystone bearing
strata. This should be accomplished by a roughening tooth placed on the auger. Shaft bearing
surfaces must be cleaned prior to concrete placement. A representative of Terracon should
observe the bearing surface and shaft configuration.
4.4 Seismic Considerations
Code Used Site Classification
2012 International Building Code (IBC) 1 D 2
1. In general accordance with the 2012 International Building Code, Table 1613.5.2.
2. The 2012 International Building Code (IBC) requires a site soil profile determination extending a
depth of 100 feet for seismic site classification. The current scope requested does not include the
required 100 foot soil profile determination. The borings completed for this project extended to a
maximum depth of about 55 feet and this seismic site class definition considers that similar soil and
bedrock conditions exist below the maximum depth of the subsurface exploration. Additional
exploration to deeper depths could be performed to confirm the conditions below the current depth of
exploration. Alternatively, a geophysical exploration could be utilized in order to attempt to justify a
more favorable seismic site class. However, we believe a higher seismic site class for this site is
unlikely.
4.5 Floor Systems
A slab-on-grade system is recommended for portions of the proposed below-grade parking level
requiring a floor slab provided the subgrade soils are over excavated a minimum of 1 foot, moisture
conditioned and recompacted as presented in the 4.2 Earthwork section of this report. We
recommend replacing the upper 6 inches with CDOT Class 1 structure backfill. If the estimated
movement cannot be tolerated, a structurally-supported floor system, supported independent of
the subgrade materials, is recommended.
Subgrade soils beneath interior and exterior slabs and at the base of the over-excavation should
be scarified to a depth of at least 8 inches, moisture conditioned and compacted. The moisture
content and compaction of subgrade soils should be maintained until slab construction.
4.5.1 Floor System - Design Recommendations
Even when bearing on properly prepared soils, movement of the slab-on-grade floor system is
possible should the subgrade soils undergo an increase in moisture content. We estimate
movement of about 1 inch is possible. If the owner cannot accept the risk of slab movement, a
structural floor should be used. If conventional slab-on-grade is utilized, the subgrade soils should
be over-excavated and prepared as presented in the 4.2 Earthwork section of this report.
For structural design of concrete slabs-on-grade subjected to point loadings, a modulus of
subgrade reaction of 100 pounds per cubic inch (pci) may be used for floors supported on re-
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 13
compacted existing soils at the site. A modulus of 200 pci may be used for floors supported on
at least 1 foot of non-expansive, imported granular fill.
Additional floor slab design and construction recommendations are as follows:
Positive separations and/or isolation joints should be provided between slabs and all
foundations, columns, or utility lines to allow independent movement.
Control joints should be saw-cut in slabs in accordance with ACI Design Manual, Section
302.1R-37 8.3.12 (tooled control joints are not recommended) to control the location and
extent of cracking.
Interior utility trench backfill placed beneath slabs should be compacted in accordance
with the recommendations presented in the 4.2 Earthwork section of this report.
Floor slabs should not be constructed on frozen subgrade.
The use of a vapor retarder should be considered beneath concrete slabs that will be
covered with wood, tile, carpet or other moisture sensitive or impervious floor coverings,
or when the slab will support equipment sensitive to moisture. When conditions warrant
the use of a vapor retarder, the slab designer and slab contractor should refer to ACI
302 for procedures and cautions regarding the use and placement of a vapor retarder.
Other design and construction considerations, as outlined in the ACI Design Manual,
Section 302.1R are recommended.
4.5.2 Floor Systems - Construction Considerations
Movements of slabs-on-grade using the recommendations discussed in previous sections of this
report will likely be reduced and tend to be more uniform. The estimates discussed above assume
that the other recommendations in this report are followed. Additional movement could occur
should the subsurface soils become wetted to significant depths, which could result in potential
excessive movement causing uneven floor slabs and severe cracking. This could be due to over
watering of landscaping, poor drainage, improperly functioning drain systems, and/or broken utility
lines. Therefore, it is imperative that the recommendations presented in this report be followed.
4.6 Lateral Earth Pressures
Reinforced concrete walls with unbalanced backfill levels on opposite sides should be designed
for earth pressures at least equal to those indicated in the following table. Earth pressures will be
influenced by structural design of the walls, conditions of wall restraint, methods of construction
and/or compaction and the strength of the materials being restrained. Two wall restraint
conditions are shown. Active earth pressure is commonly used for design of free-standing
cantilever retaining walls and assumes wall movement. The "at-rest" condition assumes no wall
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 14
movement. The recommended design lateral earth pressures do not include a factor of safety
and do not provide for possible hydrostatic pressure on the walls.
EARTH PRESSURE COEFFICIENTS
Earth Pressure
Conditions
Coefficient for
Backfill Type
Equivalent Fluid
Density (pcf)
Surcharge
Pressure,
p1 (psf)
Earth
Pressure,
p2 (psf)
Active (Ka)
Granular Soil - 0.27
Lean Clay - 0.41
35
49
(0.27)S
(0.41)S
(35)H
(49)H
At-Rest (Ko)
Granular Soil - 0.43
Lean Clay - 0.58
56
70
(0.43)S
(0.58)S
(56)H
(70)H
Passive (Kp)
Granular Soil - 3.69
Lean Clay - 2.46
480
295
---
---
---
---
Applicable conditions to the above include:
For active earth pressure, wall must rotate about base, with top lateral movements of about
0.002 H to 0.004 H, where H is wall height;
For passive earth pressure to develop, wall must move horizontally to mobilize resistance;
Uniform surcharge, where S is surcharge pressure;
In-situ soil backfill weight a maximum of 120 pcf;
Horizontal backfill, compacted between 95 and 98 percent of maximum dry unit weight as
determined by ASTM D698;
Loading from heavy compaction equipment not included;
No hydrostatic pressures acting on wall;
No dynamic loading;
No safety factor included in soil parameters; and
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 15
Ignore passive pressure in frost zone.
