HomeMy WebLinkAboutCAPSTONE COTTAGES - FDP - FDP150046 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS12
4
8'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
2'-0" 2'-0"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
CJ CJ
WIN. H.H.
@ 8'-7"
WIN. H.H.
@ 7'-7"
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
6:12 SLOPE
6:12 SLOPE
4
12
4
C
A
A
38'-1 1/4"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 8'-7"
WIN. H.H.
@ 7'-7"
DOOR/WIN. H.H.
@ 6'-9"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 8'-7"
WIN. H.H.
@ 7'-7"
4:12 SLOPE
12
4
8'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
2'-0" 2'-0"
CJ CJ
6:12 SLOPE
6:12 SLOPE
4
12
4
C
A
A
38'-1 1/4"
2'-0"
6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
2'-0"
WIN. H.H.
@ 8'-7"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-6"
TOP OF PLATE
@ DORMER
3'-8"
CJ CJ
6
12
6
12
6:12 6:12 SLOPE
4
12
6:12
6:12
4
C
A
A
1
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
4
12
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
TOP OF PLATE
@ DORMER
3'-8"
CJ CJ
6
12
6
12
6:12 SLOPE
4
12
6:12
6:12
6:12
4:12 SLOPE
4
C
A
A
1
4
12
6
12
6
12
6:12 SLOPE
6
12
6
12
6
12
6
12
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
CJ CJ
6
12
6
12
6:12 6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-6"
6:12
4
12
TOP OF PLATE
@ DORMER
3'-8"
6:12
4
C
A
A
1
38'-3"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
4
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
TOP OF PLATE
@ DORMER
3'-8"
6
12
6
12
6:12 SLOPE
4
12
6:12
6:12
6:12
6'-9" DOOR H.H.
4:12 SLOPE
4
C
A
A
1
38'-3"
4
12
6
12
6
12
6
12
6
12
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
4
12
4
12
PORCH BEARING
@ 8'-4"
7'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
TOP OF PLATE
@ DORMER
3'-6"
12
4
2'-0" 2'-0"
12
8
12
4
8:12 SLOPE
3'-6"
6:12
12
6
6
4
17
C
A
A
41'-41
4"
H
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
4
12
4
12
7'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
PORCH BEARING
@ 8'-4"
12
4
12
8
12
4
8:12 SLOPE
TOP OF PLATE
@ DORMER
3'-6"
4:12 SLOPE
6:12
12
6
6
4
A
B
15
H
A
A
41'-41
4"
C
CJ J CJ
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
4
12
4
12
7'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
3'-6"
12
6
12
4
12
6
12
4
2'-0"
6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
TOP OF PLATE
@ DORMER
3'-6"
2'-0"
PORCH BEARING
@ 8'-4"
4:12 SLOPE
4
12
6
A
A
C
38'-51
2"
H
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
4
12
4
12
7'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
3'-6"
12
6
12
4
12
6
12
4
2'-0"
6:12 SLOPE
2'-0"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
TOP OF PLATE
@ DORMER
3'-6"
PORCH BEARING
@ 8'-4"
4:12 SLOPE
6
C
A
A
12
6
4:12 SLOPE
38'-51
2"
12
6
12
4
12
4
12
6
TOP OF PLATE
4
12
4
12
7'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
3'-6"
12
6
12
4
12
6
12
4
2'-0"
6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
TOP OF PLATE
@ DORMER
3'-6"
2'-0"
PORCH BEARING
@ 8'-4"
4:12 SLOPE
12
6
4
C
A
A
38'-51
2"
H
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
4
12
4
12
7'-7" WIN. H.H. 7'-7" WIN. H.H.
CJ CJ
7'-6" WIN. H.H.
