HomeMy WebLinkAboutRAW URTH DESIGNS - FDP - FDP160001 - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSJanuary 11, 2015
City of Fort Collins Planning Department,
This letter is to address the planning department comments on Raw Urth Designs. Below are the
comments, in italics, and our response in bold. Comments are also reflected on the drawings and
have been clouded accordingly.
Thank You
Curtis Koldeway
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 fax
fcgov.com/developmentreview
December 29, 2015
Curtis Koldeway
Hauser Architects
3780 E. 15th St. Ste 201
Loveland, CO 80538
RE: Raw Urth Designs, PDP150007, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 9702246045 or cfrickey@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 9702216567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/07/2015
10/06/2015: The legal descriptions provided pertaining to the two easement
dedications and rightofway dedication should all be titled Exhibit A instead of
Exhibits A, B & C, as our standard deeds of dedication would have to have their
references changed from their standard Exhibit A reference otherwise. These
legals are being checked by Technical Services. We'll need completed deeds
of dedication along with $750 total Transportation Development Review Fee for
3 dedications, and recording fees (amount to be determined), prior to approval
of the mylars. (Note that a replat of the property with these dedications being
done by the replat is another option that negates the need for the fees listed, but
I'm unsure what are the cost/time implications with the replat option. Either
options is equally acceptable.)
07/07/2015: The project needs to reflect the dedication of additional
rightofway along both Red Cedar Circle and Conifer Street in order for the
sidewalk installed along both streets (to the collector standard with an 8 foot
parkway and 5 foot detached sidewalk) to be in rightofway. In addition,
dedication of additional utility easement behind the new rightofway is required
in order to ensure a total of a 9 foot utility easement from behind the new
rightofway line. Each deed of dedication for rightofway and utility easement
(if done by separate document and not done via replat) will require a $250 deed
of dedication fee as part of our Transportation Development Review Fee
schedule as well as recording costs to record the deeds of dedication as
assessed by Larimer County.
Department: Environmental Planning
Contact: Kelly Kimple, 9704162401, kkimple@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 10/06/2015
10/06/2015: As noted in the prairie dog removal plan, removal methods will
follow the Fort Collins Municipal Code standards, as well as the Colorado
Division of Parks and Wildlife requirements. Furthermore, if removal is
scheduled between March 15 and October 31, a burrowing owl survey will need
to be completed following the Colorado Division of Parks and Wildlife survey
requirements.
Acknowledged
Contact: Rebecca Everette, 9704162625, reverette@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/21/2015
10/07/2015: City staff has not received an ECS. We did receive an
environmental report but it is not the standard ECS required by LUC 3.4.1. We
are willing to waive the ECS requirement and accept an updated Blacktailed
Prairie Dog removal plan, as addressed in comment #2.
The ECS will be submitted along with an updated Blacktailed Prairie Dog removal plan.
08/21/2015: The response to comments notes that an Ecological
Characterization Study was completed, but we do not have it in our records.
Was this provided prior to the submittal? Please send to Kelly Kimple
(kkimple@fcgov.com) and myself (reverette@fcgov.com) for review.
Comment Number: 2 Comment Originated: 08/21/2015
08/21/2015: The prairie dog removal plan references a different site than what
is currently proposed. Please update the removal plan with the correct site
information.
Updated
Comment Number: 3 Comment Originated: 08/21/2015
10/07/2015: In order to further comply with Section 3.4.1 of the Land Use Code,
to replace the lost ecological value from the removal of the site's prairie dog
colony, City staff recommends additional landscaping onsite that provides
enhanced habitat for birds, insects, and small terrestrial wildlife, such as
evergreen trees, fruitbearing trees and shrubs, and flowering plants.
The current plan shows a variety of habitat enhancing plantings, including evergreen trees and shrubs,
fruit and seed bearing flowering plants and a thicket of willows and native grasses in the detention
area.
08/21/2015: As noted at the conceptual review stage, mitigation for the
removal of the prairie dog colony will be requried to replace the value of the
habitat that will be lost. Please coordinate with Kelly Kimple
(kkimple@fcgov.com) or myslef (reverette@fcgov.com) to further discuss how
mitigation will occur.
Department: Forestry
Contact: Tim Buchanan, 9702216361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 07/08/2015
10/07/2015:
COMMENT CONTINUED: It appears that the standard notes have not been
added. Include the tree protection notes. Obtain these notes from Clay Frickey
for placement on the plans.
07/08/2015:
These notes have been added to sheet L1 of the landscape plan.
Obtain the standard landscape notes from the Planning Department to place on
the plan. Standard notes can be obtained from Clay Frickey or Jason Holland in
the Planning Department. Use the Planning Departments standard notes on the
plan.
Comment Number: 7 Comment Originated: 10/07/2015
10/07/2015:
Is it feasible to place trees on the north side of the entrance off Red Cedar
Street or are there utility constraints to doing so?
Trees are not proposed there due to the owner's wishes and the drainage swale that runs through the
area.