To control hydrostatic pressure behind the wall we recommend that a drain be installed at the
foundation wall with a collection pipe leading to a reliable discharge. If this is not possible, then
combined hydrostatic and lateral earth pressures should be calculated for lean clay backfill using
an equivalent fluid weighing 90 and 100 pcf for active and at-rest conditions, respectively. For
granular backfill, an equivalent fluid weighing 85 and 90 pcf should be used for active and at-rest,
respectively. These pressures do not include the influence of surcharge, equipment or floor
loading, which should be added. Heavy equipment should not operate within a distance closer
than the exposed height of retaining walls to prevent lateral pressures more than those provided.
4.7 Pavements
The proposed below-grade parking level should be designed and constructed as a pavement
section. The recommendations presented in the 4.5 Floor Systems section of this report are not
suitable for support of traffic.
4.7.1 Pavements – Subgrade Preparation
On most project sites, the site grading is accomplished relatively early in the construction phase.
Fills are typically placed and compacted in a uniform manner. However as construction proceeds,
the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, or
rainfall/snow melt. As a result, the pavement subgrade may not be suitable for pavement
construction and corrective action will be required. The subgrade should be carefully evaluated
at the time of pavement construction for signs of disturbance or instability. We recommend the
pavement subgrade be thoroughly proofrolled with a loaded tandem-axle dump truck prior to final
grading and paving. All pavement areas should be moisture conditioned and properly compacted
to the recommendations in this report immediately prior to paving.
4.7.2 Pavements – Design Recommendations
Design of new privately-maintained pavements for the project has been based on the procedures
described by the National Asphalt Pavement Associations (NAPA) and the American Concrete
Institute (ACI).
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 16
We assumed the following design parameters for NAPA flexible pavement thickness design:
Automobile Parking Areas
Class I - Parking stalls and parking lots for cars and pick-up trucks, with
Equivalent Single Axle Load (ESAL) up to 7,000 over 20 years
Main Traffic Corridors
Class II – Parking lots with a maximum of 10 trucks per day with Equivalent
Single Axle Load (ESAL) up to 27,000 over 20 years (Including trash trucks)
Subgrade Soil Characteristics
USCS Classification – CL, classified by NAPA as poor
We assumed the following design parameters for ACI rigid pavement thickness design based
upon the average daily truck traffic (ADTT):
Automobile Parking Areas
ACI Category A: Automobile parking with an ADTT of 1 over 20 years
Main Traffic Corridors
ACI Category A: Automobile parking area and service lanes with an ADTT of
up to 10 over 20 years
Subgrade Soil Characteristics
USCS Classification – CL
Concrete modulus of rupture value of 600 psi
We should be contacted to confirm and/or modify the recommendations contained herein if actual
traffic volumes differ from the assumed values shown above.
Recommended alternatives for flexible and rigid pavements are summarized for each traffic area
as follows:
Traffic Area
Alternative
Recommended Pavement Thickness (Inches)
Asphaltic
Concrete
Surface
Aggregate
Base
Course
Portland
Cement
Concrete
Total
Automobile Parking
(NAPA Class I and ACI Category A)
A 3 6 -- 9
B -- 4 5½ 5½
Service Lanes
(NAPA Class II and ACI Category A)
A 4½ 6 -- 10½
B -- 4 6 6
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 17
Aggregate base course should consist of a blend of sand and gravel which meets strict
specifications for quality and gradation. Use of materials meeting Colorado Department of
Transportation (CDOT) Class 5 or 6 specifications is recommended for aggregate base course.
Aggregate base course should be placed in lifts not exceeding 6 inches and compacted to a
minimum of 95 percent of the maximum dry unit weight as determined by ASTM D698.
Asphaltic concrete should be composed of a mixture of aggregate, filler and additives (if required)
and approved bituminous material. The asphalt concrete should conform to approved mix
designs stating the Superpave properties, optimum asphalt content, job mix formula and
recommended mixing and placing temperatures. Aggregate used in asphalt concrete should
meet particular gradations. Material meeting CDOT Grading S specifications or equivalent is
recommended for asphalt concrete. Mix designs should be submitted prior to construction to
verify their adequacy. Asphalt material should be placed in maximum 3-inch lifts and compacted
within a range of 92 to 96 percent of the theoretical maximum (Rice) density (ASTM D2041).
Where rigid pavements are used, the concrete should be produced from an approved mix design
with the following minimum properties:
Properties Value
Compressive strength 4,000 psi
Cement type Type I or II portland cement
Entrained air content (%) 5 to 8
Concrete aggregate ASTM C33 and CDOT Section 703
Concrete should be deposited by truck mixers or agitators and placed a maximum of 90 minutes
from the time the water is added to the mix. Longitudinal and transverse joints should be provided
as needed in concrete pavements for expansion/contraction and isolation per ACI 325. The
location and extent of joints should be based upon the final pavement geometry.
For areas subject to concentrated and repetitive loading conditions (if any) such as dumpster
pads, truck delivery docks and ingress/egress aprons, we recommend using a portland cement
concrete pavement with a thickness of at least 6 inches underlain by at least 4 inches of granular
base. Prior to placement of the granular base, the areas should be thoroughly proofrolled. For
dumpster pads, the concrete pavement area should be large enough to support the container and
tipping axle of the refuse truck.
Pavement performance is affected by its surroundings. In addition to providing preventive
maintenance, the civil engineer should consider the following recommendations in the design and
layout of pavements:
Site grades should slope a minimum of 2 percent away from the pavements;
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 18
The subgrade and the pavement surface have a minimum 2 percent slope to promote proper
surface drainage;
Consider appropriate edge drainage and pavement under drain systems;
A drainage system should be designed for the proposed below-grade parking level;
Install pavement drainage surrounding areas anticipated for frequent wetting;
Install joint sealant and seal cracks immediately;
Seal all landscaped areas in, or adjacent to pavements to reduce moisture migration to
subgrade soils; and
Placing compacted, low permeability backfill against the exterior side of curb and gutter.
4.7.3 Pavements – Construction Considerations
Openings in pavement, such as landscape islands, are sources for water infiltration into
surrounding pavements. Water collects in the islands and migrates into the surrounding subgrade
soils thereby degrading support of the pavement. This is especially applicable for islands with
raised concrete curbs, irrigated foliage, and low permeability near-surface soils. The civil design
for the pavements with these conditions should include features to restrict or to collect and
discharge excess water from the islands. Examples of features are edge drains connected to the
storm water collection system or other suitable outlet and impermeable barriers preventing lateral
migration of water such as a cutoff wall installed to a depth below the pavement structure.
