Loading...
HomeMy WebLinkAbout2133 TIMBERLINE RD., OFFICE & RESTAURANT - MAJOR AMENDMENT - MJA150009 - CORRESPONDENCE -Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview January 15, 2016 Keith Meyer 1315 OAKRIDGE DR SUITE 120 Fort Collins, CO 80525 RE: 2133 Timberline Rd.-Office and Restaurant, MJA150009, Round Number 1 Comment Summary: Department: Planning Services Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com Topic: Building Elevations 01/12/2016: The architectural character of the Timberline Center was established by approval of the final plan. (attached) Please conform with these guidelines. Comment Number: 1 Comment Originated: 01/12/2016 Topic: Landscape Plans 01/12/2016: Please provide dense landscaping along the east side of your parking lot to buffer the headlights from Timberline Road. Comment Number: 2 Comment Originated: 01/12/2016 01/12/2016: The landscape plan should be consistent with the Timberline Center which has tight clusters of Snow Crab Apple and Blue Spruce. The landscaping along the Timberline Road frontage needs to be much denser. Please see redlines. Comment Number: 3 Comment Originated: 01/12/2016 Topic: Site Plan 01/12/2016: The parking chart appears to be incorrect. According to my calculations, the total minimum requirement is 21 spaces and maximum is 46 spaces. Also, the square footage does not total the 8361 s.f. as noted. Comment Number: 1 Comment Originated: 01/12/2016 01/12/2016: The proposed Long-Term Parking Stalls are not appropriate for this entire development proposal, perhaps only for the Office portion. Sec. 5.1.2 - Long-term parking shall mean parking which has limited turnover during a normal working weekday. Long-term parking includes employee-type parking or residential-type parking. Comment Number: 2 Comment Originated: 01/12/2016 01/12/2016: How does this lot connect to the lot south? Comment Number: 3 Comment Originated: 01/12/2016 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or slorson@fcgov.com. Page 1 of 8 01/12/2016: The sidewalk connecting to the Timberline sidewalk should be 6 feet wide instead of the proposed 5 feet, per Section 3.2.2(C)(5)(a). Comment Number: 4 Comment Originated: 01/12/2016 Department: Engineering Development Review Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com Topic: General 01/12/2016: Change the legal description on the Utility Plan to "Timberline Center, Third Filing" as depicted on the replat. Comment Number: 1 Comment Originated: 01/12/2016 01/12/2016: Note #2 about the drainage & erosion control study was removed from Section D. Storm Drainage Notes on Sheet 2. Comment Number: 2 Comment Originated: 01/12/2016 01/12/2016: Please list all neighboring lots with the legal descriptions. Please see redlines. Comment Number: 3 Comment Originated: 01/12/2016 01/12/2016: Please show the Utility and Drainage Easement along Timberline Road. (Sheet 2) Comment Number: 4 Comment Originated: 01/12/2016 01/12/2016: The Existing Conditions Sheet (Sheet 3) doesn't show the existing blanket utility easement. The building envelope and blanket easement shows what is being proposed with the replat. Comment Number: 5 Comment Originated: 01/12/2016 01/12/2016: Will this development be removing & repairing the landscape islands on Lot 2, Timberline Center, Second Filing? An offsite easement will be required to perform the work. Comment Number: 6 Comment Originated: 01/12/2016 01/12/2016: Show sidewalk width on Timberline Road Comment Number: 7 Comment Originated: 01/12/2016 01/12/2016: Show and label all easements with labels. It is unclear where easement boundary is to the west. Comment Number: 8 Comment Originated: 01/12/2016 01/12/2016: The drainage memo indicates the parking to the north of the building will be pervious pavers. Please change the Utility Plans (and other plans) to indicate the pavers. Comment Number: 9 Comment Originated: 01/12/2016 01/12/2016: Will the drainage along the south of the building include sidewalk chases or will they be piped? Comment Number: 10 Comment Originated: 01/12/2016 01/12/2016: Please take a look at the Overall Grading Plan sheet (Sheet 8). It looks like there are a couple low spots that won't drain. Also, there are a couple spot elevations that do not match the elevations that were approved for Lot 2, Timberline Center, Second Filing. Comment Number: 11 Comment Originated: 01/12/2016 01/12/2016: The proposed bio-swale to the south of the property needs to be in a drainage easement. Currently it is within the building envelope. Please adjust the boundary and plat to reflect this change. Comment Number: 12 Comment Originated: 01/12/2016 Page 2 of 8 01/12/2016: Label all details on Sheet 12 as On-Site Only. Comment Number: 13 Comment Originated: 01/12/2016 01/12/2016: The slope and drainage easement at the southeast corner of the property is no longer needed. Please adjust the plat to show the removal of this easement. The blanket Utility, drainage, access & emergency access easement can remain. Comment Number: 14 Comment Originated: 01/12/2016 Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: Landscape Plans 01/11/2016: The landscape plans