Loading...
HomeMy WebLinkAboutLEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY - FDP - FDP160005 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT FOR LEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY Prepared For: FORT COLLINS SELF-STORAGE, LLC 5013 Bluestem Court Fort Collins, CO 80525 December 22, 2015 Project No. 39708.02 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................................... i Vicinity Map ......................................................................................................................................................... 1 General Description and Location .................................................................................................................. 2 Location And Existing Site Characteristics ................................................................................................. 2 Site Soils ........................................................................................................................................................... 2 Floodplain ........................................................................................................................................................ 2 Drainage Basins and Sub-Basins ....................................................................................................................... 3 Major Basin ...................................................................................................................................................... 3 Historic Sub-Basins ........................................................................................................................................ 3 Developed Sub-Basins.................................................................................................................................... 4 Drainage Design Criteria .................................................................................................................................. 6 Regulations ...................................................................................................................................................... 6 Low-Impact Development ............................................................................................................................ 6 Development Criteria Reference and Constraints ................................................................................... 7 Hydrologic Criteria ........................................................................................................................................ 7 Hydraulic Criteria........................................................................................................................................... 7 Floodplain Regulation Compliance .............................................................................................................. 8 Modifications of Criteria ............................................................................................................................... 8 Drainage Facility Design .................................................................................................................................... 9 General Concept ............................................................................................................................................ 9 Water Quality/ Detention Facilities ............................................................................................................ 9 Stormwater Pollution Prevention ..................................................................................................................11 Temporary Erosion Control ......................................................................................................................11 Permanent Erosion Control .......................................................................................................................11 Summary & Conclusions .................................................................................................................................12 References .........................................................................................................................................................13 Page ii APPENDIX Appendix A – Site & Soil Descriptions and Characteristics Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Existing & Proposed Drainage Plans Appendix E – LID Exhibit Page iii Engineer’s Certification Block I hereby certify that this Final Drainage Report for Lemay Avenue Craft Brewery & Self-Storage Facility was prepared by me (or under my direct supervision) for JR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Timothy J. Halopoff, PE Registered Professional Engineer State of Colorado No. 37953 Page 1 VICINITY MAP Page 2 GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS Lemay Avenue Craft Brewery & Self- Storage is located in the northeast quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian in the City of Fort Collins, Larimer County, Colorado. More specifically, the Lemay Avenue Craft Brewery & Self- Storage site is a 6.35 acre property that is currently undeveloped. The site is zoned I (Industrial) and will support the proposed craft brewery and self-storage facilities. The site is surrounded by Buckingham Street to the north, Lemay Avenue to the east, and developed land to the south and west. The proposed use of the site is split into three lots. The first lot contains the craft brewery building with 7,912 total square feet. The second lot contains the self-storage facilities with 8 buildings totaling 104,000 square feet. The third lot is for a future development and will be a lawn area until the lot is developed. The proposed detention pond was designed for the future development of lot 3 at 60% impervious. The existing site generally slopes from the north to south with slopes ranging between 0.60% and 2.5%. The property is generally covered with sparse native grasses. The site currently drains to the southeast corner of the site where runoff is collected in an existing 30” CMP culvert and piped south in the City’s Lemay Avenue Right-Of-Way. SITE SOILS The Lemay Avenue Craft Brewery & Self- Storage site soils consist of loamy soil, predominately Nunn clay loam. Nunn clay loam belongs to hydrologic soils Group C. Group C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Nunn clay loam with 0-3 percent slopes generally has a combined surface layer thickness of approx. 