4.7.4 Pavements – Maintenance
Preventative maintenance should be planned and provided for an ongoing pavement
management program in order to enhance future pavement performance. Preventive
maintenance consists of both localized maintenance (e.g. crack and joint sealing and patching)
and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first
priority when implementing a planned pavement maintenance program and provides the highest
return on investment for pavements.
5.0 GENERAL COMMENTS
Terracon’s Scope of Services has been provided under the belief that this site will be used as
apartments. As such, Terracon would like to inform the Client that if this apartment project is
converted at any time to another purpose such as condominiums, the Client understands the
services Terracon is providing is not applicable for a condominium project and that a separate
consultant will need to be retained for such services. Terracon will have no liability for any such
unintended use of our services and Client agrees to defend, indemnify, and hold harmless
Terracon for any such unintended usage.
Terracon should be retained to review the final design plans and specifications so comments can
be made regarding interpretation and implementation of our geotechnical recommendations in
the design and specifications. Terracon also should be retained to provide observation and testing
services during grading, excavation, foundation construction and other earth-related construction
phases of the project.
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable 19
The analysis and recommendations presented in this report are based upon the data obtained
from the borings performed at the indicated locations and from other information discussed in this
report. This report does not reflect variations that may occur between borings, across the site, or
due to the modifying effects of construction or weather. The nature and extent of such variations
may not become evident until during or after construction. If variations appear, we should be
immediately notified so that further evaluation and supplemental recommendations can be
provided.
The scope of services for this project does not include either specifically or by implication any
environmental or biological (e.g., mold, fungi, and bacteria) assessment of the site or identification
or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about
the potential for such contamination or pollution, other studies should be undertaken.
This report has been prepared for the exclusive use of our client for specific application to the
project discussed and has been prepared in accordance with generally accepted geotechnical
engineering practices. No warranties, either express or implied, are intended or made. Site
safety, excavation support, and dewatering requirements are the responsibility of others. In the
event that changes in the nature, design, or location of the project as described in this report are
planned, the conclusions and recommendations contained in this report shall not be considered
valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this
report in writing.
APPENDIX A
FIELD EXPLORATION
SITE LOCATION MAP
West Lake Street Student Housing
821 West Lake Street
Fort Collins, CO
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: FORT COLLINS, CO (1/1/1984).
1901 Sharp Point Dr Suite C
Ft. Collins, CO 80525
20155052
Project Manager:
Drawn by:
Checked by:
Approved by:
BCR
EDB
EDB
1”=24,000 SF
11/20/2015
Project No.
Scale:
File Name:
Date: A-1
BCR Exhibit
EXPLORATION PLAN
West Lake Street Student Housing
821 West Lake Street
Fort Collins, CO
1901 Sharp Point Dr Suite C
Ft. Collins, CO 80525
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
20155052
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
BCR
EDB
EDB
AS SHOWN
11/20/2015
Scale:
A-2
Project Manager: Exhibit
Drawn by:
Checked by:
Approved by:
Project No.
File Name:
Date:
BCR
Legend
Approximate Boring Location
Approximate Temporary
Benchmark Location (Top of
Concrete of Electric Box,
Assumed Elevation 200.0’)
1
TBM
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable Exhibit A-3
Field Exploration Description
The locations of borings were based upon the proposed development shown on the provided site
plan. The borings were located in the field using a hand held GPS device accurate to within 15
feet. The ground surface elevation was surveyed at each boring location referencing the
temporary benchmark shown on Exhibit A-2 using an engineer’s level.
The borings were drilled with a CME-55 truck-mounted rotary drill rig with solid-stem augers.
During the drilling operations, lithologic logs of the borings were recorded by the field engineer.
Disturbed samples were obtained at selected intervals utilizing a 2-inch outside diameter split-
spoon sampler and a 3-inch outside diameter ring-barrel sampler. Penetration resistance values
were recorded in a manner similar to the standard penetration test (SPT). This test consists of
driving the sampler into the ground with a 140-pound hammer free-falling through a distance of
30 inches. The number of blows required to advance the ring-barrel sampler 12 inches (18 inches
for standard split-spoon samplers, final 12 inches are recorded) or the interval indicated, is
recorded as a standard penetration resistance value (N-value). The blow count values are
indicated on the boring logs at the respective sample depths. Ring-barrel sample blow counts are
not considered N-values.
A CME automatic SPT hammer was used to advance the samplers in the borings performed on this
site. A greater efficiency is typically achieved with the automatic hammer compared to the
conventional safety hammer operated with a cathead and rope. Published correlations between the
SPT values and soil properties are based on the lower efficiency cathead and rope method. This
higher efficiency affects the standard penetration resistance blow count value by increasing the
penetration per hammer blow over what would be obtained using the cathead and rope method. The
effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of
the subsurface information for this report.
The standard penetration test provides a reasonable indication of the in-place density of sandy
type materials, but only provides an indication of the relative stiffness of cohesive materials since
the blow count in these soils may be affected by the moisture content of the soil. In addition,
considerable care should be exercised in interpreting the N-values in gravelly soils, particularly
where the size of the gravel particle exceeds the inside diameter of the sampler.
Groundwater measurements were obtained in the borings at the time of site exploration and
several days after drilling. Four (4) of the borings were converted to temporary piezometers for
future groundwater measurements. The remaining 3 borings were backfilled with auger cuttings
and sand (if needed). Some settlement of the backfill may occur and should be repaired as soon
as possible.
