HomeMy WebLinkAboutBROOKFIELD SECOND FILING, TRACTS D & E - PDP/FDP - FDP150025 - CORRESPONDENCE - REVISIONS (5)1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
December 31, 2015
Morningside Land Company, LLC
1170 W Ash St Ste 100
Windsor, CO 80550
RE: Brookfield Second Filing Tracts D and E, FDP150025, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Rebecca Everette, at 970-416-2625 or reverette@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Building Elevations
Comment Number: 18 Comment Originated: 12/29/2015
12/29/2015: See elevations for one minor redline.
RESPONSE: Revised
Topic: Site Plan
Comment Number: 19 Comment Originated: 12/31/2015
12/31/2015: Given the location of the accessible units in the condo building,
please move the handicap accessible parking spaces to the west end of each
parking strip.
RESPONSE: Parking spaces remain at the east end of the parking spaces next to accessible
ramps and walks.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 28 Comment Originated: 12/29/2015
12/29/2015: Make sure that the ped ramp on the east side of Northern Lights
lines up with the ramp at the corner opposite of it. With the change to the
directional ramps at the corner this one doesn't line up right now.
RESPONSE: Revised to line up.
2
Comment Number: 29 Comment Originated: 12/29/2015
12/29/2015: Sheet G4 - the match line is over some elevations. Either mask or
make sure the numbers are rotated so that they are readable.
RESPONSE: Revised by moving matchline text.
Comment Number: 30 Comment Originated: 12/29/2015
12/29/2015: Forebay detail. This looks like it needs some more information.
How does the concrete cover work - base it sits on? Is there a handle? Rebar
in this cover? Standard cover ordered somewhere or built?
RESPONSE: Revised detail to show galvanized plate cover. Cover can be removed for access and
maintenance of forebay.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 18 Comment Originated: 12/29/2015
12/29/2015: The top of bank line does not appear to be in the correct location. I
believe the top of bank is what is currently labeled as "Fossil Creek Ditch." This
label can be updated to read "Fossil Creek Ditch Top of Bank" instead. The 50'
buffer along the ditch is measured from the top of bank. See redlines.
RESPONSE: Revised labels. Added FCRID Top of Bank label and 50’ offset dimension. Added North
Poudre Irrigation Company Ditch Road and Maintenance Easement label.
Comment Number: 19 Comment Originated: 12/29/2015
12/29/2015: It will be simpler for maintenance and inspections of the Natural
Habitat Buffer Zone if it followed the east edge of the sidewalk, rather than the
strict 50' buffer. Based on the conversation at the staff review meeting, please
adjust all plans that show the buffer.
RESPONSE: Revised Buffer Zone to extend from property line to east edge of pedestrian trail.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 08/07/2015
11/04/2015: CONTINUED
Canopy shade trees used as street trees need to be positioned 40 feet from
street lights. Ornamental trees can be 15 feet from lights. Review current
placement of trees near lights and provide the required separation.
RESPONSE: Revised as noted
3
08/07/2015: Show the actual location of street lights and stop signs and place street trees
away to LUC standards.
RESPONSE: Revised as noted
Street lights: 40 feet separation for shade trees and 15 feet for ornamental trees
RESPONSE: Revised as noted
Stop signs: 20 feet separation for trees
RESPONSE: Revised as noted
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/06/2015
08/06/2015: Light & Power has existing electric facilities along the N. side of
Precision Dr. between Brookfield and Northern Lights; and as far North as the
existing clubhouse. Electric would need to be extended North along Brookfield
and along Northern Lights to feed this development. Any modification or
relocation to existing electric facilities will be at the applicants expense.
RESPONSE: Acknowledged
Comment Number: 2 Comment Originated: 08/06/2015
08/06/2015: Electric Capacity Fee, Building Site charges and any system
modification charges necessary will apply to this development.
RESPONSE: Acknowledged
Comment Number: 7 Comment Originated: 10/29/2015
10/29/2015: Please contact Light & Power Engineering if you have any
questions at 221-6700. Please reference our policies, development charge
processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
RESPONSE: Acknowledged
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 5 Comment Originated: 12/14/2015
12/14/2015: MARKING
The proposed fire lane signage plan (to include directional arrows) appears
appropriate except for two locations. The eastern loop drive, surrounding Bldg.
36 should have one sign located approximately 15' back from both, north and
south street connection. Fire lane signage shall be placed at 75' intervals along
the path of fire access and therefore another sign is warranted farther to the
east at each location. Refer to IFC Appendix D103.6 for fire lane sign details.
RESPONSE: Acknowledged and Revised sign locations.