3'-6"
12
6
12
4
12
6
12
4
2'-0"
6:12 SLOPE
2'-0"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
TOP OF PLATE
@ DORMER
3'-6"
PORCH BEARING
@ 8'-4"
4:12 SLOPE
12
6
4:12 SLOPE
C
A
A
38'-51
2"
6
12
6
12
4
12
4
12
6
TOP OF PLATE
9 9 9
35'-6"
1
4
6
6
4
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
1
4
6
14
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
35'-6"
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
1
A2-0
FRONT ELEVATION
3/16" = 1'-0"
GENERAL NOTE:
- Use high temp modified bitumen underlayment around roof
penetrations, in keeping with underlayment manufacturer's
recommendations; install underlayment along both sides of valleys at
48" upslope. If required, see detail 27 for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
-Use high temp modified bitumen underlayment at penetrations, typ.
- Use non-corrosive fasteners and use of elastomeric washers where
applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
1
4
6
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
35'-6"
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1
4
6
14
35'-6"
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
1
A2-1
BACK ELEVATION
3/16" = 1'-0"
GENERAL NOTE:
- Use high temp modified bitumen underlayment around roof
penetrations, in keeping with underlayment manufacturer's
9 9 9
35'-6"
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
1
4
6
35'-6"
9'-0" 1'-2
3
4" 1'-2
3
4"
9'-0" 9'-0"
1
4
6
14
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
1
A2-0
FRONT ELEVATION
3/16" = 1'-0"
GENERAL NOTE:
- Use high temp modified bitumen underlayment around roof
penetrations, in keeping with underlayment manufacturer's
recommendations; install underlayment along both sides of valleys at
48" upslope. If required, see detail 27 for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
-Use high temp modified bitumen underlayment at penetrations, typ.
- Use non-corrosive fasteners and use of elastomeric washers where
applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
35'-6"
1
4
6
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
35'-6"
9'-0" 9'-0" 9'-0"
14
1'-23
4" 1'-2
3
4"
Painted Solid
Timber Bracket
Vinyl window unit
Painted SmartSide
Casing
Painted Solid
Timber Bracket
1
4
6
1
A2-1
BACK ELEVATION
3/16" = 1'-0"
GENERAL NOTE:
- Use high temp modified bitumen underlayment around roof
penetrations, in keeping with underlayment manufacturer's
recommendations; install underlayment along both sides of valleys at
48" upslope. If required, see detail 27 for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
-Use high temp modified bitumen underlayment at penetrations, typ.
- Use non-corrosive fasteners and use of elastomeric washers where
applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF SLAB
@ MAIN LEVEL
TOP OF PLATE
@ 1ST FLOOR
9'-0" 1'-2
3
4"
8'-0" WIN. H.H.
7'-0" WIN. H.H.
6:12 SLOPE
8'-0" WIN. H.H.
4
1
6
4
12
14
4:12 SLOPE
TOP OF PLATE
@ PORCH
8'-6"
12
6
12
6
16
9
26'-5"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
1'-23
4"
9'-0"
1
1
6
4
DRYER VENT LOCATION
7'-6" SHUTTER H.H.
12
4
4
11
14
15
12
6
12
6
8'-6"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
1'-23
4"
9'-0"
1
4
WIN. H.H
@ 7'-0"
6'-8" DOOR H.H.
12
14
15
4:12 SLOPE
9
25'-3"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
1'-23
4"
9'-0"
12
4
1
4
4
DRYER VENT LOCATION
8'-0" SHUTTER H.H.
8
7'-6" WIN. H.H.
11
14
15
12
4
4:12 SLOPE
6
12
4
16
25'-3"
1
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
9
7'-6" WIN. H.H.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
27'-3"
8:12 SLOPE
6'-8" DOOR H.H.
3:12 SLOPE
1
4
11
6
14
16
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
12
3
1
4
4
7'-6" WIN. H.H. 7'-6" WIN. H.H.
11
14
12
8
6:12 SLOPE
6
12
6
16
14
27'-3"
16
E
E
12
8
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
9
7'-6" WIN. H.H.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
27'-3"
8:12 SLOPE
6'-8" DOOR H.H.
1
4
11
6
14
16
12
8
12
8
7'-6" WIN. H.H.
4:12 SLOPE
8:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
1
4
4
7'-6" WIN. H.H. 7'-6" WIN. H.H.
11
14
12
8
6
12
6
16
14
27'-3"
16
E
E
12
8
4
9
7'-6" WIN. H.H.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
8:12 SLOPE
6'-8" DOOR H.H.