89
91
6
8
23
21
24
23
23
27
26
36-19-17
38-18-20
200
199
193
180
178
159.5
7-9-8
N=17
4-7-6
N=13
2-3-4
N=7
3-3-4
N=7
1-6-3
N=9
1-2-3
N=5
2-3-4
N=7
3-4-5
N=9
5-6-6
N=12
0.4
1.0
7.0
20.0
22.0
40.5
ASPHALT PAVEMENT - 5 inches
FILL - AGGREGATE BASE COURSE - 7 inches
CLAYEY SAND WITH GRAVEL, reddish-brown, medium dense
LEAN CLAY (CL), reddish-brown, medium stiff to stiff
POORLY GRADED SAND, coarse to medium grained, gray and brown
SANDY LEAN CLAY, brown, medium stiff to stiff
Boring Terminated at 40.5 Feet
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 1 of 1
Advancement Method:
4-inch solid flight auger
Abandonment Method:
15
13
16
20
22
29
11
31
32
97
110
199
173.5
161.5
155.5
6-9
6-7-10
N=17
6-9
3-4-6
N=10
3-5-7
N=12
3-2-3
N=5
9-9-7
N=16
4-4-5
N=9
4-4-7
N=11
0.5
26.0
38.0
44.0
LADSCAPE GRASS - 6 inches
LEAN CLAY WITH SAND, dark brown to reddish-brown, medium stiff to
stiff
WELL GRADED SAND, fine to coarse grained, brown, loose to medium
dense
LEAN CLAY, dark brown and reddish-brown, stiff
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 1 of 2
Advancement Method:
4-inch solid flight auger
Abandonment Method:
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
PIEZOMETER LOG NO. 2
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
144
10-15-15
55.5 N=30
SEDIMENTARY BEDROCK - CLAYSTONE, blue-gray to brown,
medium hard (continued)
Boring Terminated at 55.5 Feet
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 2 of 2
Advancement Method:
4-inch solid flight auger
Abandonment Method:
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
PIEZOMETER LOG NO. 2
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
Boring Completed: 11/6/2015
Exhibit: A-6
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 199.5 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
50
55
FIELD TEST
RESULTS
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.568659° Longitude: -105.092026°
While drilling
11/20/2015
WATER LEVEL OBSERVATIONS
41
8
13
11
16
17
20
16
27
24
104
118
111
26-20-6
200
193.5
181.5
168.5
160
10-18
6-7-8
N=15
7-10
2-3-2
N=5
6-9
0-2-3
N=5
11-19-13
N=32
3-5-6
N=11
6-8-8
N=16
0.3
7.0
19.0
32.0
40.5
LANDSCAPE GRASS - 3 inches
SILTY SAND, trace calcareous nodules, fine to coarse grained, brown,
medium dense
SILTY CLAYEY SAND, fine to coarse grained, reddish-brown, loose to
medium dense
SANDY LEAN CLAY, reddish-brown, medium stiff to stiff
WELL GRADED SAND WITH CLAY AND GRAVEL, brown, medium
dense to dense
Boring Terminated at 40.5 Feet
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 1 of 1
Advancement Method:
4-inch solid flight auger
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
5
5
17
18
15
18
24
26
23
109
115
200.5
197
190
179
8-10-10
N=20
11-22
2-4-3
N=7
7-3
4-5-5
N=10
3-7-9
N=16
2-2-2
N=4
2-3-5
N=8
6-6-10
N=16
0.3
4.0
11.0
22.0
LANDSCAPE GRASS - 4 inches
SILTY SAND, fine to coarse grained, reddish-brown, medium dense
SILTY CLAYEY SAND, fine to coarse grained, reddish-brown, loose
SANDY LEAN CLAY, reddish-brown, stiff to very stiff
LEAN CLAY, reddish-brown to gray and brown, medium stiff to very stiff
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 1 of 2
Advancement Method:
4-inch solid flight auger
Abandonment Method:
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
PIEZOMETER LOG NO. 4
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
154
145.5
14-23-23
N=46
47.0
55.5
LEAN CLAY, reddish-brown to gray and brown, medium stiff to very stiff
(continued)
SEDIMENTARY BEDROCK - SANDSTONE, gray yellow and brown,
medium hard
Boring Terminated at 55.5 Feet
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 2 of 2
Advancement Method:
4-inch solid flight auger
Abandonment Method:
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
PIEZOMETER LOG NO. 4
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
Boring Completed: 11/6/2015
Exhibit: A-9
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 200.8 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
50
55
FIELD TEST
RESULTS
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.568074° Longitude: -105.092594°
5 30
5
13
13
25
27
15
26
25
125
118
NP
199.5
193
178
174
168
159.5
9-7-10
N=17
6-20
3-3-4
N=7
5-9
2-2-6
N=8
2-2-3
N=5
26-22-24
N=46
3-3-5
N=8
5-5-6
N=11
0.3
7.0
22.0
26.0
32.0
40.5
LANDSCAPE GRASS - 4 inches
SILTY SAND (SM), fine to coarse grained, reddish-brown, medium
dense
SILTY CLAYEY SAND, reddish-brown, loose
SANDY LEAN CLAY, trace iron oxide, red to brown, medium stiff
WELL GRADED SAND, trace gravel, fine to coarse grained, brown,
dense
SANDY LEAN CLAY, trace iron oxide, brown, stiff
Boring Terminated at 40.5 Feet
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 1 of 1
Advancement Method:
4-inch solid flight auger
Abandonment Method:
1901 Sharp Point Drive, Suite C
2
2
200
195
4-6-15
N=21
5-9-15
N=24
0.5
5.5
LANDSCAPE GRASS - 6 inches
SILTY SAND, fine grained, reddish-brown, medium dense to dense
Boring Terminated at 5.5 Feet
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 1 of 1
Advancement Method:
4-inch solid flight auger
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
BORING LOG NO. 6
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
Boring Completed: 10/16/2015
Exhibit: A-11
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 200.7 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
FIELD TEST
RESULTS
DEPTH
2 18
2
NP
200
195
6-6
6-9-15
N=24
0.5
5.5
LANDSCAPE GRASS - 6 inches
SILTY SAND WITH GRAVEL (SM), fine grained, reddish-brown,
medium dense
Boring Terminated at 5.5 Feet
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
GRAPHIC LOG
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155052.GPJ TERRACON2015.GDT 11/24/15
821 West Lake Street
Fort Collins, Colorado
SITE:
Page 1 of 1
Advancement Method:
4-inch solid flight auger
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
BORING LOG NO. 7
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
Boring Completed: 10/16/2015
Exhibit: A-12
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 200.3 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
FIELD TEST
RESULTS
APPENDIX B
LABORATORY TESTING
Geotechnical Engineering Report
West Lake Street Student Housing ■ Fort Collins, Colorado
November 24, 2015 ■ Terracon Project No. 20155052
Responsive ■ Resourceful ■ Reliable Exhibit B-1
Laboratory Testing Description
The soil and bedrock samples retrieved during the field exploration were returned to the laboratory
for observation by the project geotechnical engineer. At that time, the field descriptions were
reviewed and an applicable laboratory testing program was formulated to determine engineering
properties of the subsurface materials.
