HomeMy WebLinkAboutHARMONY COMMONS - PDP - PDP150027 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT
Harmony Commons Subdivision
Prepared for:
Brinkman Partners
3528 Precision Drive, Suite 100
Fort Collins, CO 80528
(970) 667-0954
Prepared by:
Interwest Consulting Group
1218 West Ash, Suite A
Windsor, Colorado 80550
(970) 674-3300
January 20, 2016
Job Number 1254-045-00
iii
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................ iii
1. GENERAL LOCATION AND DESCRIPTION ................................................................ 1
1.1 Location ........................................................................................................................... 1
1.2 Description of Property ................................................................................................. 1
1.3 Floodplain Submittal Requirements ............................................................................. 1
2. DRAINAGE BASINS AND SUB-BASINS .......................................................................... 2
2.1 Major Basin Description ................................................................................................ 2
2.2 Sub-basin Description .................................................................................................... 2
3. DRAINAGE DESIGN CRITERIA ...................................................................................... 2
3.1 Regulations ...................................................................................................................... 2
3.2 Directly Connected Impervious Area (DCIA) Discussion .......................................... 2
3.3 Development Criteria Reference and Constraints ...................................................... 3
3.4 Hydrological Criteria ..................................................................................................... 4
3.5 Hydraulic Criteria .......................................................................................................... 5
3.6 Floodplain Regulations Compliance ............................................................................. 5
3.7 Modifications of Criteria ............................................................................................... 5
4. DRAINAGE FACILITY DESIGN ....................................................................................... 5
4.1 General Concept ............................................................................................................. 5
4.2 Specific Details ................................................................................................................ 5
5. CONCLUSIONS .................................................................................................................... 9
5.1 Compliance with Standards .......................................................................................... 9
5.2 Drainage Concept ........................................................................................................... 9
6. REFERENCES ...................................................................................................................... 9
APPENDIX
VICINITY MAP AND DRAINAGE PLAN .............................................................................. A
HYDROLOGIC COMPUTATIONS .......................................................................................... B
HYDRAULIC COMPUTATIONS (PROVIDED AT FINAL) ................................................. C
WATER QUALITY AND LID INFORMATION .................................................................... D
EXCERPTS FROM REFERENCE REPORTS......................................................................... E
OFFSITE STORM SYSTEM ...................................................................................................... F
1
1. GENERAL LOCATION AND DESCRIPTION
1.1 Location
The Harmony Commons Subdivision is located in the Northwest Quarter of Section 4,
Township 6 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort
Collins, Larimer County, Colorado. Please refer to the vicinity map in Appendix A.
The project site is located at the southwest corner of E. Harmony Road and Lady Moon
Drive. Lady Moon Drive bounds the property on the east, E. Harmony Road on the north,
a vacant parcel on the west and Timberwood Drive on the south. The Harmony
Commons Subdivision development consists of Lots 1 through 6 and is a replat of Lot
One, Harmony Technology Park Second Filing.
1.2 Description of Property
The property consists of about 9.2 acres of land and will be constructed in two phases.
The first phase (Lots 3, 4 and 5) will consist of three new buildings and new parking and
drive aisles. The second phase (Lots 1, 2 and 6) will also consist of three new buildings
and additional parking and drive aisles.
This report is specific to the design of Lots 3, 4 and 5 which are the only lots included in
the current Project Development Plan.
The site generally slopes in an easterly direction at approximately 0.5% to 1.0%. The land
is currently vacant. Offsite flow contributes to the site from the adjacent south half of
Harmony Road and the adjacent full width of Lady Moon Drive.
According to FEMA Panel 08069C0994F there are no mapped FEMA Floodways on this
property.
1.3 Floodplain Submittal Requirements
Because the project is not within any FEMA or City of Fort Collins mapped floodway, a
Floodplain Submittal is not required and a “City of Fort Collins Floodplain Review
Checklist for 50% Submittals” has not been included with this report.
2
2. DRAINAGE BASINS AND SUB-BASINS
2.1 Major Basin Description
The proposed development lies within the McClellands Basin and McClellands Creek
Master Drainage Plan. The overall development has been designed with a master plan by
Stantec Consulting, Inc. and titled “Final Drainage and Erosion Control Study Harmony
Technology Park Site Master Plan”, dated May 19, 2008.
2.2 Sub-basin Description
Historically, the site generally drains to the storm system in Lady Moon and eventually
reaches the Fossil Creek Reservoir Inlet Ditch (FCRID).
3. DRAINAGE DESIGN CRITERIA
3.1 Regulations
This report was prepared to meet or exceed the “City of Fort Collins Storm Drainage
Design Criteria Manual” specifications. Where applicable, the criteria established in the
“Urban Storm Drainage Criteria Manual” (UDFCD), developed by the Denver Regional
Council of Governments, has been used.
3.2 Directly Connected Impervious Area (DCIA) Discussion
Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process
for receiving water protection that focuses on reducing runoff volumes, treating the water
quality capture volume (WQCV), stabilizing drainageways and implementing long-term
source controls. The Four Step Process applies to the management of smaller, frequently
occurring events.
Step 1: Employ Runoff Reduction Practices
To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement
Low Impact Development (LID) strategies, including Minimizing Directly Connected
Impervious Areas (MDCIA).
3
Runoff for the northern portion adjacent to Harmony Road will be routed through
vegetated areas through sheet flow thereby reducing runoff from impervious surfaces over
permeable areas to slow runoff and increase the time of concentration and promote
infiltration. Runoff for the eastern portion adjacent to Lady Moon Drive will be routed
through two bioswales thereby reducing runoff from impervious surfaces over permeable
areas to slow runoff and increase the time of concentration and promote infiltration.
Runoff from the parking lots and surrounding sidewalks shall drain directly into porous
pavement systems thereby slowing runoff and also promoting infiltration
Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow
Release
Once runoff has been minimized, the remaining runoff shall be treated through the porous
pavement system. The porous pavement system allows for settlement of sediments.
Step 3: Stabilize Drainageways
Natural Drainageways are subject to bed and bank erosion due to increases in frequency,
duration, rate and volume of runoff during and following development. Because the site
will drain to a master planned regional water quality and detention pond, bank
stabilization is unnecessary with this project.
Step 4: Implement Site Specific and Other Source Control BMPs
Proactively controlling pollutants at their source by preventing pollution rather than
removing contaminants once they have entered the stormwater system or receiving waters
is important when protecting storm systems and receiving waters. This can be
accomplished through site specific needs such as construction site runoff control, post-
construction runoff control and pollution prevention / good housekeeping. It will be the
responsibility of the contractor to develop a procedural best management practice for the
site.
3.3 Development Criteria Reference and Constraints
The runoff from this site has been routed to conform to the requirements of the City
Stormwater Department and the approved Harmony Tech Park drainage plan. Because
water quality capture volume from this site will be provided for in the downstream
regional detention and water quality pond 301, water quality facilities are not required for
the site. However, City LID requirements are necessary therefore; additional water
4
quality will be accomplished through the use of the porous pavement systems that include
12” of storage in the voids below the pavers and bioswales located along Lady Moon
Drive. The impervious area for the site has also already been accounted for in Pond 301
and was assumed to have a C value of 0.80 and an impervious value of 80%. Please refer
to supporting documentation in Appendix E.
Runoff reduction practices (LID techniques) are also required. No less than fifty percent
of any newly added impervious area must be treated using one or a combination of LID
techniques. The project adds 177,583 sf of new impervious area. Using the porous paver
LID technique, 97,224 sf of new impervious area (55%) will be treated which exceeds the
50% requirement.
No less than twenty five percent of any newly added pavement areas must be treated
using a permeable pavement technology. The project adds 106,822 sf of new pavement
area. This project will incorporate 29,571 sf of porous pavers which is 28% of the newly
added pavement which meets the required 25%.
Please refer to Appendix D for LID calculations and information.
3.4 Hydrologic Criteria
Runoff computations were prepared for the 10-year minor and 100-year major storm
frequency utilizing the rational method.
All hydrologic calculations associated with the basins are included in Appendix B of this
report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub-
basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub-
basins and Design Points associated with this site.
Water quality capture volume and detention has been provided for in the downstream
regional detention and water quality pond 301.
5
3.5 Hydraulic Criteria
All hydraulic calculations will be presented in the final drainage report and prepared in
accordance with the City of Fort Collins Drainage Criteria. Preliminary StormCAD
calculations are included in Appendix C of this report.
Finalized hydraulic calculations will be presented in the final drainage report.
3.6 Floodplain Regulations Compliance
The project is not within any FEMA or City of Fort Collins mapped floodway ; therefore,
Floodplain Regulations Compliance is not required.
3.7 Modifications of Criteria
The Master Plan basin cannot all reach Pond 301 at Lady Moon and Harmony. This area
will free release and is discussed in the report.
4. DRAINAGE FACILITY DESIGN
4.1 General Concept
The majority of the proposed development will be collected and conveyed to the
proposed storm drain system via porous pavement systems before being under
Timberwood Drive to Pond 301. Lady Moon and Harmony flows will be treated for
water quality via bioswales before being released into the existing storm system in Lady
Moon Drive.
4.2 Specific Details
A summary of the drainage patterns within each basin is provided in the following
paragraphs. Please refer to Appendix A for the drainage plan.
6
PROPOSED DEVELOPMENT (LOTS 3, 4 AND 5)
Basins A and B are 0.56 and 0.81 acres, respectively. They contain the parking lot on
Lot 5. Basin A is calculated to have a 10-year discharge of 1.7 cfs and a 100-year
discharge of 4.8 cfs. Flows from Basin A are captured by the porous paver system where
the 100-year flow will be detained and reduced to 1.5 cfs. Basin B is calculated to have a
10-year discharge of 2.5 cfs and a 100-year discharge of 6.8 cfs. Flows from Basin B are
also captured by the porous paver system where the 100-year flow will be detained and
reduced to 3.2 cfs. An underdrain system will release this flow into the proposed storm
system. This system releases into the east side of the existing double 5’x2’ box culvert
under Timberwood Drive. This culvert directs flow south to Pond 301.
Basin C is 0.19 acres, contains the western east-west drive aisle and is calculated to have
a 10-year discharge of 0.7 cfs and a 100-year discharge of 1.7 cfs. Flows from Basin C
are captured by the proposed Type R inlets in the drive aisle that direct flow to the
proposed storm system that releases to the existing double 5’x2’ box culvert under
Timberwood Drive.
Basin D1 and D2 are 0.25 and 0.37 acres, respectively. These basins contain the Lot 5
building and eastern most portion of the east-west drive aisle and the southern parking lot
of Lot 4. Basin D1 has a 10-year discharge of 1.0 cfs and a 100-year discharge of 2.5 cfs.
Flows from the parking lot will be captured in the proposed Type R inlet located at design
point d1. Flows from the north half of the drive aisle will be captured in the proposed
Type R inlet in the drive aisle. Basin D2 has a 10-year discharge of 1.6 cfs and a 100-
year discharge of 3.7 cfs. Flows from the south half of the drive aisle will be captured in
the proposed Type R inlet in the drive aisle and the roof flow will be collected in roof
drains. Both inlets and roof drains will drain to the same proposed storm system that
releases into the existing double 5’x2’ box culvert under Timberwood Drive.
Basins E and F are 0.82 and 0.83 acres, respectively. They contain the north-south drive
aisle and the parking lots on the south side of Lots 3 and 4. Basin E is calculated to have
a 10-year discharge of 2.8 cfs and a 100-year discharge of 6.5 cfs. Flows from Basin E
are captured by the porous paver system where the 100-year flow will be detained and
reduced to 2.2 cfs. Basin F is calculated to have a 10-year discharge of 2.6 cfs and a 100-
year discharge of 7.6 cfs. Flows from Basin F are also captured by the porous paver
7
system where the 100-year flow will be detained and reduced to 2.5 cfs. An underdrain
system will release this flow into the proposed storm system. This system releases into
the existing double 5’x2’ box culvert under Timberwood Drive. This culvert directs flow
south to Pond 301.
Basin G is 1.18 acres and contains buildings of Lots 3 and 4. This basin has a 10-year
discharge of 2.9 cfs and 8.2 cfs. Flows from the buildings roofs will be collected in roof
drains that will drain to the same proposed storm system that releases into the existing
double 5’x2’ box culvert under Timberwood Drive.
Basin H is 0.69 acres, contains the south half of Harmony Road adjacent to Lots 2 and 3
and is calculated to have a 10-year discharge of 1.9 cfs and a 100-year discharge of 5.5
cfs. Flows from Basin B are captured by the existing 24” flared end section which directs
flow into the proposed storm system that releases into the existing double 5’x2’ box
culvert under Timberwood Drive.
FUTURE DEVELOPMENT (LOTS 1, 2 AND 6)
The final design of the future development will occur when these projects submit a PDP.
Basin I is 1.73 acres and has a 10-year discharge of 4.3 cfs and a 100-year discharge of
12.0 cfs. Basin I contains Lot 6’s building, the adjacent east-west drive aisle located to
the north of the building and parking lot located to the south of the building. Flows from
this basin will be collected in the building roof drains, Type R inlets proposed in the drive
aisle and porous paver system that will all drain to a proposed storm system (future) that
will release into the west side of the existing double 5’x2’ box culvert under Timberwood
Drive. The porous paver system will reduce the 100-year flow to 7.0 cfs.
Basin J is 1.39 acres and contains Lot 1’s parking lot and southern portion of Lot 1’s
building and the southern portion of Lot 2’s parking lot. Basin J is calculated to have a
10-year discharge of 3.5 cfs and a 100-year discharge of 9.8 cfs. Flows from Basin J will
be captured by the porous paver system where the 100-year flow will be detained and
reduced to 5.0 cfs. An underdrain system will release this flow into the proposed storm
system (future) that will release into the existing double 5’x2’ box culvert under
Timberwood Drive.
