Loading...
HomeMy WebLinkAboutCAPSTONE COTTAGES - FDP - FDP150046 - PLANS - EROSION CONTROL LETTER/REPORT (4)Project Number: 939-001 Location: Fort Collins, CO Date: February 15, 2016 Total Acres: 28.62 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price L.F. 3849 $1.50 $5,773.50 Construction Fence w/Rock Sock L.F. 0 $4.50 $0.00 each 21 $75.00 $1,575.00 Wattle Dike Inlet Protection L.F. 9068 $1.75 $15,869.00 each 0 $75.00 $0.00 Wattle Dike Swale Protection each 0 $100.00 $0.00 each 3 $300.00 $900.00 each 1 $150.00 $150.00 each 1 $200.00 $200.00 each 0 $75.00 $0.00 L.F. 1000 $1.00 $1,000.00 per hour 25 $60.00 $1,500.00 Sub-Total: $26,967.50 1.5 x Sub-Total: $40,451.25 Amount of security: $40,451.25 Total Acres x $1325/acre: $37,921.50 Sub-Total: $37,921.50 1.5 x Sub-Total: $56,882.25 Cost to Re-seed: $56,882.25 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $56,882.25 NOTE: 'Total Acres' represents total disturbed area. Capstone Cottages Erosion Control Cost Estimate Silt Fencing Inlet Protection Wattle Dike Curb Side Check Dam Vehicle Tracking Control Pads Option 2 | Cost to Re-seed Disturbed acreage Option 3 | Miniumum Escrow Amount Final Escrow Amount Sediment Trap Concrete Washout Area Rock Sock Sawcutting Pollution Prevention Street Sweeping and Cleaning Option 1 | BMP Costs