Loading...
HomeMy WebLinkAboutBROOKVIEW APARTMENTS - PDP - PDP160003 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT January 6, 2016 BROOKVIEW APARTMENTS Fort Collins, Colorado Prepared for: Old Town Square Properties 5 Old Town Square, Suite 216 Fort Collins, CO 80524 970-221-9332 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1109-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Preliminary Drainage and Erosion Control Report for Brookview Apartments Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies Project Development Plan submittal for the proposed Brookview Apartments development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer Brookview Apartments Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 1 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 F. Floodplain Regulations Compliance .................................................................................................. 6 G. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Specific Details (to be provided with Final Design) ........................................................................... 7 V. CONCLUSIONS ........................................................................................................ 8 A. Compliance with Standards .............................................................................................................. 8 B. Drainage Concept .............................................................................................................................. 8 References ......................................................................................................................... 9 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations (to be provided with final design) APPENDIX C – Erosion Control Report Brookview Apartments Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2 – Proposed Site Plan ............................................................................................... 3 Figure 3 – Existing Floodplains ............................................................................................. 4 MAP POCKET: DR1 - Drainage Exhibit Brookview Apartments Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. Located in the Northwest ¼ of Section 19, Township 7 North, Range 68 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. The site is a part of Lot 1, Spring Creek Village 2nd. 3. Bounded to the north by existing apartment buildings. Bounded to the south by Stuart Street. Bounded to the west by existing Stuart Professional Park Condos. Bounded to the east by existing apartment buildings. 4. No offsite flows are directed into the site. 5. Brookview Apartments is an existing apartment complex. This project encompasses the additional of a new apartment building to the existing complex. B. Description of Property 1. The total disturbed site area is 0.81 acres. Total area of site is 1.19 acres. Brookview Apartments Preliminary Drainage Report 2 Figure 1 – Aerial Photograph 2. The existing site is comprised of an existing parking lot, curb and gutter, irrigated turf, numerous conifer and deciduous trees, and berming. 3. Generally, the west half of the site slopes to the existing parking lot, the northeast quarter of the site slopes to a low point leading to an existing concrete pan, and the southeast quarter of the site slopes to Stuart Street. 4. A Web Soil Survey provided by the Natural Resources Conservation Service on September 22, 2015 has identified the on-site soil as 68% Hydrologic Soil Group C and 32% Hydrologic Soil Group B. Hydrologic Soil Group B have a moderate infiltration rate, and Hydrologic Soil Group C have a slow infiltration rate when thoroughly wet. For conservative purposes, calculations have been done assuming a Hydrologic Soil Group C for the site. 5. The proposed project site plan is composed of 2-Story Apartment Building and expanded parking lot. This site will employ many water quality features and runoff reduction facilities including porous pavers, and minimized directly connected impervious areas (MDCIA). Brookview Apartments Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 6. Existing irrigation facilities are expected on-site. Facilities will need to be relocated during construction. 7. The project site is within the existing Brookview Apartments development. Additional runoff from the site will be detained prior to being released and routed through the existing development, as historic. The proposed project is not requesting a change in the land use. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. Brookview Apartments Preliminary Drainage Report 4 Figure 3 – Existing Floodplains II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Brookview Apartments project is located within the Spring Creek Drainage Basin, which is located between the foothills and Timberline Road from east to west and approximately between Horsetooth Road and Prospect Road from north to south. B. Sub-Basin Description 1. The historic drainage sub-basin H-A encompasses the western half of the site. This basin drains north through the existing parking lot to an inlet near the northeast corner of the parking lot. This inlet releases to Spring Creek. Basin H-A has an existing total impervious area of 0.28 acres and 100-yr runoff of 3.64 cfs. 2. The historic drainage sub-basin H-B encompasses the northeast quarter of the site. This basin drains to a small sump surrounded by berming. This sump when filled overflows to the north. Stormwater runoff is directed to a concrete pan that traverses the site to an inlet. This inlet releases to Spring Creek. Basin H-B has an existing total impervious area of 0.0 acres and 100-yr runoff of 0.63 cfs. 3. The historic drainage sub-basin H-C encompasses the southeast quarter of the site. This basin drains to Stuart Street and is conveyed via curb and gutter east along Stuart Brookview Apartments Preliminary Drainage Report 5 Street to a downstream inlet. Basin H-C has an existing total impervious area of 0.01 acres and 100-yr runoff of 0.69 cfs. 4. The total existing runoff from the site during a 100-yr event is 4.96 cfs. 5. The proposed plan will generally maintain these release points. The total proposed runoff from the site will mimic the total existing runoff from the site. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Brookview Apartments project. B. Four Step Process The overall stormwater management strategy employed with Brookview Apartments project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Providing large vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Providing permeable paver areas to increase time of concentration promote infiltration and provide water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release Additional water quality has not been provided within the detention pond, with guidance from the City. It was determined that water quality treatment within the detention pond would mostly be treating rooftop stormwater runoff. Since rooftops generally do not produce the same amount of contamination as parking lots, it was determined that water quality treatment would be unnecessary. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. This project discharges to existing an existing parking lot and concrete pan. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: A portion of the existing parking lot will be treated for water quality via permeable pavers. This will improve the runoff from the existing condition. C. Development Criteria Reference and Constraints 1. All drainage facilities proposed with the Brookview Apartments project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. Brookview Apartments Preliminary Drainage Report 6 D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. As of this report, pervious pavers have not been added to Table RO-11. A coefficient of runoff of 0.40 was assumed for the pervious pavers. This is a value published by Advanced Pavement Technology. 3. The Rational Formula-based Modified Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, generally, the west half of the site slopes to the existing parking lot, the northeast quarter of the site slopes to a low point leading to an existing concrete pan, and the southeast quarter of the site slopes to Stuart Street.. 2. All drainage facilities proposed with the Brookview Apartments project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is not located within a FEMA regulatory floodplain. 4. The Brookview Apartments project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Brookview Apartments drainage design are to maintain the allowable storm runoffs as outlined by the FCSCM. 2. A list of tables and figures used within this report can be found in the Table of Brookview Apartments Preliminary Drainage Report 7 Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 3. The Brookview Apartments project is divided the site into three (3) drainage sub- basins, designated as Basins A, B, and C. These basins correspond to the historic sub-basins H-A, H-B, and H-C. Though the areas of the proposed basins may have changed from the historic, the outfall location was maintained. The drainage patterns anticipated for each basin and sub-basin are further described below. Basin A Basin A consists of a proposed parking lot, permeable pavers, sidewalks, and existing vegetation. Runoff from this basin drains to the proposed parking lot. During a 2-year event, approximately 30% of the runoff is expected to be captured in the permeable pavers. During a 100-yr event, runoff will continue north through the existing parking lot to an existing inlet that outfalls to Spring Creek. Basin A has a proposed total impervious area of 0.32 acres (0.04 acres more than the existing condition) and 100- yr runoff of 4.74 cfs (1.1 cfs more than the existing condition). Basin B Basin B consists of the proposed building, detention pond, and existing vegetation. Runoff from the west and south side of the rooftops will be conveyed via roofdrain to the detention pond. Runoff from the east and north side of the rooftops will be released at grade and overland flow to the ponds. Basin B has a proposed total impervious area of 0.18 acres (0.18 acres more than the existing condition) and 100- yr runoff