8
Basin K is 1.39 acres and contains Lot 2’s building and the northern portion of Lot 2’s
parking lot and the northern portion of Lot 1’s building. Basin K is calculated to have a
10-year discharge of 3.2 cfs and a 100-year discharge of 8.8 cfs. Flows from Basin K will
be captured by the porous paver system where the 100-year flow will be detained and
reduced to 7.0 cfs. An underdrain system will release this flow into the proposed storm
system (future) that will release into the existing double 5’x2’ box culvert under
Timberwood Drive.
Basin L is 1.40 acres, contains the south half of Harmony Road adjacent to Outlot B and
Lots 1 and 2 and is calculated to have a 10-year discharge of 2.8 cfs and a 100-year
discharge of 7.2 cfs. Flows from Basin L are captured by the existing 24” flared end
section that directs flow into the proposed storm system (future) that releases into the
existing double 5’x2’ box culvert under Timberwood Drive. Today a temporary swale
will be built to drain this area.
Basin OS-1 is 2.17 acres. The majority of Basin OS-1 is the west half of Lady Moon
Drive and is calculated to have a 10-year discharge of 4.7 cfs and a 100-year discharge of
13.0 cfs. Flows from a portion of this basin will sheet to bioswales located between the
existing curb and gutter of Lady Moon and the proposed sidewalk. The bioswales will
direct flow to existing Type R inlet and storm system located in Lady Moon Drive.
Basin OS-1 is master planned to drain to Pond 301, but is physically lower than the pond
and cannot drain there. Interwest worked with the City to study the capacity of the storm
system in Lady Moon Drive from Harmony to Rock Creek and determined that 15 cfs of
free release from this area could be achieved without flooding the system. Current design
is for 13.0 cfs and therefore will not flood the system. See Appendix F for the offsite
storm system study.
The weighted average C value of the entire site is 0.65 which is below the Harmony Tech
Park model assumption of 0.80; therefore, detention is not required on-site and is
provided for in the regional Pond 301 located south of the site. Please refer to Appendix
E for excerpts from the Harmony Tech Park design.
9
5. CONCLUSIONS
5.1 Compliance with Standards
All computations that have been completed within this report are in compliance with the
City of Fort Collins Storm Drainage Design Criteria Manual.
5.2 Drainage Concept
The proposed drainage concepts presented in this report and on the construction plans
adequately provides for stormwater quantity and quality treatment of proposed
impervious areas. Conveyance elements have been designed to pass required flows and
to minimize future maintenance.
If, at the time of construction, groundwater is encountered, a Colorado Department of
Health Construction Dewatering Permit will be required.
6. REFERENCES
1. City of Fort Collins, “Fort Collins Stormwater Criteria Manual Amendments to
the Urban Drainage and Flood Control District Criteria Manual”, adopted
December 2011.
2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria
Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated November
2010.
3. JR Engineering, “Final Drainage and Erosion Control Report Harmony
Technology Park Second Filing”, dated June 20, 2001.
4. Stantec Consulting, Inc., “Final Drainage and Erosion Control Study Harmony
Technology Park Site Master Plan”, dated May 19, 2008.
A
APPENDIX A
VICINITY MAP AND DRAINAGE PLAN
B
APPENDIX B
HYDROLOGIC COMPUTATIONS
SUMMARY
DRAINAGE SUMMARY TABLE
Design Tributary Area C (10) C (100) tc (10) tc (100) Q(10)tot Q(100)tot
Sub-basin REMARKS
Point (ac) (min) (min) (cfs) (cfs)
a A 0.56 0.75 0.93 8.2 5.9 1.7 4.8 Flow reduced to 1.5 cfs
b B 0.81 0.71 0.89 6.6 5.6 2.5 6.8 Flow reduced to 3.2 cfs
c C 0.19 0.70 0.88 5.0 5.0 0.7 1.7
d1 D1 0.25 0.80 1.00 5.0 5.0 1.0 2.5
d2 D2 0.37 0.90 1.00 5.0 5.0 1.6 3.7
e E 0.82 0.73 0.91 10.1 7.2 2.3 6.5 Flow reduced to 2.2 cfs
f F 0.83 0.75 0.94 7.7 5.0 2.6 7.6 Flow reduced to 2.5 cfs
g G 1.18 0.66 0.83 10.5 8.1 2.9 8.2
h H 0.69 0.71 0.89 9.0 6.5 1.9 5.5
i I 1.73 0.64 0.80 9.4 7.5 4.3 12.0 Flow reduced to 7.0 cfs
j J 1.39 0.63 0.79 8.6 6.8 3.5 9.8 Flow reduced to 5.0 cfs
k K 1.39 0.56 0.70 8.1 6.5 3.2 8.8 Flow reduced to 7.0 cfs
l L 1.40 0.61 0.76 13.7 13.7 2.8 7.2
A-H 5.70 0.73 0.91 15.9 15.9 12.8 32.8
I-L 5.91 0.61 0.77 19.3 19.3 10.1 25.9
OS-1 2.17 0.65 0.81 13.1 11.1 4.7 13.0
Page 7
Interwest Consulting Group
RUNOFF COEFFICIENTS & % IMPERVIOUS
LOCATION: Harmony Tech
PROJECT NO: 1254-045-00
COMPUTATIONS BY: es
DATE: 1/4/2016
Recommended Runoff Coefficients from Table RO-11 of City of Fort Collins Stormwater Code, Volume I
Recommended % Impervious from Table RO-3 Urban Storm Drainage Criteria Manual, Volume I
Type B Soils Runoff %
coefficient Impervious
C
Streets, parking lots (asphalt): 0.95 100
Sidewalks (concrete): 0.95 96
Roofs: 0.95 90
Gravel or Pavers: 0.50 40
Landscape Areas (Flat, heavy) : 0.20 0
Landscape Areas (Steep, heavy) : 0.35 0
SUBBASIN TOTAL TOTAL ROOF PAVED PAVERS SIDEWALK LANDSCAPE RUNOFF %
DESIGNATION AREA AREA AREA AREA AREA AREA AREA COEFF. Impervious REMARKS
(ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (C)
A 0.56 24,180 0 13,588 6,400 1,465 2,727 0.75 73
B 0.81 35,123 0 19,331 5,571 2,387 7,834 0.71 68
C 0.19 8,395 0 4,474 0 1,143 2,778 0.70 66
D1 0.25 10,993 0 7,567 0 1,212 2,214 0.80 79
D2 0.37 15,992 12,790 1,156 0 919 1,126 0.90 85
E 0.82 35,675 0 19,449 8,931 2,117 5,178 0.73 70
F 0.83 36,353 0 13,627 8,668 9,558 4,500 0.75 72
G 1.18 51,411 25,571 0 0 6,198 19,642 0.66 56
H 0.69 30,043 0 20,294 0 106 9,644 0.71 68
I 1.73 75,441 15,656 17,447 10,162 7,427 24,749 0.64 57
J 1.39 60,573 5,020 22,757 9,025 3,282 20,489 0.63 56
K 1.39 60,453 13,762 7,838 3,667 6,157 29,029 0.56 46
L 1.40 61,034 0 33,204 0 0 27,830 0.61 54
H + L 2.09 91,077 0 53,498 0 106 37,474 0.64 59
A-H 5.70 248,164 38,361 99,486 29,570 25,105 55,643 0.73 68
I-L 5.91 257,501 34,438 81,246 22,854 16,866 102,097 0.61 53
OS-1 2.17 94,480 0 48,672 0 7,629 38,179 0.65 59
Equations
- Calculated C coefficients & % Impervious are area weighted
C = Σ (Ci Ai) / At
Ci = runoff coefficient for specific area, Ai
Ai = areas of surface with runoff coefficient of Ci
n = number of different surfaces to consider
At = total area over which C is applicable; the sum of all Ai's
1-12-16 FC FLOW.xls
Interwest Consulting Group
STANDARD FORM SF-2
TIME OF CONCENTRATION - 2 and 10 YR
LOCATION: Harmony Tech
PROJECT NO: 1254-045-00
COMPUTATIONS BY: es
DATE: 1/4/2016
2 and 10-yr storm Cf = 1.00 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I
SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS
DATA TIME (ti) (tt) (URBANIZED BASIN) tc
DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10
PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min)
(1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14)
a A 0.56 0.75 66 2.0 4.3 195 0.6 0.03 0.8 3.9 8.2 261 11.5 8.2
b B 0.81 0.71 12 2.0 2.0 227 0.6 0.03 0.8 4.6 6.6 239 11.3 6.6
c C 0.19 0.70 12 2.0 2.0 35 0.7 0.016 1.7 0.3 2.4 47 10.3 5.0
d1 D1 0.25 0.80 20 2.0 2.0 82 0.5 0.016 1.4 1.0 3.0 102 10.6 5.0
d2 D2 0.37 0.90 20 2.0 1.3 50 0.5 0.016 1.4 0.6 1.9 70 10.4 5.0
e E 0.82 0.73 82 1.2 5.9 210 0.6 0.03 0.8 4.2 10.1 292 11.6 10.1
f F 0.83 0.75 84 1.7 5.0 135 0.6 0.03 0.8 2.7 7.7 219 11.2 7.7
g G 1.18 0.66 60 1.0 6.3 355 0.5 0.016 1.4 4.2 10.5 415 12.3 10.5
h H 0.69 0.71 92 2.0 5.6 221 1.0 0.03 1.1 3.4 9.0 313 11.7 9.0
i I 1.73 0.64 60 2.0 5.3 350 0.5 0.016 1.4 4.1 9.4 410 12.3 9.4
j J 1.39 0.63 60 2.0 5.4 160 0.6 0.03 0.8 3.2 8.6 220 11.2 8.6
k K 1.39 0.56 60 2.0 6.2 95 0.6 0.03 0.8 1.9 8.1 155 10.9 8.1
l L 1.40 0.61 60 2.0 5.7 610 0.8 0.03 1.0 10.6 16.3 670 13.7 13.7
h H + L 2.09 0.64 60 2.0 5.3 831 0.9 0.03 1.0 13.6 18.9 891 15.0 15.0
A-H 5.70 0.73 92 2.0 5.3 965 0.3 0.020 0.9 18.3 23.6 1057 15.9 15.9
I-L 5.91 0.61 60 2.0 5.6 1620 0.4 0.020 1.0 26.6 32.2 1680 19.3 19.3
OS-1 2.17 0.65 100 2.0 6.7 464 0.5 0.020 1.1 6.8 13.5 564 13.1 13.1
EQUATIONS:
tc = ti + tt
ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3
tt = L/Vel.
Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual)
final tc = minimum of ti + tt and urbanized basin check
min. tc = 5 min. due to limits of IDF curves
1-12-16 FC FLOW.xls
Interwest Consulting Group
STANDARD FORM SF-2
TIME OF CONCENTRATION - 100 YR
LOCATION: Harmony Tech
PROJECT NO: 1254-045-00
COMPUTATIONS BY: es
DATE: 1/4/2016
100-yr storm Cf = 1.25 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I
SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS
DATA TIME (ti) (tt) (URBANIZED BASIN) tc
DESIGN SUBBASIN(s) Area C C*Cf Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10
PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min)
(1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14)
a A 0.56 0.75 0.93 66 2.0 2.0 195 0.6 0.03 0.8 3.9 5.9 261 11.5 5.9
b B 0.81 0.71 0.89 12 2.0 1.1 227 0.6 0.03 0.8 4.6 5.6 239 11.3 5.6
c C 0.19 0.70 0.88 12 2.0 1.1 35 0.7 0.016 1.7 0.3 1.5 47 10.3 5.0
d1 D1 0.25 0.80 1.00 20 2.0 0.7 82 0.5 0.016 1.4 1.0 1.6 102 10.6 5.0
d2 D2 0.37 0.90 1.00 20 2.0 0.7 50 0.5 0.016 1.4 0.6 1.3 70 10.4 5.0
e E 0.82 0.73 0.91 82 1.2 3.0 210 0.6 0.03 0.8 4.2 7.2 292 11.6 7.2
f F 0.83 0.75 0.94 84 1.7 2.3 135 0.6 0.03 0.8 2.7 5.0 219 11.2 5.0
g G 1.18 0.66 0.83 60 1.0 3.9 355 0.5 0.016 1.4 4.2 8.1 415 12.3 8.1
h H 0.69 0.71 0.89 92 2.0 3.0 221 1.0 0.03 1.1 3.4 6.5 313 11.7 6.5
i I 1.73 0.64 0.80 60 2.0 3.4 350 0.5 0.016 1.4 4.1 7.5 410 12.3 7.5
j J 1.39 0.63 0.79 60 2.0 3.6 160 0.6 0.03 0.8 3.2 6.8 220 11.2 6.8
k K 1.39 0.56 0.70 60 2.0 4.6 95 0.6 0.03 0.8 1.9 6.5 155 10.9 6.5
l L 1.40 0.61 0.76 60 2.0 3.9 610 0.8 0.03 1.0 10.6 14.5 670 13.7 13.7
h H + L 2.09 0.64 0.80 60 2.0 3.4 831 0.9 0.03 1.0 13.6 17.1 891 15.0 15.0
A-H 5.70 0.73 0.91 92 2.0 2.7 965 0.3 0.02 0.9 18.3 21.0 1057 15.9 15.9
I-L 5.91 0.61 0.77 60 2.0 3.8 1620 0.4 0.02 1.0 26.6 30.4 1680 19.3 19.3
OS-1 2.17 0.65 0.81 100 2.0 4.3 464 0.5 0.02 1.1 6.8 11.1 564 13.1 11.1
EQUATIONS:
tc = ti + tt
ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3
tt = L/Vel.
Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual)
final tc = minimum of ti + tt and urbanized basin check
min. tc = 5 min. due to limits of IDF curves
1-12-16 FC FLOW.xls
Interwest Consulting Group
RATIONAL METHOD PEAK RUNOFF
(City of Fort Collins, 2-Yr Storm)
LOCATION: Harmony Tech
PROJECT NO: 1254-045-00
COMPUTATIONS BY: es
DATE: 1/4/2016
2 yr storm, Cf = 1.00
DIRECT RUNOFF CARRY OVER TOTAL REMARKS
Design Tributary A C Cf tc i Q (2) from Q (2) Q(2)tot
Sub-basin Design
Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs)
a A 0.56 0.75 8.2 2.40 1.0 1.0
b B 0.81 0.71 6.6 2.59 1.5 1.5
c C 0.19 0.70 5.0 2.85 0.4 0.4
d1 D1 0.25 0.80 5.0 2.85 0.6 0.6
d2 D2 0.37 0.90 5.0 2.85 0.9 0.9
e E 0.82 0.73 10.1 2.21 1.3 1.3
f F 0.83 0.75 7.7 2.45 1.5 1.5
g G 1.18 0.66 10.5 2.18 1.7 1.7
h H 0.69 0.71 9.0 2.32 1.1 1.1
i I 1.73 0.64 9.4 2.28 2.5 2.5
j J 1.39 0.63 8.6 2.36 2.1 2.1
k K 1.39 0.56 8.1 2.41 1.9 1.9
l L 1.40 0.61 13.7 1.94 1.7 1.7
h H + L 2.09 0.64 15.0 1.87 2.5 2.5
A-H 5.70 0.73 15.9 1.81 7.5 7.5
I-L 5.91 0.61 19.3 1.64 5.9 5.9
OS-1 2.17 0.65 13.1 1.98 2.8 2.8
Q = Cf C iA
Q = peak discharge (cfs)
C = runoff coefficient
Cf = frequency adjustment factor
i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99)
A = drainage area (acres) i = 24.221 / (10+ tc)0.7968
1-12-16 FC FLOW.xls
Interwest Consulting Group
RATIONAL METHOD PEAK RUNOFF
(City of Fort Collins, 10-Yr Storm)
LOCATION: Harmony Tech
PROJECT NO: 1254-045-00
COMPUTATIONS BY: es
DATE: 1/4/2016
10 yr storm, Cf = 1.00
DIRECT RUNOFF CARRY OVER TOTAL REMARKS
Design Tributary A C Cf tc i Q (10) from Q (10) Q(10)tot
Sub-basin Design
Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs)
a A 0.56 0.75 8.2 4.10 1.7 1.7
b B 0.81 0.71 6.6 4.42 2.5 2.5
c C 0.19 0.70 5.0 4.87 0.7 0.7
d1 D1 0.25 0.80 5.0 4.87 1.0 1.0
d2 D2 0.37 0.90 5.0 4.87 1.6 1.6
e E 0.82 0.73 10.1 3.78 2.3 2.3
f F 0.83 0.75 7.7 4.18 2.6 2.6
g G 1.18 0.66 10.5 3.73 2.9 2.9
h H 0.69 0.71 9.0 3.96 1.9 1.9
i I 1.73 0.64 9.4 3.90 4.3 4.3
j J 1.39 0.63 8.6 4.02 3.5 3.5
k K 1.39 0.56 8.1 4.12 3.2 3.2
l L 1.40 0.61 13.7 3.32 2.8 2.8
h H + L 2.09 0.64 15.0 3.19 4.3 4.3
A-H 5.70 0.73 15.9 3.10 12.8 12.8
I-L 5.91 0.61 19.3 2.80 10.1 10.1
OS-1 2.17 0.65 13.1 3.39 4.7 4.7
Q = Cf C iA
Q = peak discharge (cfs)
C = runoff coefficient
Cf = frequency adjustment factor
i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99)
A = drainage area (acres) i = 41.44 / (10+ tc)0.7974
1-12-16 FC FLOW.xls
Interwest Consulting Group
RATIONAL METHOD PEAK RUNOFF
(City of Fort Collins, 100-Yr Storm)
LOCATION: Harmony Tech
PROJECT NO: 1254-045-00
COMPUTATIONS BY: es
DATE: 1/4/2016
100 yr storm, Cf = 1.25
DIRECT RUNOFF CARRY OVER TOTAL REMARKS
Des. Area A C Cf tc i Q (100) from Q (100) Q(100)tot
Design
Point Design. (ac) (min) (in/hr) (cfs) Point (cfs) (cfs)
a A 0.56 0.93 5.9 9.31 4.8 4.8
b B 0.81 0.89 5.6 9.45 6.8 6.8
c C 0.19 0.88 5.0 9.95 1.7 1.7
d1 D1 0.25 1.00 5.0 9.95 2.5 2.5
d2 D2 0.37 1.00 5.0 9.95 3.7 3.7
e E 0.82 0.91 7.2 8.75 6.5 6.5
f F 0.83 0.94 5.0 9.74 7.6 7.6
g G 1.18 0.83 8.1 8.42 8.2 8.2
h H 0.69 0.89 6.5 9.06 5.5 5.5
i I 1.73 0.80 7.5 8.64 12.0 12.0
j J 1.39 0.79 6.8 8.92 9.8 9.8
k K 1.39 0.70 6.5 9.07 8.8 8.8
l L 1.40 0.76 13.7 6.78 7.2 7.2
h H + L 2.09 0.80 15.0 6.51 10.9 10.9
A-H 5.70 0.91 15.9 6.32 32.8 32.8
I-L 5.91 0.77 19.3 5.72 25.9 25.9
OS-1 2.17 0.81 11.1 7.43 13.0 13.0
Q = C iA
Q = peak discharge (cfs)
C = runoff coefficient
i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99)
A = drainage area (acres) i = 84.682 / (10+ tc)
0.7975
1-12-16 FC FLOW.xls
✁ ✦ ✂ ✌ ☞ ✠ ✑ ☛ ✂ ✞ ✠ ✎ ✌ ☛ ✌ ✟ ✄ ✍ ✆ ✝ ☛ ✏ ✞ ☛ ☞ ☎ ✝ ☛ ✞ ✍ ✎ ✆ ✎ ✡ ✎ ✂ ✌ ✍ ✏ ☞ ✠ ✝ ✝ ✂ ✝ ✞ ✞ ☛ ✒ ✑ ✏ ✍ ✟ ✍ ☛ ✎ ✂ ✞ ✠ ✌ ✝ ☎ ✍ ✎ ✜ ☛ ✡ ✡ ✡ ✆ ✂ ✝ ✢ ☛ ✞ ☛ ✌ ✕ ✍ ✒ ✗ ✞ ✆ ✂ ✝ ☛ ✎ ✂ ✖ ✑ ☛
☞ ☛ ✎ ✙ ✝ ✌ ✝ ✞ ✖ ✞ ☞ ✍ ✌ ✂ ✒ ✠ ✏ ✌ ✌ ✂ ✠ ☛ ✝ ✎ ✞ ✟ ✞ ✎ ☛ ✌ ✡ ✍ ✂ ✜ ✡ ✝ ✝ ✂ ✆ ☞ ✎ ✝ ✝ ✏ ✟ ✂ ✠ ✞ ✝ ✔ ✌ ☎ ☛ ✝ ✆ ✎ ✡ ✌ ✞ ✆ ✏ ✗ ☞ ✆ ✝ ✎ ✚ ☞ ✕ ✁ ✞ ✌ ✍ ✏ ✎ ✑ ✆ ✏ ✂ ✓ ✌ ✑ ✠ ✎ ✂ ✎ ✌ ☛ ✏ ✠ ✎
✝ ✆ ✏ ✂ ✡ ✌ ✝ ✑ ✞ ✘ ✞ ✡ ☛ ☞ ✡ ✌ ✝ ✍ ✏ ✠ ✝ ✎ ✂ ✏ ✞ ✑ ✒ ☛ ✎ ✂ ☛ ✍ ✍ ☛ ✏ ✌ ☛ ✝ ✞ ✍ ✞ ✡ ✞ ☛ ✂ ✒ ✝ ✂ ✠ ✞ ✎ ☛ ✌ ✎ ✒ ✏ ✌ ✞ ✍ ✆ ✂ ✄ ✡ ☛ ✑ ☛ ☛ ✠ ✌ ✎ ✕ ☛ ✂ ✏ ✓ ✒ ✟ ✑ ✂ ✑ ✌ ✍ ✔ ✑ ✌ ✂ ☛ ✗ ☛ ✝ ✡
✆ ✎ ✝ ✜ ✞ ✁ ✂ ✞ ✑ ✞ ✒ ☛ ✟ ☛ ✍ ☛ ✂ ✂ ✎ ✑ ✌ ✝ ✍ ✞ ✏ ✂ ☛ ☞ ✝ ✝ ✟ ☞ ✏ ✂ ✠ ✝ ✌ ✑ ✍ ✌ ✟ ✎ ✂ ☛ ✂ ✌ ☛ ✂ ✓ ✂ ☛ ☞ ☛ ☛ ✎ ✍ ✍ ✡ ✏ ✝ ☛ ✟ ✆ ✢ ✓ ☞ ✌ ✍ ✝ ✆ ✠ ✟ ☛ ✎ ✌ ☛ ✟ ✧ ✞ ☎ ✚ ☎ ☎ ✆ ✂ ☞ ✂ ✠ ✝ ✑ ✑
✔ ✍ ✌ ☛ ☛ ☛ ✞ ✍ ✡ ✌ ✟ ✟ ☛ ☞ ✔ ✑ ✏ ☞ ✄ ✎ ✌ ✣ ✍ ✍ ✞ ✤ ✎ ☎ ✜ ✒ ✌ ✓ ✆ ✠ ☛ ✂ ☛ ✢ ✠ ✆ ✡ ✖ ✆ ✤ ☛ ✄ ✂ ✥ ✒ ✍ ✗ ✌ ☎ ✍ ☎ ✌ ✟ ✆ ✆ ✡ ✂ ✂ ✂ ☎ ✝ ✌ ✞ ✖ ✍ ✂ ☛ ☛ ✒ ☛ ✆ ✄ ✛ ☞ ☞ ☎ ☛ ✠ ✍ ✌ ✆ ✞ ✝ ✂ ✞ ✂ ✎
✝ ✏ ✍ ✎ ✌ ✝ ☛ ✏ ✂ ✆ ✎ ✡ ✟ ✕ ✎ ✂ ✎ ✑ ☛ ✄ ✍ ☛ ✠ ✠ ☞ ☛ ✍ ✠ ✌ ✙ ☛ ✝ ✆ ✘ ✘ ✘
✣ ★ ✩ ✥ ✪ ✞ ☛ ✕ ✫ ✬ ✭ ✮ ✯ ✰ ✱ ✲ ✳ ✴ ✵ ✝ ✆ ✌ ✡ ✡ ☛ ✡ ✚ ✂ ✎ ✍ ☛ ✌ ✡ ✌ ✆ ✏ ✎ ✠ ✠ ✎ ✕ ✆ ✶
✆ ✷ ✪ ✷ ✎ )✟ ✕ LQDO&✑ ✑ ✑ ✦ ☛ ✝ ✞ ☛ ✆ ✝ ☛ ✡ ✞ ✢ ✝ ✍ ☎ ✌ ✞ ✆ ✕ ✠ ✠ ✆ ✑ ☛ ORVH2XW,☞ ✜ ✞ ✝ ✡ ☞ ☛ ☛ ✠ ✟ ✎ ✕ ✍ ✌ ✂ ✆ ✞ ✝ ✝ ✄ ☛ ✎ ✂ ✡ ✑ ✘ ✞ ☎ ✢ ✄ ✂ ✆ ✄ ✑ ☎ ✂ ✌ ☛ ✂ ☎ ✝ ✍ QVSHFWLRQ
✞ ✁ ☛ ✜ ✆ ✞ ✂ ✂ ✧ ☛ ✝ ✆ ☎ ✂ ✖ ✞ ☞ ✔ ☛ ☛ ✌ ☛ ✆ ✏ ✞ ✟ ✆ ✂ ✎ ✂ ✟ ✟ ✝ ✠ ✂ ☛ ✎ ✑ ✠ ✑ ✎ ☛ ✞ ✍ ☛ ✕ ✡ ☛ ✝ ✆ ☎ ✦ ✝ ✆ ☞ ✞ ✠ ✝ ✍ ☛ ✎ ✒ ✞ ☛ ✡ ✞ ✌ ✧ ✌ ✠ ✆ ☎ ✌ ✝ ✄ ✂ ✜ ✖ ✝ ✍ ✝ ✂ ✝ ☛ ✠ ✠ ✑ ✞ ✎ ✝ ✡
☛ ✂ ✝ ✆ ✝ ✄ ☛ ✏ ☛ ✟ ✎ ✘ ✆ ☎ ✎ ✢ ✍ ✄ ✎ ✞ ✌ ☎ ✏ ✟ ✠ ✂ ✠ ✂ ✠ ✂ ☎ ✕ ✑ ✁ ✞ ✆ ✞ ☛ ✎ ☛ ✝ ✆ ✎ ✕ ✘ ✆ ☞ ✕ ✞ ✝ ✂ ☛ ✡ ☛ ☛ ✟ ✎ ☛ ☛ ✂ ✂ ✏ ✓ ✝ ✺ ✎ ✎ ✌ ☛ ✌ ✞ ✌ ✠ ✠ ✠ ✎ ✡ ✆ ✏ ☞ ✓ ✟ ☎ ✍ ✎ ✄ ✌ ✎ ✖ ✞ ✞
✄ ✆ ☛ ✟ ✆ ☛ ✞ ✂ ☛ ✧ ✍ ✂ ✂ ☎ ✆ ☎ ✑ ✞ ✟ ☛ ☛ ✎ ✌ ✂ ✞ ✞ ✂ ✝ ✝ ✜ ✎ ✂ ✡ ✟ ✞ ☛ ✝ ☛ ✍ ✂ ✞ ✗ ✔ ☛ ✌ ✂ ✡ ✗ ✟ ✝ ✂ ☛ ✂ ✔ ✝ ✓ ✷ ✓ ✆ ☛ ✝ ✑ ☎ ✠ ✂ ✎ ✝ ☛ ✟ ☛ ☞ ✑ ✆ ✦ ✄ ✌ ✝ ✎ ✞ ☛ ✆ ✞ ✌ ✞ ✌ ✠ ✂ ✂ ✑ ✆ ✸
✜ ✗ ☛ ✎ ✠ ✎ ✆ ✄ ✝ ✆ ✂ ☛ ☛ ☛ ✘ ✢ ✢ ✌ ✞ ✕ ☎ ✡ ✂ ✞ ☞ ☛ ✁ ✞ ✍ ✍ ✝ ✆ ✆ ✎ ✹ ☞ ✍ ✪ ☛ ✂ ✟ ✆ ✎ ✂ ✆ ✝ ✎ ✎ ✂ ✍ ✟ ✞ ✌ ✝ ✞ ✌ ✄ ✂ ✆ ✝ ✏ ✎ ☎ ☛ ✞ ✆ ✍ ✂ ✍ ✗ ✝ ✞ ✖ ✒ ☛
✕ ✪ ✖ ✻ ✝ ✝ ✂ ☎ ✠ ✠ ✝ ✍ ✠ ✂ ✂ ✝ ✝ ✑ ✞ ✖ ✌ ☛ ☛ ✥ ✆ ✒ ☛ ✗ ✂ ✌ ✂ ✝ ✪ ✑ ✄ ✆ ☛ ✆ ✠ ✠ ☛ ☎ ✦ ✄ ☞ ✎ ✝ ☛ ✞ ✏ ✝ ✍ ✞ ✌ ✄ ✂ ✠ ✒ ✑ ✜ ✌ ☛ ✎ ✞ ✠ ✕ ✜ ✎ ☛ ✆ ✞ ✞ ✠ ✎ ☛ ✂ ☛ ✘ ✆ ✍ ✢ ✡ ☛ ✆ ✍ ✑ ✘ ☎ ✌ ✢ ✝
✂ ✝ ☞ ✞ ☎ ✁ ✌ ✞ ✂ ✌ ✒ ✞ ✆ ✁ ☞ ☛ ✡ ✞ ☛ ✆ ✏ ✄ ✟ ☞ ✌ ✂ ☛ ✟ ✌ ✝ ✟ ✎ ✝ ✝ ✠ ✂ ✞ ✞ ✝ ✝ ✂ ✎ ✂ ✚ ☛ ✝ ✞ ✂ ☛ ✞ ✑ ✆ ✌ ☛ ✂ ✞ ✑ ✌ ✢ ✟ ☛ ✞ ☛ ✡ ✕ ✢ ✍ ✞ ✼ ☛ ✕ ☛ ✆ ✽ ✞ ✍ ☞ ☛ ✎ ✄ ✾ ✍ ✞ ✆ ☎ ✆ ✄ ✆ ✝ ✑ ✖
✂ ☎ ✌ ✝ ✡ ✆ ✠ ✓ ✂ ☛ ✝ ☛ ✂ ✄ ✝ ☞ ☛ ✍ ✖ ✎ ✆ ✎ ☛ ✞ ✓ ✌ ☛ ✆ ✞ ✝ ✞ ✂ ✡ ✍ ✡ ☛ ✌ ✟ ✂ ✌ ✎ ☛ ✂ ✎ ✞ ☞ ✂ ✆ ✎ ✠ ✂ ✂ ✌ ✑ ✍ ✞ ✂ ☎ ☛ ✑ ✟ ✏ ☛ ✜ ✂ ✎ ☛ ✆ ✍ ✝ ✡ ✌ ✂ ✔ ✏ ✂ ☎ ✝ ✝ ✆ ✞ ✟ ✞ ✏ ✎ ✡ ✌ ✟ ✞ ✟ ✝