note that a more detailed planting plan and species list will be provided at the time of final plan. I will review the complete plant schedule once it has been submitted. Comment Number: 3 Comment Originated: 01/11/2016 Topic: Lighting Plan 01/11/2016: For the LED Area Luminaire fixture, please use the 3000K version instead of the 4000K version. Cooler color temperatures are harsher at night and cause more disruption to circadian rhythms for both humans and wildlife. Comment Number: 1 Comment Originated: 01/11/2016 01/11/2016: Are the proposed sconces full cutoff and down-directional? It's hard to tell from the spec sheet - please clarify. Comment Number: 2 Comment Originated: 01/11/2016 Department: Light And Power Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com Topic: General 01/13/2016: Primary power will be need to be fed from the three phase transformer located at Burger King. This transformer and the electrical lines must be in a utility easement. The location of this transformer needs to be determined to ensure that it is currently in a utility easement. If it is not an easement will need to be obtained. Comment Number: 1 Comment Originated: 01/13/2016 01/13/2016: Transformer and meter location needs to be coordinated with Light & Power and shown on the drawings. Transformer must have an 8 feet front and 3 feet side/rear clearance. It must also be situated 10 feet of a drive over surface. Comment Number: 2 Comment Originated: 01/13/2016 01/13/2016: A one-line diagram and Commercial Service form (C-1) must be provided to ensure proper transformer sizing. A link to a C-1 form is below. http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf Comment Number: 3 Comment Originated: 01/13/2016 01/13/2016: Please contact Todd Vedder with Light & Power Engineering Department if you have any questions at 970.224.6152. Please reference our Electric Construction, Policies Practices & Procedures to ensure requirements and policies are met. http://www.fcgov.com/utilities/business/builders-and-developers Comment Number: 4 Comment Originated: 01/13/2016 Page 3 of 8 01/13/2016: New development and system modification charges may apply. A link to our online electric fee estimator is below. http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-de velopment-fees/electric-development-fee-estimator?id=3 Comment Number: 5 Comment Originated: 01/13/2016 Comment Number: Comment Originated: 01/13/2016 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 01/05/2016: MARKING No Parking - Fire Lane signage is needed on the north side of the building. Please add a sign detail and signage locations to the plan. Code language provided below. > IFC503.3: Where required by the fire code official, approved signs or other approved notices that include the words NO PARKING - FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times ad be replaced or repaired when necessary to provide adequate visibility. Comment Number: 1 Comment Originated: 01/05/2016 01/05/2016: FDC Location of the FDC will be determined at time of building permit. Although typically located on the street side of the building, it would make more sense to place it on the west or north west corner. Code language provided below. > IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA standards. Fire department connections shall be located on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access. The location of the FDC shall be approved by the fire department. Comment Number: 2 Comment Originated: 01/05/2016 01/05/2016: KEY BOXES REQUIRED The location of the Knox Box will be determined at time of building permit. Code language provided below. > IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in an approved, exterior location (or locations) on every new or existing building equipped with a required fire sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet above finished floor and within 10 feet of the front door, or closest door to the fire alarm panel. Exception can be made by the PFA if it is more logical to have the box located somewhere else on the structure. Comment Number: 3 Comment Originated: 01/05/2016 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Page 4 of 8 12/28/2015: on the Erosion Control Plan (attached page 6 on the PDF). In looking at the plans, a few rock check dams in the concrete pan to the east of the project should be install as this is where the inlets from this construction site feed to and would be a good location to have protected and to clean out any material that inadvertently left the site. Comment Number: 1 Comment Originated: 12/28/2015 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General 01/12/2016: The LID techniques proposed to meet the City's LID requirement needs to be determined before a public hearing. The current site plan only supports porous pavement and other techniques would not coincide with the current site plan. A bio-retention facility could not be accommodated with the current site plan. Comment Number: 2 Comment Originated: 01/12/2016 01/12/2016: Porous asphalt is not an LID techniques that is supported by the City at this time. Porous pavers is the