Laboratory tests were conducted on selected soil and bedrock samples. The results of these
tests are presented on the boring logs and in this appendix. The test results were used for the
geotechnical engineering analyses, and the development of foundation and earthwork
recommendations. The laboratory tests were performed in general accordance with applicable
locally accepted standards. Soil samples were classified in general accordance with the Unified
Soil Classification System described in Appendix C. Rock samples were visually classified in
general accordance with the description of rock properties presented in Appendix C. Procedural
standards noted in this report are for reference to methodology in general. In some cases variations
to methods are applied as a result of local practice or professional judgment.
Water content Plasticity index
Grain-size distribution
Consolidation/swell
Dry density
Water-soluble sulfate content
0
10
20
30
40
50
60
0 20 40 60 80 100
CL or OL CH or OH
ML or OL
MH or OH
Boring ID Depth PL PI Description
LEAN CLAY
LEAN CLAY
SILTY, CLAYEY SAND
SILTY SAND
SILTY SAND with GRAVEL
CL
CL
SC-SM
SM
SM
"U" Line
"A" Line
36
38
26
NP
NP
19
18
20
NP
NP
17
20
6
NP
NP
89
91
41
30
18
LL USCS
1
1
3
5
7
ATTERBERG LIMITS RESULTS
ASTM D4318
9 - 10.5
29 - 30.5
14 - 15.5
2 - 3.5
2 - 3
Fines
P
L
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
100 10 1 0.1 0.01 0.001
88.9
91.0
41.1
30.5
18.4
%Fines
LL PL PI
1 4
3/4 1/2
60
fine
1
1
3
5
7
GRAIN SIZE IN MILLIMETERS
PERCENT FINER BY WEIGHT
coarse fine
U.HYDROMETERS. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS
19
18
20
NP
NP
17
20
6
NP
NP
D100
Cc Cu
SILT OR CLAY
4
D30 D10 %Gravel %Sand
1
1
3
-4
-2
0
2
4
6
8
10
100 1,000 10,000
AXIAL STRAIN, %
PRESSURE, psf
SWELL CONSOLIDATION TEST
ASTM D4546
NOTES: Sample exhibited 0.8 percent swell upon wetting under an applied pressure of 1,000 psf.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20155052
PROJECT: West Lake Street Student
Housing
SITE: 821 West Lake Street
Fort Collins, Colorado
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
EXHIBIT: B-4
Specimen Identification Classification , pcf
2 114 16
WC, %
9 - 10 ft LEAN CLAY with SAND(CL)
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155052.GPJ TERRACON2012.GDT 11/24/15
-4
-2
0
2
4
6
8
10
100 1,000 10,000
AXIAL STRAIN, %
PRESSURE, psf
SWELL CONSOLIDATION TEST
ASTM D4546
NOTES: Sample exhibited 1.3 percent consolidation upon wetting under an applied pressure of 500 psf.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20155052
PROJECT: West Lake Street Student
Housing
SITE: 821 West Lake Street
Fort Collins, Colorado
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
EXHIBIT: B-5
Specimen Identification Classification , pcf
3 104 8
WC, %
2 - 3 ft SILTY SAND(SM)
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155052.GPJ TERRACON2012.GDT 11/24/15
-4
-2
0
2
4
6
8
10
100 1,000 10,000
AXIAL STRAIN, %
PRESSURE, psf
SWELL CONSOLIDATION TEST
ASTM D4546
NOTES: Sample exhibited 0.5 percent consolidation upon wetting under an applied pressure of 500 psf.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20155052
PROJECT: West Lake Street Student
Housing
SITE: 821 West Lake Street
Fort Collins, Colorado
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
EXHIBIT: B-6
Specimen Identification Classification , pcf
4 109 5
WC, %
4 - 5 ft SILTY CLAYEY SAND(SC-SM)
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155052.GPJ TERRACON2012.GDT 11/24/15
-4
-2
0
2
4
6
8
10
100 1,000 10,000
AXIAL STRAIN, %
PRESSURE, psf
SWELL CONSOLIDATION TEST
ASTM D4546
NOTES: Sample exhibited no movement upon wetting under an applied pressure of 1,000 psf.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20155052
PROJECT: West Lake Street Student
Housing
SITE: 821 West Lake Street
Fort Collins, Colorado
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
EXHIBIT: B-7
Specimen Identification Classification , pcf
5 114 13
WC, %
14 - 15 ft SILTY CLAYEY SAND(SC-SM)
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155052.GPJ TERRACON2012.GDT 11/24/15
TASK NO: 151102050
Analytical Results
Terracon, Inc. - Fort Collins
Eric D. Bernhardt
Company:
Report To:
Company:
Bill To:
1901 Sharp Point Drive
Suite C
Fort Collins CO 80525
Accounts Payable
Terracon, Inc. - Lenexa
13910 W. 96th Terrace
Lenexa KS 66215
20155055
Date Reported: 11/9/15
Task No.: 151102050
Matrix: Soil - Geotech
Date Received: 11/2/15
Client Project:
Client PO:
Customer Sample ID 1 @ 4 Ft.
Test Method
Lab Number: 151102050-01
Result
Sulfate - Water Soluble 0.012 % AASHTO T290-91/ ASTM D4327
240 South Main Street / Brighton, CO 80601-0507 / 303-659-2313
Mailing Address: P.O. Box 507 / Brighton, CO 80601-0507 / Fax: 303-659-2315
DATA APPROVED FOR RELEASE BY
Abbreviations/ References:
151102050
AASHTO - American Association of State Highway and Transportation Officials.
ASTM - American Society for Testing and Materials.