Comment Number: 8 Comment Originated: 10/07/2015
10/07/2015:
It appears that some ornamental grasses shown along the north boundary may
be on the other side of the fence. Is this the intent?
Yes, the grasses are to soften the fence when viewed from the adjacent property.
Comment Number: 8 Comment Originated: 10/07/2015
10/07/2015:
Explore adding some xeric small trees in the landscape area on the south side
of the building such as Canyon Maple or Russian hawthorn.
These trees are not added to this area due to owner's request to leave the building architectural
features visible. The proposed Saskatoon Serviceberry and Peking Cotoneaster will provide the height
of small trees over time.
Comment Number: 9 Comment Originated: 10/07/2015
10/07/2015:
Mark on the Landscape and Utility plans that the offside mature Junipers to the
north of the project will be protected. It appears that the underdrain in the LID
swale is fairly close to these trees. Contact the City Forester for an onsite
meeting to evaluate possible impact to these existing trees.
The existing offsite Junipers are noted to be protected.
Department: Historical Preservation
Contact: Karen McWilliams, 9702246078, kmcwilliams@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/26/2015
06/26/2015:
No Historic Preservation concerns
Department: Internal Services
Contact: Russell Hovland, 9704162341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 06/18/2015
06/18/2015:
Building Permit PreSubmittal Meeting:
PreSubmittal meetings are offered to assist the designer/builder by assuring,
early on in the design, that the new commercial or multifamily projects are on
track to complying with all of the adopted City codes and Standards listed
below. The proposed project should be in the early to middesign stage for this
meeting to be effective and is typically scheduled after the Current Planning
conceptual review meeting. Applicants of new commercial or multifamily
projects are advised to call 4162341 to schedule a presubmittal meeting.
Applicants should be prepared to present site plans, floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 95 & ICC/ANSI A117.12009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100 MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multifamily and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multifamily 4 stories and taller: 2012 IECC commercial
chapter.
City of Fort Collins
Building Services
Plan Review
4162341
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 09/30/2015
09/30/2015: 1Phase & 3Phase power is available at the site on both the East
and West side of the property.
Comment Number: 6 Comment Originated: 09/30/2015
09/30/2015: Please contact Light & Power Engineering if you have any
questions at 2216700. Please reference our policies, development charge
processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/buildersanddevelopers.
Comment Number: 7 Comment Originated: 10/09/2015
10/09/2015: Contact Light & Power Engineering to coordinate the transformer
location. Transformer must be within 10' of an asphalt/concrete surface. An 8'
clearance from the front of the transformer and 3' on the sides and back is
required.
The transformer has been located on the architectural site plan.
Contact: Rob Irish, 9702246167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/26/2015
06/26/2015: Owner will be responsible to pay for any relocation or modification
of existing electric facilities at the proposed site.
Comment Number: 2 Comment Originated: 06/26/2015
06/26/2015: Electric Capacity Fee, Building Site charges and any necessary
system modification charges will apply. Please see the Electric Estimating
Calculator and Electric Construction Policies, Practices & Procedures at the
following link
http://www.fcgov.com/utilities/business/buildersanddevelopers/plantinvestmen
tdevelopmentfees
Comment Number: 3 Comment Originated: 06/26/2015
06/26/2015: Please provide a one line diagram and a C1 form to Light and
Power Engineering. The C1 form can be found at:
http://zeus.fcgov.com/utilsprocedures/files/EngWiki/WikiPdfs/C/C1Form.pdf
Comment Number: 4 Comment Originated: 06/26/2015
06/26/2015: Contact Light & Power Engineering to coordinate the transformer
location. Transformer must be within 10' of an asphalt/concrete surface. Pay
close attention to the transformer clearances in the Electric Construction
Policies, Practices & Procedures.
Department: PFA
Contact: Jim Lynxwiler, 9704162869, jlynxwiler@poudrefire.org
Topic: General
Comment Number: 3 Comment Originated: 07/08/2015
07/08/2015: PUBLICSAFETY RADIO AMPLIFICATION SYSTEM
New buildings require a fire department, emergency communication system
evaluation after the core/shell but prior to final build out. For the purposes of this
section, fire walls shall not be used to define separate buildings. Where
adequate radio coverage cannot be established within a building, publicsafety
radio amplification systems shall be designed and installed in accordance with
criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau
Admin Policy #0701
Comment Number: 6 Comment Originated: 09/25/2015
09/25/2015: EXHIBIT C PARCEL DESCRIPTION
Limits of the easement have been described but not labeled as an Emergency
Access Easement in the document as far as I could tell. Please clarify.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: Construction Drawings
Comment Number: 9 Comment Originated: 07/07/2015
10/06/2015: Slope is shown to be 0.8%, which is less than the recommended
2%. Please consider add a soft pan or concrete pan to mitigate against
standing water issues in the future.
07/07/2015: Please show slope for pond bottom.
Comment Number: 10 Comment Originated: 07/07/2015
10/06/2015: Please provide additional information on detail including depth
that wall is to extend.