1
4
11
6
14
16
7'-6" WIN. H.H.
4:12 SLOPE
8:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
1
4
4
7'-6" WIN. H.H. 7'-6" WIN. H.H.
11
14
12
8
6
12
6
16
14
27'-3"
16
E
E
12
8
4
4:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
9
7'-6" WIN. H.H.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
27'-3"
6'-8" DOOR H.H.
1
4
11
6
14
16
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
12
3
1
4
4
7'-6" WIN. H.H. 7'-6" WIN. H.H.
11
14
12
8
6:12 SLOPE
6
12
6
14
16
E
12
8
1
A2-1
FRONT ELEVATION
1/4" = 1'-0"
2
A2-1
LEFT SIDE ELEVATION
1/4" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 6"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
12
3
1
4
4
7'-6" WIN. H.H. 7'-6" WIN. H.H.
11
14
12
8
6:12 SLOPE
6
12
6
14
27'-3"
16
E
12
8
6'-9" WIN. H.H.
DRYER VENT
LOCATION
15
6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
27'-3"
7'-6" WIN. H.H.
7'-6" WIN. H.H.
8:12 SLOPE
1
4
4
11
6
16
2
A2-2
RIGHT SIDE ELEVATION
1/4" = 1'-0"
1
A2-2
REAR ELEVATION
1/4" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 6"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
GENERAL NOTE:
- Use modified bitumen (High Temp)
underlayment along eaves, and slope
transitions, in 18"-24"-36" widths, in
keeping with underlayment
manufacturers recommendations; install
underlayment along both sides of valleys
at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing
under metal flashing installations at
windows, louvers, faux vents and wall
accents.
- Use non-corrosive fasteners and use of
elastometric washers where applicable
and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2"
joint openings, wall penetrations, along
inside corners and cladding changes
- Flash and seal wall penetrations to
create a watertight cladding installation
capable of performing under 6.24 psf
water pressure test or equivalent rainfall -
per IBC 2009; typ.
- Use double dipped galvanized roofing
nails with ring shank for penetration
flashing flange securement over the long
term
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
GENERAL NOTE:
- Use modified bitumen (High Temp)
underlayment along eaves, and slope
transitions, in 18"-24"-36" widths, in
keeping with underlayment
manufacturers recommendations; install
underlayment along both sides of valleys
at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing
under metal flashing installations at
windows, louvers, faux vents and wall
accents.
- Use non-corrosive fasteners and use of
elastometric washers where applicable
and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2"
joint openings, wall penetrations, along
inside corners and cladding changes
- Flash and seal wall penetrations to
create a watertight cladding installation
capable of performing under 6.24 psf
water pressure test or equivalent rainfall -
per IBC 2009; typ.
- Use double dipped galvanized roofing
nails with ring shank for penetration
flashing flange securement over the long
term
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
12
3
1
4
4
7'-6" WIN. H.H. 7'-6" WIN. H.H.
11
14
12
8
6
12
6
16
14
27'-3"
16
E
E
12
8
4
4:12 SLOPE
6'-9" WIN. H.H.
DRYER VENT
LOCATION
15
6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
27'-3"
7'-6" WIN. H.H.
7'-6" WIN. H.H.
8:12 SLOPE
1
4
4
11
6
16
1
A2-1
FRONT ELEVATION
1/4" = 1'-0"
2
A2-1
RIGHT SIDE ELEVATION
1/4" = 1'-0"
3
A2-1
REAR ELEVATION
1/4" = 1'-0"
4
A2-1
LEFT SIDE ELEVATION
1/4" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 6"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
GENERAL NOTE:
- Use modified bitumen (High Temp)
underlayment along eaves, and slope
transitions, in 18"-24"-36" widths, in
keeping with underlayment
manufacturers recommendations; install
underlayment along both sides of valleys
at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing
under metal flashing installations at
windows, louvers, faux vents and wall
accents.
- Use non-corrosive fasteners and use of
elastometric washers where applicable
and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2"
joint openings, wall penetrations, along
inside corners and cladding changes
- Flash and seal wall penetrations to
create a watertight cladding installation
capable of performing under 6.24 psf
water pressure test or equivalent rainfall -
per IBC 2009; typ.
