Loading...
HomeMy WebLinkAboutTHE GREEN SOLUTION - PDP/FDP - FDP150045 - SUBMITTAL DOCUMENTS - ROUND 2 - STORMWATER-RELATED DOCUMENTSPROPERTY LOCATION BFE AT UPSTREAM EDGE OF BUILDING = 4967.77* FLOOR AREA DATA BFE AT UPSTREAM EDGE OF BUILDING = 4967.77* PROPOSED BUILDING FOOTPRINT EXISTING NEIGHBORING BUILDING EXISTING NEIGHBORING BUILDING PROPERTY BOUNDARY PROPERTY BOUNDARY EXISTING BUILDING FOOTPRINT EXISTING 100-YR FLOODPLAIN LIMITS SUPER-IMPOSED FROM THE FIRM FLOODPLAIN CROSS SECTIONS P.O. BOX 150894 Ŷ Lakewood, Colorado 80215 Ŷ ph: (720) 837-0648 Ŷ www.FloodplainSpecialists.com SITE DEVELOPMENT 1 OF 2 FLOODPLAIN SITE PLAN FOR THE GREEN SOLUTION AT 810 NORTH COLLEGE AVENUE FT. COLLINS, CO LARIMER COUNTY FLOODPLAIN SITE PLAN ORIGIN. SHEET DESCRIPTION DATE 12-09-15 C5.0 FLOODPLAIN SITE PLAN 12-09-15 C5.1 FLOODPLAIN CROSS SECTION AND FLOODPROOFING NOTES LEGEND * VERTICAL DATUM = NAVD88 OVERALL FLOODPLAIN MAP (NTS) NAVD88 = NGVD29 + 3.17' PROPOSED NORTH ELEVATION BFE AT UPSTREAM EDGE OF BUILDING = 4967.6 BFE AT UPSTREAM EDGE OF BUILDING = 4967.77* REGULATORY FLOOD PROTECTION ELEV. = 4969.77 2.0' FREEBOARD ZONE FREEBOARD ELEV. = 4969.77 FREEBOARD ELEV. = 4969.77 WATER RESISTANT MATERIALS REQUIRED WITHIN FREEBOARD ZONE, SEE NOTES THIS SHEET FOR ADDITIONAL INFOMRATION (NTS) ALL DUCT WORK, HEATING, VENTILATION, ELECTRICAL SYSTEMS, ETC. TO BE ELEVATED TO THE REGULATORY FLOOD PROTECTION ELEVATION (RFPE) P.O. BOX 150894 Ŷ Lakewood, Colorado 80215 Ŷ ph: (720) 837-0648 Ŷ www.FloodplainSpecialists.com SITE DEVELOPMENT 2 OF 2 FLOODPLAIN SITE PLAN FOR THE GREEN SOLUTION AT 810 NORTH COLLEGE AVENUE FT. COLLINS, CO LARIMER COUNTY FLOODPLAIN CROSS SECTION AND FLOODPROOFING NOTES ORIGIN. SHEET DESCRIPTION DATE 12-09-15 C5.0 FLOODPLAIN SITE PLAN 12-09-15 C5.1 FLOODPLAIN CROSS SECTION AND FLOODPROOFING NOTES TABLE 2, SUGGESTED MATERIALS BELOW BFE (AND WITHIN THE FREEBOARD ZONE.) SEE FEMA TECHNICAL BULLETIN #2 FOR MORE INFORMATION SUBSTANTIAL AND REDEVELOPMENT IMPROVEMENTS FOR NON-RESIDENTIAL STRUCTURES: (THE PROPOSED NON-RESIDENTIAL ADDITION IS A SUBSTANTIAL IMPROVEMENT.) A. A SUBSTANTIAL IMPROVEMENT OCCURS WHEN ALL OF THE CONDITIONS ARE MET: a. A BUILDING PERMIT IS REQUIRED. b. THE COST OF THE IMPROVEMENT, OR THE AMOUNT OF THE DAMAGE, EQUALS OR EXCEEDS 50 PERCENT OF