ASA - American Society of Agronomy.
DIPRA - Ductile Iron Pipe Research Association Handbook of Ductile Iron Pipe.
Exhibit B-8
APPENDIX C
SUPPORTING DOCUMENTS
Exhibit: C-1
Unconfined
Compressive
Strength
Qu, (psf)
500 to 1,000
2,000 to 4,000
> 8,000
less than 500
1,000 to 2,000
4,000 to 8,000
Non-plastic
Low
Medium
High
DESCRIPTION OF SYMBOLS AND ABBREVIATIONS
SAMPLING
WATER LEVEL
FIELD TESTS
GENERAL NOTES
Over 12 in. (300 mm)
12 in. to 3 in. (300mm to 75mm)
3 in. to #4 sieve (75mm to 4.75 mm)
#4 to #200 sieve (4.75mm to 0.075mm
Passing #200 sieve (0.075mm)
Particle Size
< 5
5 - 12
> 12
Percent of
Dry Weight
Descriptive Term(s)
of other constituents
RELATIVE PROPORTIONS OF FINES
0
1 - 10
11 - 30
> 30
Plasticity Index
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry
weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have
less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and
silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be
added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
LOCATION AND ELEVATION NOTES
Percent of
Dry Weight
Major Component
of Sample
Trace
With
Modifier
RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY
Trace
With
Modifier
DESCRIPTIVE SOIL CLASSIFICATION
Boulders
Cobbles
UNIFIED SOIL CLASSIFICATION SYSTEM
Exhibit C-2
Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A
Soil Classification
Group
Symbol Group Name B
Coarse Grained Soils:
More than 50% retained
on No. 200 sieve
Gravels:
More than 50% of
coarse fraction retained
on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu 4 and 1 Cc 3 E GW Well-graded gravel F
Cu 4 and/or 1 Cc 3 E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F,G,H
Fines classify as CL or CH GC Clayey gravel F,G,H
Sands:
50% or more of coarse
fraction passes No. 4
sieve
Clean Sands:
Less than 5% fines D
Cu 6 and 1 Cc 3 E SW Well-graded sand I
Cu 6 and/or 1 Cc 3 E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G,H,I
Fines classify as CL or CH SC Clayey sand G,H,I
Fine-Grained Soils:
50% or more passes the
No. 200 sieve
Silts and Clays:
Liquid limit less than 50
Inorganic:
PI 7 and plots on or above “A” line J CL Lean clay K,L,M
PI 4 or plots below “A” line J ML Silt K,L,M
Organic:
Liquid limit - oven dried
0.75 OL
Organic clay K,L,M,N
Liquid limit - not dried Organic silt K,L,M,O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K,L,M
PI plots below “A” line MH Elastic Silt K,L,M
Organic:
Liquid limit - oven dried
0.75 OH
Organic clay K,L,M,P
Liquid limit - not dried Organic silt K,L,M,Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-inch (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
DESCRIPTION OF ROCK PROPERTIES
Exhibit C-3
WEATHERING
Fresh Rock fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline.
Very slight Rock generally fresh, joints stained, some joints may show thin clay coatings, crystals in broken face show
bright. Rock rings under hammer if crystalline.
Slight Rock generally fresh, joints stained, and discoloration extends into rock up to 1 in. Joints may contain clay. In
granitoid rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer.
Moderate Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull
and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength
as compared with fresh rock.
Moderately severe All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority
show kaolinization. Rock shows severe loss of strength and can be excavated with geologist’s pick.
Severe All rock except quartz discolored or stained. Rock “fabric” clear and evident, but reduced in strength to strong
soil. In granitoid rocks, all feldspars kaolinized to some extent. Some fragments of strong rock usually left.
Very severe All rock except quartz discolored or stained. Rock “fabric” discernible, but mass effectively reduced to “soil” with
only fragments of strong rock remaining.
Complete Rock reduced to ”soil”. Rock “fabric” not discernible or discernible only in small, scattered locations. Quartz may
be present as dikes or stringers.
HARDNESS (for engineering description of rock – not to be confused with Moh’s scale for minerals)
Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of
geologist’s pick.
Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen.
Moderately hard Can be scratched with knife or pick. Gouges or grooves to ¼ in. deep can be excavated by hard blow of point of
a geologist’s pick. Hand specimens can be detached by moderate blow.
Medium Can be grooved or gouged 1/16 in. deep by firm pressure on knife or pick point. Can be excavated in small
chips to pieces about 1-in. maximum size by hard blows of the point of a geologist’s pick.
Soft Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in
size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure.
Very soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 1-in. or more in thickness can be
broken with finger pressure. Can be scratched readily by fingernail.
Joint, Bedding, and Foliation Spacing in Rock
a
Spacing Joints Bedding/Foliation
Less than 2 in. Very close Very thin
2 in. – 1 ft. Close Thin
1 ft. – 3 ft. Moderately close Medium
3 ft. – 10 ft. Wide Thick
More than 10 ft. Very wide Very thick
a. Spacing refers to the distance normal to the planes, of the described feature, which are parallel to each other or nearly so.
Rock Quality Designator (RQD) a Joint Openness Descriptors
RQD, as a percentage Diagnostic description Openness Descriptor
Exceeding 90 Excellent No Visible Separation Tight
90 – 75 Good Less than 1/32 in. Slightly Open
75 – 50 Fair 1/32 to 1/8 in. Moderately Open
50 – 25 Poor 1/8 to 3/8 in. Open
Less than 25 Very poor 3/8 in. to 0.1 ft. Moderately Wide
a. RQD (given as a percentage) = length of core in pieces Greater than 0.1 ft. Wide
4 in. and longer/length of run.
References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56. Subsurface Investigation for
Design and Construction of Foundations of Buildings. New York: American Society of Civil Engineers, 1976. U.S.
Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual.
Exhibit C-4
LABORATORY TEST
SIGNIFICANCE AND PURPOSE
Test Significance Purpose
California Bearing
Ratio
Used to evaluate the potential strength of subgrade soil,
subbase, and base course material, including recycled
materials for use in road and airfield pavements.
Pavement Thickness
Design
Consolidation
Used to develop an estimate of both the rate and amount of
both differential and total settlement of a structure.