✎ ✞ ✂ ✂ ✝ ✌ ✄ ✒ ✎ ✟ ✞ ☞ ✌ ✂ ✞ ✠ ✎ ✝ ✝ ✡ ✞ ✌ ✏ ✏ ✞ ✟ ✂ ✎ ✟ ✑ ✌ ✍ ☛ ☛ ✄ ✍ ✍ ✜ ✕ ✔ ✌ ✝ ✂ ✝ ✝ ✞ ✝ ✂ ✂ ✎ ✔ ✑ ✒ ✞ ✂ ✎ ✂ ✑ ✑ ✏ ☎ ✌ ✎ ☛ ✂ ✂ ✍ ✶ ✂ ✌ ✑ ✂ ☞ ✑ ☛ ☞ ☛ ✆ ✍ ☛ ✎ ☛ ✞ ✍ ✓ ☛ ✂ ☛ ✝ ✆ ✡
✂ ☞ ✔ ✎ ✏ ✂ ✞ ✝ ✑ ✞ ✆ ✌ ✌ ✝ ✘ ✂ ✠
✟ ✡ ☞ ✖ ✥ ✥ ✠ ✥ ✌ ✞ ✪ ✪ ✪ ✡ ✠ ✠ ✠ ✠ ✠ ✠ ✎ ✡ ✂ ✍ ✟ ☛ ☛ ✍ ☎ ✄ ✓ ✌ ✄ ✝ ☛ ☞ ✞ ✒ ☛ ✎ ✌ ☛ ✞ ✒ ✍ ✂ ✂ ✌ ✌ ☛ ✆ ✍ ✂ ✔ ✌ ✝ ✏ ✎ ✌ ✞ ✼ ✞ ✟ ✡ ✝ ✽ ✠ ✄ ✌ ✝ ✂ ✍ ✾ ☛ ✝ ☛ ☛ ✌ ✆ ✆ ✏ ✆ ✑ ☎ ☎ ✌ ✌ ✞ ✍ ✞ ✓
☛ ✟ ✡ ✆ ☛ ✂ ✝ ✌ ✌ ✎ ✖ ☞ ✍ ✞ ☛ ☛ ☞ ✝ ☛ ✞ ☎ ✞ ✟ ✒ ✍ ✎ ✂ ✍ ✄ ☛ ✌ ☛ ✞ ✆ ✄ ☞ ✌ ✡ ✠ ✎ ✞ ☛ ☛ ✓ ✟ ✂ ✆ ☛ ☛ ☛ ✝ ✡ ✒ ✆ ✌ ✞ ✞ ✑ ✏ ☛ ✍ ✡ ✌ ✎ ✡ ✓ ✌ ✄ ✗ ☛ ✠ ✠ ✖ ✂ ✆ ✑ ☛ ✎ ☛ ☛ ✝ ✞ ✠ ✡ ✆ ☛ ✟ ☎ ✓ ✠ ☛
✍ ☛ ✏ ✌ ✠ ✌ ✍ ✎ ✟ ☛ ☞ ☛ ✡ ✄ ✆ ✎ ✌ ☛ ✏ ✍ ✞ ☛ ✌ ✂ ✞ ✆ ✆ ✔ ✂ ✝ ✌ ✂ ☛ ✡ ✖ ✗ ☛ ✠ ☛ ✖ ✗ ✍ ✝ ✆ ✌ ✞ ✡ ✆ ☛ ✡ ✝ ✄ ☛ ✞ ✂ ✗
✣ ✣ ✣ ✣ ✣ ★ ★ ★ ★ ★ ❅ ❃ ❂ ❁ ★ ✥ ✥ ✥ ✥ ✥ ✫ ✫ ✫ ✫ ✫ ✬ ✬ ✬ ✬ ✬ ✭ ✭ ✭ ✭ ✭ ✮ ✮ ✮ ✮ ✮ ✯ ✯ ✯ ✯ ✯ ✰ ✰ ✰ ✰ ✰ ✱ ✱ ✱ ✱ ✱ ✿ ✿ ✿ ✿ ✿ ✳ ✳ ✳ ✳ ✳ ❆ ❄ ✵ ✴ ❀ ✝ ✝ ✝ ✝ ✝ ✆ ✆ ✆ ✆ ✆ ✡ ✡ ✡ ✡ ✡ ☛ ☛ ☛ ☛ ☛ ✠
✠ ✠ ✠ ✠ ☛ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✂ ☛ ☛ ☛ ☛ ☛ ✡ ✡ ✡ ✡ ✡ ✝ ✝ ✝ ✝ ✝ ✞ ✞ ✞ ✞ ✞ ✝ ✝ ✝ ✝ ✝ ✂ ✂ ✂ ✂ ✂ ✆ ✆ ✆ ✆ ✆ ☛ ☛ ☛ ☛ ☛ ✞ ✞ ✞ ✞ ✞ ✂ ✂ ✂ ✂ ✂ ✝ ✝ ✝ ✝ ✝ ✍ ✍ ✍ ✍ ✍ ☛ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✂ ✔ ✔ ✔ ✔ ✔ ✗ ✗
✗ ✗ ✗
✣ ✣ ✣ ✣ ✣ ❁ ❁ ❁ ★ ★ ❑ ✩ ❏ ❇ ▲ ✥ ✥ ✥ ✥ ✥ ❖ ❈ ❈ ❈ ❈ ❉ ❉ ❉ ❉ ✯ P ❊ ❊ ❊ ❊ ◗ ❋ ❋ ❋ ❋ ✬ ✬ ✬ ✬ ❘ ✬ ● ● ● ● ● ❍ ❍ ❍ ❍ ❍ ■ ■ ■ ■ ❆ ❄ ✵ ✴ ■ ✴ ✤ ✝ ✝ ✝ ✆ ✆ ✆ ▼ ✝ ✆ ✡ ✡ ✡ ☛ ✡ ☛ ☛ ☛ ✧ ✠ ✠ ☛ ✠ ☎ ☛
☛ ☛ ✠ ✝ ✂ ✂ ☛ ✂ ✍ ☛ ☛ ☛ ✂ ☛ ✡ ✡ ☛ ✡ ✡ ✡ ✝ ✝ ✝ ✽ ✞ ✞ ✞ ✝ ✞ ✝ ✝ ✝ ✌ ✂ ✂ ✂ ✝ ✆ ✆ ✆ ✝ ✂ ✞ ✆ ☛ ☛ ☛ ✂ ☛ ✞ ✞ ☛ ✞ ✞ ✞ ✂ ✂ ✂ ✝ ✝ ✝ ✌ ✂ ✍ ✍ ✍ ✝ ✞ ☛ ☛ ☛ ✍ ☛ ✂ ✂ ✂ ✟ ✔ ✔ ✔ ✂ ☛ ✔ ✗ ✗ ✗ ◆ ✗ ✌ ✆ ☛
✄ ☛ ✞ ✂ ✆ ✤ ✝ ✆ ✌ ✡ ✡ ☛ ✡ ✗
✣ ✣ % ✩ ▲ ✥ ✥
❞
✣ ★ ✥ ✩ ✪ ✎ ✘ ✏ ✔ ✞ ☛ ☛ ☛ ✙ ✌ ✕ ✟ ✍ ☛ ✆ ✫ ☛ ✂ ✡ ✬ ✎ ✭ ✌ ✍ ✮ ✄ ✞ ✯ ✰ ✟ ✗ ☛ ✱ ☛ ✴ ✓ ✳ ✵ ☛ ✍ ✝ ✔ ✆ ✔ ✌ ☛ ✡ ✌ ✡ ✍ ☛ ✥ ✡ ✗ ✚ ✁ ✂ ✞ ✎ ✆ ✍ ☛ ✎ ✌ ✄ ✡ ☛ ✌ ✝ ✆ ✞ ✏ ✆ ✎ ✂ ✌ ✠ ✠ ✞ ✎ ✟ ✕ ☛ ✆ ✆ ✶
✂ ✑ ☛ ▲ ❑ ❑ ✘ ✔ ☛ ✌ ✍ ✆ ✂ ✎ ✍ ✄ ✍ ✎ ☎ ✂ ✝ ✞ ✒ ✎ ✏ ✍ ☎ ✞ ✎ ✏ ✏ ✕ ✝ ✠ ✠ ✞ ✎ ✂ ✖ ☛ ✂ ✑ ☛ ✆ ✌ ✄ ☛ ✌ ✆ ✂ ✑ ✌ ✂ ✏ ✎ ✍ ✂ ✑ ☛
✣ ❁ ✥ ✪ ☞ ✡ ✔ ✷
❻
⑥ ⑥ ⑥ ⑥ ⑥ ❸ ⑨ ⑤ ❷ ⑩ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ⑨ ❸ ⑦ ⑨ ❶ ❷ ❸ ⑩ ⑥ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑦ ⑤ ⑨ ⑨ ❸ ❸ ⑤ ❶ ⑨ ❶ ⑨ ⑤ ⑨ ⑨ ⑨ ⑤ ⑦ ⑦ ⑦ ⑦ ❺ ❶ ⑧ ⑩ ⑦ ⑥ ❶ ⑧ ⑩ ⑧
⑥ ⑥ ❸ ⑧ ❶ ❺ ❹ ❹ ❹ ⑦ ⑦ ❸ ❸ ⑦ ❸ ⑨ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑥ ⑥ ⑥ ❶ ⑤ ❹ ⑨ ⑨ ⑨ ⑦ ⑦ ❷ ⑤ ⑦ ❷ ❶ ⑥
7DEOH5$
&LW\RI)RUW&ROOLQV5DLQIDOO,QWHQVLW\±'XUDWLRQ±)UHTXHQF\7DEOHIRU8VHZLWKWKH5DWLRQDO0HWKRG
❢ ❣ ❤ ✐ ❥ ❦ ❧ ❸ ❸ ❸ ❸ ♠ ❹ ⑥ ❸ ⑨ ♥ ♦ ❦ ♠ ♣ q r s t ✐ ❤ ✉ ♠ ❥ ❹ ❹ ❹ ❹ t ⑦ ⑦ ⑦ ⑦ ♠ ⑥ ⑥ ⑥ ❹ ✈ ⑩ ⑨ ⑥ ❶ ❦ ❥ ✇ ♥ ❦ PLQXWHVWRPLQXWHV ♠ ① ② ❤ ♣ ③ ④ r s t ✐ ❤ ✉ ♠ ⑥ ⑥ ⑥ ⑥ ❥ t ⑦ ⑦ ⑦ ⑦
❹ ❹ ❺ ❺ ♠ ❷ ⑥ ⑧ ⑨ ✈ ❦ ❥ ✇
❽
7DEOH5$
❢ ❣ ❤ ✐ ❥ ❦ ❧ ♠ ♥ ♦ ❦ ♠ ♣ q r s t ✐ ♥ ❦ ❤ ♠ ✉ ① &② ♠ LW\❤ ❥ ♣ t ♠ RI)✈ ❦ ❥ ✇ RUW&❾ ROOLQV5DLQIDOO,r s t ✐ ♥ ❦ ❤ ♠ ✉ ① ② ♠ ❥ ❤ ♣ t ♠ ✈ ❦ ❥ ✇ QWHQVLW\③ ④ r s ±'XUDWLRQ±)t ♥ ✐ ❦ ♠
❤ ① ✉ ② ♠ ❤ ❥ ♣ t ♠ ✈ ❦ ❥ ✇ UHTXHQF\q 7DEOHIRU8VHZLWK6:00
❾ r s t ♥ ✐ ❦ ♠ ❤ ① ✉ ② ♠ ❤ ❥ ♣ t ♠ ✈ ❦ ❥ ✇ ❾ ④ r s t ♥ ✐ ❦ ♠ ❤ ① ✉ ② ♠ ❤ ❥ ♣ t ♠ ✈ ❦ ❥ ✇ ③ ④ ④ r s t ♥ ❦ ✐ ♠ ❤ ① ② ✉ ♠ ❤ ♣ ❥ t ♠ ✈ ❦ ❥ ✇
❹ ❹ ⑥ ⑥ ⑤ ❺ ⑤ ❺ ⑤ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❷ ⑥ ❸ ❸ ⑧ ❶ ❸ ⑧ ⑨ ❹ ❺ ❺ ❺ ❺ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ⑤ ⑧ ❹ ❺ ⑤ ❸ ❶ ❸ ❺ ❺ ❺ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ⑤ ❷ ❺ ❸ ❶ ❷ ⑤ ❶ ❶ ❺ ❺ ❺ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ❷ ⑩ ⑧ ⑨ ⑧ ❸ ⑥ ⑨ ❹ ❺ ❺ ❺
❹ ❹ ⑥ ⑦ ⑦ ⑦ ⑦ ⑦ ⑩ ❶ ❺ ⑩ ⑥ ❶ ❺ ⑤ ⑩ ⑤ ❹ ❹ ❹ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑦ ❺ ❹ ❸ ⑥ ⑧ ❺ ⑨ ❸ ❸ ⑨
❸ ❸ ⑨ ⑨ ⑤ ❺ ⑤ ❺ ⑤ ❺ ❹ ⑥ ❹ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑤ ⑧ ❹ ⑩ ⑨ ⑩ ⑤ ⑧ ❹ ⑥ ⑥ ❸ ❹ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❷ ❹ ❶ ❶ ⑤ ❶ ⑩ ⑨ ❶ ⑧ ⑥ ⑨ ⑥ ❹ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❷ ⑧ ❺ ⑥ ⑩ ❶ ⑩ ⑥ ❹ ❹ ❸ ❷ ⑥ ❹ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ❸ ❷ ⑨ ❶ ⑧ ❺ ❹ ⑩ ⑥ ⑨
⑩ ❸ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ❸ ❶ ⑥ ❶ ❹ ❷ ❺ ⑩ ⑩ ❷ ⑤ ❶ ⑨ ⑥ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ❶ ❹ ⑨ ⑨ ❶ ⑤ ⑥ ⑧ ❷
⑤ ❷ ❷ ⑩ ⑩ ⑤ ❺ ⑤ ❺ ⑤ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❸ ❸ ⑥ ❹ ❹ ⑤ ❺ ❺ ❶ ⑧ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ⑥ ⑥ ⑥ ❶ ⑥ ⑧ ⑩ ⑤ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❷ ⑤ ❸ ❸ ❸ ❺ ⑥ ❶ ⑩ ⑤ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑩ ❷ ❷ ⑤ ⑤ ⑩ ⑩ ⑥ ❶ ❷ ❺
❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❶ ⑧ ⑩ ⑩ ⑩ ⑩ ⑨ ❶ ⑤ ⑥ ❹ ❹ ❹ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑥ ❺ ❺ ❶ ❶ ⑥ ❷ ❺ ⑤ ❹
❹ ⑧ ⑧ ❶ ❶ ❺ ❺ ⑤ ❺ ⑤ ❺ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❹ ❹ ❹ ❹ ❹ ⑩ ⑩ ❷ ⑤ ⑤ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑥ ⑥ ⑥ ⑥ ⑥ ⑨ ❸ ⑥ ❹ ❺ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❸ ❸ ❸ ❸ ⑥ ⑨ ⑥ ❹ ❺ ❶ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑤ ⑤ ⑤ ⑨ ⑨ ⑨ ⑥ ❺ ⑧ ⑩
❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ❷ ❷ ❷ ❷ ❷ ❶ ❷ ⑨ ⑥ ❺ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑧ ⑧ ⑧ ⑩ ⑩ ⑩ ⑨ ❹ ⑧ ⑤
✣ ▲ ★ ✥ ✫ ✬ ❹ ❹ ❹ ❹ ✭ ❺ ❹ ❹ ⑥ ⑤ ❺ ⑤ ❺ ✮ ✯ ✰ ✱ ❿ ✳ ❀ ✝ ✆ ✡ ☛ ✠ ☛ ❺ ❺ ❺ ❺ ✂ ☛ ⑦ ⑦ ⑦ ⑦ ❹ ❹ ❹ ❹ ✡ ⑨ ⑨ ❸ ❸ ✝ ✞ ✝ ✂ ✆ ☛ ✞ ✂ ✝ ✍ ☛ ✂ ✔ ✗ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ❹ ❹ ❹ ❹ ❶ ❶ ⑧ ⑧ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑥ ⑥
⑥ ⑥ ⑧ ⑩ ❷ ⑤ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ⑨ ⑨ ⑤ ⑨ ⑥ ❹ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑤ ⑤ ⑤ ⑤ ⑧ ❷ ⑨ ❸ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑩ ⑩ ❷ ❷ ❸ ❹ ❶ ⑩
✣ ✣ ✣ ✣ ▲ ▲ ▲ ▲ ❅ ❃ ❂ ❁ ✥ ✥ ✥ ✥ ✫ ✫ ✫ ✫ ✬ ✬ ✬ ✬ ✭ ✭ ✭ ✭ ✮ ✮ ✮ ✮ ✯ ✯ ✯ ✯ ✰ ✰ ✰ ✰ ✱ ✱ ✱ ✱ ✲ ✿ ✿ ✿ ✳ ✳ ✳ ✳ ✵ ✴ ❀ ❀ ✝ ✝ ✝ ✝ ✆ ✆ ✆ ✆ ✡ ✡ ✡ ✡ ☛ ☛ ☛ ☛ ✠ ✠ ✠ ✠ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ☛ ☛ ☛ ☛ ✡ ✡ ✡
✡ ✝ ✝ ✝ ✝ ✞ ✞ ✞ ✞ ✝ ✝ ✝ ✝ ✂ ✂ ✂ ✂ ✆ ✆ ✆ ✆ ☛ ☛ ☛ ☛ ✞ ✞ ✞ ✞ ✂ ✂ ✂ ✂ ✝ ✝ ✝ ✝ ✍ ✍ ✍ ✍ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✔ ✔ ✔ ✔ ✗ ✗ ✗ ✗
✣ ✣ ✣ ✣ ✩ ✩ ▲ ▲ ❑ ❏ ❇ ▲ ✥ ✥ ✥ ✥ ✫ ✫ ❈ ❈ ✬ ✬ ❉ ❉ ✭ ✭ ❊ ❊ ✮ ✮ ❋ ❋ ✯ ✯ ✬ ✬ ✰ ✰ ✱ ✱ ➁ ➁ ➂ ➂ ➀ ✿ ✳ ✳ ■ ■ ❀ ❄ ✵ ✴ ✝ ✝ ✝ ✝ ✆ ✆ ✆ ✆ ✡ ✡ ✡ ✡ ☛ ☛ ☛ ☛ ✠ ✠ ✠ ✠ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ☛ ☛ ☛ ☛ ✡ ✡ ✡ ✡ ✝
✝ ✝ ✝ ✞ ✞ ✞ ✞ ✝ ✝ ✝ ✝ ✂ ✂ ✂ ✂ ✆ ✆ ✆ ✆ ☛ ☛ ☛ ☛ ✞ ✞ ✞ ✞ ✂ ✂ ✂ ✂ ✝ ✝ ✝ ✝ ✍ ✍ ✍ ✍ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✔ ✔ ✔ ✔ ✗ ✗ ✗ ✗
