RE: Fire Flow Analysis Revised
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, 5, and 6 of Foothills Mall Redevelopment
Dear Mr. Mogen
Since two areas within the development will have dead-end mainlines, fire flow analysis was
completed to determine residual pressure at each dead end during the fire flow. The
calculations are based on a fire flow test conducted on July 10, 2015. Please note the results
were provided to Olsson. I did not observe the fire flow test. See Exhibit B Fire Flow Test
Results. Based on the results an initial static pressure of 76 pounds per square inch was
measured at a fire hydrant as shown on page 3 of Exhibit B. The elevation at the location of the
fire hydrant was assumed to be 5016 feet. The 2012 International Fire Code was referenced to
determine the fire flow requirements for the buildings served by the dead end water lines. From
those requirements hydraulic calculations were completed to determine the residual pressure at
the dead end. The following tables summarize the requirements and calculations.
Table 1: Fire Flow Requirements
Description
Building
Served
Building
Type
Sprinkler
System
Gross
Area
(sq-ft)
Fire Flow
(gpm)
Allowed
Reduction
Required
Fire Flow
(gpm)
Dead End 1 Building 1 VB NFPA 13 20,199 3,750 75% 1,500
Dead End 2
Building
19
VA NFPA 13 91,907 5,500 75% 1,500
Table 2: Hydraulic Calculations
Description Size
Pipe
Type
Pressure at Mainline
Loop Connection
(Pressure 1, psi)
Flow
(gpm)
Resulting Residual
Pressure
(Pressure 2, psi)
Dead End 1 8-inch PVC 81 1,500 74
Dead End 2 8-inch PVC 77 1,500 74
Fire Flow Analysis
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, 5, and 6 of Foothills Mall Redevelopment
Page 2
In conclusion, the calculations indicate the residual pressures will be far above the
recommended residual fire flow pressure of 20 pounds per square inch. The following
supporting materials are attached for reference:
• Exhibit A – Vicinity Map
• Exhibit B – Fire Flow Test Results
• Exhibit C – Dead End 1 Details
• Exhibit D – Dead End 2 Details
• Exhibit E – Dead End 1 Hydraulic Calculations
• Exhibit F – Dead End 2 Hydraulic Calculations
• 2012 International Fire Code - Appendix B - Fire-Flow Requirements for Buildings
If you have any questions or need additional information, please contact me.
Sincerely,
Olsson Associates
Daniel Hull, PE
Senior Project Engineer
Enclosures
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
Foothills Mall Multi-Family
Lot 3
Lot 4
Lot 5
Lot 6
12/12/2015
Exhibit A
Vicinity Map
Dead End 2
Dead End 1
Location of Fire
Hydrant
Static Pressure
Exhibit B
Fire Flow Test Results
(Page 1 of 4)
Exhibit B
Fire Flow Test Results
(Page 2 of 4)
Exhibit B
Fire Flow Test Results
(Page 3 of 4)
Exhibit B
Fire Flow Test Results
(Page 4 of 4)
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
R
T T
AREA INLET TYP.
SANITARY MANHOLE
SANITARY MANHOLE
STORM MANHOLE
STORM MANHOLE
PROPOSED FIRE HYDRANT
AREA INLET TYP.
39.1 L.F.
OF 12" STORM
36.7 L.F.
OF 12" STORM
STORM MANHOLE
EXISITING 8"
WATER MAIN
EXISTING 10" WATERLINE
1.5" SERVICE
METER PIT
1.5" SERVICE
METER PIT
1.5" SERVICE
METER PIT
1.5" SERVICE
METER PIT
110.0 L.F.
OF 18" STORM
106.1 L.F.
OF 18" STORM
111.9 L.F.
OF 18" STORM 110.1 L.F.