30 inches. Runoff is moderately high, and the hazards of wind erosion are moderately low. Supporting figures can be found in the Appendix, page A-1. FLOODPLAIN The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. The “City of Fort Collins Floodplain Review Checklist for 50% Submittals” checklist is not applicable for this Drainage Report. Page 3 DRAINAGE BASINS AND SUB-BASINS MAJOR BASIN The proposed Lemay Avenue Craft Brewery & Self-Storage site is located in the Dry Creek major basin. The Dry Creek drainage basin is tributary to the Cache la Poudre River and extends from the Wyoming border to where it joins the river near Mulberry and Timberline. The Dry Creek basin is approximately 23 miles long and six miles wide and encompasses approximately 62 square miles. The land used in the upper and middle portion of the basin is primarily rangeland and irrigated hay meadows and pastures. The majority of the lower portion of the basin is developed and includes commercial, industrial and residential uses. The project site is a part of the lower Dry Creek basin. There are no major drainageways located within or immediately adjacent to the site. The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. An annotated FIRM exhibit is included in Appendix A. HISTORIC SUB-BASINS Lemay Avenue Craft Brewery & Self-Storage is an infill development piece of property. It is governed by the City’s Reasonable Use policy, in which the proposed drainage basins will need to follow the generally accepted principle of releasing the 100-year developed condition flow rate at the same location and at a magnitude of 0.2cfs/acre as the pre-development condition. There are no offsite areas that flow across the proposed development site. Referring to the “Existing Drainage Plan”, included in the Appendix, the following describes the existing condition drainage basins. Existing Onsite Sub-Basins: The site has two existing onsite drainage basins. Sub-basin EX1 consists of a 6.20 acre area of undeveloped open space with native grasses and weeds covering the majority of the ground and is assumed to be 2% impervious. Runoff generally flows to the southeast across basin EX-1, at slopes ranging from 0.50% to 2.0%, generally leaving the site at the southeast corner, where it is piped south off-site through an existing 30” CMP culvert. Sub-basin EX2 consists of a 1.51 acre area of undeveloped open space with the same ground cover and percentage imperviousness as sub-basin EX-1. Runoff in sub-basin EX-1 collects in a roadside swale and flows south to the southeast corner, of the site where it is piped south, off-site through an existing 30” CMP culvert. Page 4 DEVELOPED SUB-BASINS The proposed developed condition sub-basins have been designed to mimic the historic basins’ runoff patterns. The following describes the proposed conditions on-site drainage basins. Refer to the “Proposed Drainage Plan” in the appendix for review. Proposed Onsite Sub-Basins: Sub-basin A consists of 0.98 acres on the northern portion of the subject property. Runoff from the proposed building and parking lot travels west to an LID basin in the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin B consists of 0.85 acres on the northwest corner of the subject property. Runoff from sub-basin b is collected in an LID basin on the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin C consists of 0.41 acres near the northwest corner of the subject property. Runoff from the proposed building and driveways travels west to an LID basin on the western edge of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin D consists of 0.16 acres on the western edge of the subject property. Runoff is captured in a proposed soft swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin E consists of 0.39 acres in the western portion of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southwest corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub-basin F consists of 0.16 acres on the east side of the subject on the western edge of the subject property. Runoff is captured in a proposed soft swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin G consists of 0.77 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin and then flows south into the proposed detention pond on the southern edge of the property. Page 5 Sub-basin H consists of 0.68 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin I is comprised of 0.82 acres in the center of the subject property. Runoff from the proposed lawn area is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin J is comprised of 0.19 acres at the eastern edge of the subject property. Runoff from this basin is captured in a swale and flows south through an LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin K is comprised of 0.32 acres near the southeast corner of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southeast corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub-basin L is comprised of 0.76 acres and contains the proposed detention pond area. Runoff from this basin is collected in the proposed detention pond on the southern edge of the property. Sub-basin M is comprised of 0.53 acres on the northern edge of the subject property. Runoff from this basin is collected in a proposed sump inlet along Buckingham Street. Captured flows are piped east to the corner of Buckingham Street and Lemay Avenue where they are release into a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off-site through and existing 30” CMP culvert. Sub-basin N is comprised of 1.48 acres on the eastern edge of the subject property. Runoff from this basin is collected in a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off-site through and existing 30” CMP culvert. Sub-basin O is comprised of 0.10 acres on the southern edge of the subject property. Runoff from this basin sheet flow south off-site. Page 6 DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Storm Drainage Design Criteria and Construction Manual (with all current 2011 Revisions)(FCSDDCCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. LOW-IMPACT DEVELOPMENT Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management. Per City criteria, a minimum of 50 percent of new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP) ) as well as 25% of the new drive area must be treated by porous pavement. The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. The proposed site uses porous pavers, bio- swales and LID basins for the LID/BMP design elements. In total 100% of the new impervious area is treated by an LID and 25.1% of the new pavement area is porous pavement, see the tables below for more details on each. Since 100% of the new impervious area is being treated by an LID, water quality is not needed in the detention pond. An illustrative LID/Surface Maps as well as sizing of the LID/BMPs is provided in Appendix E. Table1: LID Requirements 50% On-Site Treatment by LID Requirement New Impervious Area 155,637 sq. ft. Required Minimum Impervious Area to be Treated 77,819 sq. ft. (=50% of new impervious area) Area of Paver Section #1 16,748 sq. ft. Impervious Run-on area for Paver Section #1 (1.5:1) 25,090 sq. ft. Impervious Area Directly Treated by LID Treatment Method #2 - LID Basin #2 17,770 sq. ft. Impervious Area Directly Treated by LID Treatment Method #3 - LID Swale #1 7,377 sq. ft. Impervious Area Directly Treated by LID Treatment Method #4 - LID Basin #3 64,572 sq. ft. Impervious Area Directly Treated by LID Treatment Method #5 - LID Basin #4 29,713 sq. ft. Impervious Area Directly Treated by LID Treatment Method #6 - LID Basin & Swale #5 11,115 sq. ft. Total Impervious Area Treated 155,637 sq. ft. Actual % of Impervious Area Treated 100.0 % Page 7 Table2: Porous Pavement Requirement 25% Porous Pavement Requirement New Driveable Area 68,778 sq. ft. Required Minimum Area of Porous Pavement (=25% of new pavement area) 17,195 sq. ft. Area of Paver Section #1 17,280 sq. ft. Total Porous Pavement Area 17,280 sq. ft. Actual % of Porous Pavement Provided 25.1 % DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS There were no previous drainage reports or master plan used in the development of this final drainage report. The developed site runoff is constrained to release 0.2 cfs per acre from the proposed detention pond. There are 6.49 acres contributing to the pond and therefore the maximum pond release is set to 1.3 cfs. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent imperviousness and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type C hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO-3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To more closely match the City of Fort Collins IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-year, 1-hour rainfall depth of 0.82 inches and a 100-year, 1- hour rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. The 2- hour 100-year rainfall total is 3.67 inches, based on the rainfall frequencies adopted by the City of Fort Collins. HYDRAULIC CRITERIA This report demonstrates that the proposed stormwater detention concept is able to reduce the 100-year developed condition flows to a flow rate of 0.2 cfs/ acre; thereby satisfying the City’s Reasonable Use requirements. The Rational Formula-based Federal Aviation Administration (FAA) method is used to preliminarily size the detention pond in accordance with City criteria, as the tributary area is less than 20 acres in size. The ultimate Lemay Avenue Craft Brewery & Self-Storage storm drainage system will be designed to convey the minor and major storm events through the property with the proposed inlets, storm sewer pipes, soft swales, and LID measures for the flows being calculated by this report. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm flows. During the major developed condition 100-year storm, the accumulated water depth in the Page 8 ponds will be held to a maximum level of one-foot below all building finished floor elevations. Additionally, this report summarizes if any, the expected changes to offsite conditions or flows. This project will eventually show that the flow rate released downstream is less than would historically be experienced, and that the sedimentation is lessened through increase infiltration. All swale and pipe outlets will be protected with turf mat or riprap; whichever is most appropriate. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection of downstream conveyance channels and culverts. Lid measures have been integrated into this design on higher levels than most City of Fort Collin’s projects to date. In all, 85% of this project’s impervious areas pass through and are treated in LID’s prior to reaching the detention pond. FLOODPLAIN REGULATION COMPLIANCE The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. The “City of Fort Collins Floodplain Review Checklist for 50% Submittals” checklist is not applicable for this Drainage Report. MODIFICATIONS OF CRITERIA There are no modifications to the Storm Drainage Criteria Manual and Construction Standards being requested. Page 9 DRAINAGE FACILITY DESIGN GENERAL CONCEPT The proposed improvements to the Lemay Avenue Craft Brewery & Self-Storage site will result in developed condition runoff being conveyed around the proposed buildings and to the south via concrete pans and swales. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, permeable pavement systems are proposed for portions of the parking lot, Lid infiltration forebay basins to treat roof and driveway drainage, and grass lined bio-swales (soft-swales) are proposed on the west and east sides of the site to improve water quality. Runoff from the site is captured in LID basins and swales located around the self-storage site and in open areas adjacent to the building. Runoff is conveyed via sheet flow, concrete pans and bio- swales in a southerly direction to the proposed detention pond at the southern end of the site. The existing drainage outfall from the site is in the southeast corner of the property. The proposed detention pond is sized to detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. Runoff collected from Buckingham Street and Lemay Avenue will combine with flows released from the proposed detention pond and will continue to flow south off-site through an existing 30” CMP culvert, similar to historic conditions. WATER QUALITY/ DETENTION FACILITIES Water quality will be provided for the site through the use of LID basins and swales. Detention will be provided for the site through the proposed detention pond on the southern edge of the site. Within the detention pond is located an underground gravel storm water infiltration basin for LID measures, which will also provide detention volume. The voids provided by the poorly graded gravel in the depression increases infiltration with the supportive soils. The proposed detention pond will detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. The 100 yr water surface elevation and the overflow weir elevation for the pond is at 4944.90. The proposed pond also has 1 foot of freeboard above this elevation. The most recent version of the UD-Detention software (Version 2.35, January 2015) was used to determine the ultimate detention volume requirements. Per City of Fort Collins requirements, one- foot of freeboard is provided in this detention configuration. See Table 1, below, for detention pond sizing and release rates. Page 10 Table3: Detention Pond Values Storage Volume Required (acre-ft) WQCV Volume Required (acre-ft) (provided in LID basins and swales) Storage Volume Provided Including volume provided by void space in Gravel Infiltration Basin (acre-ft) 100-yr Max Inflow Rate (cfs) 100-yr Max Release Rate (cfs) 1.31 0.16 1.31 28.9 1.3 Page 11 STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, and others. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed detention/water quality ponds, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. JR will provide a detailed Storm Water Management and Erosion Control Plan at the time of the FDP submittal that will meet all requirements of the City of Fort Collins. Page 12 SUMMARY & CONCLUSIONS The existing conditions drainage has two onsite sub-basins with the same outfall point in the southeast corner of the subject property. The proposed drainage condition was designed to mimic the historic basins’ runoff patterns. The existing conditions drainage patterns are maintained in the design of the project. The proposed improvements will have positive impacts on the timing, flow rate, and quality of runoff leaving the site; and will reduce potential impacts for flooding downstream of this site. The hydrologic and retention/detention calculations were performed using the required methods as outlined in the City of Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual. The proposed drainage improvements meet or exceed the City’s requirements. The proposed concept for the development of the Lemay Avenue Craft Brewery & Self-Storage site involves routing developed condition flows to a proposed onsite detention pond. LID site enhancements will treat the site runoff at the source before allowing the runoff to be conveyed to the proposed detention pond. The site’s stormwater facilities are sized to meet the City of Fort Collins “Storm Drainage Criteria Manual and Construction Standards” for both detention and water quality. Page 13 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997. 3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [July 21, 2010] APPENDIX A SITE & SOIL DESCRIPTIONS AND CHARACTERISTICS LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 1- VICINITY MAP SITE LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 2 - SOILS MAP LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 3 - FIRM MAP APPENDIX B HYDROLOGIC CALCULATIONS Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 12/22/15 A 0.98 100 0.73 74.69 5 0.15 0.80 90 0.10 9.20 84.69 B 0.85 100 0.00 0.00 5 0.85 5.00 90 0.00 0.00 5.00 C 0.41 100 0.23 56.10 5 0.00 0.00 90 0.18 39.50 95.60 D 0.16 100 0.00 0.00 5 0.08 2.50 90 0.08 45.00 47.50 E 0.39 100 0.21 53.85 5 0.00 0.00 90 0.18 41.50 95.35 F 0.16 100 0.00 0.00 5 0.06 1.90 90 0.10 56.30 58.20 G 0.77 100 0.36 46.75 5 0.00 0.00 90 0.41 47.90 94.65 H 0.68 100 0.33 48.53 5 0.00 0.00 90 0.35 46.30 94.83 I 0.82 100 0.48 58.54 5 0.34 2.10 90 0.00 0.00 60.64 J 0.19 100 0.00 0.00 5 0.19 5.00 90 0.00 0.00 5.00 K 0.32 100 0.16 50.00 5 0.00 0.00 90 0.16 45.00 95.00 L 0.76 100 0.00 0.00 5 0.76 5.00 90 0.00 0.00 5.00 M 0.53 100 0.39 72.88 5 0.14 1.40 90 0.00 0.00 74.28 N 1.48 100 0.45 30.41 5 0.96 3.20 90 0.07 4.30 37.91 O 0.10 100 0.00 0.00 5 0.10 5.00 90 0.00 0.00 5.00 39708.02 COMPOSITE % IMPERVIOUS CALCULATIONS Paved Roads/ Drives Lawns Roof Area (ac) Weighted % Imp. Basins Total Weighted % Basin ID Total Area (ac) % Imp. Area (ac) Imp. Weighted % Imp. % Imp. Area (ac) Weighted % Imp. % Imp. X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 12/17/2015 Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 12/22/15 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) A 0.98 C 84.7 0.78 0.65 70 1.4 6.2 200 1.0 20.0 2.0 1.7 7.8 270.0 11.5 7.8 B 0.85 C 5.0 0.52 0.08 20 5.0 4.9 95 0.5 15.0 1.1 1.5 6.4 115.0 10.6 6.4 C 0.41 C 95.6 0.90 0.81 15 3.0 1.4 150 0.8 20.0 1.8 1.4 2.8 165.0 10.9 5.0 D 0.16 C 47.5 0.60 0.32 35 20.0 3.1 150 0.8 15.0 1.3 1.9 5.0 185.0 11.0 5.0 E 0.39 C 95.4 0.90 0.81 15 3.0 1.4 150 0.8 20.0 1.8 1.4 2.8 165.0 10.9 5.0 F 0.16 C 58.2 0.63 0.39 35 20.0 2.8 150 0.8 15.0 1.3 1.9 4.7 185.0 11.0 5.0 G 0.77 C 94.7 0.89 0.80 35 2.0 2.6 150 0.6 20.0 1.5 1.6 4.2 185.0 11.0 5.0 H 0.68 C 94.8 0.89 0.80 50 2.8 2.8 250 0.5 20.0 1.4 2.9 5.7 300.0 11.7 5.7 I 0.82 C 60.6 0.64 0.41 120 1.6 11.8 140 1.5 15.0 1.8 1.3 13.1 260.0 11.4 11.4 J 0.19 C 5.0 0.52 0.08 10 20.0 2.2 150 1.3 15.0 1.7 1.5 3.6 160.0 10.9 5.0 K 0.32 C 95.0 0.89 0.80 50 2.8 2.8 120 1.6 20.0 2.5 0.8 3.5 170.0 10.9 5.0 L 0.76 C 5.0 0.52 0.08 50 6.0 7.3 200 1.0 15.0 1.5 2.2 9.5 250.0 11.4 9.5 M 0.53 C 74.3 0.70 0.53 40 2.0 5.2 230 0.4 20.0 1.3 3.0 8.3 270.0 11.5 8.3 N 1.48 C 37.9 0.58 0.27 30 13.0 3.5 430 1.4 15.0 1.8 4.0 7.6 460.0 12.6 7.6 O 0.10 C 5.0 0.52 0.08 10 20.0 2.2 130 1.5 20.0 2.4 0.9 3.1 140.0 10.8 5.0 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Tc CHECK 39708.02 DATA (URBANIZED BASINS) INITIAL/OVERLAND (Ti) Grassed waterway TRAVEL TIME (Tt) Paved areas and shallow paved swales Type of Land Surface Heavy Meadow Tillage/field Short pasture and lawns Nearly bare ground X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 12/17/2015 Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 12/22/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS 1 A 0.98 0.65 7.8 0.64 2.43 1.6 1 B 0.85 0.08 6.4 0.07 2.60 0.18 7.8 0.71 2.43 1.73 0.8 1.73 150 1.8 1.4 Swale flow to DP2 2 C 0.41 0.81 5.0 0.33 2.78 0.92 2 D 0.16 0.32 5.0 0.05 2.78 0.14 5.00 0.38 2.78 1.06 Total flow at DP2 2 9.2 1.09 2.29 2.50 0.8 2.50 150 1.8 1.4 Swale flow to DP3 3 E 0.39 0.81 5.0 0.32 2.78 0.9 3 F 0.16 0.39 5.0 0.06 2.78 0.2 5.0 0.38 2.78 1.1 Total flow at DP3 3 10.6 1.47 2.17 3.2 1.0 3.2 100 2.0 0.8 Swale flow to DP8 4 G 0.77 0.80 5.0 0.62 2.78 1.7 1 1.7 100 2.0 0.8 Swale flow to DP8 5 H 0.68 0.80 5.7 0.54 2.68 1.4 5 I 0.82 0.41 11.4 0.34 2.10 0.7 11.4 0.88 2.10 1.8 1.3 1.8 150 2.3 1.1 Swale flow to DP6 6 J 0.19 0.08 5.0 0.02 2.78 0.1 Total flow at DP6 6 12.5 0.90 2.02 1.8 0.65 1.8 70 1.6 0.7 Swale flow to DP7 7 K 0.32 0.80 5.0 0.26 2.78 0.7 Total flow Flow at DP7 7 13.3 1.16 1.97 2.3 1.0 2.3 100 2.0 0.8 Swale flow to DP8 Detention Pond Area 8 L 0.76 0.08 9.5 0.06 2.26 0.1 Detention Pond Outlet Total flow at DP8 8 14.1 3.25 1.92 6.2 Piped to DP10 Sump Inlet 9 M 0.53 0.53 8.3 0.28 2.38 0.7 1.4 0.7 700 2.4 4.9 Piped/ Swale flow to DP10 10 N 1.48 0.27 7.6 0.40 2.46 1.0 Total flow at DP 10 10 13.2 0.68 1.97 1.3 0.3 Total Release from site 10 1.6 Flow Off-site south O 0.10 0.08 5.0 0.01 2.78 0.03 PIPE Add Pond Release Pond Release STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 12/22/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS 1 A 0.98 0.78 7.8 0.76 8.47 6.4 1 B 0.85 0.52 6.4 0.44 9.05 4.0 7.8 1.20 8.47 10.2 0.8 10.16 150 1.8 1.4 Swale flow to DP2 2 C 0.41 0.90 5.0 0.37 9.70 3.6 2 D 0.16 0.60 5.0 0.10 9.70 1.0 5.00 0.47 9.70 4.6 Total flow at DP2 2 9.2 1.67 7.98 13.3 0.8 13.33 150 1.8 1.4 Swale flow to DP3 3 E 0.39 0.90 5.0 0.35 9.70 3.4 3 F 0.16 0.63 5.0 0.10 9.70 1.0 5.0 0.45 9.70 4.4 Total flow at DP3 3 10.6 2.12 7.55 16.0 1.0 16.0 100 2.0 0.8 Swale flow to DP8 4 G 0.77 0.89 5.0 0.69 9.70 6.7 1 6.7 100 2.0 0.8 Swale flow to DP8 5 H 0.68 0.89 5.7 0.61 9.35 5.7 5 I 0.82 0.64 11.4 0.52 7.32 3.8 11.4 1.13 7.32 8.3 1.3 8.3 150 2.3 1.1 Swale flow to DP6 6 J 0.19 0.52 5.0 0.10 9.70 1.0 Total flow at DP6 6 12.5 1.23 7.04 8.7 0.65 8.7 70 1.6 0.7 Swale flow to DP7 7 K 0.32 0.89 5.0 0.28 9.70 2.7 Total flow Flow at DP7 7 13.3 1.51 6.87 10.4 1.0 10.4 100 2.0 0.8 Swale flow to DP8 Detention Pond Area 8 L 0.76 0.52 9.5 0.40 7.90 3.2 Detention Pond Outlet Total flow at DP8 8 14.1 4.32 6.68 28.9 Piped to DP10 Sump Inlet 9 M 0.53 0.70 8.3 0.37 8.31 3.1 1.4 3.1 700 2.4 4.9 Piped/ Swale flow to DP10 10 N 1.48 0.58 7.6 0.86 8.56 7.4 Total flow at DP 10 10 13.2 1.23 6.89 8.5 1.3 Total Release from site 10 9.8 Flow Off-site south O 0.10 0.52 5.0 0.05 9.70 0.5 PIPE Add Pond Release Pond Release STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 