- Use double dipped galvanized roofing
nails with ring shank for penetration
flashing flange securement over the long
term
4:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
12
3
1
4
4
7'-6" WIN. H.H. 7'-6" WIN. H.H.
11
14
12
8
6
12
6
16
14
27'-3"
16
E
E
12
8
4
4:12 SLOPE
6'-9" WIN. H.H.
DRYER VENT
LOCATION
15
6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
27'-3"
7'-6" WIN. H.H.
7'-6" WIN. H.H.
8:12 SLOPE
1
4
4
11
6
16
1
A2-1
FRONT ELEVATION
1/4" = 1'-0"
2
A2-1
RIGHT SIDE ELEVATION
1/4" = 1'-0"
3
A2-1
REAR ELEVATION
1/4" = 1'-0"
4
A2-1
LEFT SIDE ELEVATION
1/4" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 6"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
GENERAL NOTE:
- Use modified bitumen (High Temp)
underlayment along eaves, and slope
transitions, in 18"-24"-36" widths, in
keeping with underlayment
manufacturers recommendations; install
underlayment along both sides of valleys
at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing
under metal flashing installations at
windows, louvers, faux vents and wall
accents.
- Use non-corrosive fasteners and use of
elastometric washers where applicable
and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2"
joint openings, wall penetrations, along
inside corners and cladding changes
- Flash and seal wall penetrations to
create a watertight cladding installation
capable of performing under 6.24 psf
water pressure test or equivalent rainfall -
per IBC 2009; typ.
- Use double dipped galvanized roofing
nails with ring shank for penetration
flashing flange securement over the long
term
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
12
3
1
4
4
7'-6" WIN. H.H. 8'-0" SHUTTER H.H.
11
14
6:12 SLOPE
6
12
6
16
14
27'-3"
16
E
E
16
12
8
12
8
6'-9" WIN. H.H.
DRYER VENT
LOCATION
15
6:12 SLOPE
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ 1ST FLOOR
1'-23
4"
9'-0"
27'-3"
7'-6" WIN. H.H.
7'-6" WIN. H.H.
8:12 SLOPE
1
4
4
11
6
16
1
A2-1
FRONT ELEVATION
1/4" = 1'-0"
2
A2-1
RIGHT SIDE ELEVATION
1/4" = 1'-0"
3
A2-1
REAR ELEVATION
1/4" = 1'-0"
4
A2-1
LEFT SIDE ELEVATION
1/4" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 6"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
GENERAL NOTE:
- Use modified bitumen (High Temp)
underlayment along eaves, and slope
transitions, in 18"-24"-36" widths, in
keeping with underlayment
manufacturers recommendations; install
underlayment along both sides of valleys
at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing
under metal flashing installations at
windows, louvers, faux vents and wall
accents.
- Use non-corrosive fasteners and use of
elastometric washers where applicable
and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2"
joint openings, wall penetrations, along
inside corners and cladding changes
- Flash and seal wall penetrations to
create a watertight cladding installation
capable of performing under 6.24 psf
water pressure test or equivalent rainfall -
per IBC 2009; typ.
- Use double dipped galvanized roofing
nails with ring shank for penetration
flashing flange securement over the long
term
TOP OF SLAB
@ MAIN LEVEL
1'-23
4"
9'-0"
7'-6"SHUTTER H.H. 8'-0" SHUTTER H.H.
4
10'-0"
8
8
11
12
4
12
4
4:12 SLOPE
14
6
16
25'-3"
7'-0" WIN. H.H.
8'-0" WIN. H.H.
7'-0" WIN. H.H.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
1'-23
4"
9'-0"
7'-6" WIN. H.H.
1
4
15
15
11
15
4:12 SLOPE
12
4
12
4
6
6'-8" DOOR H.H.