THE MARKET VALUE OF THE STRUCTURE EITHER BEFORE THE IMPROVEMENT OR REPAIRS IS STARTED OR BEFORE THE BUILDING WAS DAMAGED. c. THE COST IS CALCULATED CUMULATIVELY OVER THE LIFE OF THE STRUCTURE DURING THE TIME THE STRUCTURE HAS BEEN LOCATED IN A DESIGNATED FLOODPLAIN. B. IF A SUBSTANTIAL IMPROVEMENT OCCURS, THE LOWEST FLOOR OF A NON-CONFORMING STRUCTURE, INCLUDING THE BASEMENT AND ALL HVAC AND ELECTRICAL, MUST BE ELEVATED OR FLOODPROOFED 24-INCHES ABOVE THE FLOOD ELEVATION. C. A REDEVELOPMENT OCCURS WHEN THERE IS A SUBSTANTIAL IMPROVEMENT AND MORE THAN 50 PERCENT OF THE WALL PERIMETER IS REMOVED BUT THE BUILDING FOOTPRINT IS NOT INCREASED. FREEBOARD FOR NON-RESIDENTIAL STRUCTURES: A. FREEBOARD IS 24-INCHES. B. ALLOWED TO ELEVATE OR FLOODPROOF THE STRUCTURE. C. IF ELEVATING, THE LOWEST FLOOR OF THE STRUCTURE INCLUDING THE BASEMENT, ALL HVAC AND ELECTRICAL EQUIPMENT MUST BE ELEVATED ABOVE THE FREEBOARD HEIGHT. D. IF FLOODPROOFING, THE STRUCTURE AS WELL AS ALL HVAC AND ELECTRICAL, MUST BE FLOODPROOFED TO THE FREEBOARD HEIGHT. FLOODPROOFING REQUIREMENTS: (THE NON-RESIDENTIAL STRUCTURES ARE PROPOSED TO BE DRY-FLOODPROOFED.) A. MATERIALS BELOW THE FREEBOARD ELEVATION MUST BE CONSTRUCTED WITH MATERIALS AND UTILITY EQUIPMENT RESISTANT TO FLOOD DAMAGE (SEE TABLE 2 OF FEMA TECHNICAL BULLETIN 3, "NON-RESIDENTIAL FLOODPROOFING - REQUIREMENTS AND CERTIFICATION." B. CONSTRUCTION OF A NONRESIDENTIAL ADDITION IS ALLOWED IN A FEMA 100-YEAR FLOOD FRINGE, AS LONG AS ALL DUCT WORK, HEATING, VENTILATION, ELECTRICAL SYSTEMS, ETC. ARE ELEVATED 24-INCHES ABOVE THE BASE FLOOD ELEVATION (BFE). THIS ELEVATION IS KNOWN AS THE REGULATORY FLOOD PROTECTION ELEVATION (RFPE). FLOATABLE MATERIALS: (NO FLOATABLE MATERIALS ARE PROPOSED WITHIN THE FLOODWAY OR WITHIN THE FLOOD FRING; BIKERACK AND COMPACTOR TO BE BOLTED THROUGH PERMANENT PAVEMENT- CONCRETE OR ASPHALT.) A. "FLOATABLE MATERIAL" IS DEFINED AS MATERIAL THAT IS NOT SECURED IN PLACE OR COMPLETELY ENCLOSED IN A STRUCTURE SO THAT IT COULD FLOAT OFF-SITE DURING A FLOOD AND POTENTIALLY CAUSE HARM TO DOWNSTREAM PROPERTY OWNERS OR THAT COULD CAUSE BLOCKAGE OF A CULVERT, BRIDGE, OR OTHER DRAINAGE FACILITY. B. IN THE FLOOD FRINGE, FLOATABLE MATERIALS ASSOCIATED WITH ANY NON-RESIDENTIAL USE IS NOT ALLOWED. C. IN THE FLOOD FRINGE, OUTSIDE STORAGE