07/07/2015: Headwall design does not appear to be stable. Please consider
adding footer and/or extending below frost depth.
Added a concrete pand
Topic: Drainage Report
Comment Number: 5 Comment Originated: 07/07/2015
10/06/2015: Detail seen. Please provide calculations.
07/07/2015: Please provide calculations for sizing of the sidewalk culvert in the
report and provide detail in the plans.
Added weir calculations and channel calculations
Topic: Easements
Comment Number: 14 Comment Originated: 07/08/2015
10/06/2015: Please expand drainage easement as is, it does not cover the
entire detention basin.
07/08/2015: Please provide easement for detention basin, outfall pipe and
spillway.
See revised drainage easement document.
Topic: General
Comment Number: 15 Comment Originated: 10/07/2015
10/06/2015: Please add the spillway elevation to the stagestorage table.
Added – same elevation as the 100 year WSEL
Comment Number: 16 Comment Originated: 10/07/2015
10/06/2015: Please show that the detention basin is in compliance with drain
times per Colorado Revised Statute 3792602(8).
Added a pdf of the State spreadsheet.
Contact: Jesse Schlam, 9702182932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 06/30/2015
10/05/2015: Minor issue with rock berm detail not containing an emergancy
overflow. If you need clarification concerning this, or if there are any questions
please contact Jesse Schlam 9702182932 or email @ jschlam@fcgov.com
06/30/2015: Minor redline on Erosion Control Plan will look for change in FDP.
Report OK Escrow OK. If you need clarification concerning this, or if there are
any questions please contact Jesse Schlam 9702182932 or email @
jschlam@fcgov.com
See revised detail.
Department: Technical Services
Contact: Jeff County, 9702216588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 07/08/2015
10/05/2015: No comments.
07/08/2015: No comments.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 07/08/2015
10/05/2015: Please correct the titleblocks on sheets 28 as marked. See
redlines.
Corrected per your comments.
07/08/2015: Please correct the legal description on sheet 1, and the titleblocks
as shown. See redlines.
Comment Number: 3 Comment Originated: 07/08/2015
10/05/2015: The Benchmark Statement must match the format shown in the
previous comment.
Corrected per your comments
07/08/2015: The Benchmark Statement needs to match the following:
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 X.XX¿.
Comment Number: 4 Comment Originated: 07/08/2015
10/05/2015: There are still line over text issues. See redlines.
07/08/2015: There are line over text issues. See redlines.
Corrected per your comments
Topic: General
Comment Number: 12 Comment Originated: 10/05/2015
10/05/2015: Since right of way & easements are being dedicated, you might
consider replatting Lot 20. This would dedicate everything on one document.
We already have the right of way and easements dedicated via separate instrument. We will not be
replatting.
Topic: Lighting Plan
Comment Number: 7 Comment Originated: 07/08/2015
10/05/2015: No comments.
07/08/2015: No comments.
Topic: Site Plan
Comment Number: 9 Comment Originated: 07/08/2015
10/05/2015: The southeast corner of the property does not match the legal
description dedicating the new Utility Easement.
07/08/2015: What is the 5' dimension (marked) along the north side of the
property? If it is an easement line/dimension, it does not match the Plat. Please
see the lines marked at the southeast corner of the property also. If these are
easement lines they do not match the Plat. If these lines are easement lines,
please correct them. If they are not, please disregard.
Department: Traffic Operation
Contact: Martina Wilkinson, 9702216887, mwilkinson@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 07/07/2015
10/06/2015: Check on the design details for the sidewalk ramp connection to
ensure you're showing the current standards.
07/07/2015: The sidewalk ramps at Red Cedar need to be directional.
Department: Water Conservation
Contact: Eric Olson, 9702216704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/06/2015
10/06/2015: The irrigation plan is incomplete. Please refer to the provisions
outlined in Section 3.2.1(J) of the Land Use Code. Identify master valve and
smart controller with weather station on the irrigation legend and on irrigation
plan. Direct questions concerning irrigation requirements to Eric Olson, at
2216704 or eolson@fcgov.com
These items are now shown and labeled on the irrigation plan and irrigation legend.
Department: Zoning
Contact: Noah Beals, 9704162313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/07/2015
07/07/2015: ON sheet A1 under the 'General Notes', specifically note number
6, please include the language " Signs are not approved with this plan. All signs
will be approved through a separate sign permit."
Comment Number: 2 Comment Originated: 07/07/2015
07/07/2015: In reference to the sign shown on the elevations, this sign does not
meet the sign code standards.
Comment Number: 3 Comment Originated: 07/07/2015
07/07/2015: Please label the ramp from the handicap loading area to the
internal sidewalk.
Comment Number: 4 Comment Originated: 07/07/2015
07/07/2015: The plans are only showing an area for trash please include the
area for recycling also.
Comment Number: 5 Comment Originated: 07/07/2015
07/07/2015: Please, clarify the property line on the landscape plan. It is difficult
to discern.
The property boundary has been labeled (PL) on all 4 sides if the site.