of 3.13 cfs (2.50 cfs more than the existing condition). Developed runoff will be detained in the detention pond and released at the historic 2-yr rate of 0.14 cfs. Basin C Basin C consists of the proposed parking lot, sidewalk, and existing vegetation. Runoff from this basin is captured and conveyed via curb and gutter east along Stuart Street. Basin C has a proposed total impervious area of 0.03 acres (0.02 acres more than the existing condition) and 100-yr runoff of 0.66 cfs (0.03 cfs less than the existing condition). The total runoff, including detention release, for the proposed site during a 100-yr event is 5.54 cfs. The proposed runoff total 0.58 cfs more than the existing condition. Due to the proximity of the site to Spring Creek, the effect of this additional runoff is considered negligible. Downstream facilities are not expected to be impacted by this project. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details (to be provided with Final Design) 1. All storm sewers were modeling using Hydraflow Storm Sewers Extension for Autodesk AutoCAD. 2. Detention pond orifice plate were completed with an Excel spreadsheet. Brookview Apartments Preliminary Drainage Report 8 V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Brookview Apartments project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Brookview Apartments project complies with the City of Fort Collins’ Master Drainage Plan for the Spring Creek Drainage Basin. 3. There are no regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site achieves the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 32% of proposed paved areas as permeable pavers and providing 53% of total impervious areas as being treated through an LID treatment and/or grass buffers. B. Drainage Concept 1. The drainage design proposed with this project will effectively comply with City, State, and Federal regulations. Proposed stormwater facilities will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development 2. The drainage design is anticipated to be fairly conservative. We have omitted any runoff reduction that will manifest due to infiltration from pervious pavement. This is currently unable to be calculated with available soils data. Brookview Apartments Preliminary Drainage Report 9 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Brookview Apartments CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Brookview Apartments Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….. 0.95 100% Date: December 30, 2015 Concrete …….......……………….….……….………………..….…………………………………………………….. 0.95 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….. 0.50 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….. 0.15 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….. 0.25 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite Brookview Apartments Overland Flow, Time of Concentration: Brookview Apartments Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 H-A No 0.52 0.52 0.65 178 1.69% 12.2 12.2 9.5 126 3.17% 3.56 0.6 12.8 12.8 10.1 2 H-B No 0.25 0.25 0.31 85 2.71% 10.5 10.5 9.7 0 N/A N/A N/A 10.5 10.5 9.7 3 H-C No 0.28 0.28 0.34 48 9.17% 5.1 5.1 4.7 162 0.93% 1.92 1.4 6.5 6.5 6.1 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. HISTORIC TIME OF CONCENTRATION COMPUTATIONS Brookview Apartments Rational Method Equation: Project: Brookview Apartments Calculations By: Date: Rainfall Intensity: 1 H-A 0.73 13 13 10 0.52 0.52 0.65 2.02 3.45 7.72 0.76 1.30 3.64 2 H-B 0.25 11 11 10 0.25 0.25 0.31 2.17 3.71 7.88 0.14 0.24 0.63 3 H-C 0.21 7 7 6 0.28 0.28 0.34 2.60 4.44 9.31 0.15 0.26 0.69 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) HISTORIC RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 December 30, 2015 Intensity, i10 (in/hr) C10 Q = C f ( C )( i )( A ) 12/30/2015 9:05 AM D:\Projects\1109-001\Drainage\Hydrology\1109-001_Historic Rational Calcs.xlsx\Runoff Brookview Apartments CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: Brookview Apartments Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….. 0.95 100% Date: 12/30/15 Concrete …….......……………….….……….………………..….…………………………………………………….. 0.95 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….. 0.50 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….. 0.15 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….. 0.25 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year C f = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Existing Asphalt (ac) Area of Proposed Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient Brookview Apartments Overland Flow, Time of Concentration: Brookview Apartments Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 A No 0.60 0.60 0.75 77 2.34% 6.2 6.2 4.3 194 3.51% 3.74 0.9 7.0 7.0 5.2 2 B No 0.58 0.58 0.73 121 4.55% 6.4 6.4 4.6 0 N/A N/A N/A 6.4 6.4 5.0 3 C No 0.41 0.41 0.51 46 9.57% 4.1 4.1 3.5 170 1.00% 2.00 1.4 5.6 5.6 5.0 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS Brookview Apartments Rational Method Equation: Project: Brookview Apartments Calculations By: Date: Rainfall Intensity: 1 A 0.63 7 7 5 0.60 0.60 0.75 2.52 4.31 9.95 0.96 1.64 4.74 2 B 0.43 6 6 5 0.58 0.58 0.73 