✣ ✣ ✣ ✣ ✩ ✩ ✩ ✩ ❂ ❁ ★ ✩ ✥ ✥ ✥ ✥ ❈ ❈ ❈ ❈ ❉ ❉ ❉ ❉ ❊ ❊ ❊ ❊ ❋ ❋ ❋ ❋ ✬ ✬ ✬ ✬ ➁ ➁ ➁ ➁ ➂ ➂ ➂ ➂ ■ ■ ■ ■ ✲ ❿ ❆ ❄ ✝ ✝ ✝ ✝ ✆ ✆ ✆ ✆ ✡ ✡ ✡ ✡ ☛ ☛ ☛ ☛ ✠ ✠ ✠ ✠ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ☛ ☛ ☛ ☛ ✡ ✡ ✡ ✡ ✝ ✝ ✝
✝ ✞ ✞ ✞ ✞ ✝ ✝ ✝ ✝ ✂ ✂ ✂ ✂ ✆ ✆ ✆ ✆ ☛ ☛ ☛ ☛ ✞ ✞ ✞ ✞ ✂ ✂ ✂ ✂ ✝ ✝ ✝ ✝ ✍ ✍ ✍ ✍ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✔ ✔ ✔ ✔ ✗ ✗ ✗ ✗
✣ ✩ ❃ ✥ ✄ ❈ ❉ ✝ ❊ ✞ ❋ ☎ ✬ ✂ ☛ ➁ ✆ ➂ ✂ ✎ ■ ✿ ★ ➃ ❑ ✜ ✄ ✝ ✝ ✂ ✞ ✔ ☎ ✎ ✂ ☛ ✏ ✆ ✥ ✦ ✝ ✎ ✆ ✍ ✂ ✌ ✡ ✜ ✡ ✎ ☛ ✠ ✡ ✠ ✝ ✗ ✞ ✆ ▼ ✌ ✝ ✞ ✏ ✌ ✠ ✠ ✁ ✞ ✂ ☛ ✞ ✆ ✝ ✂ ✔ ✘ ✻ ☎ ✍ ✌ ✂ ✝ ✎ ✞ ✘ ✦ ✍ ☛ ✧ ☎ ☛
✞ ✟ ✔ ✷ ✌ ✖ ✠ ☛ ✏ ✎ ✍ ☎ ✆ ☛ ✕ ✝ ✂ ✑ ✂ ✑ ☛ ▼ ✌ ✂ ✝ ✎ ✞ ✌ ✠ ✽ ☛ ✂ ✑ ✎ ✡ ✣ ❂
C
APPENDIX C
HYDRAULIC CALCULATIONS
(PROVIDED AT FINAL)
D
APPENDIX D
WATER QUALITY
AND
LID INFORMATION
FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME
Rational Volumetric (FAA) Method
OVERALL 100-Year Event
LOCATION: HTP 6 Basin A Paver Area 6400 ft
PROJECT NO: 1254-045-00 Void Depth 1 ft
COMPUTATIONS BY: MPO 30% Void 1920 cf
DATE: 11/19/2015
Equations: Area trib. to pavers = 24180 sf
Developed flow = QD = CIA C (100) = 0.93
Vol. In = Vi = T C I A = T QD Developed C A = 22487 sf
Vol. Out = Vo =K QPO T Release rate, QPO = 1.5 cfs
storage = S = Vi - Vo K = 0.9
Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall
Storm Rainfall QD Vol. In Vol. Out Storage
Duration, T Intensity, I (cfs) Vi Vo S
(min) (in/hr) (ft3) (ft3) (ft3)
5 9.95 5.1 1541 405 1136
6 9.31 4.8 1730 486 1244
7 8.80 4.5 1908 567 1341
8 8.38 4.3 2077 648 1429
9 8.03 4.1 2239 729 1510
10 7.72 4.0 2391 810 1581
11 7.42 3.8 2528 891 1637
12 7.16 3.7 2661 972 1689
13 6.92 3.6 2786 1053 1733
14 6.71 3.5 2910 1134 1776
15 6.52 3.4 3029 1215 1814
16 6.30 3.3 3122 1296 1826
17 6.10 3.1 3212 1377 1835
18 5.92 3.1 3301 1458 1843
19 5.75 3.0 3384 1539 1845
20 5.60 2.9 3469 1620 1849
21 5.46 2.8 3552 1701 1851
22 5.32 2.7 3625 1782 1843
23 5.20 2.7 3705 1863 1842
24 5.09 2.6 3784 1944 1840
25 4.98 2.6 3856 2025 1831
26 4.87 2.5 3922 2106 1816
27 4.78 2.5 3998 2187 1811
28 4.69 2.4 4068 2268 1800
29 4.60 2.4 4132 2349 1783
30 4.52 2.3 4200 2430 1770
Storage Volume for Design Flow:1851 ft3
1-12-16 FAA POND PAVER FLOW REDUCTION 1FT DEEP.xls,HTP A
FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME
Rational Volumetric (FAA) Method
OVERALL 100-Year Event
LOCATION: HTP 6 Basin B Paver Area 5571 ft
PROJECT NO: 1254-045-00 Void Depth 1 ft
COMPUTATIONS BY: MPO 30% Void 1671 cf
DATE: 11/19/2015
Equations: Area trib. to pavers = 35123 sf
Developed flow = QD = CIA C (100) = 0.89
Vol. In = Vi = T C I A = T QD Developed C A = 31172 sf
Vol. Out = Vo =K QPO T Release rate, QPO = 3.2 cfs
storage = S = Vi - Vo K = 0.9
Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall
Storm Rainfall QD Vol. In Vol. Out Storage
Duration, T Intensity, I (cfs) Vi Vo S
(min) (in/hr) (ft3) (ft3) (ft3)
5 9.95 7.1 2136 864 1272
6 9.31 6.7 2398 1037 1362
7 8.80 6.3 2645 1210 1435
8 8.38 6.0 2878 1382 1496
9 8.03 5.7 3103 1555 1548
10 7.72 5.5 3315 1728 1587
11 7.42 5.3 3504 1901 1604
12 7.16 5.1 3689 2074 1615
13 6.92 5.0 3863 2246 1616
14 6.71 4.8 4033 2419 1614
15 6.52 4.7 4199 2592 1607
16 6.30 4.5 4328 2765 1563
17 6.10 4.4 4452 2938 1515
18 5.92 4.2 4575 3110 1465
19 5.75 4.1 4691 3283 1408
20 5.60 4.0 4809 3456 1353
21 5.46 3.9 4923 3629 1294
22 5.32 3.8 5025 3802 1224
23 5.20 3.7 5135 3974 1161
24 5.09 3.6 5245 4147 1098
25 4.98 3.6 5346 4320 1026
26 4.87 3.5 5437 4493 944
27 4.78 3.4 5541 4666 876
28 4.69 3.4 5638 4838 800
29 4.60 3.3 5728 5011 716
30 4.52 3.2 5822 5184 638
Storage Volume for Design Flow:1616 ft3
1-12-16 FAA POND PAVER FLOW REDUCTION 1FT DEEP.xls,HTP B
FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME
Rational Volumetric (FAA) Method
OVERALL 100-Year Event
LOCATION: HTP 6 Basin E Paver Area 8931 ft
PROJECT NO: 1254-045-00 Void Depth 1 ft
COMPUTATIONS BY: MPO 30% Void 2679 cf
DATE: 11/19/2015
Equations: Area trib. to pavers = 35674.84 sf
Developed flow = QD = CIA C (100) = 0.91
Vol. In = Vi = T C I A = T QD Developed C A = 32464 sf
Vol. Out = Vo =K QPO T Release rate, QPO = 2.2 cfs
storage = S = Vi - Vo K = 0.9
Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall
Storm Rainfall QD Vol. In Vol. Out Storage
Duration, T Intensity, I (cfs) Vi Vo S
(min) (in/hr) (ft3) (ft3) (ft3)
5 9.95 7.4 2225 594 1631
6 9.31 6.9 2498 713 1785
7 8.80 6.6 2755 832 1923
8 8.38 6.2 2998 950 2047
9 8.03 6.0 3232 1069 2162
10 7.72 5.8 3452 1188 2264
11 7.42 5.5 3650 1307 2343
12 7.16 5.3 3842 1426 2416
13 6.92 5.2 4023 1544 2478
14 6.71 5.0 4201 1663 2537
15 6.52 4.9 4373 1782 2591
16 6.30 4.7 4507 1901 2607
17 6.10 4.5 4637 2020 2617
18 5.92 4.4 4765 2138 2627
19 5.75 4.3 4885 2257 2628
20 5.60 4.2 5008 2376 2632
21 5.46 4.1 5127 2495 2632
22 5.32 4.0 5234 2614 2620
23 5.20 3.9 5348 2732 2616
24 5.09 3.8 5463 2851 2611
25 4.98 3.7 5567 2970 2597
26 4.87 3.6 5662 3089 2573
27 4.78 3.6 5771 3208 2563
28 4.69 3.5 5872 3326 2546
29 4.60 3.4 5965 3445 2520
30 4.52 3.4 6064 3564 2500
Storage Volume for Design Flow:2632 ft3
1-12-16 FAA POND PAVER FLOW REDUCTION 1FT DEEP.xls,HTP E
FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME
Rational Volumetric (FAA) Method
OVERALL 100-Year Event
LOCATION: HTP 6 Basin F Paver Area 8668 ft
PROJECT NO: 1254-045-00 Void Depth 1 ft
COMPUTATIONS BY: MPO 30% Void 2600 cf
DATE: 11/19/2015
Equations: Area trib. to pavers = 36353 sf
Developed flow = QD = CIA C (100) = 0.94
Vol. In = Vi = T C I A = T QD Developed C A = 34081 sf
Vol. Out = Vo =K QPO T Release rate, QPO = 2.5 cfs
storage = S = Vi - Vo K = 0.9
Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall
Storm Rainfall QD Vol. In Vol. Out Storage
Duration, T Intensity, I (cfs) Vi Vo S
(min) (in/hr) (ft3) (ft3) (ft3)
5 9.95 7.8 2335 675 1660
6 9.31 7.3 2622 810 1812
7 8.80 6.9 2892 945 1947
8 8.38 6.6 3147 1080 2067
9 8.03 6.3 3393 1215 2178
10 7.72 6.0 3624 1350 2274
11 7.42 5.8 3832 1485 2347
12 7.16 5.6 4033 1620 2413
13 6.92 5.4 4223 1755 2468
14 6.71 5.2 4410 1890 2520
15 6.52 5.1 4591 2025 2566