7/1/15 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) EX1 1.51 C 2.0 0.51 0.06 30 3.0 7.2 750 0.6 5.0 0.4 32.3 39.5 780.0 14.3 14.3 EX2 6.20 C 12.3 0.54 0.12 350 0.9 34.8 200 1.5 5.0 0.6 5.4 40.2 550.0 13.1 13.1 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 (Tt) Tillage/field Short pasture and lawns Nearly bare ground Grassed waterway Paved areas and shallow paved swales DATA Heavy Meadow (URBANIZED BASINS) Type of Land Surface STANDARD FORM SF-2 EXISTING TIME OF CONCENTRATION 39708.02 SUB-BASIN INITIAL/OVERLAND TRAVEL TIME Tc CHECK (Ti) X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 7/1/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS Existing 2-yr Flows EX1 EX1 1.51 0.06 14.3 0.09 1.90 0.2 EX2 6.20 0.12 13.1 0.74 1.98 1.5 14.3 0.83 1.90 1.6 Existing 100-yr Flows EX1 EX1 1.51 0.51 14.3 0.77 6.63 5.1 EX2 6.20 0.54 13.1 3.35 6.92 23.2 14.3 4.12 6.63 27.3 STANDARD FORM SF-3 EXISTING STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 39708.02 2-Year DIRECT RUNOFF TOTAL RUNOFF STREET PIPE X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 APPENDIX C HYDRAULIC CALCULATIONS Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.6 3.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 0.7 3.1 cfs INLET IN A SUMP OR SAG LOCATION Lemay Avenue craft Brewery & Self-Storage Facility DP 9 CDOT/Denver 13 Combination H-Vert H-Curb W Lo (C) Lo (G) Wo WP Override Depths UD-Inlet_v3.14-DP 9.xlsm, Inlet In Sump 12/8/2015, 8:55 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 11.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.002 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 24.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 24.0 24.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 13.0 13.0 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Lemay Avenue craft Brewery & Self-Storage Facility DP 9 (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' UD-Inlet_v3.14-DP 9.xlsm, Q-Allow 12/8/2015, 8:53 AM Project: Basin ID: Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness Ia = 67.00 percent Catchment Drainage Imperviousness I a = 67.00 percent Catchment Drainage Area A = 6.490 acres Catchment Drainage Area A = 6.490 acres Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 14 minutes Time of Concentration of Watershed Tc = 14 minutes Allowable Unit Release Rate q = 0.04 cfs/acre Allowable Unit Release Rate q = 0.20 cfs/acre One-hour Precipitation P1 = 0.82 inches One-hour Precipitation P 1 = 2.86 inches Design Rainfall IDF Formula i = C1* P1 /(C2+Tc )^C3 Design Rainfall IDF Formula i = C1 * P1/(C2 +Tc)^C3 Coefficient One C1 = 28.50 Coefficient One C 1 = 28.50 Coefficient Two C2 = 10 Coefficient Two C 2 = 10 Coefficient Three C3 = 0.786 Coefficient Three C 3 = 0.786 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.46 Runoff Coefficient C = 0.66 Inflow Peak Runoff Qp-in = 5.74 cfs Inflow Peak Runoff Qp-in = 28.72 cfs Allowable Peak Outflow Rate Qp-out = 0.26 cfs Allowable Peak Outflow Rate Qp-out = 1.30 cfs Mod. FAA Minor Storage Volume = 11,397 cubic feet Mod. FAA Major Storage Volume = 57,045 cubic feet Mod. FAA Minor Storage Volume = 0.262 acre-ft Mod. FAA Major Storage Volume = 1.310 acre-ft 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet (input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output) 5 2.78 0.057 1.00 0.26 0.002 0.055 5 9.70 0.286 1.00 1.30 0.009 0.277 10 2.22 0.091 1.00 0.26 0.004 0.088 10 7.74 0.457 1.00 1.30 0.018 0.439 15 1.86 0.115 0.97 0.25 0.005 0.110 15 6.49 0.575 0.97 1.25 0.026 0.549 20 1.61 0.133 0.85 0.22 0.006 0.127 20 5.63 0.664 0.85 1.10 0.030 0.633 25 1.43 0.147 0.78 0.20 0.007 0.140 25 4.98 0.735 0.78 1.01 0.035 0.700 30 1.29 0.159 0.73 0.19 0.008 0.151 30 4.49 0.794 0.73 0.95 0.039 0.755 35 1.17 0.169 0.70 0.18 0.009 0.160 35 4.09 0.845 0.70 0.91 0.044 0.801 40 1.08 0.178 0.68 0.18 0.010 0.168 40 3.77 0.889 0.68 0.88 0.048 0.840 45 1.00 0.185 0.66 0.17 0.011 0.175 45 3.49 0.928 0.66 0.85 0.053 0.875 50 0.94 0.192 0.64 0.17 0.011 0.181 50 3.26 0.963 0.64 0.83 0.057 0.905 55 0.88 0.199 0.63 0.16 0.012 0.186 55 3.06 0.994 0.63 0.81 0.062 0.933 60 0.83 0.204 0.62 0.16 0.013 0.191 60 2.89 1.023 0.62 0.80 0.066 0.957 65 0.78 0.210 0.61 0.16 0.014 0.196 65 2.74 1.050 0.61 0.79 0.071 0.979 70 0.75 0.215 0.60 0.16 0.015 0.200 70 2.60 1.075 0.60 0.78 0.075 1.000 75 0.71 0.219 0.59 0.15 0.016 0.204 75 2.48 1.098 0.59 0.77 0.080 1.018 80 0.68 0.224 0.59 0.15 0.017 0.207 80 2.37 1.120 0.59 0.76 0.084 1.036 85 0.65 0.228 0.58 0.15 0.018 0.210 85 2.27 1.140 0.58 0.76 0.089 1.052 90 0.63 0.232 0.58 0.15 0.019 0.213 90 2.18 1.160 0.58 0.75 0.093 1.067 95 0.60 0.235 0.57 0.15 0.019 0.216 95 2.10 1.178 0.57 0.74 0.097 1.081 100 0.58 0.239 0.57 0.15 0.020 0.219 100 2.03 1.195 0.57 0.74 0.102 1.094 105 0.56 0.242 0.57 0.15 0.021 0.221 105 1.96 1.212 0.57 0.74 0.106 1.106 110 0.54 0.245 0.56 0.15 0.022 0.223 110 1.89 1.228 0.56 0.73 0.111 1.117 115 0.53 0.248 0.56 0.15 0.023 0.225 115 1.83 1.243 0.56 0.73 0.115 1.128 120 0.51 0.251 0.56 0.14 0.024 0.227 120 1.78 1.258 0.56 0.72 0.120 1.138 125 0.49 0.254 0.56 0.14 0.025 0.229 125 1.72 1.272 0.56 0.72 0.124 1.148 130 0.48 0.257 0.55 0.14 0.026 0.231 130 1.68 1.286 0.55 0.72 0.129 1.157 Project: Basin ID: DETENTION VOLUME BY THE MODIFIED FAA METHOD Lemay Ave. Craft Brewery & Self Storage UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 0 50 100 150 200 250 300 350 Volume (acre-feet) Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Minor Storm Inflow Volume Minor Storm Outflow Volume Minor Storm Storage Volume Major Storm Inflow Volume Major Storm Outflow Volume Major Storm Storage Volume 3970802 UD-Detention_v2.35.xls, Modified FAA 12/17/2015, 12:35 PM Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: 0 Date: 12/22/15 Basin EX1 Basin Area % Impervious A 0.98 84.7 B 0.85 5.0 C 0.41 95.6 D 0.16 47.5 E 0.39 95.4 F 0.16 58.2 G 0.77 94.7 H 0.68 94.8 I 0.82 60.6 J 0.19 5.0 K 0.32 95.0 L 0.76 5.0 TOTAL 6.49 62.1 WQCV = 6,877 cf WQCV = 0.16 acre-ft Pond WCQV Sizing WQCV = (0.91I 3 - 1.19I 2 + 0.78I) * A/12 X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 12/17/2015 Subdivision 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location Fort Collins Project No. 39708.02 By: BAB Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: 0 A - Upper Surface Date: 12/22/15 B - Lower Surface Pond Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet) (cubic feet) (cubic feet) (acre feet) 0.00 4941.35 3,500 0 0 0.00 1.00 4942.00 5,060 2,766 2,766 0.06 2.00 4943.00 12,540 8,522 11,288 0.26 3.00 4944.00 18,670 15,504 26,792 0.62 3.90 4944.90 27,102 20,478 47,270 1.09 1.31 Volume (acre feet) Volume Water Surface Elevation Water Quality 0.16 4942.18 100-Year Detention 1.31 4944.90 Gravel Void Space Calculations Volume of voids= Porosity * Total Volume Porosity of poorley graded gravel = 0.40 Total Volume of Gravel Inlfiltration Basin =7962 square ft * 3 feet deep =23886 cubic feet = 0.548 acre-ft Volume of Voids = 0.40* 0.548 acre-ft Volume