Loading...
HomeMy WebLinkAboutCITY OF FORT COLLINS COMMUNITY RECYCLE CENTER - FDP - FDP150047 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT Community Recycling Center Prepared for: City of Fort Collins Operation Services 300 LaPorte Ave., Building B Fort Collins, CO 80521 (970) 221-6610 Prepared by: Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado 80550 (970) 674-3300 May 19, 2015 Job Number 1165-012-12 ii May 19, 2015 Mr. Dan Mogan City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Final Drainage Report for Community Recycling Center Dear Dan, I am pleased to submit for your review and approval, this Final Drainage Report for the Community Recycling Center development. I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual with variances noted. City comments, dated May 7, 2015 have been addressed in this report. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Reviewed By: Erika Schneider, P.E. Michael Oberlander, P.E., LEED AP Colorado Professional Colorado Professional Engineer No. 41777 Engineer No. 34288 iii TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................ iii 1. GENERAL LOCATION AND DESCRIPTION ................................................................ 1 1.1 Location ........................................................................................................................... 1 1.2 Description of Property ................................................................................................. 1 2. DRAINAGE BASINS AND SUB-BASINS .......................................................................... 2 2.1 Major Basin Description ................................................................................................ 2 2.2 Sub-Basin Description ................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA ...................................................................................... 2 3.1 Regulations ...................................................................................................................... 2 3.2 Directly Connected Impervious Area (DCIA) Discussion .......................................... 2 3.3 Development Criteria Reference and Constraints ...................................................... 4 3.4 Hydrological Criteria ..................................................................................................... 4 3.5 Hydraulic Criteria .......................................................................................................... 5 3.6 Floodplain Regulations Compliance ............................................................................. 5 4. DRAINAGE FACILITY DESIGN ....................................................................................... 5 4.1 General Concept ............................................................................................................. 5 4.2 Specific Flow Routing .................................................................................................... 6 4.3 Drainage Summary ........................................................................................................ 7 5. CONCLUSIONS .................................................................................................................... 7 5.1 Compliance with Standards .......................................................................................... 7 5.2 Drainage Concept ........................................................................................................... 7 6. DRAINAGE SYSTEM MAINTENANCE STANDARD OPERATING PROCEDURE 8 6.1 Rain Garden.................................................................................................................... 8 6.2 Storm Drain System (including SNOUT® Water Quality System) ........................... 8 6.3 Forebay-6” Curb with “V” Notches ............................................................................. 9 7. REFERENCES ...................................................................................................................... 9 APPENDIX A VICINITY MAP, DRAINAGE AND GRADING PLANS APPENDIX B HYDROLOGIC COMPUTATIONS APPENDIX C HYDRAULIC COMPUTATIONS APPENDIX D WATER QUALITY AND DETENTION POND, RAIN GARDEN, SNOUT® WATER QUALITY SYSTEM INFORMATION AND ALTERNATIVE COMPLIANCE/VARIANCE APPLICATION APPENDIX E SOILS INFORMATION, FIGURES, TABLES AND EXCERPTS FROM REPORTS 1 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The Community Recycling Center development is located in east Fort Collins. It is located in the Northeast Quarter of Section 19, Township 7 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. Please refer to the location map in Appendix A. The project is located west of Timberline Road and south of the Timberline Substation. The Power Trail and Union Pacific Railroad is located to the west of the project and the un-platted Timberline Star property is located to the south. 1.2 Description of Property The property consists of 4.56 acres and is owned by the City of Fort Collins. The project is an open air facility and will not have any buildings (except for a service shed). It will consist of a variety of hard surfaced areas for unloading and materials storage as well as a circulation drive off of Timberline. The land currently slopes to the north at about 8%. The land is currently vacant. The majority of the ground cover is dry land vegetation. There is offsite flow onto the property parallel to Timberline Road. Flow from the Timberline Star property to the south enters a drainage ditch at the southeast corner of the property. The ditch is adjacent to Timberline and directs flow north to an existing pipe in the Railroad Right-of-Way. The majority of existing soil type on-site consists of Larimer-Stoneham complex which is classified as Type B by the Natural Resources Conservation Service. Soil information is located in Appendix E. 2 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description The proposed development lies within the Spring Creek Master Drainage Basin. It is also a portion of Basin 13 of the Timberline Road Widening Drake to Prospect Drainage Report, by North Star Design, Inc. dated April 6, 2005. Excerpts from the City approved “100% Design Drainage Report for Interim Timberline Road Widening Drake to Prospect” can be found in Appendix E of this report. The Developed Drainage Plan for the Timberline Road Widening is also located in Appendix E. 2.2 Sub-basin Description The existing site drains to the north where it is intercepted by an existing 24” storm system in the RR right-of-way that discharges into Spring Creek. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the “City of Fort Collins Storm Drainage Design Criteria Manual” specifications. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Directly Connected Impervious Area (DCIA) Discussion Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. 3 Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Runoff for the site will be routed through vegetated areas, a SNOUT® water quality device with a sump and a forebay along the north curb and gutter thereby reducing runoff from impervious surfaces over permeable areas to slow runoff and increase the time of concentration and promote infiltration. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release Once runoff has been minimized, the remaining runoff shall be treated through the water quality pond (rain garden) located north of the project. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to a proposed detention and water quality pond, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post- construction runoff control and pollution prevention / good housekeeping. 4 3.3 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the City Stormwater Department. Water quality facilities are required for the new construction proposed on the site. Water quality will be met through the use of a rain garden at the bottom of the detention pond. Onsite detention is required for the runoff volume difference between the 100 year developed inflow rate and the 2 year historic release rate of 3.6 cfs, which works out to be approximately 0.6 cfs/acre, and will be provided in the proposed water quality and detention pond. Runoff reduction practices (LID techniques) are also required. No less than fifty percent of any newly added impervious area must be treated using one or a combination of LID techniques. This project will incorporate a SNOUT® water quality system, a forebay in the form of a 6” curb with “V” cuts every 6’ along the north curb and gutter, and a rain garden as LID techniques. The project added 83,329 sf of new impervious area. Using the LID techniques, 100% of the new impervious area will be treated which exceeds the 50% requirement. No less than twenty five percent of any newly added pavement areas must be treated using a permeable pavement technology. Because of the significant water quality facilities on the site and the nature of the heavy traffic and flow patterns, porous pavement is not proposed. The only useful location for pavers is the main drive which will have frequent truck traffic potentially damaging the paver system. Reversing the site operation (such as moving the drive to the south) in order to find a good place for the porous pavement would not be a good option because driveway spacing with the warehouse to the south would be too short. The 100% LID techniques of the SNOUT®, forebay and rain garden are intended to offset the need for pavers. 3.4 Hydrologic Criteria Runoff computations were prepared for the 2-year and 10-year minor and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. 5 Water quality volume and detention were calculated using the methods recommended in the “Urban Storm Drainage Criteria Manual”. All calculations are located in Appendix D. 3.5 Hydraulic Criteria All hydraulic calculations are prepared in accordance with the City of Fort Collins Drainage Criteria. All calculations are included in Appendix C of this report. 3.6 Floodplain Regulations Compliance The site is not within a City of Fort Collins floodway or FEMA special flood hazard area (Panel 08069C1000F). Therefore, a completed “City of Fort Collins Floodplain Review Checklist” has not been included with this report. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The majority of the proposed development (including the adjacent west half of the ultimate Timberline road) will be collected and conveyed to the proposed water quality and detention pond on the northern most portion of the site where it will be treated before being released. The water quality capture volume for a 12-hour drain time (rain garden) is 3,259 cf and will be accomplished with the rain garden built in the invert of the pond with a maximum of 12 inches depth. Detention will be in addition to this water quality capture volume. The pond outfall will discharge to an existing 18-inch storm pipe and swale that discharges north to an existing 24-inch storm system in the Railroad right-of- way. This system discharges into Spring Creek. An emergency overflow spillway will be constructed and is designed to pass the 100-year flow of the site plus the 100-year existing condition of the Timberline Star property (sub-basin OS-2) located just south of the site. 6 4.2 Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin A is 4.56 acres and includes the majority of the site. Runoff from this basin will flow north to the forebay curb and gutter and then to the water quality and detention pond located to the north. Basin A contains the water quality and detention pond. Discharge from the pond will be directed north to the existing 18-inch storm pipe and swale that discharges north to the