16 6.30 4.9 4732 2160 2572
17 6.10 4.8 4868 2295 2573
18 5.92 4.6 5002 2430 2572
19 5.75 4.5 5129 2565 2564
20 5.60 4.4 5258 2700 2558
21 5.46 4.3 5383 2835 2548
22 5.32 4.2 5494 2970 2524
23 5.20 4.1 5614 3105 2509
24 5.09 4.0 5735 3240 2495
25 4.98 3.9 5844 3375 2469
26 4.87 3.8 5944 3510 2434
27 4.78 3.7 6059 3645 2414
28 4.69 3.7 6165 3780 2385
29 4.60 3.6 6262 3915 2347
30 4.52 3.5 6366 4050 2316
Storage Volume for Design Flow:2573 ft3
1-12-16 FAA POND PAVER FLOW REDUCTION 1FT DEEP.xls,HTP F
FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME
Rational Volumetric (FAA) Method
OVERALL 100-Year Event
LOCATION: HTP 6 Basin I Paver Area 10162 ft
PROJECT NO: 1254-045-00 Void Depth 1 ft
COMPUTATIONS BY: MPO 30% Void 3049 cf
DATE: 11/19/2015
Equations: Area trib. to pavers = 75441 sf
Developed flow = QD = CIA C (100) = 0.80
Vol. In = Vi = T C I A = T QD Developed C A = 60353 sf
Vol. Out = Vo =K QPO T Release rate, QPO = 7.0 cfs
storage = S = Vi - Vo K = 0.9
Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall
Storm Rainfall QD Vol. In Vol. Out Storage
Duration, T Intensity, I (cfs) Vi Vo S
(min) (in/hr) (ft3) (ft3) (ft3)
5 9.95 13.8 4136 1890 2246
6 9.31 12.9 4644 2268 2376
7 8.80 12.2 5121 2646 2475
8 8.38 11.6 5573 3024 2549
9 8.03 11.1 6008 3402 2606
10 7.72 10.7 6418 3780 2638
11 7.42 10.3 6785 4158 2627
12 7.16 9.9 7143 4536 2607
13 6.92 9.6 7478 4914 2564
14 6.71 9.3 7809 5292 2517
15 6.52 9.0 8130 5670 2460
16 6.30 8.7 8380 6048 2332
17 6.10 8.5 8621 6426 2195
18 5.92 8.2 8858 6804 2054
19 5.75 8.0 9082 7182 1900
20 5.60 7.8 9311 7560 1751
21 5.46 7.6 9532 7938 1594
22 5.32 7.4 9730 8316 1414
23 5.20 7.2 9942 8694 1248
24 5.09 7.1 10155 9072 1083
25 4.98 6.9 10350 9450 900
26 4.87 6.7 10526 9828 698
27 4.78 6.6 10729 10206 523
28 4.69 6.5 10917 10584 333
29 4.60 6.4 11090 10962 128
30 4.52 6.3 11273 11340 -67
Storage Volume for Design Flow:2638 ft3
1-12-16 FAA POND PAVER FLOW REDUCTION 1FT DEEP.xls,HTP I
FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME
Rational Volumetric (FAA) Method
OVERALL 100-Year Event
LOCATION: HTP 6 Basin J Paver Area 9025 ft
PROJECT NO: 1254-045-00 Void Depth 1 ft
COMPUTATIONS BY: MPO 30% Void 2708 cf
DATE: 11/19/2015
Equations: Area trib. to pavers = 60573 sf
Developed flow = QD = CIA C (100) = 0.79
Vol. In = Vi = T C I A = T QD Developed C A = 47701 sf
Vol. Out = Vo =K QPO T Release rate, QPO = 5.0 cfs
storage = S = Vi - Vo K = 0.9
Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall
Storm Rainfall QD Vol. In Vol. Out Storage
Duration, T Intensity, I (cfs) Vi Vo S
(min) (in/hr) (ft3) (ft3) (ft3)
5 9.95 10.9 3269 1350 1919
6 9.31 10.2 3670 1620 2050
7 8.80 9.6 4047 1890 2157
8 8.38 9.2 4405 2160 2245
9 8.03 8.8 4748 2430 2318
10 7.72 8.5 5072 2700 2372
11 7.42 8.1 5363 2970 2393
12 7.16 7.8 5645 3240 2405
13 6.92 7.6 5911 3510 2401
14 6.71 7.3 6172 3780 2392
15 6.52 7.1 6426 4050 2376
16 6.30 6.9 6623 4320 2303
17 6.10 6.7 6814 4590 2224
18 5.92 6.5 7001 4860 2141
19 5.75 6.3 7178 5130 2048
20 5.60 6.1 7359 5400 1959
21 5.46 6.0 7534 5670 1864
22 5.32 5.8 7690 5940 1750
23 5.20 5.7 7858 6210 1648
24 5.09 5.6 8026 6480 1546
25 4.98 5.5 8180 6750 1430
26 4.87 5.3 8319 7020 1299
27 4.78 5.2 8480 7290 1190
28 4.69 5.1 8628 7560 1068
29 4.60 5.0 8765 7830 935
30 4.52 4.9 8909 8100 809
Storage Volume for Design Flow:2405 ft3
1-12-16 FAA POND PAVER FLOW REDUCTION 1FT DEEP.xls,HTP J
FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME
Rational Volumetric (FAA) Method
OVERALL 100-Year Event
LOCATION: HTP 6 Basin K Paver Area 3667 ft
PROJECT NO: 1254-045-00 Void Depth 1 ft
COMPUTATIONS BY: MPO 30% Void 1100 cf
DATE: 11/19/2015
Equations: Area trib. to pavers = 60453 sf
Developed flow = QD = CIA C (100) = 0.70
Vol. In = Vi = T C I A = T QD Developed C A = 42317 sf
Vol. Out = Vo =K QPO T Release rate, QPO = 7.0 cfs
storage = S = Vi - Vo K = 0.9
Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall
Storm Rainfall QD Vol. In Vol. Out Storage
Duration, T Intensity, I (cfs) Vi Vo S
(min) (in/hr) (ft3) (ft3) (ft3)
5 9.95 9.7 2900 1890 1010
6 9.31 9.0 3256 2268 988
7 8.80 8.5 3591 2646 945
8 8.38 8.1 3908 3024 884
9 8.03 7.8 4212 3402 810
10 7.72 7.5 4500 3780 720
11 7.42 7.2 4757 4158 599
12 7.16 7.0 5008 4536 472
13 6.92 6.7 5244 4914 330
14 6.71 6.5 5476 5292 184
15 6.52 6.3 5701 5670 31
16 6.30 6.1 5875 6048 -173
17 6.10 5.9 6044 6426 -382
18 5.92 5.8 6211 6804 -593
19 5.75 5.6 6368 7182 -814
20 5.60 5.4 6528 7560 -1032
21 5.46 5.3 6683 7938 -1255
22 5.32 5.2 6822 8316 -1494
23 5.20 5.1 6971 8694 -1723
24 5.09 4.9 7120 9072 -1952
25 4.98 4.8 7257 9450 -2193
26 4.87 4.7 7380 9828 -2448
27 4.78 4.6 7523 10206 -2683
28 4.69 4.6 7654 10584 -2930
29 4.60 4.5 7776 10962 -3186
30 4.52 4.4 7904 11340 -3436
Storage Volume for Design Flow:1010 ft3
1-12-16 FAA POND PAVER FLOW REDUCTION 1FT DEEP.xls,HTP K
New Impervious Area 177,583 acre/sq. ft.
Required Minimum Impervious Area to be Treated 88,792 acre/sq. ft.
Area of Paver Section #1 6,401 acre/sq. ft.
Pavement area for Paver Section #1 (up to 3:1 is permited) 19,971 acre/sq. ft.
Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 20,813 acre/sq. ft.
Area of Paver Section #2 5,571 acre/sq. ft.
Pavement area for Paver Section #2 (up to 3:1 is permited) 17,521 acre/sq. ft.
Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 19,254 acre/sq. ft.
Area of Paver Section #3 2,656 acre/sq. ft.
Pavement area for Paver Section #3 (up to 3:1 is permited) 6,409 acre/sq. ft.
Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 7,080 acre/sq. ft.
Area of Paver Section #4 6,276 acre/sq. ft.
Pavement area for Paver Section #4 (up to 3:1 is permited) 16,138 acre/sq. ft.
Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 17,805 acre/sq. ft.
Area of Paver Section #5 2,805 acre/sq. ft.
Pavement area for Paver Section #5 (up to 3:1 is permited) 9,092 acre/sq. ft.
Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 12,302 acre/sq. ft.
Area of Paver Section #6 5,863 acre/sq. ft.