of Voids = 0.22 acre-ft POND VOLUME CALCULATIONS Void Space in Gravel Infiltration Basin calculated to have 0.22 acre-ft of storage X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 2 12/17/2015 Subdivision 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location Fort Collins Project No. 39708.02 By: BAB Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: 0 A - Upper Surface Date: 12/22/15 B - Lower Surface WQ Volume in LIDs Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet) (cubic feet) (cubic feet) (acre feet) 0.00 4943.00 500 0 0 0.00 1.00 4944.00 2,500 1,373 1,373 0.03 2.00 4945.00 2,000 2,245 3,618 0.08 3.00 4946.00 1,500 1,744 5,362 0.12 4.00 4947.00 1,300 1,399 6,761 0.16 Volume (acre feet) Volume needed Cumulative Volume Provided Water Quality 0.16 0.16 POND VOLUME CALCULATIONS X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 2 12/17/2015 Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia = 55.0 percent Catchment Area, A = 6.49 acres Diameter of holes, D = 0.575 inches Depth at WQCV outlet above lowest perforation, H = 3 feet Number of holes per row, N = 1 Vertical distance between rows, h = 4.00 inches OR Number of rows, NL = 7.00 Orifice discharge coefficient, Co = 0.62 Height of slot, H = inches Slope of Basin Trickle Channel, S = 0.020 ft / ft Width of slot, W = inches Time to Drain the Pond = 40 hours Watershed Design Information (Input): 2.65 Percent Soil Type A = % Percent Soil Type B = % Percent Soil Type C/D = 100 % Outlet Design Information (Output): Water Quality Capture Volume, WQCV = 0.263 watershed inches Water Quality Capture Volume (WQCV) = 0.142 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol = 0.171 acre-feet Outlet area per row, Ao = 0.26 square inches Total opening area at each row based on user-input above, Ao = 0.26 square inches Total opening area at each row based on user-input above, Ao = 0.002 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 6 41.35 41.68 42.02 42.35 42.68 43.02 43.35 Flow 4941.35 0.6290 0.6290 0.6290 0.6290 0.6290 0.6289 0.6289 4.40 4941.85 0.6291 0.6291 0.6290 0.6290 0.6290 0.6290 0.6289 4.40 4942.35 0.6291 0.6291 0.6291 0.6290 0.6290 0.6290 0.6290 4.40 4942.85 0.6291 0.6291 0.6291 0.6291 0.6291 0.6290 0.6290 4.40 4943.35 0.6292 0.6291 0.6291 0.6291 0.6291 0.6291 0.6290 4.40 4943.85 0.6292 0.6292 0.6292 0.6291 0.6291 0.6291 0.6291 4.40 4944.35 0.6292 0.6292 0.6292 0.6292 0.6291 0.6291 0.6291 4.40 4944.85 0.6293 0.6292 0.6292 0.6292 0.6292 0.6292 0.6291 4.40 4944.90 0.6293 0.6292 0.6292 0.6292 0.6292 0.6292 0.6291 4.40 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Worksheet Protected Project: Basin ID: STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Lemay Ave. Craft Brewery & Self Storage 4941.00 4941.50 4942.00 4942.50 4943.00 4943.50 4944.00 4944.50 4945.00 4945.50 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 Stage (feet, elev.) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE 3970802 UD-Detention_v2.35.xls, WQCV 12/8/2015, 12:30 PM Project: Basin ID: 1 #1 Vertical #2 Vertical Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Orifice Orifice Water Surface Elevation at Design Depth Elev: WS = 4,944.90 feet Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 4,941.34 feet Required Peak Flow through Orifice at Design Depth Q = 1.30 cfs Pipe/Vertical Orifice Diameter (inches) Dia = 12.0 inches Orifice Coefficient Co = 0.62 Full-flow Capacity (Calculated) Full-flow area Af = 0.79 sq ft Half Central Angle in Radians Theta = 3.14 rad Full-flow capacity Qf = 6.8 cfs Percent of Design Flow = 526% Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416) Theta = 1.01 rad Flow area Ao = 0.14 sq ft Top width of Orifice (inches) To = 10.18 inches Height from Invert of Orifice to Bottom of Plate (feet) Yo = 0.24 feet Elevation of Bottom of Plate Elev Plate Bottom Edge = 4,941.58 feet Resultant Peak Flow Through Orifice at Design Depth Qo = 1.3 cfs Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 0.58 feet Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. = 4,941.46 feet Lemay Ave. Craft Brewery & Self Storage RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES 3970802 UD-Detention_v2.35.xls, Restrictor Plate 12/11/2015, 11:13 AM Project: Basin ID: Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert. Circular Opening: Diameter in Inches Dia. = inches OR Rectangular Opening: Width in Feet W = 3.00 0.58 ft. Length (Height for Vertical) L or H = 3.00 0.24 ft. Percentage of Open Area After Trash Rack Reduction % open = 50 100 % Orifice Coefficient Co = 0.62 0.62 Weir Coefficient Cw = 3.00 Orifice Elevation (Bottom for Vertical) Eo = 4944.00 4,941.34 ft. Calculation of Collection Capacity: Net Opening Area (after Trash Rack Reduction) Ao = 4.50 0.14 sq. ft. OPTIONAL: User-Overide Net Opening Area Ao = sq. ft. Perimeter as Weir Length Lw = 9.00 ft. OPTIONAL: User-Overide Weir Length Lw = ft. Top Elevation of Vertical Orifice Opening, Top = 4941.58 ft. Center Elevation of Vertical Orifice Opening, Cen = 4941.46 ft. Horizontal Orifices Vertical Orifices Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor, & Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes (input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek) 4941.00 4.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4942.00 4.40 0.00 0.00 0.00 0.00 0.51 0.00 0.51 4943.00 4.40 0.00 0.00 0.00 0.00 0.86 0.00 0.86 4944.00 4.40 0.00 0.00 0.00 0.00 1.11 0.00 1.11 4944.90 4.40 23.05 21.24 0.00 0.00 1.29 0.00 1.29 4.40 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A 4.40 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A 4.40 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A 4.40 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A Project: Basin ID: STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) 4941 4941.5 4942 4942.5 4943 4943.5 4944 4944.5 4945 4945.5 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Stage (feet, elev.) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE OUTLET STRUCTURE 3970802 UD-Detention_v2.35.xls, Outlet 12/11/2015, 11:14 AM Plan View North CO-7 CO-6 CO-5 CO-4 CO-3 CO-1 O-4 O-1 DP9 Single Type 13 Combo Inlet Pond Outlet 18" FES Plug MH-3 MH-2 MH-2 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA Page 1 of 1 +1-203-755-1666 12/10/2015 Bentley StormCAD V8i (SELECTseries 3) 3970802-Lemay.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] 2yr Results J-loss Coeff N-value Pipe Velocity Down (ft/s) Velocity Up (ft/s) Velocity Avg (ft/s) EGL Down (ft) EGL Up (ft) HGL Down (ft) HGL Up (ft) Invert Down (ft) Invert Up (ft) Line Slope (ft/ft) Line Length (ft) Line Size (in) Capacity (Design) (cfs) Flow (cfs) Label CO-1 0.70 5.89 18.0 19.1 0.003 4,943.21 4,943.15 4,943.56 4,943.46 4,943.64 4,943.57 2.24 2.26 2.65 0.013 1.500 CO-2 1.40 12.38 24.0 123.5 0.003 4,942.65 4,942.28 4,943.12 4,943.02 4,943.21 4,943.05 2.61 2.52 1.32 0.013 1.000 CO-3 2.40 12.27 24.0 68.0 0.003 4,942.28 4,942.08 4,942.88 4,942.62 4,943.02 4,942.81 3.03 3.03 3.52 0.013 1.000 CO-4 0.70 5.76 18.0 29.9 0.003 4,943.24 4,943.15 4,943.59 4,943.46 4,943.67 4,943.57 2.21 2.21 2.65 0.013 1.500 CO-5 1.00 6.65 18.0 338.9 0.004 4,944.49 4,943.13 4,944.88 4,943.53 4,945.00 4,943.64 2.71 2.71 2.65 0.013 1.500 CO-6 1.00 6.67 18.0 84.2 0.004 4,943.12 4,942.78 4,943.51 4,943.15 4,943.63 4,943.29 2.72 2.72 2.92 0.013 0.150 CO-7 0.30 2.27 12.0 91.3 0.004 4,941.34 4,940.97 4,941.59 4,941.20 4,941.65 4,941.27 2.00 2.00 2.26 0.013 1.500 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203 Page 1 of 1 -755-1666 12/14/2015 Bentley StormCAD V8i (SELECTseries 3) 3970802-Lemay.