only approved technique supported by the City at this time. Comment Number: 3 Comment Originated: 01/12/2016 01/12/2016: More clarification is required for the layout of the sub-basins. Basins 1 and 2 do not match with the grading between these two basins. Comment Number: 4 Comment Originated: 01/12/2016 01/12/2016: Please clarify if any run-on area is being proposed onto the porous pavement. It is unclear if flows from additional pavement (including off-site) will be directed toward the pavers. Comment Number: 5 Comment Originated: 01/12/2016 01/12/2016: Please include the City's standard LID table to document if the site is meeting the LID requirement. Run-on area (maximum 3:1) onto the paver section can be included in the calculation. Comment Number: 6 Comment Originated: 01/12/2016 01/12/2016: The bio-swale at the southern edge of the site looks to be taking a large amount of flow. The swale needs to be sized to treat the area draining to it. these type of swales can not be counted as LID treatment unless they are sized appropriately. Comment Number: 7 Comment Originated: 01/12/2016 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations 01/07/2016: There are line over text issues. See redlines. Comment Number: 9 Comment Originated: 01/07/2016 01/07/2016: Please make sure the project name/title matches all other plans. Comment Number: 10 Comment Originated: 01/07/2016 Topic: Construction Drawings 01/07/2016: Please make sure the project name/title matches all other plans. Comment Number: 12 Comment Originated: 01/07/2016 Page 5 of 8 01/07/2016: The City has moved to the NAVD88 vertical datum, and as of January 1, 2015 all projects are required to be on NAVD88 datum. Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - X.XX¿. Comment Number: 13 Comment Originated: 01/07/2016 01/07/2016: All plan sheets must be 24"x36". Comment Number: 14 Comment Originated: 01/07/2016 01/07/2016: There are line over text issues. See redlines. Comment Number: 15 Comment Originated: 01/07/2016 01/07/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Comment Number: 16 Comment Originated: 01/07/2016 Topic: Landscape Plans 01/07/2016: Please make sure the project name/title matches all other plans. Comment Number: 8 Comment Originated: 01/07/2016 Topic: Lighting Plan 01/07/2016: Please make sure the project name/title matches all other plans. Comment Number: 11 Comment Originated: 01/07/2016 Topic: Plat 01/07/2016: Please add the space in the Statement Of Ownership And Subdivision as marked. See redlines. Comment Number: 1 Comment Originated: 01/07/2016 01/07/2016: Please make the major road names text larger in the vicinity map. See redlines. Comment Number: 2 Comment Originated: 01/07/2016 01/07/2016: Please show the right of way lines on the opposite side of all adjacent streets. See redlines. Comment Number: 3 Comment Originated: 01/07/2016 01/07/2016: Please label all surrounding properties with "Unplatted" or the subdivision name. This includes properties across right of ways. See redlines. Comment Number: 4 Comment Originated: 01/07/2016 Page 6 of 8 01/07/2016: Please correct the name in the titleblock. See redlines. Comment Number: 5 Comment Originated: 01/07/2016 Topic: Site Plan 01/07/2016: Please make sure the project name/title matches all other plans. Comment Number: 6 Comment Originated: 01/07/2016 01/07/2016: Please make changes to the legal description as shown. See redlines. Comment Number: 7 Comment Originated: 01/07/2016 Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: General 01/12/2016: Is the head in parking going to occur directly off the main north/south drive aisle? As other lots have come in, there hasn't been parking directly on this aisle (i.e. burger king and proposed coffee shop). (Since this is private, we don't have jurisdiction to require a change), but something to think about. Comment Number: 1 Comment Originated: 01/12/2016 Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General 01/12/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Comment Number: 1 Comment Originated: 01/12/2016 Department: Water-Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General 01/12/2016: Pleae document what is existing and proposed on the plans regarding the water service and fire service. Comment Number: 1 Comment Originated: 01/12/2016 01/12/2016: Note B on the Utility plans needs further clarification. Comment Number: 2 Comment Originated: 01/12/2016 Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General 01/13/2016: Please change the Planning Signature Block to Director of Community Development and Neighborhood Services. There needs to be a sheet index for the Planning set on the sheet that includes the signature blocks. Comment Number: 1 Comment Originated: 01/13/2016 Page 7 of 8 01/13/2016: This will need a Minor Amendment to the property to the west. Comment Number: 2 Comment Originated: 01/13/2016 01/13/2016: Need additional trees along the south property line. Comment Number: 3 Comment Originated: 01/13/2016 01/13/2016: The landscape plan needs to fill in the blanks left in the table. Comment Number: 4 Comment Originated: 01/13/2016 Page 8 of 8