4:12 SLOPE
16
25'-3"
1
A2-1
FRONT ELEVATION
1/4" = 1'-0"
2
A2-1
RIGHT SIDE ELEVATION
1/4" = 1'-0"
3
A2-1
REAR ELEVATION
1/4" = 1'-0"
4
A2-1
LEFT SIDE ELEVATION
1/4" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 6"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
GENERAL NOTE:
- Use modified bitumen (High Temp)
underlayment along eaves, and slope
transitions, in 18"-24"-36" widths, in
keeping with underlayment
manufacturers recommendations; install
underlayment along both sides of valleys
at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing
under metal flashing installations at
windows, louvers, faux vents and wall
accents.
- Use non-corrosive fasteners and use of
elastometric washers where applicable
and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2"
joint openings, wall penetrations, along
inside corners and cladding changes
- Flash and seal wall penetrations to
create a watertight cladding installation
capable of performing under 6.24 psf
water pressure test or equivalent rainfall -
per IBC 2009; typ.
- Use double dipped galvanized roofing
nails with ring shank for penetration
flashing flange securement over the long
term
12
4
6:12
TOP OF PLATE
@ PORCH
6:12 SLOPE
16
26'-5"
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
1'-23
4"
9'-0"
4
6
1
1
6:12 SLOPE
8'-0" SHUTTER H.H.
8'-0" SHUTTER H.H.
7'-0" SHUTTER H.H.
7'-0" SHUTTER H.H.
14'-0" 10'-0" 8'-0"
8
11
14
12
6
12
6
TOP OF PLATE
@ PORCH
TOP OF SLAB
@ MAIN LEVEL
12
4
6:12
7'-0" WIN. H.H.
7'-0" WIN. H.H.
7'-0" WIN. H.H.
TOP OF PLATE
@ 2ND FLOOR
TOP OF SUBFLOOR
9'-0"
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
1'-23
4"
9'-0"
7'-0" WIN. H.H.
6:12 SLOPE
4
1
6
1
8
8
4:12 SLOPE
11
15
12
6
12
6
26'-5"
1
A2-1
FRONT ELEVATION
1/4" = 1'-0"
2
A2-1
RIGHT SIDE ELEVATION
1/4" = 1'-0"
3
A2-1
REAR ELEVATION
1/4" = 1'-0"
4
A2-1
LEFT SIDE ELEVATION
1/4" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 6"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
GENERAL NOTE:
- Use modified bitumen (High Temp)
underlayment along eaves, and slope
transitions, in 18"-24"-36" widths, in
keeping with underlayment
manufacturers recommendations; install
underlayment along both sides of valleys
at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing
under metal flashing installations at
windows, louvers, faux vents and wall
accents.
- Use non-corrosive fasteners and use of
elastometric washers where applicable
and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2"
joint openings, wall penetrations, along
inside corners and cladding changes
- Flash and seal wall penetrations to
create a watertight cladding installation
capable of performing under 6.24 psf
water pressure test or equivalent rainfall -
per IBC 2009; typ.
- Use double dipped galvanized roofing
nails with ring shank for penetration
flashing flange securement over the long
term
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
STUCCO FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
2
A2-1
SIDE ELEVATION
3/16" = 1'-0"
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
STUCCO FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
2
A2-0
SIDE ELEVATION
3/16" = 1'-0"
recommendations; install underlayment along both sides of valleys at
48" upslope. If required, see detail 27 for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
-Use high temp modified bitumen underlayment at penetrations, typ.
- Use non-corrosive fasteners and use of elastomeric washers where
applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
STUCCO FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
2
A2-1
SIDE ELEVATION
3/16" = 1'-0"
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
STUCCO FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
2
A2-0
SIDE ELEVATION
3/16" = 1'-0"
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE
WIN H.H
@ 7'-7"
WIN H.H
@ 7'-7"
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6:12 SLOPE
4:12 SLOPE
C
A
B
17
15
6
B
C
G
A
A
H
4
5
B
38'-51
2"
B
C
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-1
BACK ELEVATION
3/16 = 1'-0"
2
A2-1
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
12
6
12
4
12
4
DOOR/ WIN H.H
@ 6'-9"
WIN H.H
@ 7'-7"
PORCH BEARING
@ 8'-4"
4:12 SLOPE
12
6
3'-6"
TOP OF PLATE
@ DORMER
3'-6"
12
6
6:12 SLOPE
4:12 SLOPE
6:12 SLOPE
4:12 SLOPE
4:12 SLOPE 4:12 SLOPE
17
4
6
15
5
5 14
A
B
C
G
B
E
G
B
E
B
38'-51
2"
H
C
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-0
FRONT ELEVATION
3/16 = 1'-0"
2
A2-0
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
@ 2ND FLOOR
TOP OF SUBFLOOR
TOP OF PLATE
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE
WIN H.H
@ 7'-7"
WIN H.H
@ 7'-7"
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6'-9" WIN. H.H.