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] 100yr Results J-loss Coeff N-value Pipe Velocity Down (ft/s) Velocity Up (ft/s) Velocity Avg (ft/s) EGL Down (ft) EGL Up (ft) HGL Down (ft) HGL Up (ft) Invert Down (ft) Invert Up (ft) Line Slope (ft/ft) Line Length (ft) Line Size (in) Capacity (Design) (cfs) Flow (cfs) Label CO-1 3.10 5.89 18.0 19.1 0.003 4,943.21 4,943.15 4,944.25 4,944.24 4,944.34 4,944.31 3.38 2.37 2.26 0.013 1.500 CO-2 6.20 12.38 24.0 123.5 0.003 4,942.65 4,942.28 4,944.14 4,944.07 4,944.24 4,944.14 3.94 2.47 2.09 0.013 1.000 CO-3 11.50 12.27 24.0 68.0 0.003 4,942.28 4,942.08 4,943.72 4,943.30 4,944.07 4,943.81 4.44 4.73 5.74 0.013 1.000 CO-4 3.10 5.76 18.0 29.9 0.003 4,943.24 4,943.15 4,944.26 4,944.24 4,944.35 4,944.31 3.32 2.42 2.26 0.013 1.500 CO-5 5.30 6.65 18.0 338.9 0.004 4,944.49 4,943.13 4,945.50 4,944.28 4,945.77 4,944.49 4.18 4.18 3.64 0.013 1.500 CO-6 5.30 6.67 18.0 84.2 0.004 4,943.12 4,942.78 4,944.25 4,944.07 4,944.46 4,944.24 4.19 3.72 3.27 0.013 0.150 CO-7 1.30 2.27 12.0 91.3 0.004 4,941.34 4,940.97 4,941.88 4,941.45 4,942.02 4,941.64 2.99 2.99 3.47 0.013 1.500 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203 Page 1 of 1 -755-1666 12/14/2015 Bentley StormCAD V8i (SELECTseries 3) 3970802-Lemay.stsw Bentley Systems, Inc. Haestad Methods Solution Center [08.11.03.84] HY-8 Culvert Analysis Report Table 1 - Culvert Summary Table: Culvert 1 Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) 2yr 1.73 1.73 4947.33 0.806 0.590 1-S2n 0.544 0.557 0.544 0.547 3.435 100yr 10.20 6.13 4949.27 2.630 2.750 4-FFf 1.000 0.931 1.000 1.064 7.806 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4946.52 ft, Outlet Elevation (invert): 4946.41 ft Culvert Length: 22.45 ft, Culvert Slope: 0.0049 ******************************************************************************** Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 1.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE Water Surface Profile Plot for Culvert: Culvert 1 Table 2 - Culvert Summary Table: Culvert 1 Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) 2yr 1.80 1.80 4944.25 0.687 0.415 1-S2n 0.458 0.501 0.458 0.555 3.335 100yr 8.70 8.70 4945.42 1.802 1.855 7-M2c 1.500 1.138 1.138 1.002 6.051 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4943.56 ft, Outlet Elevation (invert): 4943.42 ft Culvert Length: 31.94 ft, Culvert Slope: 0.0044 ******************************************************************************** Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 1.50 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE Water Surface Profile Plot for Culvert: Culvert 1 Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: 0 Date: 7/1/15 24" RCP FES Pond Outfall Q100 (cfs) 11.5 1.3 Flows are the greater of proposed vs. future D or H (in) 24 24 W (ft) Slope (%) 1.30 1.30 Yn (in) Yt (ft) Unknown Unknown If "unknown" Yt/D=0.4 Yt/D, Yt/H 0.40 0.40 Per section MD 7.2 Supercritical No No Q/D^2.5, Q/WH^1.5 2.03 0.23 Q/D^1.5, Q/WH^0.5 4.07 0.46 Da, Ha (in) * Da=0.5(D+Yn), Ha=0.5(H+Yn) Q/Da^1.5, Q/WHa^0.5 * d50 (in), Required 3.37 0.38 Required Riprap Size L L Fig. MD-21 OR MD-22 Use Riprap Size L L d50 (in) 9 9 Table MD-7 1/(2 tanT) 4.00 4.00 Fig. MD-23 OR MD-24 Erosive Soils Yes Yes At 2.09 0.24 At=Q/5.5 L 2.5 -6.8 L=(1/(2 tan T))(At/Yt - D) Min L 6.0 6.0 Min L=3D or 3H Max L 20.0 20.0 Max L=10D or 10H Length (ft) 6.0 6.0 Bottom Width (ft) 6.0 6.0 Width=3D (Minimum) Riprap Depth (in) 18 18 Depth=2(d50) Type II Base Depth (in) 6 6 Table MD-12 (fine grained soils) Cutoff Wall Cutoff Wall Depth (ft) Depth of Riprap and Base Cutoff Wall Width (ft) Note: No Type II Base to be used if Soil Riprap is specified within the plans * For use when the flow in the culvert is supercritical (and less than full). PIPE OUTFALL RIPRAP SIZING CALCULATIONS STORM DRAIN SYSTEM X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 12/14/2015 APPENDIX D EXISTING & PROPOSED DRAINAGE PLANS A Westrian Company LEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY EXISTING CONDITIONS DRAINAGE MAP Know what's tc Q5 Q100 C100 C5 (min) (cfs) (cfs) EX1 1.51 0.51 0.06 14.3 0.2 4.8 EX2 6.20 0.54 0.12 13.1 1.7 21.6 Existing Runoff Summary Table Basin ID Area (acres) LEMAY AVENUE BUCKINGHAM STREET A Westrian Company LEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY PROPOSED CONDITIONS DRAINAGE MAP Know what's tc Q5 Q100 C100 C5 (min) (cfs) (cfs) A 0.98 0.78 0.65 7.8 1.6 6.4 B 0.85 0.52 0.08 6.4 0.2 4.0 C 0.41 0.90 0.81 5.0 0.9 3.6 D 0.16 0.60 0.32 5.0 0.1 1.0 E 0.39 0.90 0.81 5.0 0.9 3.4 F 0.16 0.63 0.39 5.0 0.2 1.0 G 0.77 0.89 0.80 5.0 1.7 6.7 H 0.68 0.89 0.80 5.7 1.4 5.7 I 0.82 0.64 0.41 11.4 0.7 3.8 J 0.19 0.52 0.08 5.0 0.1 1.0 K 0.32 0.89 0.80 5.0 0.7 2.7 L 0.76 0.52 0.08 9.5 0.1 3.2 M 0.53 0.70 0.53 8.3 0.7 3.1 N 1.48 0.58 0.27 7.6 1.0 7.4 O 0.10 0.52 0.08 5.0 0.03 0.5 Runoff Summary Table Basin ID Area (acres) LEMAY AVENUE BUCKINGHAM STREET APPENDIX E LID EXHIBITS Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date New Impervious Area 155,637 sq. ft. Required Minimum Impervious Area to be Treated 77,819 sq. ft. (=50% of new impervious area) Area of Paver Section #1 16,748 sq. ft. Impervious Run-on area for Paver Section #1 (1.5:1) 25,090 sq. ft. Impervious Area Directly Treated by LID Treatment Method #2 - LID Basin #2 17,770 sq. ft. Impervious Area Directly Treated by LID Treatment Method #3 - LID Swale #1 7,377 sq. ft. Impervious Area Directly Treated by LID Treatment Method #4 - LID Basin #3 64,572 sq. ft. Impervious Area Directly Treated by LID Treatment Method #5 - LID Basin #4 29,713 sq. ft. Impervious Area Directly Treated by LID Treatment Method #6 - LID Basin & Swale #5 11,115 sq. ft. Total Impervious Area Treated 155,637 sq. ft. Actual % of Impervious Area Treated 100.0 % New Driveable Area 68,778 sq. ft. Required Minimum Area of Porous Pavement (=25% of new pavement area) 17,195 sq. ft. Area of Paver Section #1 17,280 sq. ft. Total Porous Pavement Area 17,280 sq. ft. Actual % of Porous Pavement Provided 25.1% 50% On-Site Treatment by LID Requirement 25% Porous Pavement Requirement PAVER SECTION #1 RUN-ON AREA #1 LEMAY AVENUE BUCKINGHAM STREET Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge for 2-Year Return Period Q2 = 0.34 cfs 2. Hydraulic Residence Time A) : Length of Grass Swale LS = 210.0 ft B) Calculated Residence Time (based on design velocity below) THR= 6.3 minutes 