OF 24" STORM
382.5 L.F.
OF 6" SANITARY
SEWER MAIN
121.0 L.F. 4"
FIRE SERVICE
110.3 L.F. 4"
FIRE SERVICE
115.3 L.F. 1.5"
WATER SERVICE
36.3 L.F. 1.5"
WATER SERVICE
36.3 L.F. 4"
FIRE SERVICE 121.0 L.F. 1.5"
WATER SERVICE
335.0 L.F. 8"
WATER MAIN
15.0 L.F.
OF 6" SANITARY
SEWER SERVICE
16.0 L.F.
OF 6" SANITARY
SEWER SERVICE
15.9 L.F.
OF 6" SANITARY
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
R
Exhibit D
Dead End 2 Details
Pressure 1:
Elevation 5014'
Static Pressure 77 psi
Pressure 2:
Elevation 5015'
Dead End 2:
Length 163'
Size 8-inch
Type = PVC
Foothills Mall Multi-Family
135 ft
28 ft
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
Exhibit E Dead End 1 5285 McWhinney Boulevard
Hydraulic Calculations
Project Description
Friction Method Hazen-Williams Formula
Solve For Pressure at 2
Input Data
Pressure 1 81 psi
Elevation 1 5005 ft
Elevation 2 5009 ft
Length 348 ft
Roughness Coefficient 130
Diameter 8 in
Discharge 1500 gal/min
Results
Pressure 2 74 psi
Headloss 13.47 ft
Energy Grade 1 5193.52 ft
Energy Grade 2 5180.04 ft
Hydraulic Grade 1 5192.09 ft
Hydraulic Grade 2 5178.62 ft
Flow Area 0.35 ft²
Wetted Perimeter 2.09 ft
Velocity 9.57 ft/s
Velocity Head 1.42 ft
Friction Slope 0.03872 ft/ft
Dead End 1 Hydraulic Calculations
Foothills Mall Multi-Family
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
Exhibit F Dead End 2 5285 McWhinney Boulevard
Hydraulic Calculations
Foothills Mall Multi-Family
Project Description
Friction Method Hazen-Williams Formula
Solve For Pressure at 2
Input Data
Pressure 1 77 psi
Elevation 1 5014 ft
Elevation 2 5015 ft
Length 163 ft
Roughness Coefficient 130
Diameter 8 in
Discharge 1500 gal/min
Results
Pressure 2 74 psi
Headloss 6.31 ft
Energy Grade 1 5193.03 ft
Energy Grade 2 5186.72 ft
Hydraulic Grade 1 5191.61 ft
Hydraulic Grade 2 5185.30 ft
Flow Area 0.35 ft²
Wetted Perimeter 2.09 ft
Velocity 9.57 ft/s
Velocity Head 1.42 ft
Friction Slope 0.03872 ft/ft
Worksheet for Dead End 2
SEWER SERVICE
15.6 L.F.
OF 6" SANITARY
SEWER SERVICE
TRANSFORMER
TRANSFORMER
TRANSFORMER
TRANSFORMER
BUILDING 1
TYPE D3
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
INSTALL 4" TAP
W/ VALVE AND
THRUST BLOCK
INSTALL 4" TAP
W/ VALVE AND
THRUST BLOCK
INSTALL 4" TAP
W/ VALVE AND
THRUST BLOCK
INSTALL 4" TAP
W/ VALVE AND
THRUST BLOCK
INSTALL 1.5" TAP INSTALL 1.5" TAP
INSTALL 1.5" TAP
INSTALL 1.5" TAP
18.0 L.F. 1.5"
WATER SERVICE
18.0 L.F. 4"
FIRE SERVICE
116.6 L.F. 8"
WATER MAIN
7.6 L.F. 8"
WATER MAIN
SANITARY MANHOLE
PROPOSED FIRE HYDRANT
Exhibit C
Dead End 1 Details
348 ft
Pressure 1:
Elevation 5005
Static Pressure 81 psi
Pressure 2:
Elevation 5009
Dead End 1:
Length 348'
Size 8-inch
Type = PVC