4
> IFC503.3: Where required by the fire code official, approved signs or other
approved notices that include the words NO PARKING - FIRE LANE shall be
provided for fire apparatus access roads to identify such roads or prohibit the
obstruction thereof. The means by which fire lanes are designated shall be
maintained in a clean and legible condition at all times ad be replaced or
repaired when necessary to provide adequate visibility.
RESPONSE: Added Fire Lane Sign Detail to sheet D7.
Comment Number: 6 Comment Originated: 12/14/2015
12/14/2015: ADDRESSING & WAYFINDING
The project team is welcome to resolve this issue with Tech Services Dept.
however at some point the plan shall be reviewed and approved by the fire
department prior to implementation. This plan need not necessarily include
address numerals but a plan for how and where addressing will be posted in
order to facilitate effective wayfinding in the event of an emergency.
RESPONSE: Acknowledged
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 08/04/2015
12/30/2015: Please review. It appears there was a problem with printing when
the detail was moved to D8.
RESPONSE: Revised
11/02/2015: Detail D-54 is seen on Sheet D7 and Paver Sections are seen on
Sheet SG1. Please review/revise for consistency between the details and also
call out media types, depths, etc. that are specific to this project.
RESPONSE: Revised
08/04/2015: Please review City Paver Detail D-54 and modify paver sections
shown on sheet SG1 appropriately.
RESPONSE: Revised
Comment Number: 9 Comment Originated: 11/02/2015
12/30/2015:
- Please review sizing spreadsheet, plans, and LID letter for consistency in the
depth being used in the rain garden.
- Please provide drain time compliance or show that the rain garden falls under
the smallest size able to be modeled by the compliance spreadsheet.
- Please provide additional detail on the proposed forebay. What is the cover?
Is it removable or how will it be accessed to be cleaned? Are there to be weep
holes or how will the volume drain after a rain event?
5
RESPONSE: Revised Grading Plan Sheets, LID Conformance Report and Drainage Memorandum to be
consistent with LID information. Added design depth to detail sheets.
Modified the Forebay detail to show a plate cover that can be removed for access and
maintenance. Added weep holes.
11/02/2015: For the rain garden, please provide:
- sizing calculations.
- easement for the basin area.
- verification that rain garden is in compliance with statewide drain time
requirements.
- media types and depths consistent with City Detail D-53. Biorention Sand
Media Specifications are available here
(http://www.fcgov.com/utilities/img/site_specific/uploads/Bioretention_Sand_Me
dia_Specs.pdf).
RESPONSE: Included Stormwater Detention and Infiltration Design Data Sheet for the rain garden as
Attachment F in the Drainage Memorandum to show compliance with State Drain Times.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 08/03/2015
12/29/2015: There are some minor corrections to be made. See redlines.
RESPONSE: Revised
10/22/2015: There are some minor corrections to be made. See redlines.
RESPONSE: Revised
08/03/2015: Please make changes to the Benchmark Statement as shown.
See redlines.
RESPONSE: Revised
Comment Number: 8 Comment Originated: 08/03/2015
12/29/2015: There are line over text issues. See redlines.
RESPONSE: Revised
10/22/2015: There are line over text issues. See redlines.
RESPONSE: Revised
08/03/2015: There are line over text issues. See redlines.
RESPONSE: Revised
Comment Number: 9 Comment Originated: 08/03/2015
12/29/2015: There is text that needs to be masked. Mask all text in hatched
6
areas. See redlines.
RESPONSE: Revised
10/22/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
RESPONSE: Revised
08/03/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
RESPONSE: Revised
Comment Number: 11 Comment Originated: 08/04/2015
12/29/2015: There are text over text issues. See redlines.
RESPONSE: Revised
10/27/2015: There are text over text issues. See redlines.
RESPONSE: Revised
08/04/2015: There are text over text issues. See redlines.
RESPONSE: Revised
Topic: Site Plan
Comment Number: 24 Comment Originated: 08/04/2015
12/29/2015: There are line over text issues. See redlines.
RESPONSE: Revised
10/22/2015: There are line over text issues. See redlines.
RESPONSE: Revised
08/04/2015: There are line over text issues. See redlines.
RESPONSE: Revised
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 12/29/2015
12/29/2015: The typical sections are 30 ft wide roadways with parking on both
sides which leaves limited drive aisle space. If upon construction and
occupancy function of the roadway becomes problematic with complaints,
parking may be restricted to only one side.
RESPONSE: Acknowledged
7
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
RESPONSE: Irrigation Plan to be submitted at time of permit
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 10/28/2015
12/29/2015: Please show in plan view how the bike parking, trash and recycling
receptacles will lay out in the garage. Add a note to the site plan saying
"trash/recycling containers will be enclosed in each individual garage"
RESPONSE: Note added