3. Longitudinal Slope (vertical distance per unit horizontal) A) Available Slope (based on site constraints) Savail = 0.010 ft / ft B) Design Slope SD = 0.008 ft / ft 4. Swale Geometry A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft / ft B) Bottom Width of Swale (enter 0 for triangular section) WB = 0.00 ft 5. Vegetation A) Type of Planting (seed vs. sod, affects vegetal retardance factor) 6. Design Velocity (0.7 ft / s maximum for desirable 5-minute residence time) V2 = 0.56 ft / s 7. Design Flow Depth (1 foot maximum) D2 = 0.39 ft A) Flow Area A2 = 0.6 sq ft B) Top Width of Swale WT = 3.1 ft C) Froude Number (0.50 maximum) F = 0.22 D) Hydraulic Radius RH = 0.19 E) Velocity-Hydraulic Radius Product for Vegetal Retardance VR = 0.11 F) Manning's n (based on SCS vegetal retardance curve E for seeded grass) n = 0.078 G) Cumulative Height of Grade Control Structures Required HD = 0.40 ft AN UNDERDRAIN IS 8. Underdrain REQUIRED IF THE (Is an underdrain necessary?) DESIGN SLOPE < 2.0% 9. Soil Preparation (Describe soil amendment) 10. Irrigation Notes: Design Procedure Form: Grass Swale (GS) BAB JR Engineering January 22, 2016 Lemay Avenue Craft Brewery & Self-Storage Bio-Swale #1 Choose One Temporary Permanent Choose One Grass From Seed Grass From Sod Choose One YES NO 3970802 UD-BMP_v3.03- Bio-Swale #1.xlsm, GS 1/22/2016, 2:37 PM Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge for 2-Year Return Period Q2 = 1.70 cfs 2. Hydraulic Residence Time A) : Length of Grass Swale LS = 105.0 ft B) Calculated Residence Time (based on design velocity below) THR= 2.4 minutes 3. Longitudinal Slope (vertical distance per unit horizontal) A) Available Slope (based on site constraints) Savail = 0.004 ft / ft B) Design Slope SD = 0.003 ft / ft 4. Swale Geometry A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft / ft B) Bottom Width of Swale (enter 0 for triangular section) WB = 0.00 ft 5. Vegetation A) Type of Planting (seed vs. sod, affects vegetal retardance factor) 6. Design Velocity (0.35 ft / s maximum for desirable 5-minute residence time) V2 = 0.74 ft / s 7. Design Flow Depth (1 foot maximum) D2 = 0.76 ft A) Flow Area A2 = 2.3 sq ft B) Top Width of Swale WT = 6.1 ft C) Froude Number (0.50 maximum) F = 0.21 D) Hydraulic Radius RH = 0.37 E) Velocity-Hydraulic Radius Product for Vegetal Retardance VR = 0.27 F) Manning's n (based on SCS vegetal retardance curve E for seeded grass) n = 0.057 G) Cumulative Height of Grade Control Structures Required HD = 0.10 ft AN UNDERDRAIN IS 8. Underdrain REQUIRED IF THE (Is an underdrain necessary?) DESIGN SLOPE < 2.0% 9. Soil Preparation (Describe soil amendment) 10. Irrigation Notes: Design Procedure Form: Grass Swale (GS) BAB JR Engineering January 22, 2016 Lemay Avenue Craft Brewery & Self-Storage Bio-Swale #2 Choose One Temporary Permanent Choose One Grass From Seed Grass From Sod Choose One YES NO 3970802 UD-BMP_v3.03- Bio-Swale #2.xlsm, GS 1/22/2016, 2:40 PM #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be applied to culvert sheet (#2 vertical & horizontal openings is not used). STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) Current Routing Order is #3 W.S. EL. WQ W.S. EL. Minor W.S. EL. Major WQ H1 H2 V1 V2 Routing Order #1 (Standard) V1 W.S. EL. WQ W.S. EL. Design Storm WQ H1 Routing Order #3 (Single Stage) Routing Order #4 V2 V1 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ W.S. EL. Emergency Spillway Emergency Overflow into Pipe- H2 V2 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ V1 Routing Order #2 3970802 UD-Detention_v2.35.xls, Outlet 12/11/2015, 11:14 AM #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Lemay Ave. Craft Brewery & Self Storage 3970802 UD-Detention_v2.35.xls, WQCV 12/8/2015, 12:30 PM 135 0.47 0.260 0.55 0.14 0.027 0.233 135 1.63 1.299 0.55 0.72 0.133 1.166 140 0.46 0.262 0.55 0.14 0.028 0.235 140 1.59 1.312 0.55 0.71 0.138 1.174 145 0.44 0.265 0.55 0.14 0.028 0.236 145 1.55 1.324 0.55 0.71 0.142 1.182 150 0.43 0.267 0.55 0.14 0.029 0.238 150 1.51 1.336 0.55 0.71 0.147 1.189 155 0.42 0.269 0.55 0.14 0.030 0.239 155 1.47 1.347 0.55 0.71 0.151 1.196 160 0.41 0.271 0.54 0.14 0.031 0.240 160 1.44 1.358 0.54 0.71 0.156 1.203 165 0.40 0.274 0.54 0.14 0.032 0.242 165 1.41 1.369 0.54 0.70 0.160 1.209 170 0.39 0.276 0.54 0.14 0.033 0.243 170 1.38 1.380 0.54 0.70 0.164 1.215 175 0.39 0.278 0.54 0.14 0.034 0.244 175 1.35 1.390 0.54 0.70 0.169 1.221 180 0.38 0.280 0.54 0.14 0.035 0.245 180 1.32 1.400 0.54 0.70 0.173 1.227 185 0.37 0.282 0.54 0.14 0.036 0.246 185 1.29 1.410 0.54 0.70 0.178 1.232 190 0.36 0.284 0.54 0.14 0.036 0.247 190 1.27 1.420 0.54 0.70 0.182 1.237 195 0.36 0.286 0.54 0.14 0.037 0.248 195 1.24 1.429 0.54 0.70 0.187 1.242 200 0.35 0.287 0.54 0.14 0.038 0.249 200 1.22 1.438 0.54 0.69 0.191 1.247 205 0.34 0.289 0.53 0.14 0.039 0.250 205 1.20 1.447 0.53 0.69 0.196 1.251 210 0.34 0.291 0.53 0.14 0.040 0.251 210 1.18 1.456 0.53 0.69 0.200 1.256 215 0.33 0.293 0.53 0.14 0.041 0.252 215 1.15 1.464 0.53 0.69 0.205 1.260 220 0.33 0.294 0.53 0.14 0.042 0.252 220 1.13 1.473 0.53 0.69 0.209 1.264 225 0.32 0.296 0.53 0.14 0.043 0.253 225 1.12 1.481 0.53 0.69 0.214 1.267 230 0.31 0.298 0.53 0.14 0.044 0.254 230 1.10 1.489 0.53 0.69 0.218 1.271 235 0.31 0.299 0.53 0.14 0.045 0.255 235 1.08 1.497 0.53 0.69 0.223 1.274 240 0.30 0.301 0.53 0.14 0.045 0.255 240 1.06 1.505 0.53 0.69 0.227 1.278 245 0.30 0.302 0.53 0.14 0.046 0.256 245 1.05 1.512 0.53 0.69 0.232 1.281 250 0.30 0.304 0.53 0.14 0.047 0.257 250 1.03 1.520 0.53 0.69 0.236 1.284 255 0.29 0.305 0.53 0.14 0.048 0.257 255 1.02 1.527 0.53 0.68 0.240 1.287 260 0.29 0.307 0.53 0.14 0.049 0.258 260 1.00 1.535 0.53 0.68 0.245 1.290 265 0.28 0.308 0.53 0.14 0.050 0.258 265 0.99 1.542 0.53 0.68 0.249 1.292 270 0.28 0.309 0.53 0.14 0.051 0.259 270 0.97 1.549 0.53 0.68 0.254 1.295 275 0.27 0.311 0.53 0.14 0.052 0.259 275 0.96 1.556 0.53 0.68 0.258 1.297 280 0.27 0.312 0.53 0.14 0.053 0.260 280 0.95 1.562 0.53 0.68 0.263 1.300 285 0.27 0.314 0.52 0.14 0.053 0.260 285 0.93 1.569 0.52 0.68 0.267 1.302 290 0.26 0.315 0.52 0.14 0.054 0.260 290 0.92 1.576 0.52 0.68 0.272 1.304 295 0.26 0.316 0.52 0.14 0.055 0.261 295 0.91 1.582 0.52 0.68 0.276 1.306 300 0.26 0.317 0.52 0.14 0.056 0.261 300 0.90 1.588 0.52 0.68 0.281 1.308 305 0.25 0.319 0.52 0.14 0.057 0.262 305 0.89 1.595 0.52 0.68 0.285 1.310 Mod. FAA Minor Storage Volume (cubic ft.) = 11,397 Mod. FAA Major Storage Volume (cubic ft.) = 57,045 Mod. FAA Minor Storage Volume (acre-ft.) = 0.2616 Mod. FAA Major Storage Volume (acre-ft.) = 1.3096 DETENTION VOLUME BY THE MODIFIED FAA METHOD Lemay Ave. Craft Brewery & Self Storage Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 Determination of MINOR Detention Volume Using Modified FAA Method 3970802 UD-Detention_v2.35.xls, Modified FAA 12/17/2015, 12:35 PM 39708.02 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 12/17/2015 2-Year 39708.02 DIRECT RUNOFF TOTAL RUNOFF STREET/SWALE X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 12/17/2015