6:12 SLOPE
4:12 SLOPE
C
A
B
B
B
A
B
A
4
5
17
6
G
15
H
38'-51
2"
C
C
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-1
BACK ELEVATION
3/16 = 1'-0"
2
A2-1
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
12
6
12
4
12
4
DOOR/ WIN H.H
@ 6'-9"
WIN H.H
@ 7'-7"
PORCH BEARING
@ 8'-4"
12
6
3'-6"
TOP OF PLATE
@ DORMER
3'-6"
12
6
6:12 SLOPE
4:12 SLOPE
6:12 SLOPE
4:12 SLOPE
4:12 SLOPE 4:12 SLOPE
E
B
17
4
6
15
5
5 14
38'-51
2"
A
B
C
G
B
E
G
B H
C
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-0
FRONT ELEVATION
3/16 = 1'-0"
2
A2-0
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H
@ 7'-7"
WIN H.H
@ 7'-7"
8'-1" WIN. H.H.
4:12 SLOPE
12
4
12
8
12
4
12
4
12
8
12
4
8:12 SLOPE
8'-1" WIN. H.H.
6'-9" DOOR. H.H.
8'-1" WIN. H.H.
6'-9" DOOR. H.H.
1
4
17
A
B
17
15
6
B
4
G
A
B
B
C
A
C
41'-41
4"
H
6
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-1
BACK ELEVATION
3/16 = 1'-0"
2
A2-1
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
4:12 SLOPE
4:12 SLOPE
8:12 SLOPE
PORCH BEARING
@ 8'-4" DOOR H.H
@ 6'-8"
WIN H.H
@ 7'-7"
DOOR/ WIN H.H
@ 6'-9"
CJ CJ
TOP OF PLATE
@ DORMER
3'-6"
12
4
12
8
12
4
12
4
12
8
12
4
3'-6"
6:12
12
6
17
4
15
6
5
5 14
A
B
C
G
B
E
G
B
E
B
41'-41
4"
H
C
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-0
FRONT ELEVATION
3/16 = 1'-0"
2
A2-0
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
3 COAT STUCCO SYSTEM
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
6:12 SLOPE
6
12 6
12
6
12
6
12 6:12 SLOPE
4:12
DOOR/WIN. H.H.
@ 6'-9"
1
4
C
B
17
15
6
B
G
A
B
1
C
A
A
C
38'-3"
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-1
BACK ELEVATION
3/16 = 1'-0"
2
A2-1
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
12
6
12
6
12
6:12 SLOPE
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
4:12 SLOPE
DOOR/ WIN. H.H.
@ 6'-9"
TOP OF PLATE
@ DORMER
3'-8"
6
12
6
12
6:12 SLOPE
4:12 SLOPE 4:12 SLOPE
4
12
6
12
6
12
6
12
4:12 SLOPE 4:12 SLOPE
17
1
15
6
17
4
C
A
B
G
B
E
4
C
B
38'-3"
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-0
FRONT ELEVATION
3/16 = 1'-0"
2
A2-0
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
@ 1ST FLOOR
TOP OF SLAB
@ MAIN LEVEL
TOP OF SUBFLOOR
TOP OF PLATE
@ 3RD FLOOR
1'-2 9'-0"
3
4"
1'-2 9'-0"
3
4"
9'-0"
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
6:12 SLOPE
DOOR/ WIN. H.H.