Pavement area for Paver Section #6 (up to 3:1 is permited) 13,599 acre/sq. ft.
Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 19,969 acre/sq. ft.
Total Impervious Area Treated 97,224 acre/sq. ft.
Actual % On-Site Treated by LID 55 %
New Pavement Area 106,822 acre/sq. ft.
Required Minimum Area of Porous Pavement 26,706 acre/sq. ft.
Area of Paver Section #1 6,401 acre/sq. ft.
Area of Paver Section #2 5,571 acre/sq. ft.
Area of Paver Section #3 2,656 acre/sq. ft.
Area of Paver Section #4 6,276 acre/sq. ft.
Area of Paver Section #5 2,805 acre/sq. ft.
Area of Paver Section #6 5,863 acre/sq. ft.
Total Porous Pavement Area 29,571 acre/sq. ft.
Actual % of Porous Pavement Provided 28 %
50% On-Site Treatment by LID Requirement
25% Porous Pavement Requirement
LID Table
E
APPENDIX E
EXCERPTS FROM REFERENCE REPORTS
F
APPENDIX F
OFFSITE STORM SYSTEM
♥ ❦ ♠ ① ② ❤ ♣ ③ ④ ④ r s t ✐ ❤ ✉ ♠ ⑨ ⑨ ⑨ ⑨ ❥ ⑦ ⑦ ⑦ ⑦ t ⑨ ❸ ⑥ ❹ ♠ ⑥ ❸ ⑨ ❷ ✈ ❦ ❥ ✇ ♥ ❦ ♠ ① ② ❤ ♣
❸ ❸ ❸ ❸ ❸ ⑤ ❷ ⑩ ⑧ ❶ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ❹ ❹ ❹ ❹ ❺ ⑩ ⑤ ❷ ❹ ❶ ❹ ❹ ❹ ❹ ⑥ ⑦ ⑦ ⑦ ⑦ ❶ ❶ ⑧ ⑧ ⑦ ❺ ❷ ❸ ❶ ❷ ⑨ ⑨ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ❺ ❺ ❶ ⑧ ⑦ ⑧ ⑧ ❹ ❸ ⑩
⑨ ⑨ ⑨ ⑨ ⑨ ❺ ❹ ⑥ ❸ ⑨ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ❺ ❺ ❺ ❺ ❺ ⑩ ⑤ ⑨ ⑥ ❹ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑧ ⑩ ⑩ ⑩ ⑦ ⑧ ❸ ⑩ ⑨ ⑥ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ⑦ ⑩ ❷ ❷ ⑤ ⑤ ⑨ ⑧ ⑥ ❷ ❹
⑨ ⑨ ⑨ ⑨ ⑨ ⑤ ❷ ⑩ ⑧ ❶ ⑦ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ❶ ❶ ❶ ❶ ❶ ❶ ⑧ ❷ ⑤ ⑨ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ❷ ❷ ❷ ❷ ⑦ ❷ ❶ ⑩ ⑨ ⑥ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ❸ ❸ ⑥ ❷ ❹ ❷ ❹ ⑩
⑤ ⑤ ⑤ ⑤ ⑤ ❺ ❹ ⑥ ❸ ⑨ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ❶ ❶ ⑧ ⑧ ⑦ ❶ ⑥ ❹ ❶ ⑧ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑤ ⑤ ⑤ ⑤ ⑦ ⑤ ⑧ ❷ ⑨ ⑥ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ⑥ ❹ ❹ ❺ ⑦ ❹ ❸ ⑧ ⑨ ⑩
⑤ ⑤ ⑤ ⑤ ⑤ ⑤ ❷ ⑩ ⑧ ❶ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑧ ⑧ ⑧ ⑧ ⑧ ⑩ ❷ ⑤ ⑨ ❸ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ⑨ ⑨ ⑨ ⑧ ⑩ ⑤ ❸ ⑥ ❸ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑦ ❺ ❶ ❶ ❶ ⑧ ❸ ❶ ❷ ❷ ❶
✣ ▲ ✩ ✥ ✪ ✞ ☛ ✕ ✫ ✬ ✭ ✮ ✯ ✰ ✱ ❆ ✳ ✴ ✝ ✆ ❷ ❺ ✌ ✡ ✡ ☛ ✡ ✚ ✂ ✎ ✍ ☛ ✌ ✡ ✌ ✆ ❺ ✏ ✎ ⑦ ⑧ ✠ ⑥ ✠ ✎ ✕ ✆ ✶ ❹ ⑦ ⑨ ⑥ ⑦ ⑧ ❷
❂ ✷ ,QWHQVLW\❑ ✑ ✘ ☛ ✌ ✑ ✞ ✔ ✡ ☛ ✂ ▲ ✎ 'XUDWLRQ)❑ ✒ ❑ ✍ ✘ ✌ ✔ ☞ ☛ ✑ ✌ ✍ ✝ ✞ ✜ ☞ ✝ ☎ ✂ ✔ ✂ ✎ UHTXHQF\✎ ☞ ✏ ✂ ✦ ✝ ✎ ✎ ✞ ✍ ✂ ✄ ✜ ☎ ✎ &✆ ✠ ✂ ✠ ✝ XUYHVIRU6:✖ ✞ ☛ ✆ ✍ ✆ ✌ ☛ ✝ ✠ ✞
☛ ✟ ✏ ✌ ✂ ☛ ✠ ✠ ✡ ☛ ✕ ✓ ☛ ✑ 00 ✞ ☛ ✂ ✞ ✆ ✟ ✌ ✍ ✍ ☛ ☛ ✌ ☞ ✂ ✝ ✍ ✞ ✎ ✒ ✓ ✝ ❝ ✡ ❼ ☛ ✡ ✽ ✝ ✞ ✽ ✷ ✌ ✝ ✞ ✖ ☞ ✠ ☛ ☎ ✂ ▼ ✏ ✪ ✝ ✠ ✘ ☛ ❏ ✆ ✗ ✗ ✸ ✔ ☛ ✂ ✎ ✒ ✍ ✌ ☞ ✑ ✆ ✏ ✎ ✍ ✂ ✑ ☛ ✩ ✘ ✚ ❂ ✘ ✚ ▲
❑ ✘ ✚ ✩ ❂ ✘ ✚
6WRUP3URYLVLRQV 0LQRU ☛ ✎ ✌ ✑ ✌ ✄ ✞ ✞ ☛ ✍ ☛ ✡ ✌ ✎ ✕ ✆ ✆ ✒ ✂ ✚ ✖ ☛ ✎ ✛ ✫ ✍ <✍ ☛ ✝ ✬ ✌ ✓ ✄ ✟ ✭ ✞ ☛ ✂ ✮ ✝ ✡ ✍ ✯ ✡ ✓ ✆ ✰ HDU ✍ ☛ ✚ ✂ ✱ ✌ ✎ ✆ ✆ ✝ ✂ ✴ ✞ ✎ ✍ ✍ ✳ ✌ ☛ ☛ ❄ ✏ ✒ ✌ ✡ ✆ ☛
✄ ✝ ☎ ✆ ☎ ✟ ✆ ✆ ✟ ✌ ☛ ✔ ✚ ✑ ✡ ✆ ✌ ✄ ✡ ✂ ✞ ✡ ☛ ☛ ✌ ✡ ✍ ✄ ✡ ✌ ✝ ✞ ✚ ✡ ✝ ✞ ✂ ✄ ✂ ☛ ☛ ✎ ✌ ✂ ✞ ✌ ☛ ✒ ✍ ✌ ✔ ✞ ☛ ☛ ✞ ✂ ✌ ✝ ✝ ✆ ✟ ✞ ✎ ✡ ✔ ☛ ✟ ✞ ✆ ✌ ✠ ✟ ✂ ☎ ✆ ✏ ☛ ✎ ✌ ✡ ✏ ✄ ✟ ✆ ✎ ☛ ✂ ✝ ✠ ✆ ✠
✆ ✠ ☞ ✝ ✎ ✂ ☎ ✝ ✠ ✝ ✞ ✕ ✌ ✟ ☛ ✞ ✑ ✆ ✆ ✎ ✗ ✞ ✶ ✍ ✏ ✝ ✡ ✌ ✞ ✟ ☛ ✒ ✝ ✍ ✠ ✝ ✌ ✂ ✂ ✎ ✍ ✝ ☛ ☛ ✆ ✟ ✂ ✍ ✎ ✌ ☛ ✆ ✌ ✄ ✂ ✟ ☛ ☎ ✝ ✞ ✍ ✌ ✝ ✖ ✞ ✄ ✌ ✎ ✝ ✞ ❡ ✍ ✡ ☛ ✡ ☛ ✒ ✝ ✍ ✞ ☎ ✠ ✟ ✔ ✂ ✎ ✂ ☛ ✡ ✞ ✍
✍ ✓ ✚ ✌ ☛ ✆ ✝ ✞ ✞ ✂ ✎ ✝ ✌ ☛ ✍ ✒ ✄ ✞ ☛ ✟ ☛ ✆ ✆ ☛ ✚ ✔ ✕ ✆ ✂ ✎ ✂ ☛ ☛ ✍ ✄ ☞ ✚ ✍ ✎ ✎ ✌ ☞ ✂ ✂ ☛ ☛ ✟ ✌ ✞ ✂ ✍ ✟ ✌ ☛ ✑ ✒ ✌ ✌ ✌ ✆ ✞ ✎ ✝ ✞ ✞ ✞ ✆ ☛ ✌ ✂ ✠ ✖ ✆ ✍ ✠ ✚ ☛ ☛ ✡ ✟ ✍ ✟ ☎ ✌ ✎ ✍ ✝ ✍ ✆ ✞ ✝
✂ ✞ ✌ ✗ ✒ ✒ ☛ ✷ ✄ ✕ ✑ ✝ ☛ ✌ ✞ ✔ ✎ ✩ ✆ ✍ ✘ ✚
✣ ❂ ✥ ✫ ✡ ✡ ✟ ✷ 0DMRU ✎ ✬ ✌ ☛ ✑ ✭ ✄ ✂ ✎ ☛ ☛ ✮ ✍ ✯ ✞ ✌ ✡ ✰ ✎ ✒ ✂ ✝ ✱ ✝ ✖ ✞ ☛ ✎ ✛ <✌ ✗ ✵ ✞ ☛ ✂ ✟ ✳ ☛ ✽ ❀ ✏ ✂ ✡ ✌ ✝ ✓ ✝ ✌ ✟ ✡ ✆ ✛ ☛ ✝ ✠ ✎ ✍ ✆ ✡ ✝ ✌ HDU ✍ ✂ ☛ ✝ ✝ ✎ ✞ ✠ ✡ ☛ ☛
✏ ✆ ✌ ✍
6WRUP3URYLVLRQV ✂ ✌ ✗ ✒ ✂ ☛ ✑ ✝ ☛ ✡ ✞ ✷ ☛ ✌ ✆ ✝ ✑ ✞ ✔ ✒ ▲ ☛ ✆ ☛ ❑ ✝ ✂ ✟ ✂ ❑ ☛ ✆ ✆ ✎ ✔ ✘ ✄ ✍ ☛ ✔ ✆ ✍ ✞ ☛ ✂ ☛ ✝ ☛ ✂ ✌ ✆ ✠ ✝ ✄ ✌ ✍ ✍ ✡ ✂ ☛ ✆ ✝ ✆ ☛ ✂ ✎ ✂ ✔ ✆ ✄ ✎ ✞ ✝ ✗ ✒ ✍ ✌ ✖ ✄ ✞ ✔ ☛