2.67 4.56 9.95 0.67 1.15 3.13 3 C 0.13 6 6 5 0.41 0.41 0.51 2.76 4.72 9.95 0.15 0.25 0.66 December 30, 2015 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Q = C f ( C )( i )( A ) 12/30/2015 9:04 AM D:\Projects\1109-001\Drainage\Hydrology\1109-001_Rational Calcs.xlsx\Runoff Hydrologic Soil Group—Larimer County Area, Colorado (Brookview Apartments) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/22/2015 Page 1 of 4 4490300 4490310 4490320 4490330 4490340 4490350 4490360 4490370 4490380 4490390 4490300 4490310 4490320 4490330 4490340 4490350 4490360 4490370 4490380 4490390 495220 495230 495240 495250 495260 495270 495280 495290 495300 495310 495320 495330 495340 495350 495360 495220 495230 495240 495250 495260 495270 495280 495290 495300 495310 495320 495330 495340 495350 495360 40° 33' 51'' N 105° 3' 23'' W 40° 33' 51'' N 105° 3' 17'' W 40° 33' 48'' N 105° 3' 23'' W 40° 33' 48'' N 105° 3' 17'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 30 60 120 180 Feet 0 5 10 20 30 Meters Map Scale: 1:667 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes C 0.9 67.9% 101 Stoneham loam, 1 to 3 percent slopes B 0.4 32.1% Totals for Area of Interest 1.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Brookview Apartments Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/22/2015 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Brookview Apartments Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/22/2015 Page 4 of 4 APPENDIX B HYDRAULIC COMPUTATIONS (TO BE PROVIDED WITH FINAL REPORT) APPENDIX C EROSION CONTROL REPORT Brookview Apartments Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT T T T T T T T T T T T T T EAST STUART STREET T T T T T T T T T G BANK OF 21 GAS METERS G G H-A H-B H-C 1 EAST STUART STREET EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING STUART PROFESSIONAL PARK CONDOS 3RD These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com DR2 NORTH CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL X X X X X X X X X X X X G BANK OF 21 GAS METERS G G 1 2 B A C 1 EAST STUART STREET EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING STUART PROFESSIONAL PARK CONDOS 3RD PROPOSED BUILDING PROPOSED BUILDING RETAINING WALL PROPOSED STORM DRAIN PROPOSED SMALL AREA INLET PROPOSED SMALL AREA INLET PROPOSED UNDERDRAIN PROPOSED STORM DRAIN These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com DR1 NORTH CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A 0.63 0.60 0.75 7.0 5.2 0.96 4.74 2 B 0.43 0.58 0.73 6.4 5.0 0.67 3.13 3 C 0.13 0.41 0.51 5.6 5.0 0.15 0.66 Environmental Planner LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION Survey Area Data: Version 9, Sep 22, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Brookview Apartments) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/22/2015 Page 2 of 4 S. Thomas December 30, 2015 Design Point Sub-Basin Overland Flow Gutter/Pipe Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/30/2015 9:04 AM D:\Projects\1109-001\Drainage\Hydrology\1109-001_Rational Calcs.xlsx\Tc 100-year Composite Runoff Coefficient Composite % Imperv. Impervious Area (ac) Basin Treated thru LID? Percent of Basin Treated with LID Impervious Area Treated with LID (ac) LID Treated Impervious Area (ac) A 0.63 0.15 0.07 0.08 0.04 0.01 Clayey | Average 2% to 7% 0.29 0.60 0.60 0.75 50% 0.32 YES 30% 0.09 0.09 B 0.43 0.00 0.00 0.02 0.00 0.19 Clayey | Average 2% to 7% 0.23 0.58 0.58 0.73 43% 0.18 YES 100% 0.18 0.18 C 0.13 0.00 0.01 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.10 0.41 0.41 0.51 21% 0.03 NO 0% 0.00 0.00 TOTAL 1.20 0.15 0.08 0.12 0.04 0.19 Clayey | Average 2% to 7% 0.62 0.57 0.57 0.72 44% 0.53 NO 0.28 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Permeable Pavement LID Treatment Total Pavement, including Existing (ac)= 0.27 Total Impermeable Area(ac)= 0.53 Total Proposed Pavement (ac)= 0.11 Total Impermeable Area Treated with LID(ac)= 0.28 Total Permeable Pavement (ac)= 0.04 Percent Treated with LID= 53% LID Requirements Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS LID Treatment 12/30/2015 9:03 AM D:\Projects\1109-001\Drainage\Hydrology\1109-001_Rational Calcs.xlsx\Composite C S. Thomas December 30, 2015 Design Point Sub-Basin Overland Flow Gutter/Pipe Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/30/2015 9:05 AM D:\Projects\1109-001\Drainage\Hydrology\1109-001_Historic Rational Calcs.xlsx\Tc % Imperv. Impervious Area (ac) Basin Treated thru LID? LID Treated Impervious Area (ac) H-A 0.73 0.21 0.04 0.07 0.00 0.00 Clayey | Average 2% to 7% 0.40 0.52 0.52 0.65 38% 0.28 NO 0.00 H-B 0.25 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.25 0.25 0.25 0.31 0% 0.00 NO 0.00 H-C 0.21 0.01 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.21 0.28 0.28 0.34 4% 0.01 NO 0.00 TOTAL 1.20 0.22 0.04 0.07 0.00 0.00 Clayey | Average 2% to 7% 0.86 0.42 0.42 0.52 24% 0.28 NO 0.00 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Composite Runoff Coefficient with Adjustment LID Treatment EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 12/30/2015 9:05 AM D:\Projects\1109-001\Drainage\Hydrology\1109-001_Historic Rational Calcs.xlsx\Composite C