existing 24-inch storm system in the Railroad right-of-way. Basin OS-1 is 1.26 acres and includes the west half of the ultimate condition of Timberline Road and a small portion in the southeast of the project site. The basin drains to a CDOT Type C sump inlet (design point 1) that contains a SNOUT® water quality system and sump. Flow will be then be directed north to the water quality and detention pond. Basin OS-2 is 4.82 acres and includes the Timberline Star property located just south of the site. Runoff from this basin enters a drainage ditch at the southeast corner of the property. The ditch is adjacent to Timberline and directs flow north to the Type C inlet at design point 1. Existing conditions remain and flow from this basin will be passed over the water quality and detention pond’s emergency spillway. Water from the site will be detained and treated for water quality in the water quality and detention pond located north of the site. The existing 2-year rate for basins A and OS-1 is 3.6 cfs. A 640’ long and 6’ wide swath along the bottom of the pond will also be designed as a rain garden with underdrain for water quality treatment. After treatment, water will be released to the north to an existing storm system and eventually to Spring Creek. Please refer to Appendix D for pond information. Because of the significant water quality facilities on the site and the nature of the heavy traffic and flow patterns, porous pavement is not proposed. 7 4.3 Drainage Summary Drainage facilities located outside of the right of way (including water quality and detention pond, proposed storm drain system, rain garden and the pond outlet) will be maintained by the operational staff of the facility. 5. CONCLUSIONS 5.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the Storm Drainage Design Criteria Manual. Because of the significant water quality facilities on the site and the nature of the heavy traffic and flow patterns, porous pavement is not proposed and we request a variance from the porous pavement requirement of 25%. Please refer to Appendix D. 5.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater quantity and quality treatment of proposed impervious areas. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 8 6. DRAINAGE SYSTEM MAINTENANCE STANDARD OPERATING PROCEDURE: Records shall be kept regarding perpetual maintenance activities. The records shall show when and which facilities have been inspected and cleaned. Spill and illegal dumping incidents and responses to both incidents shall also be documented and tracked. 6.1 Rain Garden Inspect the infiltrating surface at least twice annually following precipitation events to determine if the rain garden pond area is providing acceptable infiltration. If standing water persists for more than 24 hours after runoff has ceased, clogging should be further investigated and remedied. Additionally, check for erosion and repair as necessary. Remove debris and litter from the infiltrating surface to minimize clogging of media. Remove debris and litter from the overflow area. Maintain healthy, weed-free vegetation. If ponded water is observed in an infiltration pond for more than 24 hours after the end of a runoff event, check outfall location for blockages. If clogging is primarily related to sediment accumulation of the filter surface, remove excess accumulated sediment and scarify the surface of the filter with a rake. If the clogging is due to migration of sediments deeper into the pore spaces of the media, remove and replace all or a portion of the media. Full media removal and replacement is anticipated every 5-10 years. 6.2 Storm Drain System (including SNOUT® Water Quality System) Inspect and clean as needed all drainage catch basins (inlets) at least once a year. Remove as much debris, silt, trash and sediment as possible from the storm drain system when cleaning. Prevent material from washing into adjacent storm sewers, streams or channels. Monitor the SNOUT® monthly during the first year of new installation after the site has been stabilized. Measurements should be taken after each rain event of 0.5 inches or 9 more, or monthly, as determined by local weather conditions. The structure should be cleaned when the sump is half full (2 feet of material collected in a 5 foot sump). The structure should also be cleaned if a spill or other incident causes a larger than normal accumulation of pollutants in the structure. Maintenance is best done with a vacuum truck. Finally, annual inspection of the anti-siphon vent and access hatch are recommended. Flush the vent or gently rod with a flexible wire is required to maintain the anti-siphon properties. 6.3 Forebay-6” Curb with “V” Notches Street sweep every month along the curb to clean out the forebay. Remove as much debris, silt, trash and sediment as possible from the notches when cleaning. Prevent material from washing to the pond slope. 7. REFERENCES 1. City of Fort Collins, “Storm Drainage Criteria Manual”, (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated September 1999. 3. North Star Design, “100% Design Drainage Report for Interim Timberline Road Widening Drake to Prospect”, dated April 6, 2005. Detention Pond - Stage/Storage LOCATION: Intergrated Recycling Center PROJECT NO: 1165-012-12 COMPUTATIONS BY: es DATE: 5/19/2015 V = 1/3 d ( A + B + sqrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Surface Incremental Detention Total Stage Area Storage Storage Storage (Elev) (Ft^2) (Ac-ft) (Ac-ft) (Ac-ft) 4929.9 0 Bottom Rain Garden 4930.0 7900 0.01 0.01 Top Rain Garden 4931.0 16300 0.27 0.00 0.28 100 year Detention 4932.0 25300 0.47 0.47 0.75 Spillway 4933.0 34600 0.68 1.16 1.44 Top Berm 4934.0 44300 0.90 2.06 2.34 REQUIRED WQCV ( RAIN GARDEN 3,259 CF)= 0.07 AC-FT PROVIDED WQCV= 0.28 AC-FT REQUIRED DET VOL= 0.65 AC-FT PROVIDED DET VOL= 0.75 AC-FT 5-19-15 Pond Volume.xls