☛ ✂ ✡ ✝ ✡ ✕ ✞ ✍ ✌ ✟ ☛ ✌ ✞ ✠ ☛ ✝ ☎ ✞ ✡ ✞ ✡ ✌ ✟ ☛ ✂ ✒ ✑ ✎ ☛ ✆ ☛ ✞ ✂ ✎ ✆ ✆ ✄ ✂ ✔ ✍ ✍ ✄ ✝ ✆ ☎ ✞ ✂ ✟ ☛ ✎ ✆ ✂ ✄ ✍ ☛ ☛ ✡ ✕ ✌ ☞ ✗ ✞ ☛ ✠ ✡ ✍ ✌ ✆ ✞ ✄ ✚ ✞ ✎ ✌ ✝ ☞ ✛ ✞ ✎ ☛ ✒ ✍ ✞ ✌ ✆ ✟ ✂ ✍ ✑ ✎ ☛
✌ ✍ ✄ ✂ ✞ ✎ ✞ ✆ ☛ ☛ ✔ ✠ ✠ ✆ ✆ ✝ ✚ ✄ ✂ ☛ ✡ ✝ ✄ ✍ ✞ ✌ ✌ ✝ ✄ ✂ ✞ ☛ ✌ ☎ ✒ ✆ ✆ ☎ ☛ ✂ ✕ ✖ ✖ ✆ ☛ ✌ ✂ ✔ ✌ ✌ ✞ ✆ ✞ ✚ ✂ ✌ ✝ ☞ ✠ ✌ ✔ ✎ ✠ ❡ ✞ ✠ ☛ ✡ ✎ ✡ ✆ ✆ ✚ ✆ ✂ ✎ ✍ ✎ ✝ ✓ ☛ ✏ ☛ ✞ ✠ ✍ ✆ ✝ ✆ ✏ ☎
✚ ☛ ✍ ✆ ☛ ✂ ✎ ✍ ✂ ✍ ☛ ✑ ✌ ✌ ☞ ✄ ✂ ✍ ✎ ✌ ✆ ☞ ✚ ✕ ☛ ✌ ✍ ☛ ✞ ✂ ✠ ✡ ✔ ✠
✣ ✣ ✣ ✣ ✣ ❏ ❇ ❅ ❃ ▲ ❑ ✥ ✥ ✥ ✥ ✥ ✫ ✫ ✫ ✫ ✫ ✬ ✬ ✬ ✬ ✬ ✭ ✭ ✭ ✭ ✭ ✮ ✮ ✮ ✮ ✮ ✯ ✯ ✯ ✯ ✯ ✰ ✰ ✰ ✰ ✰ ✱ ✱ ✱ ✱ ✱ ❄ ❄ ❄ ✵ ✵ ✳ ✳ ✳ ✳ ✳ ✵ ✴ ❀ ✵ ✴ ✝ ✝ ✝ ✝ ✝ ✆ ✆ ✆ ✆ ✆ ✡ ✡ ✡ ✡ ✡ ☛ ☛ ☛ ☛ ☛ ✠ ✠ ✠ ✠ ✠
☛ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✂ ☛ ☛ ☛ ☛ ☛ ✡ ✡ ✡ ✡ ✡ ✝ ✝ ✝ ✝ ✝ ✞ ✞ ✞ ✞ ✞ ✝ ✝ ✝ ✝ ✝ ✂ ✂ ✂ ✂ ✂ ✆ ✆ ✆ ✆ ✆ ☛ ☛ ☛ ☛ ☛ ✞ ✞ ✞ ✞ ✞ ✂ ✂ ✂ ✂ ✂ ✝ ✝ ✝ ✝ ✝ ✍ ✍ ✍ ✍ ✍ ☛ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✂ ✔ ✔ ✔ ✔ ✔ ✗ ✗ ✗ ✗ ✗
✣ ▲ ▲ ✥ ✫ ✬ ✭ ✮ ✯ ✰ ✱ ❆ ✳ ❀ ✝ ✆ ✌ ✄ ☛ ✞ ✡ ☛ ✡ ✂ ✎ ✍ ☛ ✌ ✡ ✌ ✆ ✏ ✎ ✠ ✠ ✎ ✕ ✆ ✶
✷ ☞ ,QWHQVLW\✍ ✑ ✎ ☛ ✓ ✝ ✎ ✡ ✞ ☛ ☛ ✡ ✘ ✑ 'XUDWLRQ)✝ ✞ ✎ ☎ ✷ ✍ ✌ ✖ ✍ ✌ ✠ ☛ ✝ ✞ ▼ ✏ ✌ ✪ ✠ ✠ ✘ UHTXHQF\❅ ✁ ✞ ✌ ✂ ✞ ☛ ✞ ✡ ✆ ✝ ✝ ✞ ✂ ✔ ✷ ✘ &✻ ✌ ✖ ☎ XUYHVIRU5DWLRQDO0HWKRG ✠ ✍
☛ ✌ ✂ ▼ ✝ ✎ ✪ ✞ ✘ ✘ ❇ ✦ ✗ ✍ ☛ ✧ ☎ ☛ ✞ ✟ ✔ ✂ ✌ ✖ ✠ ☛ ✆ ✏ ✎ ✍ ☎ ✆ ☛ ✕ ✝ ✂ ✑ ✂ ✑ ☛ ▼ ✌ ✂ ✝ ✎ ✞ ✌ ✠ ✽ ☛ ✂ ✑ ✎ ✡ ✎ ✏ ✍ ☎ ✞ ✎ ✏ ✏ ✌ ✞ ✌ ✠ ✔ ✆ ✝ ✆ ✌ ✍ ☛
7DEOH5$
&LW\RI)RUW&ROOLQV5DLQIDOO,QWHQVLW\±'XUDWLRQ±)UHTXHQF\7DEOHIRU8VH:LWKWKH5DWLRQDO0HWKRG
❢
❣ ❤ ✐ ❥ ❦ ❧ ⑤ ❷ ⑩ ⑧ ♠ ♥ ♦ ❦ ♠ ♣ q r s t ✐ ❤ ✉ ♠ ❥ ⑥ ⑥ ⑥ t ⑥ ⑦ ⑦ ⑦ ♠ ⑧ ❷ ⑤ ⑦ ⑨ ✈ ⑤ ⑩ ⑥ ❦ ❥ ✇ ♥ ❦ ♠ PLQXWHVWRPLQXWHV ① ② ❤ ♣ ③ ④ r s t ✐ ❤ ✉ ♠ ⑨ ⑨ ⑨ ❥ ⑨ t ⑦ ⑦ ⑦ ⑧ ⑤ ❸ ⑦ ♠ ❹ ⑩
❷ ❹ ✈ ❦ ❥ ✇ ♥ ❦ ♠ ① ② ❤ ♣ ③ ④ ④ r s t ✐ ❤ ✉ ♠ ❶ ❶ ⑧ ⑧ ❥ ⑦ ⑦ ⑦ t ❶ ❸ ❸ ⑦ ⑧ ♠ ⑤ ❹ ⑧ ✈ ❦ ❥ ✇ ♥ ❦ ♠ ① ② ❤ ♣
❹ ❹ ❹ ❹ ❶ ❺ ❹ ⑥ ❸ ⑥ ⑥ ⑥ ❹ ⑥ ⑦ ⑦ ⑦ ⑦ ⑥ ❹ ❺ ❶ ⑦ ❸ ❹ ❸ ⑤ ⑧ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ❶ ⑩ ❷ ❸ ⑦ ⑤ ❸ ⑧ ❸ ❶ ⑧ ⑩ ⑩ ⑩ ❷ ⑦ ⑦ ⑦ ⑦ ⑦ ❺ ⑩ ⑨ ❹ ❶ ❸ ⑥ ⑥ ❷ ⑥
❹ ❹ ❹ ❹ ❹ ⑨ ⑤ ❷ ⑩ ⑧ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ❶ ⑧ ⑧ ⑩ ⑦ ⑩ ⑥ ⑩ ❹ ⑤ ❸ ❸ ❸ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑥ ❹ ❺ ❶ ⑦ ❶ ❶ ❶ ⑧ ❶ ❷ ❷ ⑤ ❷ ❷ ⑦ ⑦ ⑦ ⑩ ⑤ ❶ ⑦ ⑦ ❸ ❹ ❹ ⑥ ⑥
❹ ⑥ ⑥ ⑥ ❶ ❺ ❹ ⑥ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ❷ ❷ ⑤ ⑤ ⑤ ❹ ❷ ❸ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑧ ⑩ ❷ ❷ ⑥ ⑨ ⑩ ❹ ⑤ ⑤ ⑤ ⑤ ⑦ ⑦ ⑦ ⑩ ⑨ ❸ ⑦ ❷ ⑤ ❷ ⑥
✫ ✪ ❙ ✬ ❚ ✭ ✞ ❯ ✮ ☛ ❱ ✯ ✕ ❲ ✰ ✱ ❳ ✫ ✴ ✬ ❨ ✳ ✭ ❩ ❀ ✮ ❬ ✯ ✝ ✰ ✆ ❭ ✱ ✡ ❪ ❫ ✴ ☛ ✠ ✳ ❴ ✴ ☛ ❳ ✂ ❵ ☛ ✝ ✆ ✡ ❛ ✌ 5DLQIDOO ✝ ✡ ✞ ✡ ✝ ☛ ✂ ✆ ✡ ✚ ☛ ✂ ✞ ✎ ✂ ✝ ✍ ✍ ☛ ☛ ✌ ✂ ✔ ✡ ✗ ✌ ✆ ✏ ✎ ✠ ✠
✎ ✕ ✆ ✶
✂ ✠ ✎ ✎ ✷ ✪ *✝ ☛ ✍ ✞ ✌ ✑ ✠ ✄ HQHUDO'HVLJQ6WRUPV ✠ ✠ ✆ ☛ ✂ ✆ ✄ ❝ ✑ ✡ ✏ ✗ ☛ ✂ ✍ ✝ ✌ ✎ ✍ ✌ ✠ ✌ ✆ ✍ ✝ ✠ ✂ ✞ ✓ ✄ ☛ ✌ ✍ ☛ ✝ ✤ ✆ ✒ ✍ ✡ ✚ ✌ ☛ ✂ ☛ ✒ ✑ ✕ ☞ ☛ ☛ ✆ ✑ ✂ ✔ ✚ ✑ ☛ ✝ ✆ ✎ ✟ ✝
✂ ✎ ✑ ✒ ✞ ☛ ✏ ✑ ✟ ✄ ✝ ☛ ✂ ✍ ✆ ✝ ✌ ☛ ☛ ✡ ✂ ✝ ✂ ✑ ✞ ✓ ☛ ✑ ☛ ✗ ☛ ✆ ✝ ✣ ✍ ✩ ✒ ✷ ❇ ✔ ✘ ✞ ❑ ✑ ✔ ✂ ✂ ✕ ✝ ☛ ✌ ✑ ✆ ✌ ✞ ✥ ✎ ✆ ✍ ✡ ☞ ✂ ✣ ✆ ✎ ☛ ✩ ✟ ✂ ✍ ✎ ✍ ✥ ✎ ✄ ✟ ✍ ✞ ✔ ☛ ✄ ☛ ✆ ✞ ☛ ✂ ✌ ✓ ✂ ✍ ✝
✝ ✍ ☎ ✞ ☛ ✠ ✆ ☛ ✞ ✟ ✂ ✣ ✂ ✂ ✑ ✆ ✎ ✝ ✎ ✂ ✝ ☛ ✍ ✎ ✆ ✞ ✟ ✍ ✎ ☎ ✄ ✝ ✞ ✄ ✆ ✂ ✔ ☛ ☛ ☎ ☛ ✡ ✂ ✎ ✓ ✆ ✑ ✂ ✂ ✏ ☛ ✌ ✎ ✞ ✂ ✦ ✂ ✌ ✂ ✡ ✎ ✑ ✺ ✎ ☛ ✍ ✌ ☛ ✆ ✂ ✍ ✆ ✝ ✜ ✝ ✒ ✂ ✌ ✞ ✑ ✞ ✎ ✂ ☛ ✏ ✎ ✠ ✝ ✕ ✠ ✍
✏ ✝ ✌ ✟ ✂ ✞ ✌ ✔ ✝ ✎ ✆ ✂ ✞ ☛ ✗ ✞ ☞ ✍ ✆ ☛ ☛ ✷ ✝ ✧ ✓ ✍ ✡ ✟ ✑ ☛ ☎ ☛ ☛ ✞ ✝ ✌ ✍ ✆ ✞ ✂ ✠ ✌ ✝ ✂ ✝ ✂ ✏ ✂ ✆ ✝ ✔ ✎ ✟ ✎ ✑ ✍ ✂ ✞ ✏ ✑ ✌ ☛ ✕ ☛ ✞ ✂ ✌ ✑ ✑ ✟ ✂ ✆ ☎ ✍ ✝ ☛ ✂ ✟ ☛ ✎ ✍ ☛ ✑ ☛ ☞ ✍ ✆ ✄ ✍ ❇ ✆
✗ ✎ ☛ ❑ ✖ ✂ ☞ ✷ ✑ ❜ ✌ ✌ ✑ ✌ ✖ ✍ ✂ ☛ ✝ ✎ ✌ ✠ ✑ ✂ ✝ ✏ ✆ ☛ ✂ ✌ ☛ ✔ ✌ ✆ ✟ ✌ ✠ ✎ ✠ ✎ ✞ ✌ ✏ ✞ ✍ ✡ ✌ ☞ ✡ ☛ ✝ ✍ ✡ ✙ ✞ ✎ ✝ ✝ ✟ ✆ ✖ ✆ ☛ ☛ ✂ ✂ ✌ ✓ ☛ ✝ ✑ ✖ ✞ ☛ ✡ ☛ ✝ ✟ ✞ ✌ ✠ ✂ ✤ ✝ ✂ ✞ ✂ ✆ ✽ ✡ ✔
✟ ✑ ☛ ✍ ✝ ✎ ✌ ✌ ✞ ☛ ✏ ✝ ✓ ✎ ✞ ✓ ☛ ✎ ✍ ✌ ☛ ✤ ✟ ✒ ✍ ✌ ✟ ✔ ☛ ✎ ✞ ☎ ✍ ✔ ✍ ☞ ☛ ✍ ✤ ☛ ✧ ✍ ✝ ✁ ✌ ✎ ✞ ☎ ✞ ✍ ✖ ✒ ✌ ✝ ✥ ✘ ✘ ✠ ✚ ✗
✷ ☞ ✍ ✑ ✎ ☛ ✖ ✌ ✂ ✑ ✖ ✝ ✝ ✍ ✠ ✡ ✝ ✂ ✔ ✝ ✆ ✎ ✂ ✏ ✑ ✎ ☛ ✟ ✤ ✟ ✽ ☎ ✍ ✌ ✍ ✛ ✝ ✞ ✎ ✒ ✍ ✚ ❝ ✎ ✂ ✞ ✎ ✍ ✂ ✄ ✑ ☛ ✤ ✚ ✌ ✕ ✓ ☛ ✑ ✍ ✝ ✌ ✟ ✒ ✑ ☛ ✚ ✝ ✆ ✎ ✞ ✂ ✑ ✟ ☛ ☛ ☛ ▲ ❑ ✓ ☛ ❑ ✍ ✘ ✔ ✔ ☛ ✎ ✌ ✞ ✍
☛ ✆ ✑ ✂ ✎ ☎ ✍ ✞ ✄ ✡ ✍ ✝ ☛ ✞ ✡ ✂ ✣ ✑ ▲ ☛ ❑ ❑ ✟ ✝ ✥ ✂ ✔ ✔ ☛ ✎ ✌ ✏ ✍ ✆ ✦ ✣ ✎ ✎ ✍ ✍ ✂ ✎ ✜ ✞ ✎ ☛ ✠ ✠ ✂ ✝ ✑ ✞ ✌ ✆ ✂ ✗ ✑ ✷ ✌ ✆ ✑ ✝ ✌ ✆ ✎ ✝ ✞ ✆ ☛ ✂ ✑ ☞ ☛ ☛ ✍ ✆ ✟ ✂ ✎ ☛ ✞ ✍ ✄ ✂ ☞ ✂ ✍ ✑ ✎ ✌ ✖
✂ ✌ ✖ ✑ ✌ ✝ ✠ ✆ ✝ ✂ ✔ ✌