@ 6'-9"
C
A
1
4
C
B
17
15
6
B
G
A
B
1
A
C
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-1
BACK ELEVATION
3/16 = 1'-0"
2
A2-1
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
6
12
6
12
6:12 SLOPE
6
12
6
12
6
12
WIN. H.H.
@ 7'-7"
WIN. H.H.
@ 7'-7"
6:12 SLOPE
4:12 SLOPE
DOOR/ WIN. H.H.
@ 6'-9"
TOP OF PLATE
@ DORMER
3'-8"
6
12
6
12
4:12 SLOPE 4:12 SLOPE 4:12 SLOPE 4:12 SLOPE
17
1
15
6
17
4
C
A
B
G
B
E
4
C
B
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-0
FRONT ELEVATION
3/16 = 1'-0"
2
A2-0
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
WIN. H.H.
@ 7'-7"
12
4
DOOR/ WIN. H.H.
@ 6'-9"
1
4
C
A
B
17
15
6
B
4
17
G
A
B
B
C
A
C
38'-1 1/4"
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-1
BACK ELEVATION
3/16 = 1'-0"
2
A2-1
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
4
12
TOP OF PLATE
@ DORMER
2'-4"
6:12 SLOPE 6:12 SLOPE
4:12 SLOPE 4:12 SLOPE 4:12 SLOPE
17
1
15
6
17
B
C
G
B
E
G
B
E
C
A
A
38'-1 1/4"
GENERAL NOTE:
- Use high temp modified bitumen underlayment along eaves, slope
transitions and ridges, in 18"-24"-36" widths, in keeping with
underlayment manufacturers recommendations; install underlayment
along both sides of valleys at 48" upslope. If required, see detail 27
for detail of flashing at valleys.
- Use membrane (high temp) flashing under metal flashing
installations at windows, louvers, faux vents and wall accents.
- Use non-corrosive fasteners and use of elastometric washers
where applicable and for securing downspouts; typical.
- Use 15# felt on all roofs.
- Use neutral cure silicone sealant at all 1
2" joint openings, wall
penetrations, along inside corners and cladding changes
- Flash and seal wall penetrations to create a watertight cladding
installation capable of performing under 6.24 psf water pressure test
or equivalent rainfall - per IBC 2009; typ.
-- Use double dipped galvanized roofing nails with ring shank for
penetration flashing flange securement over the long term
1
A2-0
FRONT ELEVATION
3/16 = 1'-0"
2
A2-0
SIDE ELEVATION
3/16 = 1'-0"
EXTERIOR PAINT SCHEDULE
EAVES/FASCIA
WINDOW/DOOR TRIM
LAP SIDING FINISH
SHUTTERS
PORCH (TRIM & COLUMNS)
DORMERS
DOOR
A
B
C
D
E
F
G
SEE COLOR SCHEME BOOK FOR PAINT COLOR
SELECTIONS
H STUCCO FINISH
EXTERIOR MATERIAL SCHEDULE
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 7"
EXPOSURE
3/8" SMARTSIDE VERTICAL EXTERIOR PANEL W/
BATTEN STRIPS @ 16" O.C.
SITE FENCING. SEE CIVIL FOR DETAIL.
DIMENSIONAL ASPHALT SHINGLES
SIMULATED STONE VENEER
5/4" "SMARTSIDE" CORNER BOARD
4" @ FRONT/REAR, 4" @ SIDES
WOOD LOUVER DORMER VENT
FAUX SHUTTERS. SEE DETAIL 15a to 15d ON SHEET
A3.0 FOR DETAIL
IF FOUR OR MORE RISERS ARE REQUIRED SEE
DETAIL 72. PER IRC R311.7.7
6" VERTICAL TONGUE & GROOVE BOARDS
MORTAR SMEAR
SEE DETAIL 12 FOR HOUSE NUMBER LOCATION
MORTAR SMEAR @ PORCH
SEE DETAIL 13 FOR WINDOW CALL OUTS AND
DETAILS
6" K STYLE - 4" ROUND - HIDDEN HANGER 6" -
FASTENED W/ 1
1
2 " GALV. SCREW W/ NEOPRENE
WASHER
"SMARTSIDE" HORIZONTAL LAP SIDING W/ 4"
EXPOSURE
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17