Foundation Design
Direct Shear
Used to determine the consolidated drained shear strength
of soil or rock.
Bearing Capacity,
Foundation Design,
and Slope Stability
Dry Density
Used to determine the in-place density of natural, inorganic,
fine-grained soils.
Index Property Soil
Behavior
Expansion
Used to measure the expansive potential of fine-grained soil
and to provide a basis for swell potential classification.
Foundation and Slab
Design
Gradation
Used for the quantitative determination of the distribution of
particle sizes in soil.
Soil Classification
Liquid & Plastic Limit,
Plasticity Index
Used as an integral part of engineering classification
systems to characterize the fine-grained fraction of soils, and
to specify the fine-grained fraction of construction materials.
Soil Classification
Permeability
Used to determine the capacity of soil or rock to conduct a
liquid or gas.
Groundwater Flow
Analysis
pH Used to determine the degree of acidity or alkalinity of a soil. Corrosion Potential
Resistivity
Used to indicate the relative ability of a soil medium to carry
electrical currents.
Corrosion Potential
R-Value
Used to evaluate the potential strength of subgrade soil,
subbase, and base course material, including recycled
materials for use in road and airfield pavements.
Pavement Thickness
Design
Soluble Sulfate
Used to determine the quantitative amount of soluble
sulfates within a soil mass.
Exhibit C-5
REPORT TERMINOLOGY
(Based on ASTM D653)
Allowable Soil
Bearing Capacity
The recommended maximum contact stress developed at the interface of the foundation
element and the supporting material.
Alluvium
Soil, the constituents of which have been transported in suspension by flowing water and
subsequently deposited by sedimentation.
Aggregate Base
Course
A layer of specified material placed on a subgrade or subbase usually beneath slabs or
pavements.
Backfill A specified material placed and compacted in a confined area.
Bedrock
A natural aggregate of mineral grains connected by strong and permanent cohesive forces.
Usually requires drilling, wedging, blasting or other methods of extraordinary force for
excavation.
Bench A horizontal surface in a sloped deposit.
Caisson (Drilled
Pier or Shaft)
A concrete foundation element cast in a circular excavation which may have an enlarged base.
Sometimes referred to as a cast-in-place pier or drilled shaft.
Coefficient of
Friction
A constant proportionality factor relating normal stress and the corresponding shear stress at
which sliding starts between the two surfaces.
Colluvium
Soil, the constituents of which have been deposited chiefly by gravity such as at the foot of a
slope or cliff.
Compaction The densification of a soil by means of mechanical manipulation
Concrete Slab-on-
Grade
A concrete surface layer cast directly upon a base, subbase or subgrade, and typically used
as a floor system.
Differential
Movement
Unequal settlement or heave between, or within foundation elements of structure.
Earth Pressure The pressure exerted by soil on any boundary such as a foundation wall.
ESAL
Equivalent Single Axle Load, a criteria used to convert traffic to a uniform standard, (18,000
pound axle loads).
Engineered Fill
Specified material placed and compacted to specified density and/or moisture conditions
under observations of a representative of a geotechnical engineer.
Equivalent Fluid
A hypothetical fluid having a unit weight such that it will produce a pressure against a lateral
support presumed to be equivalent to that produced by the actual soil. This simplified
approach is valid only when deformation conditions are such that the pressure increases
linearly with depth and the wall friction is neglected.
Existing Fill (or
Man-Made Fill)
Materials deposited throughout the action of man prior to exploration of the site.
Existing Grade The ground surface at the time of field exploration.
Exhibit C-6
REPORT TERMINOLOGY
(Based on ASTM D653)
Expansive Potential The potential of a soil to expand (increase in volume) due to absorption of moisture.
Finished Grade The final grade created as a part of the project.
Footing A portion of the foundation of a structure that transmits loads directly to the soil.
Foundation The lower part of a structure that transmits the loads to the soil or bedrock.
Frost Depth The depth at which the ground becomes frozen during the winter season.
Grade Beam
A foundation element or wall, typically constructed of reinforced concrete, used to span between
other foundation elements such as drilled piers.
Groundwater Subsurface water found in the zone of saturation of soils or within fractures in bedrock.
Heave Upward movement.
Lithologic The characteristics which describe the composition and texture of soil and rock by observation.
Native Grade The naturally occurring ground surface.
Native Soil Naturally occurring on-site soil, sometimes referred to as natural soil.
Optimum Moisture
Content
The water content at which a soil can be compacted to a maximum dry unit weight by a given
compactive effort.
Perched Water
Groundwater, usually of limited area maintained above a normal water elevation by the
presence of an intervening relatively impervious continuous stratum.
Scarify To mechanically loosen soil or break down existing soil structure.
Settlement Downward movement.
Skin Friction (Side
Shear)
The frictional resistance developed between soil and an element of the structure such as a
drilled pier.
Soil (Earth)
Sediments or other unconsolidated accumulations of solid particles produced by the physical
and chemical disintegration of rocks, and which may or may not contain organic matter.
Strain The change in length per unit of length in a given direction.
Stress The force per unit area acting within a soil mass.
Strip To remove from present location.
Subbase A layer of specified material in a pavement system between the subgrade and base course.
Subgrade The soil prepared and compacted to support a structure, slab or pavement system.
Corrosion Potential
Unconfined
Compression
To obtain the approximate compressive strength of soils that
possess sufficient cohesion to permit testing in the
unconfined state.
Bearing Capacity
Analysis for
Foundations
Water Content
Used to determine the quantitative amount of water in a soil
mass.
Index Property Soil
Behavior
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded
gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded
sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
10 60
2
30
D x D
(D )
F If soil contains 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,”
whichever is predominant.
L If soil contains 30% plus No. 200 predominantly sand, add “sandy” to
group name.
M If soil contains 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI 4 and plots on or above “A” line.
O PI 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
Gravel
Sand
Silt or Clay
Descriptive Term(s)
of other constituents
N
(HP)
(T)
(DCP)
(PID)
(OVA)
< 15
15 - 29
> 30
Term
PLASTICITY DESCRIPTION
Water levels indicated on the soil boring
logs are the levels measured in the
borehole at the times indicated.