OF MATERIAL OR EQUIPMENT THAT IS CONSIDERED "FLOATABLE MATERIAL" IS ALLOWED. REGARDING THE CITY OF FORT COLLINS FLOODPLAIN REGULATIONS FOR THE POUDRE RIVER * VERTICAL DATUM = NAVD88 NAVD88 = NGVD29 + 3.17' BEFORE A FLOODPROOFED BUILDING IS DESIGNED, NUMEROUS PLANNING CONSIDERATIONS, INCLUDING FLOOD WARNING TIME, USES OF THE BUILDING, MODE OF ENTRY TO AND EXIT FROM THE BUILDING AND THE SITE IN GENERAL, FLOODWATER VELOCITIES, FLOOD DEPTHS, DEBRIS IMPACT POTENTIAL, AND FLOOD FREQUENCY, MUST BE ADDRESSED TO ENSURE THAT DRY FLOODPROOFING WILL BE A VIABLE FLOODPLAIN MANAGEMENT TOOL. CONSIDERATIONS INCLUDE: A. WARNING TIME B. SAFETY AND ACCESS C. EMERGENCY RESPONSE AND PREPAREDNESS PLAN (ERPP) x AN ERPP HAS BEEN PREPARED, AND HAS BEEN PROVIDED TO THE CITY OF FORT COLLINS. A COPY OF THE ERPP IS TO BE POSTED IN THE STRUCTURE, REVIEWED, UNDERSTOOD, AND FOLLOWED BY THE OCCUPANTS AT ALL TIMES. D. ENGINEERING CONSIDERATIONS: x $//2)7+(%8,/',1*¶66758&785$/&20321(1760867%(&$3$%/(2)5(6,67,1*7+( HYDRO-DYNAMIC AND HYDRO-STATICE FLOOD-RELATED FORCES. REFER TO FEMA TECHNICAL BULLETIN 3-93 FOR MORE INFORMATION. x TO ACCOMPLISH A POST-PROJECT FLOOD CERTIFICATION, A STRUCTURAL ENGINEER WILL NEED TO VERIFY THAT THE BUILDING CAN WITHSTAND THESE LOADS. IT IS SUGGESTED THAT THESE CALCULATIONS OR CONCLUSIONS BE STATED ON THE STRUCTURAL PLANS PRIOR TO PLAN APPROVAL. E. FLOOD PROOF DOORWAYS: x REFER TO THE ARCHITECTURAL PLANS FOR ALL FLOOD PROOF DOORWAY DETAILS. x DOORS #101, 102A, 107A & 111 ARE TO BE FLOOD PROOF PER ARCHITECTURAL PLANS. x ALL EXTERIOR OPENINGS ARE TO BE FLOODPROOFED; THE FRONT TWO (CUSTOMER ENTRY ALONG THE WESTERN SIDE) ARE TO BE GLAZED ALUMINUM; THE OTHERS (NORTHERN AND EASTERN) DOORS TO BE FLUSH HOLLOW METAL, SUCH AS HTTP://WWW.FLOODDOOR.COM/INDEX.HTML, OR EQUIVALENT. F. BUILDING MATERIALS: x REFER TO THE ARCHITECTURAL PLANS FOR ALL BUILDING MATERIAL DETAILS. x THE ENTIRE BUILDING HAS A BRICK WAINSCOT PER ARCHITECTURAL PLANS. x ALL MATERIAL BELOW THE RFPE ARE TO BE FLOOD RESISTANT; SEE TABLE-2, FEMA TECHNICAL BULLETIN #2 FOR MORE INFORMATION; REFER TO EXCERPTS INCLUDED ON THIS SHEET. x TO ACCOMPLISH A POST-PROJECT FLOOD CERTIFICATION, AN ARCHITECT WILL NEED TO VERIFY THAT THE MATERIALS OF THE BUILDING MEET THESE REQUIREMENTS. DRY FLOODPROOFING CONSIDERATIONS