Groundwater level variations will occur
over time. In low permeability soils,
accurate determination of groundwater
levels is not possible with short term
water level observations.
Water Level After
a Specified Period of Time
Water Level After a
Specified Period of Time
Water Initially
Encountered
Modified
Dames &
Moore Ring
Sampler
Standard
Penetration
Test
Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy
of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was
conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic
maps of the area.
Standard Penetration Test
Resistance (Blows/Ft.)
Hand Penetrometer
Torvane
Dynamic Cone Penetrometer
Photo-Ionization Detector
Organic Vapor Analyzer
STRENGTH TERMS
BEDROCK
Loose
Medium Dense
Dense
0 - 3
4 - 9
10 - 29
30 - 50
7 - 18
19 - 58
Very Soft
Soft
Medium-Stiff
Stiff
Very Stiff
Standard
Penetration or
N-Value
Blows/Ft.
2 - 4
4 - 8
8 - 15
< 3
5 - 9
19 - 42
> 42
30 - 49
50 - 89
20 - 29
Medium Hard
Very Dense
RELATIVE DENSITY OF COARSE-GRAINED
SOILS
Descriptive
Term
(Density)
Very Loose
> 50
Ring
Sampler
Blows/Ft.
0 - 6
59 - 98
> 99
Descriptive
Term
(Consistency)
Hard
0 - 1
Ring
Sampler
Blows/Ft.
3 - 4
10 - 18
Ring
Sampler
Blows/Ft.
< 30
90 - 119
Standard
Penetration or
N-Value
Blows/Ft.
Descriptive
Term
(Consistency)
Weathered
Firm
Very Hard
CONSISTENCY OF FINE-GRAINED SOILS
(More than 50% retained on No. 200 sieve.)
Density determined by
Standard Penetration Resistance
(50% or more passing the No. 200 sieve.)
Consistency determined by laboratory shear strength testing, field
visual-manual procedures or standard penetration resistance
Standard
Penetration or
N-Value
Blows/Ft.
_ 15 - 30
> 30
> 119
< 20
30 - 49
50 - 79
>79
Hard
5
7
LEAN CLAY(CL)
LEAN CLAY(CL)
SILTY, CLAYEY SAND(SC-SM)
SILTY SAND(SM)
SILTY SAND with GRAVEL(SM)
36
38
26
NP
NP
0.337
0.17
0.568
2.691
9.5
4.75
9.5
19
37.5
6 16
20 30
40 50
1.5 6 200
810
0.4
0.0
1.0
9.0
33.0
14
9 - 10.5
29 - 30.5
14 - 15.5
2 - 3.5
2 - 3
3/8 3 100
3 2 140
COBBLES
GRAVEL SAND
USCS Classification
10.7
9.0
57.9
60.6
48.7
D60
coarse medium
Boring ID Depth
Boring ID Depth
GRAIN SIZE DISTRIBUTION
ASTM D422
9 - 10.5
29 - 30.5
14 - 15.5
2 - 3.5
2 - 3
PROJECT NUMBER: 20155052
PROJECT: West Lake Street Student Housing
SITE: 821 West Lake Street
Fort Collins, Colorado
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
EXHIBIT: B-3
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GRAIN SIZE: USCS-2 20155052.GPJ TERRACON2012.GDT 11/24/15
A
S
T
I
C
I
T
Y
I
N
D
E
X
LIQUID LIMIT
PROJECT NUMBER: 20155052
PROJECT: West Lake Street Student Housing
SITE: 821 West Lake Street
Fort Collins, Colorado
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
EXHIBIT: B-2
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ATTERBERG LIMITS 20155052.GPJ TERRACON2015.GDT 11/24/15
CL-ML
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.567958° Longitude: -105.092078°
WATER LEVEL OBSERVATIONS
LOCATION See Exhibit A-2
Latitude: 40.56796° Longitude: -105.092529°
WATER LEVEL OBSERVATIONS
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
PIEZOMETER LOG NO. 5
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
Boring Completed: 10/16/2015
Exhibit: A-10
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 199.9 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
15
20
25
30
35
40
FIELD TEST
RESULTS
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.568101° Longitude: -105.092091°
While drilling
11/20/2015
WATER LEVEL OBSERVATIONS
While drilling
11/20/2015
WATER LEVEL OBSERVATIONS
Boring Completed: 11/6/2015
Exhibit: A-8
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 200.8 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
15
20
25
30
35
40
45
FIELD TEST
RESULTS
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.568074° Longitude: -105.092594°
While drilling
11/20/2015
WATER LEVEL OBSERVATIONS
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
BORING LOG NO. 3
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
Boring Completed: 10/16/2015
Exhibit: A-7
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 200.3 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
15
20
25
30
35
40
FIELD TEST
RESULTS
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.568283° Longitude: -105.092487°
While drilling
WATER LEVEL OBSERVATIONS
Driller: Drillng Engineers, Inc.
Boring Completed: 11/6/2015
Exhibit: A-5
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 199.5 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
15
20
25
30
35
40
45
FIELD TEST
RESULTS
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.568659° Longitude: -105.092026°
While drilling
11/20/2015
WATER LEVEL OBSERVATIONS
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20155052
Drill Rig: CME-55
Boring Started: 10/16/2015
PIEZOMETER LOG NO. 1
CLIENT: Student Housing CSU, LLC
Middleton, Wisconsin
Driller: Drillng Engineers, Inc.
Boring Completed: 10/16/2015
Exhibit: A-4
See Exhibit A-3 for description of field procedures.
See Appendix B for description of laboratory
procedures and additional data (if any).
See Appendix C for explanation of symbols and
abbreviations.
PROJECT: West Lake Street Student Housing
PERCENT FINES
WATER
CONTENT (%)
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Surface Elev.: 200.2 (Ft.)
ELEVATION (Ft.)
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
DEPTH (Ft.)
5
10
15
20
25
30
35
40
FIELD TEST
RESULTS
DEPTH
LOCATION See Exhibit A-2
Latitude: 40.568643° Longitude: -105.092593°
While drilling
11/20/2015
WATER LEVEL OBSERVATIONS